Productivity enhancement planning using participative management concepts

A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

White, M. E.↗

Space station human productivity study. Volume 2: Executive summary and oral review presentation

Definition of design/operations requirements for support of human productivity, identification of problem areas lacking data for requirements definition, generation of management plans for conduct of studies to acquire needed data for timely space station program impact, and correlation of all issue study management plans with space station progam milestone need dates were addressed.

Source record↗

Implementing a Sleep Health Education and Sleep Disorders Screening Program in Fire Departments

The lost productivity from fatigue adds something like $2,000 per worker per year to an organization's overall costs. The human and financial burden of fatigue has prompted specialists to develop fatigue risk management plans, which have been implemented with success in industries like aviation, manufacturing, and first responders. We'll explore the common risk factors for fatigue and delve into successful programs from major players in the American marketplace, and provide actionable recommendations for change within your organization to prevent fatigue and encourage greater holistic wellness among your workers. Learning Objectives - Explain the causes and effects of the fatigue problem - Illustrate the difference between physical and chronic sleep-related fatigue - Explore fatigue management case studies from aviation, manufacturing, and warehousing - Demonstrate fatigue conclusions from research conducted at NASA - Answer common questions on fatigue management - Share recommendations from our experts on creating a fatigue management plan.

alertness↗

ERTS-1 Role in land management and planning in Minnesota

Research on applications of ERTS-1 imagery to land use has focused on evaluating the ability of ERTS-1 imagery to update and refine the detail of land use information in the Minnesota Land Management Information System. Work has been directed toward defining the capabilities of the ERTS-1 system to provide information about surface cover by identifying forest, water, and wetland resources; urban and agricultural development: and testing and evaluating data input and output procedures. As capabilities were developed, meetings were held with administrators and resource information users from various agencies of government to identify their information needs. A full scale systems test for several selected pilot areas in the state is nearly complete. Users have been identified for each test area and they have been instrumental in identifying data requirements and analysis needs for administrative purposes. Users have both rural and urban orientations and provide a basis for evaluation of the results.

Sizer, J. E.↗

Integrated risk management

The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.

Hunsucker, J. L.↗

Space Shuttle wind tunnel testing program

A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

Whitnah, A. M.↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Introduction: Lunabotics provides accredited institutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar surface in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors. The culmination of the Lunabotics virtual challenge will be the design, build and operation of a functional prototype Lunar robot. Teams are required to submit the following: (1) Project Management Plan, (2) Systems Engineering Paper, a (3) STEM Engage-ment Report, and a (4) Proof of Life Video. This is an optional item, but to qualify for the grand prize a team must also submit a: (5) Presentation and Demonstration. Background: The NASA Lunabotics University Competition was first held in 2010 as a follow on to the NASA Regolith Excavation Challenge [1]. The high level of interest and participation from over 50 universities each year has led to a sustained annual competi-ion cadence: it has been held every May for the past 14 years [2,3]. Over 6,000 students have participated and been inspired to pursue Science, Technology, En-gineering and Mathematics careers (STEM). 2024 Competition: The necessary lunar surface tasks are evolving to meet the NASA Artemis Mission requirements. In the past Lunabotics challenges we gathered data to support Lunar mining for consuma-bles in the Lunar regolith. Now, in 2024, the task is to gather data on Lunar site preparation and construction by designing and building a robot that will traverse the chaotic Lunar terrain and construct a regolith-based berm. The goal is to build a berm structure which would be useful to the Artemis Mission for blast and ejecta protection during lunar landings and launches, shading cryogenic propellant tank farms, providing radiation protection around a nuclear power plant and other mission critical uses. Lunabotics will consist of three separate events this year. The first event is NASA’s Lunabotics Project Development Challenge, where teams submit various deliverables to be scored by judges. The second event will be the University of Central Florida (UCF) Lunabotics Qualification challenge, in the Exolith laboratory, where teams will put their de-signs to the test. The top ten scoring teams from the Qualification challenge are then invited to the third and final event, NASA’s Lunabotics On-Site Challenge at Kennedy Space Center in Florida. This presentation will summarize the results and lessons learned from the NASA Lunabotics University Competition held in May 2024.

Lunabotics↗

Requirements, Resource Planning, and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗