Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Abort System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Risk Reduction Project in Pad Abort-1 Launch Vehicle Loads & Dynamics

The Pad Abort (PA-1) system includes the Launch Abort System (LAS) and the Command Module (CM). The PA-1 abort flight test will launch from the White Sands Missile Range. Prior to the ignition, the vehicle will be resting, without restraints, on a short support structure. The Launch Abort Motor will ignite and burn for less than 5 seconds before a 20 second coast. Then the LAS will separate from the CM and the CM will descend via parachute to a soil landing. The static firing of the Abort Motor (ST-1) for PA-1 Launch Vehicle resulted in unexpected higher levels that superseded the environment predictions and all the design and test loads of all subassemblies and components. A rapid project was put in place to develop the flight environments, loads and associated uncertainties for the Verification Load Cycle (VLC) of PA-1. An acoustic test and shaker test of the CM were planned and executed in support of the developments of damping and transfer functions. Instead of using the traditional structure-borne envelops, the actual ST-1 pressures and forces were used to develop the internal accelerations. The PA-1 motor was cooled to 60 Deg F using thermal conditioning to reduce the thrust profile. The plumes of the abort motor were studied to determine if the airborne environments would be reduced. The combination of all items, noted above, allowed a reduction in loads for VLC.

Sasan C Armand↗

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This paper provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles.

Jones, Daniel S.↗

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This paper provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles.

Jones, Daniel S.↗

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The National Aeronautics and Space Administration Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This report provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles

Jones, Daniel S.↗

Constellation's First Flight Test: Ares I-X

On October 28, 2009, NASA launched Ares I-X, the first flight test of the Constellation Program that will send human beings to the Moon and beyond. This successful test is the culmination of a three-and-a-half-year, multi-center effort to design, build, and fly the first demonstration vehicle of the Ares I crew launch vehicle, the successor vehicle to the Space Shuttle. The suborbital mission was designed to evaluate the atmospheric flight characteristics of a vehicle dynamically similar to Ares I; perform a first stage separation and evaluate its effects; characterize and control roll torque; stack, fly, and recover a solid-motor first stage testing the Ares I parachutes; characterize ground, flight, and reentry environments; and develop and execute new ground hardware and procedures. Built from existing flight and new simulator hardware, Ares I-X integrated a Shuttle-heritage four-segment solid rocket booster for first stage propulsion, a spacer segment to simulate a five-segment booster, Peacekeeper axial engines for roll control, and Atlas V avionics, as well as simulators for the upper stage, crew module, and launch abort system. The mission leveraged existing logistical and ground support equipment while also developing new ones to accommodate the first in-line rocket for flying astronauts since the Saturn IB last flew from Kennedy Space Center (KSC) in 1975. This paper will describe the development and integration of the various vehicle and ground elements, from conception to stacking in KSC s Vehicle Assembly Building; hardware performance prior to, during, and after the launch; and preliminary lessons and data gathered from the flight. While the Constellation Program is currently under review, Ares I-X has and will continue to provide vital lessons for NASA personnel in taking a vehicle concept from design to flight.

Davis, Stephan R.↗

Improved Verification for Aerospace Systems

Aerospace systems are subject to many stringent performance requirements to be verified with low risk. This report investigates verification planning using conditional approaches vice the standard classical statistical methods, and usage of historical surrogate data for requirement validation and in verification planning. The example used in this report to illustrate the results of these investigations is a proposed mission assurance requirement with the concomitant maximum acceptable verification risk for the NASA Constellation Program Orion Launch Abort System (LAS). This report demonstrates the following improvements: 1) verification planning using conditional approaches vice classical statistical methods results in plans that are more achievable and feasible; 2) historical surrogate data can be used to bound validation of performance requirements; and, 3) incorporation of historical surrogate data in verification planning using conditional approaches produces even less costly and more reasonable verification plans. The procedures presented in this report may produce similar improvements and cost savings in verification for any stringent performance requirement for an aerospace system.

Powell, Mark A.↗

Internal Acoustics of a Pintle Valve with Supercritical Helium Flow

Large amplitude flow unsteadiness is a common phenomenon within the high flow rate ducts and valves associated with propulsion systems. Boundary layer noise, shear layers and vortex shedding are a few of the many sources of flow oscillations. The presence of lightly damped acoustic modes can organize and amplify these sources of flow perturbation, causing undesirable loading of internal parts. The present study investigates the self-induced acoustic environment within a pintle valve subject to high Reynolds Number flow of helium gas. Experiments were conducted to measure the internal pressure oscillations of the Ares I Launch Abort System (LAS) Attitude Control Motor (ACM) valve. The AGM consists of a solid propellant gas generator with eight pintle valves attached to the aft end. The pintle valve is designed to deliver variable upstream conditions to an attache( converging diverging nozzle. In order to investigate the full range of operating conditions 28 separate tests were conducted with varying pintle position and upstream pressure. Helium gas was utilized in order to closely mimic the speed of sound of the gas generator exhaust, minimizing required scaling during data analysis. The recordec pressure measurements were interrogated to multiple ends. The development of root mean square (RMS) value! versus Reynolds Number and Pintle position are important to creating bounding unsteady load curves for valve internal parts. Spectral analysis was also performed, helping to identify power spectral densities (PSD) of acoustic natural frequencies and boundary layer noise. An interesting and unexpected result was the identification of an acoustic mode within the valve which does not respond until the valve was over 60% open. Further, the response amplitude around this mode can be as large or larger than those associated with lower frequency modes.

Fishbach, Sean R.↗

Lessons Learned in Launching Ares I-X

The Ares I-X flight test, scheduled for 2009, is the first opportunity for the Constellation Program and Ares Projects to obtain important data on the in-flight loads, first stage recovery, and ground-handling characteristics of the Ares I crew launch vehicle. The flight test vehicle will incorporate a mix of flight and mockup hardware, reflecting an acceptable representation of the mass and outer mold line characteristics of the operational Ares I vehicle. It will be powered by a four-segment solid rocket motor from the Space Shuttle inventory and will include a fifth, inert spacer segment and new forward structures to make it the same shape as the Ares I first stage. The vehicle also includes mass simulators for the upper stage, Orion crew module, and launch abort system to match the outer mold line of Ares I; an active roll control system; and avionics derived from Shuttle and Atlas hardware. This suborbital mission will take the flight test vehicle from stacking in the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC) through liftoff, maximum dynamic pressure, first stage separation, and recovery. Ares I-X presented NASA with unique project management challenges. This presentation will address those unique challenges, including managing a virtual nationwide team under a constrained timeline; designing and building the launch vehicle and ground systems; working concurrently with Space Shuttle activities; and integrating technical and management functions. It also will identify key data collected and lessons learned from the flight that will be applied to future exploration missions.

Davis, Stephan R.↗

Algorithm for Determination of Orion Ascent Abort Mode Achievability

For human spaceflight missions, a launch vehicle failure poses the challenge of returning the crew safely to earth through environments that are often much more stressful than the nominal mission. Manned spaceflight vehicles require continuous abort capability throughout the ascent trajectory to protect the crew in the event of a failure of the launch vehicle. To provide continuous abort coverage during the ascent trajectory, different types of Orion abort modes have been developed. If a launch vehicle failure occurs, the crew must be able to quickly and accurately determine the appropriate abort mode to execute. Early in the ascent, while the Launch Abort System (LAS) is attached, abort mode selection is trivial, and any failures will result in a LAS abort. For failures after LAS jettison, the Service Module (SM) effectors are employed to perform abort maneuvers. Several different SM abort mode options are available depending on the current vehicle location and energy state. During this region of flight the selection of the abort mode that maximizes the survivability of the crew becomes non-trivial. To provide the most accurate and timely information to the crew and the onboard abort decision logic, on-board algorithms have been developed to propagate the abort trajectories based on the current launch vehicle performance and to predict the current abort capability of the Orion vehicle. This paper will provide an overview of the algorithm architecture for determining abort achievability as well as the scalar integration scheme that makes the onboard computation possible. Extension of the algorithm to assessing abort coverage impacts from Orion design modifications and launch vehicle trajectory modifications is also presented.

Tedesco, Mark B.↗

Propulsion Overview of the Orion Pad Abort 1 (PA-1) Flight-Test Vehicle

The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This presentation provides a concise overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles

Jones, Daniel S.↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Ares I-X Launch Vehicle Modal Test Overview

The first test flight of NASA's Ares I crew launch vehicle, called Ares I-X, is scheduled for launch in 2009. Ares IX will use a 4-segment reusable solid rocket booster from the Space Shuttle heritage with mass simulators for the 5th segment, upper stage, crew module and launch abort system. Flight test data will provide important information on ascent loads, vehicle control, separation, and first stage reentry dynamics. As part of hardware verification, a series of modal tests were designed to verify the dynamic finite element model (FEM) used in loads assessments and flight control evaluations. Based on flight control system studies, the critical modes were the first three free-free bending mode pairs. Since a test of the free-free vehicle is not practical within project constraints, modal tests for several configurations in the nominal integration flow were defined to calibrate the FEM. A traceability study by Aerospace Corporation was used to identify the critical modes for the tested configurations. Test configurations included two partial stacks and the full Ares I-X launch vehicle on the Mobile Launcher Platform. This paper provides an overview for companion papers in the Ares I-X Modal Test Session. The requirements flow down, pre-test analysis, constraints and overall test planning are described.

Buehrle, Ralph D.↗

PEG Enhancement for EM1 and EM2+ Missions

NASA is currently building the Space Launch System (SLS) Block-1 launch vehicle for the Exploration Mission 1 (EM-1) test flight. The next evolution of SLS, the Block-1B Exploration Mission 2 (EM-2), is currently being designed. The Block-1 and Block-1B vehicles will use the Powered Explicit Guidance (PEG) algorithm. Due to the relatively low thrust-to-weight ratio of the Exploration Upper Stage (EUS), certain enhancements to the Block-1 PEG algorithm are needed to perform Block-1B missions. In order to accommodate mission design for EM-2 and beyond, PEG has been significantly improved since its use on the Space Shuttle program. The current version of PEG has the ability to switch to different targets during Core Stage (CS) or EUS flight, and can automatically reconfigure for a single Engine Out (EO) scenario, loss of communication with the Launch Abort System (LAS), and Inertial Navigation System (INS) failure. The Thrust Factor (TF) algorithm uses measured state information in addition to a priori parameters, providing PEG with an improved estimate of propulsion information. This provides robustness against unknown or undetected engine failures. A loft parameter input allows LAS jettison while maximizing payload mass. The current PEG algorithm is now able to handle various classes of missions with burn arcs much longer than were seen in the shuttle program. These missions include targeting a circular LEO orbit with a low-thrust, long-burn-duration upper stage, targeting a highly eccentric Trans-Lunar Injection (TLI) orbit, targeting a disposal orbit using the low-thrust Reaction Control System (RCS), and targeting a hyperbolic orbit. This paper will describe the design and implementation of the TF algorithm, the strategy to handle EO in various flight regimes, algorithms to cover off-nominal conditions, and other enhancements to the Block-1 PEG algorithm. This paper illustrates challenges posed by the Block-1B vehicle, and results show that the improved PEG algorithm is capable for use on the SLS Block 1-B vehicle as part of the Guidance, Navigation, and Control System.

Von der Porten, Paul↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Integrated vehicle ground vibration testing (IVGVT) will be a vital component for ensuring the safety of NASA's next generation of exploration vehicles to send human beings to the Moon and beyond. A ground vibration test (GVT) measures the fundamental dynamic characteristics of launch vehicles during various phases of flight. The Ares Flight & Integrated Test Office (FITO) will be leading the IVGVT for the Ares I crew launch vehicle at Marshall Space Flight Center (MSFC) from 2012 to 2014 using Test Stand (TS) 4550. MSFC conducted similar GVT for the Saturn V and Space Shuttle vehicles. FITO is responsible for performing the IVGVT on the Ares I crew launch vehicle, which will lift the Orion crew exploration vehicle to low Earth orbit, and the Ares V cargo launch vehicle, which can launch the lunar lander into orbit and send the combined Orionilander vehicles toward the Moon. Ares V consists of a six-engine core stage with two solid rocket boosters and an Earth departure stage (EDS). The same engine will power the EDS and the Ares I second stage. For the Ares IVGVT, the current plan is to test six configurations in three unique test positions inside TS 4550. Position 1 represents the entire launch stack at liftoff (using inert first stage segments). Position 2 consists of the entire launch stack at first stage burn-out (using empty first stage segments). Four Ares I second stage test configurations will be tested in Position 3, consisting of the Upper Stage and Orion crew module in four nominal conditions: J-2X engine ignition, post Launch Abort System (LAS) jettison, critical slosh mass, and J-2X burn-out. Because of long disuse, TS 4550 is being repaired and reactivated to conduct the Ares I IVGVT. The Shuttle-era platforms have been removed and are being replaced with mast climbers that provide ready access to the test articles and can be moved easily to support different positions within the test stand. The electrical power distribution system for TS 4550 was upgraded. Two new cranes will help move test articles at the test stand and at the Redstone Arsenal railhead where first stage segments will be received in 2011. The Hydrodynamic Support systems (HDSs) used for Saturn and Shuttle have been disassembled and evaluated for use during IVGVT. Analyses indicate that the 45-year-old HDSs can be refurbished to support the Ares I IVGVT. An alternate concept for a pneumatic suspension system is also being explored. A decision on which suspension system configuration to use for IVGVT will be made in 2010. In the next three years, the team will complete the updates to TS 4550, upgrade the test and data collection equipment, and finalize the configurations of the test articles to be used in the IVGVT. With NASA's GVT capabilities reestablished, the FITO team will be well positioned to perform similar work on Ares V, the largest exploration launch vehicle NASA has ever built. The GVT effort continues NASA's 50-year commitment to using testing and data analysis for safer, more reliable launch vehicles.

Tuma, M. L.↗

Design, Development and Test Challenges: Separation Mechanisms for the Orion Pad Abort-1 Flight Test

On May 6, 2010, NASA launched the first successful integrated flight test, Pad Abort-1, of the Orion Project from the White Sands Missile Range in Las Cruces, New Mexico. This test demonstrated the ability to perform an emergency pad abort of a full-scale 4.8 m diameter, 8200 kg crew capsule. During development of the critical separation mechanisms for this flight test, various challenges were overcome related to environments definition, installation complications, separation joint retraction speed, thruster ordnance development issues, load path validation and significant design loads increases. The Launch Abort System retention and release (LAS R&R) mechanism consisted of 6 discrete structural connections between the LAS and the crew module (CM) simulator, each of which had a preloaded tension tie, Superbolt torque-nut and frangible nut. During the flight test, the frangible nuts were pyrotechnically split, permitting the CM to separate from the LAS. The LAS separation event was the driving case in the shock environment for many co-located hardware items. During development testing, it was necessary to measure the source shock during the separation event so the predicted shock environment could be validated and used for certification testing of multiple hardware items. The Lockheed Martin test team measured the source separation shock due to the LAS R&R function, which dramatically decreased the predicted environment by 90% at 100 Hz. During development testing a hydraulic tensioner was used to preload the joint; however, the joint relaxation with the tensioner proved unsatisfactory so the design was modified to include a Superbolt torque-nut. The observed preload creep during lab testing was 4% after 30 days, with 2.5% occurring in the first 24 hours. The conversion of strain energy (preload) to kinetic energy (retraction) was measured to be 50-75%. Design features and careful monitoring of multiple strain gauges on each tension tie allowed a pure tensile load to be applied after stacking at the launch pad. Following installation, preload in each joint was monitored for 24 hours. Due to unforeseen complications and the influence of temperature on the portable data acquisition system, the team encountered difficulty in tracking the joint relaxation. In some cases, bond-line failure of the strain gauges occurred.

Dinsel, Alison↗

A Parametric Geometry Computational Fluid Dynamics (CFD) Study Utilizing Design of Experiments (DOE)

Design of Experiments (DOE) techniques were applied to the Launch Abort System (LAS) of the NASA Crew Exploration Vehicle (CEV) parametric geometry Computational Fluid Dynamics (CFD) study to efficiently identify and rank the primary contributors to the integrated drag over the vehicles ascent trajectory. Typical approaches to these types of activities involve developing all possible combinations of geometries changing one variable at a time, analyzing them with CFD, and predicting the main effects on an aerodynamic parameter, which in this application is integrated drag. The original plan for the LAS study team was to generate and analyze more than1000 geometry configurations to study 7 geometric parameters. By utilizing DOE techniques the number of geometries was strategically reduced to 84. In addition, critical information on interaction effects among the geometric factors were identified that would not have been possible with the traditional technique. Therefore, the study was performed in less time and provided more information on the geometric main effects and interactions impacting drag generated by the LAS. This paper discusses the methods utilized to develop the experimental design, execution, and data analysis.

Rhew, Ray D.↗

Orion-CEV Project Overview To the NASA Sports and Exploration "Kick-Off" Meeting

This viewgraph presentation reviews the Orion Crew Exploration vehicle (CEV) and its usage in the exploration of the moon and subsequent travel to Mars. Schedules for development and testing of the CEV are shown. Also displayed are various high level design views of the CEV, the launch abort system, the Atlas Docking adapter, and the service module.

Marshall, Paul F.↗

Crew Exploration Vehicle Service Module Ascent Abort Coverage

The Crew Exploration Vehicle (CEV) is required to maintain continuous abort capability from lift off through destination arrival. This requirement is driven by the desire to provide the capability to safely return the crew to Earth after failure scenarios during the various phases of the mission. This paper addresses abort trajectory design considerations, concept of operations and guidance algorithm prototypes for the portion of the ascent trajectory following nominal jettison of the Launch Abort System (LAS) until safe orbit insertion. Factors such as abort system performance, crew load limits, natural environments, crew recovery, and vehicle element disposal were investigated to determine how to achieve continuous vehicle abort capability.

Tedesco, Mark B.↗