Re-Assembly and Test of a COMB Dipole Magnet With STAR Wires

Rare-Earth Barium Copper Oxide (REBCO) coated conductors are an attractive option for application in high field accelerator magnets due to their high critical field and the convenience of fabrication without heat treatment compared to some other superconductors. A small REBCO accelerator magnet was previously fabricated and tested in liquid nitrogen, demonstrating over 90% critical current retention in the coils. This paper describes the magnet re-assembly with a different support structure and its test in liquid helium at 1.8–4.5 K. The magnet quench history along with the instrumentation data is presented and discussed.

43 PARTICLE ACCELERATORS↗

Fabrication and test of COMB dipole magnet with STAR® wires

Fermilab is working on superconducting accelerator magnet R&D under the framework of the U.S. MagnetDevelopment Program (USMDP). An integral part of that program is High Temperature Superconducting (HTS)accelerator magnet development to- demonstrate HTS self‐fields of 5 T or greater- be compatible with operation in hybrid LTS/HTS configuration• to probe fields beyond 16 T for future High Energy Physics (HEP) experiments

43 PARTICLE ACCELERATORS↗

FEM Analysis of Hybrid LTS/HTS Cos-Theta Dipole Magnet

After the recent results on Bi-2212 superconductive magnets realized and tested in canted cosine-theta and solenoid designs, respectively, at Lawrence Berkeley National Laboratory (LBNL) and NHMFL, the first Bi-2212 stress-managed cosine-theta insert magnet is in the assembly phase at Fermilab. This insert will be part of the first hybrid cosine-theta magnet made of Nb3Sn outer layers within the US-MDP effort to reach 20 T bore field. This paper reports the analytical analysis of the cosine-theta Nb3Sn/Bi-2212 hybrid magnet. As an introduction, it shows the validation of the finalized HTS coils' design optimized using the ROXIE code. Subsequently, it reports the parameters, logic, and implementation method of the 2D electromagnetic and mechanical FEM analysis of the LTS/HTS hybrid magnet. Results from the ANSYS detailed model made with sub-modeling geometry are compared with the homogeneous model implemented in the past. Moreover, a Python code was implemented to simulate the current degradation due to stresses in the detail-modeled conductor areas. The current degradation is introduced in the simulation dynamics for both conductors as an iteration process during the energization load step only after applying pre-stress and thermal loads. The numerical and graphic results of the 2D cosine-theta LTS/HTS magnet cross-section will be described and analyzed.

D'Agliano, A.↗

Re-assembly and test of COMB dipole magnet with STAR® wires

Fermilab is developing the Conductor on Molded Barrel (COMB) magnet technology that works well with round REBCO conductors. COMB-STAR-1 magnet based on STAR wire by AMPeers was fabricated and tested in liquid nitrogen in 2023. The magnet demonstrated >90 Ic retention in the coils (before/after winding). Even though the magnet was not originally designed for operation at lower than 77 K temperatures, it was decided to test it in liquid helium to: - check the instrumentation and the DAQ system; - check the ability to detect resistive transitions or quenches and to protect the magnet; - gather the information on possible magnet design chances and upgrades of the test facility for future testing of HTS magnets. The magnet was re-assembled with a larger iron yoke and the axial supports and tested in liquid helium in 2024 at Fermilab s Vertical Magnet Test Facility (VMTF). It was the first HTS magnet test at that facility ever.

Kashikhin, Vadim↗

Mechanical Design of the PIP-II ORBUMP Pulsed Dipole Magnet

The Proton Improvement Plan-II (PIP-II) is a vital upgrade to Fermilab's accelerator complex. The upgrade is designed to power the world s most intense high-energy neutrino beam in future experiments. The magnet pulse repetition rate of the PIP-II injection system is being upgraded from 15 Hz to 20 Hz and requires a roughly 30% increase in the magnetic field of the new Orbital Bump (ORBUMP) magnets in the Booster. The magnet is secured in a vacuum box and the core is made up of 0.127 mm thick, low carbon steel laminations with a C-5 inorganic coating. The core is clamped using external tie bars welded to the core end plates. ANSYS Finite Element Analysis (FEA) was used to evaluate the clamping design to minimize the deflection of the core post welding of the tie bars. The water-cooled single turn coil is electrically isolated from the core using virgin PEEK insulating material in the gap. An investigation into the high voltage performance of the virgin PEEK insulator was conducted. The design of the coil which shapes the magnetic field by acting as the pole tips is critical for the integrated field homogeneity. The coil manufacturing tolerances and fabrication techniques were evaluated to ensure the magnetic properties of the magnet could be obtained. The ORBUMP magnet mechanical design is presented in this paper.