SEARCH · Search NASA
Results for “MONITOR PROGRAM”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Overview of Groundwater Monitoring Programs at Sandia National Laboratories.
Abstract not provided.
West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008
Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.
Introduction to the Biological Monitoring and Abatement Program
Explore the source record for details and available documents.
Repository performance confirmation.
Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.
The Carlsbad Environmental Monitoring Research Program: Final Technical Report, 04/24/1991 thru 09/30/2013
The final technical report and 2012 annual report regarding the Carlsbad Environmental Monitoring and Research Center's independent environmental monitoring program associated with the USDOE's Waste Isolation Pilot Plant (WIPP) located in Carlsbad, NM. This report covers the 22 year period of the financial assistance grant as well as all facets of the CEMRC environmental monitoring program and the results obtained.
SRS environmental air surveillance program 1954-2015: General trends
The radiological monitoring program at SRS was established under the DuPont Company in June 1951 and was used as a measurement of the effectiveness of plant controls and as an authoritative record of environmental conditions surrounding the plant. It also served as a method of demonstrating compliance with applicable federal regulations and guidance. This document serves as a general summary of changes made specifically to the environmental air monitoring program since its inception, and a discussion of the general trends seen in the air monitoring program at SRS from 1954 to 2015. Initially, the environmental air surveillance program focused not only on releases from SRS but also on fallout from various weapons testing performed through the end of 1978. Flypaper was used to measure the amount of fallout in the atmosphere during this period, and was present at each of the 10 monitoring stations. By 1959, all site stacks were included in the air monitoring program to determine their contribution to the airborne radioactivity onsite, and the number of air surveillance samplers rose to 18. This trend of an increased number of sampling locations continued to a peak of 35 sampling locations before shifting to a downward trend in the mid-1990s. In 1962, 4 outer-range samplers were placed in Savannah and Macon, GA, and in Greenville and Columbia, SC. Until 1976, air samplers were simply placed around the perimeter of the various operation locations (after 1959, this included stacks to determine their contribution to the airborne radioactivity), with the intent of creating as representative a distribution as possible of the air surrounding operations.
Guidelines, processes and tools for coastal ecosystem restoration, with examples from the United States
This paper presents a systematic approach to coastal restoration projects in five phases: planning, implementation, performance assessment, adaptive management, and dissemination of results. Twenty features of the iterative planning process are synthesized. The planning process starts with a vision, a description of the ecosystem and landscape, and goals. A conceptual model and planning objectives are developed, a site is selected using prioritization techniques, and numerical models contribute to preliminary designs as needed. Performance criteria and reference sites are selected and the monitoring program is designed. The monitoring program is emphasized as a tool to assess project performance and identify problems affecting progression toward project goals, in an adaptive management framework. Key approaches to aspects of the monitoring program are reviewed and detailed with project examples. Within the planning process, cost analysis involves budgeting, scheduling, and financing. Finally, documentation is peer reviewed prior to making construction plans and final costing.
Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL Surface and Shallow Subsurface Monitoring
The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is one of the United States’ largest demonstrations of CO 2 capture, transportation, injection, storage and monitoring using CO 2 derived from a coal-fired electric generating unit. This report summarizes the background and initial injection phase groundwater and soil flux monitoring results. The purpose of the groundwater monitoring program, as prescribed in the Underground Injection Control (UIC) permits is to assure that the project’s activities do not harm Underground Sources of Drinking Water (USDWs). In particular, the objective of the program is to monitor for the release of injected CO2 into groundwater aquifers at the project site. Three shallow USDW monitoring wells were installed as part of the groundwater monitoring program. In addition, a water supply well located near the project’s deep characterization well was utilized for monitoring. Seventeen metals, general chemistry and field parameters (e.g. pH, specific conductance, turbidity) were sampled three times prior to injection and quarterly during the injection period to date. Changes in groundwater geochemistry potentially attributable to a release of carbon dioxide into the USDW from the injection activities are decreasing pH and increasing TIC. The change in pH may also accompany the mobilization of certain metals within the groundwater, but the changes are likely site-specific, based on the natural aquifer mineralogy (Wilkin and Diguilio, 2010). At this time, no downward trends for pH and increasing trends for TIC have been statistically determined in the monitor wells. Valid detections exceeding both the UIC discharge limit and the range of background concentrations observed as of the N=11 event include: Exceedance of the UIC permit discharge limit of manganese at D-9-7 MW-2S and D-9-9 MW-1, and exceedance of the UIC permit discharge limit of iron at D-9-9 MW-1. In addition, a statistically significant increase of barium and manganese has been observed at D-9-9 MW-1. However, Additional lines of evidence (namely, expected shifts in TIC or pH, per the research cited above) to interpret the cause (e.g., potential carbon dioxide influence) of the statistically determined exceedances and/or increases are absent at this time. Quarterly groundwater sampling and analysis will continue throughout the project. The UIC permit requires that soil CO 2 flux shall be monitored at the land surface at the injection site and at nearby locations. Twelve locations were chosen for surveys including a mix of near wellbore and offset locations. To date, 24 surveys have taken place with 12 occurring prior to the onset of injection operations in August 2012. Soil CO 2 flux appears to positively covary with soil temperature. A notably high soil CO 2 flux value (21 µmol/m 2 /sec) was observed from the D-9-9 #2 chamber location during sampling event #24 (9/24/2014). As a result of this finding, the frequency of soil CO 2 flux monitoring events will be increased to twice-monthly until this anomaly can be confirmed or determined to be an outlier. Soil CO 2 flux monitoring will continue for the duration of the project.
The role of independent monitoring in maintaining community support through a radiological incident - a WIPP case study - 15107
The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) waste repository for the permanent disposal of defense transuranic (TRU) wastes. The repository is mined in the Salado Formation, a bedded salt formation of the Permian era, approximately 655 m (2150 ft.) below land surface. Located near Carlsbad, New Mexico, the WIPP facility is the world's first deep geological disposal facility licensed to accept TRU waste. Environmental monitoring is a key component in the development and operation of any nuclear facility. Well after the WIPP facility had been sited and constructed, but before repository operations began, DOE and local community leaders recognized the value of having an independent environmental monitoring program in addition to the self-monitoring program required by regulation. An independent monitoring organization, the Carlsbad Environmental Monitoring and Research Center (CEMRC) was created by New Mexico State University at its Carlsbad campus. After almost fifteen years of successful waste disposal operations, the first airborne radiation was accidentally released from the WIPP and detected beyond the site boundary on February 14, 2014. The accident released moderate levels of radioactivity into the underground air. A small but measurable amount of radioactivity also escaped to the surface and was detected beyond the site's inner boundary. The results were reported to the public as they were obtained and verified. Releases were low and localized, and no radiation-related health effects among local workers or the public would be expected. CEMRC's independence and its extensive monitoring program played a crucial role in timely informing the local populations on the levels and types of radiation released from the WIPP. CEMRC also helped eliminate unnecessary concern surrounding fear of radiation by engaging local populations through news releases and presentations at 'town hall' meetings sponsored by the Mayor's Office and the Department of Energy. (authors)
Annual Site Environment Report for Calendar Year 2023 - Princeton Plasma Physics Laboratory
This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. In 2023, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2023, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 27, 2023.
2022 Annual Site Environment Report, Princeton Plasma Physics Laboratory
This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2022 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2022. PPPL’s on-site operations started to be restored in 2022, following curtailments in 2020 and 2021 for the global coronavirus (COVID-19) pandemic. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2022. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2022, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2022, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council.
Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2024
This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2024 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2024. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the US and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2024. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2024, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for nonradiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2024, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 25, 2024.