Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar Architecture Team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Space Weather Architecture Options to Support Human and Robotic Deep Space Exploration

Understanding solar energetic particle (SEP) event characteristics is critical to the proper design of human and robotic space missions. This report details a study of operational response time for monitoring space weather for crewed flights, specifically targeting lunar and Mars missions. The NESC assessment team evaluated the required minimum latency for data streams and forecasts that will directly affect mission operations using a 41-year database (i.e., European Space Agency (ESA) Solar Energetic Particle Environment Modeling (SEPEM) RSDv2.0) of SEP events. The database contained 192 SEP events that resulted in a dose increase above background levels. Of those, 10% were “multiple events,” or events that occurred in quick succession. The analysis provides probabilistic values for time to peak flux and dose rate for the duration of each event. This NESC assessment also evaluated the SEP threshold levels for exploration missions to determine the relevant energy range of required proton measurements.

Solar energetic particle↗

Enterprise Mission Integration for Artemis Lunar Missions

Mission integration is an iterative process by which a specific mission is formulated, refined, planned, and executed within the established vehicle(s), architecture, and ground systems design. Mission integration includes the people, vehicle(s) and ground hardware/software, products, processes, analyses, schedules, facilities, Certification of Flight Readiness, etc. The Artemis Mission Integration Task Team (MITT) developed a series of products and processes to support the complex mission integration across various Programs within the Artemis Mission Campaign (Orion, Space Launch Systems, Exploration Ground Systems, Gateway, Human Landing System, and Extravehicular Activity and Human Surface Mobility). The Moon to Mars (M2M) Program is referred to as ‘the enterprise’ as it includes both the M2M organization and the Programs supporting the Artemis Mission Campaign. Artemis Mission Integration has five phases: mission capability, mission definition, mission preparation, mission execution, and post-mission assessment. This paper focuses on one of the enterprise-level mission checkpoints as a kick-off to the Mission Preparation phase, the Mission Integration Review (MIR), which occurs 18-24 months prior to launch. The MIR helps to confirm the defined mission technical baseline is within the existing analyzed design envelope. Details are provided on the identification of dependencies, issues, or gaps for mission-specific objectives and requirements, as well as the definition of the analysis, training, mission execution products, facilities, and detailed supporting operations requirements. The MIR was held for both Artemis I and II and this paper aims to share with the aerospace community its value as we prepare for upcoming Artemis Missions.

Mary Anne Plaza↗

Recent Discoveries in Simulant Behavior and Regolith Handling

The past few years have seen an exciting increase in visibility for the use of in-situ resources to achieve sustainability at the Moon and Mars. This visibility and inclusion in the mission architectures has led to an explosion in the research and development of mining and processing of regolith at the Moon. However, there are still many fundamental issues regarding digging, transporting, and processing of lunar and Mars regolith that may slow the progress by multiple teams who need to understand these issues before proceeding with hardware development. The objective of this project is to utilize the same team of soil and thermal experts and unique facilities to allow for efficient and fast generation of fundamental data and dissemination of critical results to the larger community. The capability gaps being addressed include how to dig up hard, frozen resources, transport to the processing site, lifting/depositing into a hopper or reactor, and extracting the water, all without losing the primary product to the environment. Soil Seals: Much attention has been focused on the challenges with regolith inlet/outlet valves that must seal in process gases after being repeatedly ex-posed to abrasive regolith and dust particles. One possible solution that has been proposed is to design the inlet hopper or duct such that the bulk of regolith pro-vides sufficient sealing of the reactor. Tests are planned to parametrically measure the maximum del-ta-pressure that can be maintained across a column of soil before ‘blow-out’ occurs. Variables to be examined include column height and width, simulant type, and compaction.

Simulant↗

Trades, Architecture, and Design of the Joint Augmented Reality Visual Informatics (Joint AR) Product

Future expeditions will enable exploration and study of the planetary surfaces of the Moon and Mars by performing extravehicular activity (EVA) operations. Present-day International Space Station (ISS) EVA operations require an intricate and tight choreography of crew, space suits, tools, systems, and flight teams to plan, train, and execute with limited advanced informatics. Additionally, EVA operations, aside from the Apollo Lunar surface missions, have predominately focused on maintenance and construction tasks where success criteria are clearly measurable. However, future exploration missions expect to enable crew to carry out scientific objectives in increasingly Earth-independent ways. In this paper, the Joint Augmented Reality Visual Informatics System (Joint AR) characterizes the design space for developing a modular augmented reality (AR) device for a spacesuit form factor that can support crew decision-making for EVA. This paper highlights the project’s experience with a product-focused management style and use-case centered systems engineering approach to iteratively design, build, and test. The Joint AR product features were defined via trade studies and market analysis of previous EVA display efforts, various AR components such as optics, commercial AR systems, light engines, data interfaces, graphics engine software and analog test beds. We outline the defining architectural design decisions, including safety criticality considerations, suit mounting interfaces, computer architectures, and partnership contracting mechanisms. The outcomes of these studies, architecture decisions, and management requirements result in a recommended design which is the Joint AR product. We discuss the evolution, development of these system components, and what work remains. We hope to share a unified understanding of various design decisions and how they impact the future of crew members’ access to data during Lunar and Martian EVAs. This ongoing effort can enable a community-wide discovery process toward realizing necessary AR features and capabilities for future missions.

Augmented Reality↗

Status of Constellation Pressure Garment Development

The Constellation Program requires the development of a space suit system to meet new requirements for launch, entry, and abort crew survival functions, microgravity intravehicular and extravehicular activities, and lunar surface exploration. This paper summarizes recent work and the current status of the NASA Constellation Space Suit Element Pressure Garment and Crew Survival Subsystem (PG/CS). The emphasis of the work by the PGS/CS team has been in the areas of feasibility studies toward PGS/CS architecture definition, risk mitigation, and requirements development. Included are results from component level engineering studies, testing in the Orion Vehicle and Orion seat mockups, microgravity testing on the Reduced Gravity Aircraft, occupant protection sled testing, analyses and studies, and their implications on Constellation PG/CS subsystem.

Ross, Amy↗

Innovative Approaches to Using the International Space Station as a Mars Transit Analog

Human research on the International Space Station (ISS) crew has made significant advances in understanding of the effects of physiology on human health in space missions. However, ISS has not been as suitable for research on other hazards of human spaceflight such as isolation and communications delay. NASA recently completed a special assessment of whether modifications could be made to operations or facilities so that ISS could be used more effectively as an analog to simulate long-duration crew missions beyond low earth orbit. A cross-disciplinary team met to identify concept of operations, trade spaces, challenges, and opportunities to making ISS more operationally relevant as a Mars transit mission analog, and the results and implementation plans are summarized in this manuscript. In addition to the use case of 12-month missions (already in planning by the NASA ISS Program to bound expected Mars transit durations), three new use cases where ISS could provide valuable high-fidelity experience were identified. (1) Testing of operations procedures and medical care could be enhanced by demonstrating crew handling a simulated medical event in microgravity, autonomously, and with significant communications delay. (2) Isolation and confinement effects of deep space transit could be studied on ISS to validate current habitable volume requirements for Mars transit as well as provide context for evaluating the results of the extensive ground-based simulations in HERA and NEK. A trade study of possible operational and hardware changes that would make ISS applicable to these use cases was completed. (3) Surface operations after the physiological deconditioning of a long transit could be conducted to validate crew ability to perform critical ground tasks after 6-month Mars transit and aid in conceptual design of Mars surface element architectures. Each of the case studies includes a trade space between operational impacts on nominal ISS activities and degree of fidelity. A phased approach to implementation means that several "quick start" activities can be done in 2019-2020 at the same time as planning continues for more complex exploration analog options beginning as early as 2022. The team determined that many of these quick-start tasks could be done with available assets, entirely independent of other exploration system development timelines (such as Orion, Space Launch System). The consideration of the full suite of human spaceflight capabilities in the lunar vicinity can also be included as each step in human exploration serves as a simulation opportunity for some aspect of subsequent missions. Further discussions of options with the international community are critical for considering the benefits as well as impacts of simulation activities on ISS, as well as to better formulate future mission architectures.

Robinson, Julie A.↗

Candidate Mission from Planet Earth control and data delivery system architecture

Using a structured, experienced-based approach, Goddard Space Flight Center (GSFC) has assessed the generic functional requirements for a lunar mission control and data delivery (CDD) system. This analysis was based on lunar mission requirements outlined in GSFC-developed user traffic models. The CDD system will facilitate data transportation among user elements, element operations, and user teams by providing functions such as data management, fault isolation, fault correction, and link acquisition. The CDD system for the lunar missions must not only satisfy lunar requirements but also facilitate and provide early development of data system technologies for Mars. Reuse and evolution of existing data systems can help to maximize system reliability and minimize cost. This paper presents a set of existing and currently planned NASA data systems that provide the basic functionality. Reuse of such systems can have an impact on mission design and significantly reduce CDD and other system development costs.

Shapiro, Phillip↗

Ares V Overview and Status

As part of NASA s Constellation Program to resume exploration beyond low Earth orbit (LEO), the Ares V heavy-lift cargo launch vehicle as currently conceived will be able to send more crew and cargo to more places on the Moon than the Apollo Program Saturn V. (Figure 1) It also has unprecedented cargo mass and volume capabilities that will be a national asset for science, commerce, and national defense applications. Compared to current systems, it will offer approximately five times the mass and volume to most orbits and locations. The Columbia space shuttle accident, the resulting investigation, the Vision for Space Exploration, and the Exploration Systems Architecture Study (ESAS) broadly shaped the Constellation architecture. Out of those events and initiatives emerged an architecture intended to replace the space shuttle, complete the International Space Station (ISS), resume a much more ambitious plan to explore the moon as a stepping stone to other destinations in the solar system. The Ares I was NASA s main priority because of the goal to retire the Shuttle. Ares V remains in a concept development phase, evolving through hundreds of configurations. The current reference design was approved during the Lunar Capabilities Concept Review/Ares V Mission Concept Review (LCCR/MCR) in June 2008. This reference concept serves as a starting point for a renewed set of design trades and detailed analysis into its interaction with the other components of the Constellation architecture and existing launch infrastructure. In 2009, the Ares V team was heavily involved in supporting the Review of U.S. Human Space Flight Plans Committee. Several alternative designs for Ares V have been supplied to the committee. This paper will discuss the origins of the Ares V design, the evolution to the current reference configuration, and the options provided to the review committee.

Creech, Steve↗

NASA's Decadal Planning Team Mars Mission Analysis Summary

In June 1999 the NASA Administrator chartered an internal NASA task force, termed the Decadal Planning Team, to create new integrated vision and strategy for space exploration. The efforts of the Decadal Planning Team evolved into the Agency-wide team known as the NASA Exploration Team (NEXT). This team was also instructed to identify technology roadmaps to enable the science-driven exploration vision, established a cross-Enterprise, cross-Center systems engineering team with emphasis focused on revolutionary not evolutionary approaches. The strategy of the DPT and NEXT teams was to "Go Anywhere, Anytime" by conquering key exploration hurdles of space transportation, crew health and safety, human/robotic partnerships, affordable abundant power, and advanced space systems performance. Early emphasis was placed on revolutionary exploration concepts such as rail gun and electromagnetic launchers, propellant depots, retrograde trajectories, nano structures, and gas core nuclear rockets to name a few. Many of these revolutionary concepts turned out to be either not feasible for human exploration missions or well beyond expected technology readiness for near-term implementation. During the DPT and NEXT study cycles, several architectures were analyzed including missions to the Earth-Sun Libration Point (L2), the Earth-Moon Gateway and L1, the lunar surface, Mars (both short and long stays), one-year round trip Mars, and near-Earth asteroids. Common emphasis of these studies included utilization of the Earth-Moon Libration Point (L1) as a staging point for exploration activities, current (Shuttle) and near-term launch capabilities (EELV), advanced propulsion, and robust space power. Although there was much emphasis placed on utilization of existing launch capabilities, the team concluded that missions in near-Earth space are only marginally feasible and human missions to Mars were not feasible without a heavy lift launch capability. In addition, the team concluded that missions in Earth s neighborhood, such as to the Moon, can serve as stepping-stones toward further deep-space missions in terms of proving systems, technologies, and operational concepts. The material contained in this presentation was compiled to capture the work performed by the Mars Sub-Team of the DPT NEXT efforts in the late 1999-2001 timeframe.

Drake, Bret G.↗

Characterization of in-Space Propulsion Trade Space to Support Initial Human Mars Segment

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon to Mars blueprint objectives. The focus of the Architecture Development Office has been to decompose the blueprint objectives into the characteristics and needs for both lunar and Mars missions and develop functional needs to enable an integrated end-to-end mission architecture. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and return crew safely back to Earth. The Mars Architecture Team has been evaluating four in-space transportation options to satisfy this functional need: 1) Hybrid Nuclear Electric/ Chemical Propulsion, 2) Nuclear Thermal Propulsion, 3) Hybrid Solar Electric/ Chemical Propulsion, and 4) All-Chemical propulsion. To answer the question “which transportation option is best?” decision makers will need to understand the performance characteristics—and limitations—for each architecture in the context of their preferred metric. Each option could be considered “better” than the others, depending on whether the primary selection criteria is fast, cheap, maximum cross-government applicability, maximizes commercial capabilities, and/or any other desired metrics. The Mars Architecture Team has completed considerable analysis on the Hybrid Nuclear Electric/Chemical Propulsion concept over the past three years. The Space Nuclear Propulsion program has also conducted significant work on the Nuclear Thermal Propulsion concept. The Hybrid Solar Electric/Chemical Propulsion concept, derived from technology planned for the Gateway program, was originally configurated for minimum vehicle stack mass (and, hence, minimum Earth-launched mass/cost), leveraging a highly efficient propulsion system on a minimum energy Conjunction Class trajectory. Historically, All-Chemical concepts were considered impractical due to the enormous propellant mass required, even for minimum energy Conjunction Class/long stay mission opportunities. However, considering the emerging commercial heavy-lift capabilities, the concept must be reevaluated across a range of concepts that leverage reusable launch vehicle capabilities to reduce the cost of launching large quantities of transportation elements needed for missions of various duration. This paper aims to provide an overview of the in-space transportation assessment work that is on-going within NASA.

Mars↗

Characterization of in-Space Propulsion Trade Space to Support Initial Human Mars Segment

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon to Mars blueprint objectives. The focus of the Architecture Development Office has been to decompose the blueprint objectives into the characteristics and needs for both lunar and Mars missions and develop functional needs to enable an integrated end-to-end mission architecture. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and return crew safely back to Earth. The Mars Architecture Team has been evaluating four in-space transportation options to satisfy this functional need: 1) Hybrid Nuclear Electric/ Chemical Propulsion, 2) Nuclear Thermal Propulsion, 3) Hybrid Solar Electric/ Chemical Propulsion, and 4) All-Chemical propulsion. To answer the question “which transportation option is best?” decision makers will need to understand the performance characteristics—and limitations—for each architecture in the context of their preferred metric. Each option could be considered “better” than the others, depending on whether the primary selection criteria is fast, cheap, maximum cross-government applicability, maximizes commercial capabilities, and/or any other desired metrics. The Mars Architecture Team has completed considerable analysis on the Hybrid Nuclear Electric/Chemical Propulsion concept over the past three years. The Space Nuclear Propulsion program has also conducted significant work on the Nuclear Thermal Propulsion concept. The Hybrid Solar Electric/Chemical Propulsion concept, derived from technology planned for the Gateway program, was originally configurated for minimum vehicle stack mass (and, hence, minimum Earth-launched mass/cost), leveraging a highly efficient propulsion system on a minimum energy Conjunction Class trajectory. Historically, All-Chemical concepts were considered impractical due to the enormous propellant mass required, even for minimum energy Conjunction Class/long stay mission opportunities. However, considering the emerging commercial heavy-lift capabilities, the concept must be reevaluated across a range of concepts that leverage reusable launch vehicle capabilities to reduce the cost of launching large quantities of transportation elements needed for missions of various duration. This paper aims to provide an overview of the in-space transportation assessment work that is on-going within NASA.

Mars↗

Human Flight to Lunar and Beyond - Re-Learning Operations Paradigms

For the first time since the Apollo era, NASA is planning on sending astronauts on flights beyond LEO. The Human Space Flight (HSF) program started with a successful initial flight in Earth orbit, in December 2014. The program will continue with two Exploration Missions (EM): EM-1 will be unmanned and EM-2, carrying astronauts, will follow. NASA established a multi-center team to address the communications, and related tacking/navigation needs. This paper will focus on the lessons learned by the team designing the architecture and operations for the missions. Many of these Beyond Earth Orbit lessons had to be re-learned, as the HSF program has operated for many years in Earth orbit. Unlike the Apollo missions that were largely tracked by a dedicated ground network, the HSF planned missions will be tracked (at distances beyond GEO) by the DSN, a network that mostly serves robotic missions. There have been surprising challenges to the DSN as unique modern human spaceflight needs stretch the experience base beyond that of tracking robotic missions in deep space. Close interaction between the DSN and the HSF community to understand the unique needs (e.g. 2-way voice) resulted in a Concept of Operations (ConOps) that leverages both the deep space robotic and the Human LEO experiences. Several examples will be used to highlight the unique challenges the team faced in establishing the communications and tracking capabilities for HSF missions beyond Earth Orbit, including: Navigation. At LEO, HSF missions can rely on GPS devices for orbit determination. For Lunar-and-beyond HSF missions, techniques such as precision 2-way and 3-way Doppler and ranging, Delta-Difference-of-range, and eventually possibly on-board navigation will be used. At the same time, HSF presents a challenge to navigators, beyond those presented by robotic missions - navigating a dynamic/"noisy" spacecraft. Impact of latency - the delay associated with Round-Trip-Light-Time (RTLT). Imagine trying to have a 2-way discussion (audio or video) with an astronaut, with a 2-3 sec or more delay inserted (for lunar distances) or 20 minutes delay (for Mars distances). Balanced communications link. For robotic missions, there has been a heavy emphasis on higher downlink data rates, e.g. bringing back science data. Higher uplink data rates were of secondary importance, as uplink was used only to send commands (and occasionally small files) to the spacecraft. The ratio of downlink-to-uplink data rates was often 10:1 or more. For HSF, a continuous forward link is established and rates for uplink and downlink are more similar.

Kenny, Edward (Ted)↗

Desert Research and Technology Studies (DRATS) Traverse Planning

Slide 1] The Desert Research and Technology Studies (DRATS) include large scale field tests of manned lunar surface exploration systems; these tests are sponsored by the Director s Office of Integration (DOI) [sic, Directorate Integration Office (DIO)] within the Constellation Program and they include geological exploration objectives along well designed traverses. These traverses are designed by the Traverse Team, an ad hoc group of some 10 geologists form NASA and academia, as well as experts in mission operation who define the operational constraints applicable to specific simulation scenarios. [Slide 2] These DRATS/DOI tests focus on 1) the performance of major surface systems, such as rovers, mobile habitats, communication architecture, navigation tools, earth-moving equipment, unmanned reconnaissance robots etc. under realistic field conditions and 2) the development of operational concepts that integrate all of these systems into a single, optimized operation. The participation of science is currently concentrating on geological sciences, with the objective of developing suitable tools and documentation protocols to sample representative rocks for Earth return, and to generate some conceptual understanding of the ground support structure that will be needed for the real time science-support of a lunar surface crew. [Slide 3] Major surface systems exercised in the June 2008 analog tests at the Moses Lake site, WA. [Upper left] The Chariot Rover (developed at Johnson Space Center) is an unpressurized vehicle driven by fully suited crews. [Upper right] Mobile Habitat provided by the Jet Propulsion Laboratory. Chariot is the more nimble and mobile vehicle and the idea is to drive the habitat remotely to some rendezvous place where Chariot would catch up - after a lengthy traverse - at the end of the day. [Lower left] The K-10 remotely operated robot (provided by NASA Ames Research Center) conducting scientific/geologic reconnaissance of the prospective traverse region, locating specific sites for more detailed exploration by Chariot and its crew. [Lower right] This earth-moving equipment (provided by NASA KSC) can be attached to Chariot and is envisioned to, for example, level an outpost site or to mine lunar soi

Horz, Friedrich↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

xEMU Lunar Boots

For the past several years, the Exploration Extravehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU lunar boots. This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. Preliminary results of Design Verification Testing (DVT) and the forward strategy for final maturation into a flight-ready design will also be discussed.

NASA↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Software Approach for the Regenerative Fuel Cell Project

The Regenerative Fuel Cell (RFC) project is developing a system that combines a fuel cell subsystem for energy production with an electrolysis subsystem for energy storage. The system is primarily being developed at the Glenn Research Center with support from Johnson Space Center under the Space Technology Mission Directorate / Game Changing Development Program. Currently, the intent is to operate the RFC system in an equivalent environment to a lunar equator location for a period of several lunar day/night cycles with minimal operator input. Demonstrating an automated RFC system in this environment is a step towards showing the extensibility to a flight system. This paper describes the RFC software team’s approach for development of the monitoring and control software that allows for the automated operation of the RFC system. We describe the rationale for the choice of Core Flight System architecture, as well as the plan for software/hardware integration.

Mathew J Mccaskey↗