Search NASA⌕ Search

SEARCH · Search NASA

Results for “Landing pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

In-Situ Surface Construction of Infrastructure

In situ resources offer an opportunity to reduce the amount of items brought from Earth when exploring moons and planets. Utilizing those resources requires energy that comes with a cost. In the case of human missions to Mars, trading surface power for launch mass is beneficial for propellant and consumables required to sustain human pioneering and settlement on the planet’s surface. However, In Situ Resource Utilization (ISRU) can mean far more than propellant production and consumables replacement for missions beyond Low Earth Orbit. NASA’s Systems Capability Leader-ship Team (SCLT) for ISRU created a work break-down structure based on functions identified in roadmaps pertaining to human exploration. That WBS includes Prospecting, Extraction, Processing, Construction, Manufacturing, and Energy. Over the years, NASA has developed some capabilities and technologies for prospecting, extraction, and processing carbon dioxide and water on Mars into propellants and life support consumables. However, that is a small subset of the ISRU needs that are coming to light with NASA’s push to return to the Moon for extended periods of time. For instance, astronauts require shielding from Ga-lactic Cosmic Rays and nuclear radiation and protection from the low temperatures and pressures in Space. Surface assets including crew, landers, and ascent modules can be damaged by surface ejecta during landing and launch operations on the Moon and Mars. Creating shielding, berms, and pads requires movement of large volumes and stabilization of regolith in the context of a civil engineering construction project. Because of the multi-disciplinary nature of the aerospace systems needed for human exploration, SCLT on ISRU created an ISRU Construction Integrated Steering Group that combines expertise among several NASA Principal Technologists and Capabilities Leaders for exploring options, assessing opportunities, and developing requirements for construction and manufacturing on the Moon and Mars NASA’s new program to develop Lunar landers for small, mid, and large payload deliveries to the Lunar surface leading to human missions by 2025 spawned an investigation into plume surface interactions caused by the lander during descent and ascent. The trade space to resolve this issue includes regolith stabilization via landing pad construction techniques and lander nozzles characteristics due to vehicle systems design. Some data exists from the Apollo missions but more is required for the missions ahead. The purpose of this paper [1] is to outline an approach for developing requirements that can guide systems designs while taking advantage of flight opportunities in NASA’s plans to return to the Moon.

In-Situ↗

Analysis of navigation and guidance requirements for commercial VTOL operations

The paper presents some results of a program undertaken to define navigation and guidance requirements for commercial VTOL operations in the takeoff, cruise, terminal and landing phases of flight in weather conditions up to and including Category III. Quantitative navigation requirements are given for the parameters range, coverage, operation near obstacles, horizontal accuracy, multiple landing aircraft, multiple pad requirements, inertial/radio-inertial requirements, reliability/redundancy, update rate, and data link requirements in all flight phases. A multi-configuration straw-man navigation and guidance system for commercial VTOL operations is presented. Operation of the system is keyed to a fully automatic approach for navigation, guidance and control, with pilot as monitor-manager. The system is a hybrid navigator using a relatively low-cost inertial sensor with DME updates and MLS in the approach/departure phases.

Hoffman, W. C.↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

The Use of Solar Heating and Heat Cured Polymers for Lunar Surface Stabilization

Dust ejecta can affect visibility during a lunar landing, erode nearby coated surfaces and get into mechanical assemblies of in-place infrastructure. Regolith erosion was observed at many of the Apollo landing sites. This problem needs to be addressed at the beginning of the lunar base missions, as the amount of infrastructure susceptible to problems will increase with each landing. Protecting infrastructure from dust and debris is a crucial step in its long term functionality. A proposed way to mitigate these hazards is to build a lunar launch pad. Other areas of a lunar habitat will also need surface stabilization methods to help mitigate dust hazards. Roads would prevent dust from being lifted during movement and dust free zones might be required for certain areas critical to crew safety or to critical science missions. Work at NASA Kennedy Space Center (KSC) is investigating methods of stabilizing the lunar regolith including: sintering the regolith into a solid and using heat or UV cured polymers to stabilize the surface. Sintering, a method in which powders are heated until fusing into solids, has been proposed as one way of building a Lunar launch/landing pad. A solar concentrator has been built and used in the field to sinter JSC-1 Lunar stimulant. Polymer palliatives are used by the military to build helicopter landing pads and roads in dusty and sandy areas. Those polymers are dispersed in a solvent (water), making them unsuitable for lunar use. Commercially available, solvent free, polymer powders are being investigated to determine their viability to work in the same way as the solvent borne terrestrial analog. This presentation will describe the ongoing work at KSC in this field. Results from field testing will be presented. Physical testing results, including compression and abrasion, of field and laboratory prepared samples will be presented.

Hintze, Paul↗

Day of Launch Profile Selection for Pad Abort Guidance

A day of launch selection approach that involves choosing from an array of pitch profiles of varying loft was analyzed with the purpose of reducing the risk of a land landing failure during a pad abort. It was determined that selecting from three pitch profiles can reduce the number of waterline abort performance requirement failures approximately in half without compromising other performance metrics.

Whitley, Ryan J.↗

Model Investigation of Technique for Full Scale Landing Impact Tests at Simulated Lunar Gravity

An investigation of a 1/6-scale dynamic model has been made to develop and evaluate a technique for conducting full-scale landing-impact tests at simulated lunar gravity. Landings were made at touchdown pitch attitudes of -15 degrees, 0 degrees, and 15 degrees. All landings were made with two gear pads forward and at a roll attitude of 0 degrees. Both roll and yaw attitudes were constrained. Vertical landing speed was varied from 5 to 15 feet per second (1.5 to 4.6 m/s) and horizontal speed was varied from 0 to 10 feet per second (0 to 3.0 m/s). Most of the landings were made at a vertical and horizontal speed of 10 feet per second or 3.0 m/s (45 degree flight-path angle) while pitch attitude and surface characteristics, friction and topography, were varied. These parameters were investigated with the free-body earth-gravity and the simulated lunar-gravity test techniques. The landings were made at a model mass corresponding to a full-scale lunar weight (force due to gravity) of 1,440 pounds (6.41 kN) or an earth weight of 8,640 pounds (38.4 kN).

TESTS↗

Effluent sampling of Titan 3 C vehicle exhaust

Downwind in situ ground-level measurements of the exhaust from a Titan 3 C launch vehicle were made during a normal launch. The measurement activity was conducted as part of an overall program to obtain field data for comparison with the multilayer dispersion model currently being used to predict the behavior of rocket vehicle exhaust clouds. All measurements were confined to land, ranging from the launch pad to approximately 2 kilometers downwind from the pad. Measurement systems included detectors for hydrogen chloride (HCl), carbon dioxide (CO2), and particulates (Al2O3). Airborne and ground-based optical systems were employed to monitor exhaust cloud rise, growth, and movement. These measurement systems, located along the ground track (45 deg azimuth from the launch pad) of the exhaust cloud, showed no effluents attributable to the launch. Some hydrogen chloride and aluminum oxide were detected in the surface wind direction (15 deg azimuth) from the pad. Comparisons with the model were made in three areas: (1) assumption of cloud geometry at stabilization; (2) prediction of cloud stabilization altitude; and (3) prediction of the path of cloud travel. In addition, the importance of elemental analyses of the particulate samples is illustrated.

Gregory, G. L.↗

The INCO Expert System Project: CLIPS in Shuttle mission control

The INCO (Integrated Communications Officer) Expert System Project (IESP) was undertaken in 1987 by the Mission Operations Directorate (MOD) at NASA's Johnson Space Center (JSC) to explore the use of advanced automation in the mission operations arena. One of MOD's primary responsibilities in the space shuttle program is the manning of the flight control positions in the Mission Control Center (MCC) at JSC. The MCC is the central hub for all ground support activities in support of Space Shuttle missions. Its responsibility extends from the moment of lift-off from the launch pad though the completion of landing. The flight controllers in the MCC are tasked with monitoring the health and status of all on-board systems and payloads, detecting and remedying errors and failures, and modifying flight activity plans accordingly.

Rasmussen, Arthur N.↗

Web-based Weather Expert System (WES) for Space Shuttle Launch

The Web-based Weather Expert System (WES) is a critical module of the Virtual Test Bed development to support 'go/no go' decisions for Space Shuttle operations in the Intelligent Launch and Range Operations program of NASA. The weather rules characterize certain aspects of the environment related to the launching or landing site, the time of the day or night, the pad or runway conditions, the mission durations, the runway equipment and landing type. Expert system rules are derived from weather contingency rules, which were developed over years by NASA. Backward chaining, a goal-directed inference method is adopted, because a particular consequence or goal clause is evaluated first, and then chained backward through the rules. Once a rule is satisfied or true, then that particular rule is fired and the decision is expressed. The expert system is continuously verifying the rules against the past one-hour weather conditions and the decisions are made. The normal procedure of operations requires a formal pre-launch weather briefing held on Launch minus 1 day, which is a specific weather briefing for all areas of Space Shuttle launch operations. In this paper, the Web-based Weather Expert System of the Intelligent Launch and range Operations program is presented.

Bardina, Jorge E.↗

Combustion Joining of Regolith Tiles for In-Situ Fabrication of Launch/Landing Pads on the Moon and Mars

To mitigate dust problems during launch-landing operations in lunar and Mars missions, it is desired to build solid pads on the surface. Recently, strong tiles have been fabricated from lunar regolith simulants using high-temperature sintering. The present work investigates combustion joining of these tiles through the use of exothermic intermetallic reactions. Specifically, nickel aluminum (1:1 mole ratio) mixture was placed in a gap between the tiles sintered from JSC-1A lunar regolith simulant. Upon ignition by a laser, a self-sustained propagation of the combustion front over the mixture occurred. Joining was improved with increasing the tile thickness from 6.3 mm to 12.7 mm. The temperatures sufficient for melting the glass phase of JSC-1A were recorded for 12.7-mm tiles, which explains the observed better joining.

Ferguson, Robert E.↗

Simulator Investigation of Pilot Aids for Helicopter Terminal Area Operations with One Engine Inoperative

Two recent piloted simulation experiments have investigated advanced display concepts applied to civil transport helicopter terminal area operations. Civil Category A helicopter operations apply to multi-engine helicopters wherein a safe recovery (land or fly out) is required in the event of a single engine failure. The investigation used the NASA Ames Research Center Vertical Motion Simulator, which has a full six degrees of freedom, to simulate the flight task as closely as possible. The goal of these experiments was to use advanced cockpit displays to improve flight safety and enhance the mission performance of Category A terminal area operations in confined areas. The first experiment investigated the use of military display formats to assist civil rotorcraft in performing a Category A takeoff in confined terminal areas. Specifically, it addressed how well a difficult hovering backup path could be followed using conventional instruments in comparison to panel mounted integrated displays. The hovering backup takeoff, which enables pilots to land back to the confined area pad in the event of an engine failure, was chosen since it is a difficult task to perform. Seven NASA and Army test pilots participated in the experiment. Evaluations, based on task performance and pilot workload, showed that an integrated display enabled the pilot to consistently achieve adequate or desired performance with reasonable pilot workload. Use of conventional instruments, however, frequently resulted in unacceptable performance (poor flight path tracking), higher pilot workload, and poor situational awareness. Although OEI landbacks were considered a visual task, the improved performance on the backup portion, in conjunction with increased situational awareness resulting from use of integrated displays, enabled the pilots to handle an engine failure and land back safely. In contrast, use of conventional instruments frequently led to excessive rates of sink at touchdown. A second simulation (in progress - July - August) is being conducted to investigate the use of advanced displays to perform vertical and short takeoffs and landings. One Engine Inoperative trajectories, which were optimized based on safety of flight restrictions, are utilized. Based on comments from the first experiment and further analytic development, appropriate fly out and approach guidance was added. Displays include conventional instruments with raw data, and the following integrated displays: multi-view and side-view hover displays based on the Apache Pilot Night Vision System, and variations of the pathway-in-the-sky displays with a flight-path-vector, a leader and flight director modifications. Panel mounted and head-up displays are being evaluated. Engine modifications have been incorporated to simulate 30 second and 2 minute contingency power ratings. Evaluations are based on task performance and pilot workload. NASA, Army, FAA, and industry test pilots participated. Details concerning the design, conduct, and the results of the experiment will be reported in the proposed paper.

Iseler, Laura↗

Aircraft Rollout Iterative Energy Simulation

Aircraft Rollout Iterative Energy Simulation (ARIES) program analyzes aircraft-brake performance during rollout. Simulates threedegree-of-freedom rollout after nose-gear touchdown. Amount of brake energy dissipated during aircraft landing determines life expectancy of brake pads. ARIES incorporates brake pressure, actual flight data, crosswinds, and runway characteristics to calculate following: brake energy during rollout for up to four independent brake systems; time profiles of rollout distance, velocity, deceleration, and lateral runway position; and all aerodynamic moments on aircraft. ARIES written in FORTRAN 77 for batch execution.

Kinoshita, L.↗

The Space Shuttle's testing gauntlet

The Space Shuttle verification program is detailed, with verification network flowcharts. Performance qualification tests, life endurance tests, structural verification tests, and vibration/dynamic tests of components, subsystems, and major systems at various test levels are dealt with. Ground tests, static firings of the Shuttle main engine, external-tank separation tests, ground vibration tests of vehicle mated to external tank, and main propulsion tests and test scheduling are described. Functions of the Shuttle avionics integration laboratory and electronic systems test laboratory are discussed. Test preparations and procedures for orbital flight testing, launch pad tests, and Shuttle approach- and landing-tests are described.

Mcintosh, G. P.↗

Soft Landing of Spacecraft on Energy-Absorbing Self-Deployable Cushions

A report proposes the use of cold hibernated elastic memory (CHEM) foam structures to cushion impacts of small (1 to 50 kg) exploratory spacecraft on remote planets. Airbags, which are used on larger (800 to 1,000 kg) spacecraft have been found to (1) be too complex for smaller spacecraft; (2) provide insufficient thermal insulation between spacecraft and ground; (3) bounce on impact, thereby making it difficult to land spacecraft in precisely designated positions; and (4) be too unstable to serve as platforms for scientific observations. A CHEM foam pad according to the proposal would have a glass-transition temperature (Tg) well above ambient temperature. It would be compacted, at a temperature above Tg, to about a tenth or less of its original volume, then cooled below Tg, then installed on a spacecraft without compacting restraints. Upon entry of the spacecraft into a planetary atmosphere, the temperature would rise above Tg, causing the pad to expand to its original volume and shape. As the spacecraft decelerated and cooled, the temperature would fall below Tg, rigidifying the foam structure. The structure would absorb kinetic energy during ground impact by inelastic crushing, thus protecting the payload from damaging shocks. Thereafter, this pad would serve as a mechanically stable, thermally insulating platform for the landed spacecraft.

Sokolowski, Witold↗

STS-36: Breakfast / Suit-Up / C-7 Ex / Launch and Landing at Edwards

Live footage shows the crew members of STS-36, Commander John O. Creighton, Pilot John H. Casper, and Mission Specialists Richard M. Mullane, David C. Hilmers, and Pierre J. Thuot, having the traditional breakfast, suiting up, and walking out to the Astro-Van. Scenes include panoramic views of the shuttle on the pad, main engine start, ignition, liftoff, and booster separation. The landing of Atlantis at Edwards Air Force Base is also seen. Several playback views from different cameras of both the launch and landing are also presented.

Source record↗

Modified Fittings Enhance Industrial Safety

Kennedy Space Center is not only home to one of the largest buildings in the world - the massive Vehicle Assembly Building - it also hosts a number of one-of-a-kind facilities. The more than 30-mile-long campus has witnessed every launch from the Space Shuttle Launch Pad, as well as many homecomings at the Shuttle Landing Facility. Just as important, the Space Station Processing Facility (SSPF) has seen each element of the International Space Station (ISS) that passes through Kennedy before it goes into orbit. The SSPF is where ISS components are checked, tested, and adjusted before being packed into the Space Shuttle for transport. In an environment like the SSPF - spanning 457,000 square feet of processing areas, operational control rooms, laboratories, logistics areas, and office space - large workstands and equipment used to support the processing of ISS components need to be moved around the facility. One of the devices employed for this task is an air pallet. An air pallet moves on cushions of air instead of wheels. Compressed air inflates the cushions underneath the pallet and is then expelled through exhaust holes. This forms a thin film of air between the cushions and the floor, lifting the platform off the floor and making it easy to move the heavy workstands, equipment, and ISS components. Concerned with the safety of the connections on the pressurized air hoses used for the air pallets, engineers at Kennedy modified an existing commercial cam and groove fitting to control the air supply hose in the event of an accidental release of a pressurized hose. This modification prevented the hose from detaching and, propelled by compressed air, striking workers or equipment. "At the time, these were not available on commercial coupling halves, so NASA made a modification and then put them into use. If a worker were to accidentally try to remove a pressurized hose from the pallet, it no longer rapidly separated, and it safely relieved the pressure," says Paul Schwindt, an engineer at Kennedy who together with Alan Littlefield, also an engineer at Kennedy, designed the modification.

Source record↗

[STS-51C Launch and Landing]

This NASA KSC video release is comprised of live shots covering the day launch and landing of STS-51C/Discovery. The flight crew members were: Thomas K. Mattingly II, Commander; Loren J. Shriver, Pilot; Ellison S. Onizuka, Mission Specialist; James F. Buchli, Mission Specialist; and Gary E. Payton, Payload Specialist. The launch video is presented from several different vantage points and covers the countdown from the launch pad, main engine ignition, liftoff, and solid rocket booster separation. The landing footage contains final descent and approach, landing gear deployment, and touchdown, which was also captured from different locations including a helicopter. STS-51C carried the DoD 85-1 payload and was the first mission dedicated to the Department of Defense.

Source record↗