Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Science Orbiter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

DSMS investment in support of satellite constellations and formation flying

Over the years, NASA has supported unmanned space missions, beyond earth orbit, through a Deep Space Mission System (DSMS) that is developed and operated by the Jet Propulsion Laboratory (JPL) and subcontractors. The DSMS capabilities have been incrementally upgraded since its establishment in the late '50s and are delivered primarily through three Deep Space Communications Complexes (DSCC 's) near Goldstone, California, Madrid, Spain, and Canberra, Australia and from facilities at JPL. Traditionally, mission support (tracking, command, telemetry, etc) is assigned on an individual-mission basis, between each mission and a ground-based asset, independent of other missions. As NASA, and its international partners, move toward flying fullconstellations and precision formations, the DSMS is developing plans and technologies to provide the requisite support. The key activities under way are: (1) integrated communications architecture for Mars exploration, including relays on science orbiters and dedicated relay satellites to provide continuous coverage for orbiters, landers and rovers. JPL is developing an architecture, as well as protocols and equipment, required for the cost-effective operations of such an infrastructure. (2) Internet-type protocols that will allow for efficient operations across the deep-space distances, accounting for and accommodating the long round-trip-light-time. JPL is working with the CCSDS to convert these protocols to an international standard and will deploy such protocol, the CCSDS File Delivery Protocol (CFDP), on the Mars Reconnaissance Orbiter (MRO) and on the Deep Impact (01) missions. (3) Techniques to perform cross-navigation between spacecrafi that fly in a loose formation. Typical cases are cross-navigation between missions that approach Mars and missionsthat are at Mars, or the determination of a baseline for missions that fly in an earth-lead- lag configuration. (4) Techniques and devices that allow the precise metrology and controllability of tightformations for precision constellation missions. In this paper we discuss the four classes of constellatiodformation support with emphasis of DSMS current status (technology and implementation) and plans in the first three areas.

space operations↗

Mars Reconnaissance Orbiter Landing Site Reconnaissance Capability

The Mars Reconnaissance Orbiter (MRO) entered into orbit about Mars on March 10, 2006. After a series of aerobraking and propulsive maneuvers, the spacecraft has been in its sun-synchronous primary science orbit since September 2006 performing both scientific and Mars programmatic support roles. In addition to MRO’s scientific investigations of Mars, NASA has tasked MRO to provide reconnaissance of potential landing sites for ongoing and future Mars missions. This paper covers the mission design and analysis process to characterize MRO’s landing site coverage capability for all global locations, with special focus on potential sites for future missions: Gale Crater, Mawrth Vallis, and Noachis Human Exploration Zone.

Johnston, M. Daniel↗

The Mojave Desert: A Martian Analog Site for Future Astrobiology Themed Missions

Astrobiological interest in Mars is highlighted by evidence that Mars was once warm enough to have liquid water present on its surface long enough to create geologic formations that could only exist in the presense of extended fluvial periods. These periods existed at the same time life on Earth arose. If life began on Mars as well during this period, it is reasonable to assume it may have adapted to the subsurface as environments at the surface changed into the inhospitable state we find today. If the next series of Mars missions (Mars Science Laboratory, the ExoMars Trace Gas Orbiter proposed for launch in 2016, and potential near surface sample return) fail to discover either extinct or extant life on Mars, a subsurface mission would be necessary to attempt to "close the book" on the existence of martian life. Mars is much colder and drier than Earth, with a very low pressure CO2 environment and no obvious habitats. Terrestrial regions with limited precipitation, and hence reduced active biota, are some of the best martian low to mid latitude analogs to be found on Earth, be they the Antarctic dry valleys, the Atacama or Mojave Deserts. The Mojave Desert/Death Valley region is considered a Mars analog site by the Terrestrial Analogs Panel of the NSF-sponsored decadal survey; a field guide was even developed and a workshop was held on its applicability as a Mars analog. This region has received a great deal of attention due to its accessibility and the variety of landforms and processes observed relevant to martian studies.

Mars analog sites↗

Jet Propulsion Laboratory: Annual Report 2002

The year 2002 brought advances on many fronts in our space exploration ventures. A new orbiter settled in at Mars and delivered tantalizing science results suggesting a vast store of water ice under the planet's surface, a discovery that may have profound consequences for exploring Mars. A long-lived spacecraft made its final fly-bys of Jupiter's moons, while another started its final approach toward Saturn and yet another flew by an asteroid on its way to a comet. A new ocean satellite began science observations, joined in Earth orbit by a pair of spacecraft measuring our home planets gravity field, as well as JPL instruments on NASA and Japanese satellites. A major new infrared observatory and a pair of Mars rovers were readied for launch. All told, JPL is now communicating with 14 spacecraft cast like gems across the velvet expanses of the solar system. It is a far cry from the early 1960's, when JPL engineers made prodigious efforts to get the first planetary explorers off the ground and into space - an achievement of which we were especially mindful this year, as 2002 marked the 40th anniversary of the first successful planetary mission, Mariner 2, which barely reached our closest planetary neighbor, Venus. Added to this anniversary were celebrations surrounding the 25th anniversaries of the launches of Voyagers 1 and 2, two remarkable spacecraft that are still flying and are actively probing the outer realms of the solar system. These events of the past and present provide an occasion for reflection on the remarkable era of exploration that we at the Jet Propulsion Laboratory are privileged to be a part of. As 2002 neared its end, the Laboratory had yet another reason for celebration, as a new five-year management contract between NASA and the California Institute of Technology was signed that calls for a closer working relationship with NASA and other NASA centers as a member of the 'One NASA' team. There is a strong emphasis on cost control and management, areas in which we can improve, enabling us to become more competitive. This new agreement again confirms NASA's trust and faith in Caltech and JPL, in which we should all take great pride. If the history of JPL were a book, we are on the verge of turning the page to one that promises to be one of the most exciting and busiest chapters in JPL's history. In 2003 and 2004, we will launch 11 spacecraft or major payloads. We will land two rovers on Mars; put a spacecraft in orbit around Saturn, deliver a probe to the surface of its largest moon, Titan, and map Titan's surface withimaging radar; send a spacecraft past a comet collecting samples from its tail, while another one is launched toward a comet impact; bring a capsule back to Earth with the first samples ever collected beyond the orbit of the Moon; map the skies in the ultraviolet as well as the infrared spectrum to unprecedented accuracy; and continue the mapping of ocean topography and winds on our home planet, Earth.

National Aeronautics and Space Administration (NAS↗

Generation and Performance of Automated Jarosite Mineral Detectors for Vis/NIR Spectrometers at Mars

Sulfate salt discoveries at the Eagle and Endurance craters in Meridiani Planum by the Mars Exploration Rover Opportunity have proven mineralogically the existence and involvement of water in Mars past. Visible and near infrared spectrometers like the Mars Express OMEGA, the Mars Reconnaissance Orbiter CRISM and the 2009 Mars Science Laboratory Rover cameras are powerful tools for the identification of water-bearing salts and other high priority minerals at Mars. The increasing spectral resolution and rover mission lifetimes represented by these missions currently necessitate data compression in order to ease downlink restrictions. On board data processing techniques can be used to guide the selection, measurement and return of scientifically important data from relevant targets, thus easing bandwidth stress and increasing scientific return. We have developed an automated support vector machine (SVM) detector operating in the visible/near-infrared (VisNIR, 300-2500 nm) spectral range trained to recognize the mineral jarosite (typically KFe3(SO4)2(OH)6), positively identified by the Mossbauer spectrometer at Meridiani Planum. Additional information is included in the original extended abstract.

Gilmore, M. S.↗

The Mars Express/NASA Project at JPL

ESA s Mars Express Mission involves international collaboration between the European Space Agency (ESA) and the European space agencies with the National Aeronautics and Space Administration (NASA) as a junior partner. The primary objective of this mission is to search for hydrologic resources on the surface of Mars. Mars Express was launched from Baikonur, Kazakhstan on June 2, 2003 and arrived at Mars on December 25, 2003. Orbital science observations started in January 2004.

Thompson, T. W.↗

Delivering Images for Mars Rover Science Planning

A methodology has been developed for delivering, via the Internet, images transmitted to Earth from cameras on the Mars Explorer Rovers, the Phoenix Mars Lander, the Mars Science Laboratory, and the Mars Reconnaissance Orbiter spacecraft. The images in question are used by geographically dispersed scientists and engineers in planning Rover scientific activities and Rover maneuvers pertinent thereto.

Edmonds, Karina↗

Mars Reconnaissance Orbiter mission

The Mars Reconnaissance Orbiter will deliver to Mars orbit a payload to conduct remote sensing science observations, characterize sites for future landers, and provide critical telecom/navigation relay capability for follow-on missions.

Mars↗

Parallel Study of HEND, RAD, and DAN Instrument Response to Martian Radiation and Surface Conditions

Nuclear detection methods are being used to understand the radiation environment at Mars. JPL (Jet Propulsion Laboratory) assets on Mars include: Orbiter -2001 Mars Odyssey [High Energy Neutron Detector (HEND)]; Mars Science Laboratory Rover -Curiosity [(Radiation Assessment Detector (RAD); Dynamic Albedo Neutron (DAN))]. Spacecraft have instruments able to detect ionizing and non-ionizing radiation. Instrument response on orbit and on the surface of Mars to space weather and local conditions [is discussed] - Data available at NASA-PDS (Planetary Data System).

Mars↗

MARS Science Laboratory Post-Landing Location Estimation Using Post2 Trajectory Simulation

The Mars Science Laboratory (MSL) Curiosity rover landed safely on Mars August 5th, 2012 at 10:32 PDT, Earth Received Time. Immediately following touchdown confirmation, best estimates of position were calculated to assist in determining official MSL locations during entry, descent and landing (EDL). Additionally, estimated balance mass impact locations were provided and used to assess how predicted locations compared to actual locations. For MSL, the Program to Optimize Simulated Trajectories II (POST2) was the primary trajectory simulation tool used to predict and assess EDL performance from cruise stage separation through rover touchdown and descent stage impact. This POST2 simulation was used during MSL operations for EDL trajectory analyses in support of maneuver decisions and imaging MSL during EDL. This paper presents the simulation methodology used and results of pre/post-landing MSL location estimates and associated imagery from Mars Reconnaissance Orbiter s (MRO) High Resolution Imaging Science Experiment (HiRISE) camera. To generate these estimates, the MSL POST2 simulation nominal and Monte Carlo data, flight telemetry from onboard navigation, relay orbiter positions from MRO and Mars Odyssey and HiRISE generated digital elevation models (DEM) were utilized. A comparison of predicted rover and balance mass location estimations against actual locations are also presented.

Davis, J. L.↗

6 um Pulsed OP-GaAs OPO Laser for Unambiguous Water Ice Detection on the Moon and Other Planetary Bodies

NASA demands a laser transmitter for planetary remote sensing to detect water-ice on the Moon and other planetary bodies. Based on the measurement of the Moon Mineralogy Mapper (M3) instrument, the discovery of water ice on the Moon was acclaimed, but the measurement is disputed because OH- and/or H2O-bearing materials share the absorption line around 3 μm wavelength. Lunar Flashlight, another mission project exploring the surface of Moon which will be launched later this year, enables to map the minerals on dark area of the Moon, but could not resolve the above-mentioned ambiguity. The absorption of 6.08 μm light is uniquely associated with the bending resonance of H2O since there is no comparable vibration in confounding OH-bearing materials. 6.08 μm laser between the atmospheric windows: middle-wave infrared (3-5 μm) and long-wave infrared (8-12 μm) has not been commercially available. Our approach is a Q-switched Ho:YLF laser pumped the orientation-pattern Gallium Arsenide optical parametric oscillator (OP-GaAs OPO) for generating high-energy laser pulses at the wavelength of 6.08 μm. In the current design, a 1.94 μm Tm:fiber is used as the pump source. In the compact design, a 1.94 μm laser diode will replace the Tm:fiber laser as the pump source. We will combine this proposed mid-infrared laser with the latest HgCdTe avalanche photodiode (APD) array to design a lidar for detecting water ice on the Moon and Mars from their respective orbits, enabling novel science and in-situ resource utilization. Our instrument is an enabling technology aboard the Artemis program and others.

mid-infrared laser↗

Mars Exploration Program and Mars Technology Program

The Mars Exploration Program and constituent Mars Technology Program are described. Current, ongoing and future NASA-led missions are presented, including discussions of scientific accomplishments and objectives as well as technology validations accomplished and technological enablers for future missions. The missions summarized include (in order of actual or planned launch): Mars Global Surveyor, Mars Pathfinder, 2001 Mars Odyssey, Mars Reconnaissance Orbiter, Mars 'Smart' Lander, Mars Scouts, Mars Sample Return. Key technology areas hdiscussed include: Navigation, Entry, Descent and Landing, Science and Surface Operations, Orbital Transport and Sample Return Technologies.

overview↗

Miniature Loop Heat Pipe (MLHP) Thermal Management System

The MLHP Thermal Management System consists of a loop heat pipe (LHP) with multiple evaporators and condensers, thermal electrical coolers, and deployable radiators coated with variable emittance coatings (VECs). All components are miniaturized. It retains all the performance characteristics of state-of-the-art LHPs and offers additional advantages to enhance the functionality, versatility, and reliability of the system, including flexible locations of instruments and radiators, a single interface temperature for multiple instruments, cooling the on instruments and warming the off instruments simultaneously, improving. start-up success, maintaining a constant LHP operating temperature over a wide range of instrument powers, effecting automatic thermal switching and thermal diode actions, and reducing supplemental heater powers. It can fully achieve low mass, low power and compactness necessary for future small spacecraft. Potential applications of the MLHP thermal technology for future missions include: 1) Magnetospheric Constellation; 2) Solar Sentinels; 3) Mars Science Laboratory; 4) Mars Scouts; 5) Mars Telecom Orbiter; 6) Space Interferometry Mission; 7) Laser Interferometer Space Antenna; 8) Jupiter Icy Moon Orbiter; 9) Terrestrial Planet Finder; 10) Single Aperture Far-Infrared Observatory, and 11) Exploration Missions. The MLHP Thermal Management System combines the operating features of a variable conductance heat pipe, a thermal switch, a thermal diode, and a state-of-the-art LHP into a single integrated thermal system. It offers many advantages over conventional thermal control techniques, and can be a technology enabler for future space missions. Successful flight validation will bring the benefits of MLHP technology to the small satellite arena and will have cross-cutting applications to both Space Science and Earth Science Enterprises.

Ku, Jentung↗

Lunar and Planetary Science XXXV: Missions and Instruments: Hopes and Hope Fulfilled

The titles in this section include: 1) Mars Global Surveyor Mars Orbiter Camera in the Extended Mission: The MOC Toolkit; 2) Mars Odyssey THEMIS-VIS Calibration; 3) Early Science Operations and Results from the ESA Mars Express Mission: Focus on Imaging and Spectral Mapping; 4) The Mars Express/NASA Project at JPL; 5) Beagle 2: Mission to Mars - Current Status; 6) The Beagle 2 Microscope; 7) Mars Environmental Chamber for Dynamic Dust Deposition and Statics Analysis; 8) Locating Targets for CRISM Based on Surface Morphology and Interpretation of THEMIS Data; 9) The Phoenix Mission to Mars; 10) First Studies of Possible Landing Sites for the Phoenix Mars Scout Mission Using the BMST; 11) The 2009 Mars Telecommunications Orbiter; 12) The Aurora Exploration Program - The ExoMars Mission; 13) Electron-induced Luminescence and X-Ray Spectrometer (ELXS) System Development; 14) Remote-Raman and Micro-Raman Studies of Solid CO2, CH4, Gas Hydrates and Ice; 15) The Compact Microimaging Spectrometer (CMIS): A New Tool for In-Situ Planetary Science; 16) Preliminary Results of a New Type of Surface Property Measurement Ideal for a Future Mars Rover Mission; 17) Electrodynamic Dust Shield for Solar Panels on Mars; 18) Sensor Web for Spatio-Temporal Monitoring of a Hydrological Environment; 19) Field Testing of an In-Situ Neutron Spectrometer for Planetary Exploration: First Results; 20) A Miniature Solid-State Spectrometer for Space Applications - Field Tests; 21) Application of Laser Induced Breakdown Spectroscopy (LIBS) to Mars Polar Exploration: LIBS Analysis of Water Ice and Water Ice/Soil Mixtures; 22) LIBS Analysis of Geological Samples at Low Pressures: Application to Mars, the Moon, and Asteroids; 23) In-Situ 1-D and 2-D Mapping of Soil Core and Rock Samples Using the LIBS Long Spark; 24) Rocks Analysis at Stand Off Distance by LIBS in Martian Conditions; 25) Evaluation of a Compact Spectrograph/Detection System for a LIBS Instrument for In-Situ and Stand-Off Detection; 26) Analysis of Organic Compounds in Mars Analog Samples; 27) Report of the Organic Contamination Science Steering Group; 28) The Water-Wheel IR (WIR) - A Contact Survey Experiment for Water and Carbonates on Mars; 29) Mid-IR Fiber Optic Probe for In Situ Water Detection and Characterization; 30) Effects of Subsurface Sampling & Processing on Martian Simulant Containing Varying Quantities of Water; 31) The Subsurface Ice Probe (SIPR): A Low-Power Thermal Probe for the Martian Polar Layered Deposits; 32) Deploying Ground Penetrating Radar in Planetary Analog Sites to Evaluate Potential Instrument Capabilities on Future Mars Missions; 33) Evaluation of Rock Powdering Methods to Obtain Fine-grained Samples for CHEMIN, a Combined XRD/XRF Instrument; 34) Novel Sample-handling Approach for XRD Analysis with Minimal Sample Preparation; 35) A New Celestial Navigation Method for Mars Landers; 36) Mars Mineral Spectroscopy Web Site: A Resource for Remote Planetary Spectroscopy.

Source record↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗

The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter ( MRO ) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low -altitude science orbit. The spacecraft has been on station in its 255 x 320 k m, sun -synchronous (approximately 3 am -pm ), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

MRO↗

Calculation of Zonal Winds using Accelerometer and Rate Data from Mars Global Surveyor

The Mars Global Surveyor spacecraft was initially placed into a high eccentricity, nearly polar orbit about Mars with a 45-hour period. To accomplish the science objectives of the mission, a 2-hour, circular orbit was required. Using a method known as aerobraking, numerous passes through the upper atmosphere slowed the spacecraft, thereby reducing the orbital period and eccentricity. To successfully perform aerobraking, the spacecraft was designed to be longitudinally, aerodynamically stable in pitch and yaw. Since the orbit is nearly polar, the yaw orientation of the spacecraft was sensitive to disturbances caused by the zonal components of wind (east-to-west or west-to-east) acting on the spacecraft at aerobraking altitudes. Zonal wind velocities were computed by equating the aerodynamic and inertia-related torques acting on the spacecraft. Comparisons of calculated zonal winds with those computed from the Mars Thermospheric Global Circulation Model are discussed.

Mars thermospheric winds↗