Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar surface communications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Adaptive Power Control for Space Communications

This paper investigates the implementation of power control techniques for crosslinks communications during a rendezvous scenario of the Crew Exploration Vehicle (CEV) and the Lunar Surface Access Module (LSAM). During the rendezvous, NASA requires that the CEV supports two communication links: space-to-ground and crosslink simultaneously. The crosslink will generate excess interference to the space-to-ground link as the distances between the two vehicles decreases, if the output power is fixed and optimized for the worst-case link analysis at the maximum distance range. As a result, power control is required to maintain the optimal power level for the crosslink without interfering with the space-to-ground link. A proof-of-concept will be described and implemented with Goddard Space Flight Center (GSFC) Communications, Standard, and Technology Lab (CSTL).

Thompson, Willie L., II↗

Effects of Communication Delay on Human Spaceflight Missions

Missions onboard the International Space Station rely on the real-time availability of a large ground team of system experts to command the vehicle, solve safety-critical problems, and guide the crew during complex operations. Also, in Low Earth Orbit (LEO), supplies can be sent and crews evacuated quite quickly if needed. Future missions Beyond Low Earth Orbit (BLEO) will not have this 24/7, real-time safety net as communication latency increases, resupply difficulty increases, and evacuation opportunities diminish. There are few, if any, terrestrial analogs for human spaceflight missions BLEO that reflect the conditions—including extreme environments, long mission durations, and small crew sizes – that make these missions so high risk. Studies on specific conditions, such as communication delays and asynchronous interactions, have been performed in NASA Earth-based analog missions and have found that communication delays can disrupt ground-crew interactions and adversely impact team performance. However, there are gaps and limitations in studies conducted to date, notably on human spacecraft system failure response and recovery, the impacts of shorter lunar-relevant communication delays on complex operations, and the effectiveness of countermeasures. The work presented here breaks down real anomalies that occurred on ISS and Apollo missions and creates example scenarios fort Lunar Surface and Mars missions to explore the impact of communication delays of varying length on onboard operations and mission outcomes. Our analyses indicate that short communication delays (e.g., seconds to a minute) adversely impact the ability for ground to provide real-time oversight and guidance and to catch quickly emerging problems in time. Longer communication delays (e.g., up to 40 minutes on Mars missions) call for a shift of responsibility for tactical operations from ground to crew; crew must make time-critical decisions independently and respond to time-critical vehicle anomalies to prevent consequences.

human-systems integration↗

Effects of Communication Delay on Human Spaceflight Missions

Missions onboard the International Space Station rely on the real-time availability of a large ground team of system experts to command the vehicle, solve safety-critical problems, and guide the crew during complex operations. Also, in Low Earth Orbit (LEO), supplies can be sent and crews evacuated quite quickly if needed. Future missions Beyond Low Earth Orbit (BLEO) will not have this 24/7, real-time safety net as communication latency increases, resupply difficulty increases, and evacuation opportunities diminish. There are few, if any, terrestrial analogs for human spaceflight missions BLEO that reflect the conditions—including extreme environments, long mission durations, and small crew sizes – that make these missions so high risk. Studies on specific conditions, such as communication delays and asynchronous interactions, have been performed in NASA Earth-based analog missions and have found that communication delays can disrupt ground-crew interactions and adversely impact team performance. However, there are gaps and limitations in studies conducted to date, notably on human spacecraft system failure response and recovery, the impacts of shorter lunar-relevant communication delays on complex operations, and the effectiveness of countermeasures. The work presented here breaks down real anomalies that occurred on ISS and Apollo missions and creates example scenarios fort Lunar Surface and Mars missions to explore the impact of communication delays of varying length on onboard operations and mission outcomes. Our analyses indicate that short communication delays (e.g., seconds to a minute) adversely impact the ability for ground to provide real-time oversight and guidance and to catch quickly emerging problems in time. Longer communication delays (e.g., up to 40 minutes on Mars missions) call for a shift of responsibility for tactical operations from ground to crew; crew must make time-critical decisions independently and respond to time-critical vehicle anomalies to prevent consequences.

human-systems integration↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

Conceptual Design of a Communications Relay Satellite for a Lunar Sample Return Mission

In 2003, NASA solicited proposals for a robotic exploration of the lunar surface. Submissions were requested for a lunar sample return mission from the South Pole-Aitken Basin. The basin is of interest because it is thought to contain some of the oldest accessible rocks on the lunar surface. A mission is under study that will land a spacecraft in the basin, collect a sample of rock fragments, and return the sample to Earth. Because the Aitken Basin is on the far side of the Moon, the lander will require a communications relay satellite (CRS) to maintain contact with the Earth during its surface operation. Design of the CRS's orbit is therefore critical. This paper describes a mission design which includes potential transfer and mission orbits, required changes in velocity, orbital parameters, and mission dates. Several different low lunar polar orbits are examined to compare their availability to the lander versus the distance over which they must communicate. In addition, polar orbits are compared to a halo orbit about the Earth-Moon L2 point, which would permit continuous communication at a cost of increased fuel requirements and longer transmission distances. This thesis also examines some general parameters of the spacecraft systems for the mission under study. Mission requirements for the lander dictate the eventual choice of mission orbit. This mission could be the first step in a period of renewed lunar exploration and eventual human landings.

Brunner, Christopher W.↗

Lunar Surface Cargo Offloading Concepts

A sustainable presence on the lunar surface will serve as a vital training ground and technology demonstration test site in preparation for future human missions to Mars. Robotic lunar surface campaigns will focus on the exploration of resources providing information on the availability and extraction of usable resources, such as oxygen and water, and prepare the surface for a sustained human presence. Landers, outfitted with sensor packages, will be used to conduct risk-reduction activities and aid in the development of technologies prior to the crewed lunar missions that drive the need to for a logistics supply chain that requires offloading. A series of landers will be required on other planetary surfaces to build up the capabilities, capitalizing on those resources, required for sustained human presence. In each of those landers will be cargo including ascent vehicles, habitats, supplies, science packages, spare parts, fluids commodities for fuel and life support, and others varying in volume and ranging from mass in hundreds of kilograms to an estimated 6-14 metric tons to support Human Landing Systems and surface logistics requirements. This paper will examine the challenge of offloading examples of these cargo elements from different categories of landers on the lunar surface using a variety of methodologies. Challenges on the lunar surface arise with the conditions present (thermal, lighting, communications, regolith consistency), the desire to minimize mass of all landed systems, the desire to perform much of the activities with limited to minimal human interaction, and the overall configuration of the landers that are responsible for landing the cargo.

Lunar↗

Lunar Surface Cargo Offloading Concepts

A sustainable presence on the lunar surface will serve as a vital training ground and technology demonstration test site in preparation for future human missions to Mars. Robotic lunar surface campaigns will focus on the exploration of resources providing information on the availability and extraction of usable resources, such as oxygen and water, and prepare the surface for a sustained human presence. Landers, outfitted with sensor packages, will be used to conduct risk-reduction activities and aid in the development of technologies prior to the crewed lunar missions that drive the need to for a logistics supply chain that requires offloading. A series of landers will be required on other planetary surfaces to build up the capabilities, capitalizing on those resources, required for sustained human presence. In each of those landers will be cargo including ascent vehicles, habitats, supplies, science packages, spare parts, fluids commodities for fuel and life support, and others varying in volume and ranging from mass in hundreds of kilograms to an estimated 6-14 metric tons to support Human Landing Systems and surface logistics requirements. This paper will examine the challenge of offloading examples of these cargo elements from different categories of landers on the lunar surface using a variety of methodologies. Challenges on the lunar surface arise with the conditions present (thermal, lighting, communications, regolith consistency), the desire to minimize mass of all landed systems, the desire to perform much of the activities with limited to minimal human interaction, and the overall configuration of the landers that are responsible for landing the cargo.

Lunar↗

The Gandalf Staff: A Mobile Tool for Lunar Exploration (2nd year of development)

The Gandalf Staff is a mobile tool designed to be a flexible device supporting crewed and uncrewed operations on the lunar surface. The core of the device is a 24v battery with communications and data storage systems. Initial optional components supporting crewed Extra-Vehicular Activity (EVA) include a LiDAR and 360˚ camera. These provide 3D mapping of the traverse for documentation, and to aid future planning. The mapping also creates outreach opportunities for the public to “stand beside” the astronaut in Virtual Reality (VR). The staff provides external lighting for field site illumination in the south polar region low sun angle environment. Navigation instruments for crew position determination with Lunar Search and Rescue (LunaSAR) are also included. The staff itself can be used as a walking aid or as a splint for Incapacitated Crew Rescue (ICR). As a stand-alone device, the staff operates as a long duration untended science platform collecting environmental data and sending it to a lunar base station. The stand-alone mode requires connection to an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could become an electrical recharging station. To make rapid progress in the 1st year, and also to demonstrate innovative project management techniques, NASA guided a private industry partner, T STAR, in leading Capstone Engineering student teams at Texas A&M University (TAMU) for proof-of-concept development and testing. These teams developed the power system and demonstrated successful integration of LiDAR, WiFi communications, and external lighting subsystems. Another industry team at Jacobs Technology prototyped a tripod to hold the staff upright. For the 2nd year (FY’22), NASA will again collaborate with partners to prototype enhanced power and lighting concepts. Year 2 will also add new capability for LunaSAR and geophysical science instrumentation using a heat probe. The heat probe is based upon Apollo heritage but modified to measure subsurface volatile ice regimes at the Artemis landing site. Components of the Gandalf Staff can be developed, tested, and deployed independently, or on the integrated staff, rovers, or utility trailers. The project supports crew safety, lunar sample curation, mission science, and public outreach goals of NASA. PLAIN TEST SUMMARY: Gandalf Staff is a 24v battery powered mobile tool for the lunar surface supporting crewed geologic field site exploration, or as a stand-alone science platform. As a tool assisting astronauts conducting field geology, the Gandalf Staff provides external lighting to illuminate shadowed regions on the surface. It also documents the process of collecting rocks and dust samples using a LiDAR (laser range instrument) and cameras. The staff provides a beacon for emergency location of astronauts and augments communications when the astronauts are blocked by large boulders. As a standalone science platform, the Gandalf Staff provides a power system for instruments and sensors to measure the lunar environment over long periods of time. The staff gathers data and sends the results to a lunar base station for analysis.

External Lighting↗

Gateway - A Communications Platform for Lunar Exploration

As stated by a NASA administrator, “NASA, International Partners, and commercial partner are going forward to the moon. With Artemis, we will be exploring more of the Moon than ever before, and this time we are planning to stay. We will be demonstrating new technologies, capabilities, and business approaches needed for future exploration of Mars.” To support the complex, Artemis exploration campaign envisioned, the Gateway program is developing a communication network orbiting the Moon. Gateway will provide relay communication paths and radiometric tracking between crewed and robotic systems on the lunar surface or in cis-lunar space to mission control on the Earth. This paper is a high-level description of Gateway’s communication and ranging capabilities, the motivation and use of internationally developed interoperability standards, potential upgrade opportunities, and challenges as Gateway enables technology to support future Mars exploration.

Artemis↗

Operational Assessment of Apollo Lunar Surface Extravehicular Activity

Quantifying the operational variability of extravehicular activity (EVA) execution is critical to help design and build future support systems to enable astronauts to monitor and manage operations in deep-space, where ground support operators will no longer be able to react instantly and manage execution deviations due to the significant communication latency. This study quantifies the operational variability exhibited during Apollo 14-17 lunar surface EVA operations to better understand the challenges and natural tendencies of timeline execution and life support system performance involved in surface operations. Each EVA (11 in total) is individually summarized as well as aggregated to provide descriptive trends exhibited throughout the Apollo missions. This work extends previous EVA task analyses by calculating deviations between planned and as-performed timelines as well as examining metabolic rate and consumables usage throughout the execution of each EVA. The intent of this work is to convey the natural variability of EVA operations and to provide operational context for coping with the variability inherent to EVA execution as a means to support future concepts of operations.

planning and scheduling↗

Long-Range Transhorizon Lunar Surface Radio Wave Propagation in the Presence of a Regolith and a Sparse Exospheric Plasma

Long-range, over-the-horizon (transhorizon) radio wave propagation is considered for the case of the Moon. In the event that relay satellites are not available or otherwise unwarranted for use, transhorizon communication provides for a contingency or backup option for non line-of-sight lunar surface exploration scenarios. Two potential low-frequency propagation mechanisms characteristic of the lunar landscape are the lunar regolith and the photoelectron induced plasma exosphere enveloping the Moon. Although it was hoped that the regolith would provide for a spherical waveguide which could support a trapped surface wave phenomena, it is found that, in most cases, the regolith is deleterious to long range radio wave propagation. However, the presence of the plasma of the lunar exosphere supports wave propagation and, in fact, surpasses the attenuation of the regolith. Given the models of the regolith and exosphere adopted here, it is recommended that a frequency of 1 MHz be considered for low rate data transmission along the lunar surface. It is also recommended that further research be done to capture the descriptive physics of the regolith and the exospheric plasma so that a more complete model can be obtained. This comprehensive theoretical study is based entirely on first principles and the mathematical techniques needed are developed as required; it is self-contained and should not require the use of outside resources for its understanding.

Manning, Robert M.↗

Lunar Asset Messaging and On Orbit Navigation

NASA has titled its 2020 thrust for the Moon, Artemis. The increased focus on the Moon as a destination for future human and robotic expeditions necessitates general purpose navigational and communications infrastructure reducing their complexity to help establish a sustained presence. A framework through which Lunar missions can relay communications and localize their positions shifts the burden from the individual mission and enables resource allocation tailored to mission-specific goals. During the summer of 2020, student interns under the Innovation to Flight (i2F) program at the National Aeronautics and Space Administration’s (NASA) Jet Propulsion Laboratory (JPL) in collaboration with the University of Colorado Boulder designed, built, and tested a prototype framework capable of providing surface assets with communication and positioning services. The team utilized the existing i2F CubeSat bus in addition to developing several CubeSat engineering development units (EDUs), a ground vehicle, and a ground station to simulate a scenario in which a lunar surface mission is supported by these services. A primary goal of the summer was to develop a method for localizing the ground vehicle through trilateration. Distances are inferred from the round-trip time of flight (ToF) of radio signals between an asset and several elements. Signals were sent and received using LimeSDR software defined radios on-board both the ground vehicle and the EDUs; ToF and trilateration were calculated on a Qualcomm Snapdragon development board located within the LA MOON payload data system. The ModalAI chipset on the Qualcomm was instrumental in executing visual based position estimation. Communications was facilitated through a bent-pipe approach addressing the NASA requirement to provide solutions for in communication denied locations. The ground vehicle relayed information to other surface assets in addition to its ground station through the supporting constellation. This project demonstrates the feasibility of a lunar CubeSat constellation for the support of surface assets and explores packaging and operations of the components critical to trilateration and bent-pipe communication into a standard CubeSat form factor. When implemented, this framework will open a door for new surface missions designed with lower power requirements and increased operational access.

Huang, Calvin↗

Extended Duration: The SIRIUS 21 Crew Perspective

The SIRIUS (Scientific International Research In a Unique terrestrial Station) missions represent a collaborative effort between NASA and Russia’s Institute for Biomedical Problems (IBMP) to conduct a series of long duration isolation and confinement spaceflight analog missions. Three missions of 17-day, 4-month, and 8-month duration (SIRIUS 17, 19, and 21) have been completed at IBMP’s Ground-Based Experimental Complex / Nazemnyy eksperimental'nyy kompleks (NEK) in Moscow, Russia. The international SIRIUS 21 crew comprising representatives from the United States, United Arab Emirates and Russia recently completed the 8-month analog lunar mission. The extended duration mission included simulated lunar transit, orbital, and surface operations with corresponding deep space communication delay, during which the crew participated in nearly 70 studies, eight of which were sponsored by NASA’s Human Research Program. The studies examined the effect of isolation and confinement on the behavioral health of research subjects, and investigated medical countermeasures, team performance, crew dynamics, crew autonomy, food system risks, consequences of confinement and associated physiological stressors. SIRIUS 21 crewmembers also participated in operational tasks such as Rover and CubeSat assembly, simulated lunar sample assessment, VR activities, robotic arm training, environmental systems monitoring, exercise, greenhouse maintenance and 3D printing. Communication with Mission Control was limited to 30-minute periods every two hours. Since access to the internet and email was restricted, simulated ground support provided the Crew’s primary source of daily news and mission information. This panel discussion will include presentations from the US SIRIUS 21 crewmembers – William Brown and Ashley Kowalski – about their experience participating in the mission and science. A facilitated question and answer session will follow with attendees encouraged to ask questions and join in discussion with the SIRIUS 21 crewmembers about their experiences. William Brown came to SIRIUS 21 with experience spread across multiple industries, including the military, defense contracting, healthcare consulting, software engineering, and logistics. He has lived in the Middle East, Central Asia, and Russia. A former Boren Scholar, Brown is fluent in Russian. He holds a Master of International Business degree from the University of South Carolina’s Darla Moore School of Business. Prior to that, he earned a bachelor’s degree in Russian language, literature, and culture from the University of South Carolina. There, he also completed additional undergraduate coursework in computer science. Ashley Kowalski is a Project Leader in The Aerospace Corporation’s International Partnerships Department, where she works with, represents, and provides technical support to the the U.S. Space Force Space Systems Command International Affairs (SSC/IA) office. Through her numerous national and international assignments (Russia, China, and Germany), she has worked on topics related to international space systems, national security space systems, civil systems (including human spaceflight and civil launch projects), space policy, satellite industry analysis, and satellite manufacturing start-ups. She is proficient in Russian and German, and fluent in Polish. Kowalski received her Bachelor of Science and Master of Science degrees in mechanical and aerospace engineering from George Washington University in 2011 and 2012, respectively.

S. E. Whiting↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly↗

Lunar Relay Onboard Navigation Performance and Effects on Lander Descent to Surface

A system of Lunar relay satellites has been proposed to address communication and navigation needs and ensure robustness for the variety of upcoming robotic and human exploration missions to the Moon. The relays are envisioned to estimate self position and time knowledge onboard, allowing the system to provide in-situ navigation services to missions in the Lunar and cis-Lunar environment. The quality and accuracy of those services are highly dependent on the navigation performance of the relay itself. To assess the Lunar relay navigation performance, a series of orbit determination (OD) Monte Carlo (MC) simulations are run using Lunar gravity modeling up to a degree and order of 250 and a variety of onboard clocks and measurement types including weak-signal GNSS, Ground Network (GN) pseudorange (PR) and Doppler, and optical navigation (OpNav) center-finding (CF). The estimated trajectories produced by these Lunar relay MC simulations, along with the associated errors, and transmitted navigation reference signal parameters, are used to evaluate the expected navigation performance of a user on a descent trajectory to the Lunar surface. The scenario features a lander system performing onboard navigation relying on one-way range and Doppler measurements from reference signals emitted by the Lunar relay. This paper can be used as a reference in determining the onboard clock and measurement types necessary to obtain acceptable navigation performance for the Lunar relay, and as a baseline for Lunar lander navigation performance using accurate measurements from a relay reference signal.

Jeffrey L. Small↗

Lunar Relay Onboard Navigation Performance and Effects on Lander Descent to Surface

A system of Lunar relay satellites has been proposed to address communication and navigation needs and ensure robustness for the variety of upcoming robotic and human exploration missions to the Moon. The relays are envisioned to estimate self-position and time knowledge onboard, allowing the system to provide in-situ navigation services to missions in the Lunar and cis-Lunar environment. The quality and accuracy of those services are highly dependent on the navigation performance of the relay itself. To assess the Lunar relay navigation performance, a series of orbit determination (OD) Monte Carlo (MC) simulations are run using Lunar gravity modeling up to a degree and order of 250 and a variety of onboard clocks and measurement types including weak-signal GNSS, Ground Network (GN) pseudorange (PR) and Doppler, and optical navigation (OpNav) center-finding (CF). The estimated trajectories produced by these Lunar relay MC simulations, along with the associated errors, and transmitted navigation reference signal parameters, are used to evaluate the expected navigation performance of a user on a descent trajectory to the Lunar surface. The scenario features a lander system performing onboard navigation relying on one-way range and Doppler measurements from reference signals emitted by the Lunar relay. This paper can be used as a reference in determining the onboard clock and measurement types necessary to obtain acceptable navigation performance for the Lunar relay, and as a baseline for Lunar lander navigation performance using accurate measurements from a relay reference signal.

Jeffrey L. Small↗

NASA Lunar Exploration – Gateway’s Power and Propulsion Element Communications Links

As a key part of NASA’s Artemis program to return to the moon, the Lunar Gateway will provide a platform for staging lunar missions, for gaining experience in operations beyond earth orbit, and for creating sustainable infrastructure. Of specific interest, the Lunar Gateway will provide communications support to landers, orbiters, and surface systems, including in the South Polar Region where direct line of sight (LOS) to Earth is limited or non-existent. A foundational segment of the Gateway is the Power and Propulsion Element (PPE), which will carry: solar arrays to provide power to the Gateway; electric propulsion to maintain the Gateway in its operational orbit; and communication links between the Earth and Gateway, the Moon and Gateway, and relays from the Moon to the Earth. PPE Communication Links include an X-band link to Earth for Command, Ranging, and Telemetry (CR&T), which also carries low to medium rate data; a Ka-band Direct to Earth(DTE) link for high rate data transmissions; and a Ka-band Lunar link for high data rate connections to lunar systems. This paper describes the PPE communication links from a technical perspective. Other Gateway links supported by other modules are outside the scope of this paper.

ARTEMIS↗

A Lunar Communications and Navigation Satellite Concept for the Robotic Lunar Exploration Program

The Second Robotic Lunar Exploration Program (RLEP) mission has two primary objectives. Broadly stated, they are "To See the Light" and "To Touch the Ice", meaning one mission objective is to survey the lighting conditions on the rim of a candidate crater over the course of a year, and the second objective is to descend into th.! s crater to search for water ice. The Space Communications Program Office at NASA/GSFC is supporting the RLEP-2 Project by developing a communications and navigation architecture for the mission. The primary candidate crater studied is the Shackleton Crater near the South Pole of the Moon. The rim of this crater has approximately 14 contiguous days of visibility to the Earth over the course of a month, while mission elements in the crater have no line of sight to either the Earth or potentially an element on the rim of the crater. One solution studied is to launch a relay spacecraft with RLEP-2 to provide communications and navigation services to the elements on the lunar surface. To support operations concepts requiring long duration contacts between the relay and the elements in the crater, an inclined elliptical orbit originally conceived by Todd Ely a t JPL was chosen for the relay. The orbit was adjusted to lower the maximum range while maintaining its "frozen" nature, meaning once placed in this orbit little delta-V is required for orbit maintenance. The orbital parameters were adjusted such that the relay has visibility into the crater for approximately 8.7 hours of the 12 hour orbital period. The relay satellite design draws heavily upon heritage concepts and hardware to achieve a very low risk implementation. The design concept is a 3-axis spacecraft that is capable of supporting return communication links from multiple surface elements concurrently through a four-element S-Band Multiple Access phased array with two forward links provided through single dedicated elements. The payload is a bent-pipe relay with beamforming performed on the ground (Earth). To mitigate concerns with multipath observed during Mars missions, the preliminary design employs PN-spread signal structures which have been used successfully by Tracking and Data Relay Satellite System (TDRSS) users for simultaneous real-time and recorded data playback. Details of the relay communication trade studies and rationale for the selected design elements are discussed in the paper.

Gramling, Jeffrey J.↗