Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Telecommunication”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign is a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR will, for the firsttime ever, present a need to communicate with multiple surfaceassets that are co-located on Mars in a coordinated effort toaccomplish the unified objective of fetching, transporting, andreturning samples from Mars. Currently, Mars surface assetsrelay data to and from Earth using a number of orbiters inwhat’s known as the Mars Relay Network (MRN). This networkis characterized by a small number of surface assets distributedacross the Martian globe and a larger number of orbiters toprovide relay services. As of June 2020, there are two surfaceassets for which five orbiters are providing relay. During theMSR Campaign, there will be two rovers and a lander that allwill require relay communication from a small number of Marsorbiters to meet the aggressive MSR timeline. The inversion ofthe current MRN paradigm, a system of many surface assetsrequiring relay and few orbiters to provide relay, necessitatesthe unique challenge of optimally allocating relay passes tomaximize the operational capability of all assets. The allocationmust consider a large number of trade variables includingMars asset operational requirements and Earth ground systemconstraints, including staffing schedules, operations planningacross time zones, and more. To address these telecommunicationchallenges, the Mars Asset Relay Mission Link AllocationDesign Environment (MARMLADE) tool was developed. Itis a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets andquantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbitergeometry and telecommunication capabilities provided by JPL’sTelecom Orbit Analysis and Simulation Tool (TOAST) softwareto compute which asset should get each pass based on a seriesof heuristics and predictions of all assets’ states. WithinMARMLADE, the user can provide inputs including the optionfor time-based pass splitting, fixed FWD data rate capabilities,DFE communication capabilities, and link parameters allowingfor the assessment of complex operations and hardware tradesusing surface mission operational efficiency as a primary figureof merit. As the MSR mission concepts continue to mature,MARMLADE is being used to assess ability of all MSR elementsto meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.

Lee, Charles↗

An assessment of technology alternatives for telecommunications and information management for the space exploration initiative

On the 20th anniversary of the Apollo 11 lunar landing, President Bush set forth ambitious goals for expanding human presence in the solar system. The Space Exploration Initiative (SEI) addresses these goals beginning with Space Station Freedom, followed by a permanent return to the Moon, and a manned mission to Mars. A well designed, adaptive Telecommunications, Navigation, and Information Management (TNIM) infrastructure is vital to the success of these missions. Utilizing initial projections of user requirements, a team under the direction of NASA's Office of Space Operations developed overall architectures and point designs to implement the TNIM functions for the Lunar and Mars mission scenarios. Based on these designs, an assessment of technology alternatives for the telecommunications and information management functions was performed. This technology assessment identifies technology developments necessary to meet the telecommunications and information management system requirements for SEI. Technology requirements, technology needs and alternatives, the present level of technology readiness in each area, and a schedule for development are presented.

Ponchak, Denise S.↗

Radio Wave Propagation Handbook for Communication on and Around Mars

This handbook examines the effects of the Martian environment on radio wave propagation on Mars and in the space near the planet. The environmental effects include these from the Martian atmosphere, ionosphere, global dust storms, aerosols, clouds, and geomorphologic features. Relevant Martian environmental parameters were extracted from the measurements of Mars missions during the past 30 years, especially from Mars Pathfinder and Mars Global Surveyor. The results derived from measurements and analyses have been reviewed through an extensive literature search. The updated parameters have been theoretically analyzed to study their effects on radio propagation. This handbook also provides basic information about the entire telecommunications environment on and around Mars for propagation researchers, system engineers, and link analysts. Based on these original analyses, some important recommendations have been made, including the use of the Martian ionosphere as a reflector for Mars global or trans-horizon communication between future Martian colonies, reducing dust storm scattering effects, etc. These results have extended our wave propagation knowledge to a planet other than Earth; and the tables, models, and graphics included in this handbook will benefit telecommunication system engineers and scientific researchers.

Ho, Christian↗

Architectural Design for a Mars Communications and Navigation Orbital Infrastructure

The planet Mars has become the focus of an intensive series of missions that span decades of time, a wide array of international agencies and an evolution from robotics to humans. The number of missions to Mars at any one time, and over a period of time, is unprecedented in the annals of space exploration. To meet the operational needs of this exploratory fleet will require the implementation of new architectural concepts for communications and navigation. To this end, NASA's Jet Propulsion Laboratory has begun to define and develop a Mars communications and navigation orbital infrastructure. This architecture will make extensive use of assets at Mars, as well as use of traditional Earth-based assets, such as the Deep Space Network, DSN. Indeed, the total system can be thought of as an extension of DSN nodes and services to the Mars in-situ region. The concept has been likened to the beginnings of an interplanetary Internet that will bring the exploration of Mars right into our living rooms. The paper will begin with a high-level overview of the concept for the Mars communications and navigation infrastructure. Next, the mission requirements will be presented. These will include the relatively near-term needs of robotic landers, rovers, ascent vehicles, balloons, airplanes, and possibly orbiting, arriving and departing spacecraft. Requirements envisioned for the human exploration of Mars will also be described. The important Mars orbit design trades on telecommunications and navigation capabilities will be summarized, and the baseline infrastructure will be described. A roadmap of NASA's plan to evolve this infrastructure over time will be shown. Finally, launch considerations and delivery to Mars will be briefly treated.

Ceasrone R. J.↗

Telecommunications and data acquisition systems support for the Viking 1975 mission to Mars, volume 5

The support provided by the Deep Space Network to the Viking Project from 1 June 1978 to 30 April 1980 is described. The project was supported by the worldwide network of Deep Space Stations with 26- and 64-meter-diameter antennas, together with a ground communications system, for the transmission of commands, telemetry, radio metric data, and operational instructions between the stations and the network operation control center in Pasadena, California. Assistance was substantially less than in the previous phases of the Viking Project in order to provide adequate support to the Pioneer and Voyager Projects.

Larkin, W. E.↗

Telecommunications and data acquisition systems support for the Viking 1975 mission to Mars

The background for the Viking Lander Monitor Mission (VLMM) is given, and the technical and operational aspects of the tracking and data acquisition support that the Network was called upon to provide are described. An overview of the science results obtained from the imaging, meteorological, and radio science data is also given. The intensive efforts that were made to recover the mission are described.

Mudgway, D. J.↗

The Mars Reconnaissance Orbiter mission operations: architecture and approach

The Mars Reconnaissance Orbiter (MRO) was launched on August 12, 2005 by an Atlas V launch vehicle from Cape Canaveral Air Force Station. MRO will carry a rich set of science instruments to Mars and provide global, regional survey, and targeted observations. In addition, a set of engineering instruments providing optical navigation, Ka band telecommunication and UHF relay services to future Mars missions are part of the MRO payload.

MRO↗

The Mars Reconnaissance Orbiter Mission Operations: Architecture and Approach

The Mars Reconnaissance Orbiter (MRO) was launched on August 12, 2005 by an Atlas V launch vehicle from Cape Canaveral Air Force Station. MRO will carry a rich set of science instruments to Mars and provide global, regional survey, and targeted observations. In addition, a set of engineering instruments providing optical navigation, Ka band telecommunication and UHF relay services to future Mars missions are part of the MRO payload. During the mission, the MRO operations teams are presented with two major challenges - unprecedented high data rate and data volumes, and complex science planning and resource sharing. MRO has the capability to communicate with earth at a maximum of six Megabits per second (> 50 times any previous Mars missions). With the current Deep Space Network (DSN) contact schedule of 19 eight-hour tracks per week, the baseline mission plan is for MRO to return 34 Terabits of raw science data during the two year primary science phase. Each of the science instruments has its unique requirements for global mapping, regional survey, and targeted observations. Some instruments prefer nadir-only observations, while others require off-nadir observations (especially for stereo viewing). The requirements from these Mars viewing instruments presented a significant challenge for the operations team to design the complex science planning and resource sharing/allocation process. This paper describes what MRO project is implementing to solve these challenges.

Mars Reconnaissance Orbiter (MRO)↗

Comparative Study of Optical and Radio-Frequency Communication Systems for a Deep-Space Mission

We have performed a study on telecommunication systems for a hypothetical mission to Mars. The objective of the study was to evaluate and compare the benefits that microwave-X-band (8.4 GHz) and Ka-band (32 GHz) - and optical communications technologies a afford to future missions. The telecommunication systems were required to return data after launch and in orbit at 2.7 AU with daily data volumes of 0.1, 1.0, or 10.0 Gbits (Gb). Spacecraft terminals capable of delivering each of the three data volumes were proposed and characterized in terms of mass, power consumption, size, and cost. The estimated parameters for X-band, Ka-band, and optical frequencies are compared and presented here. For all cases, the optical light terminal exhibits about 60 percent of the mass of the corresponding radio frequency (RF) subsystem. Power consumption is comparable for all three technologies at a 0.1 Gb/day data volume, but the power required at either Ka-band or optical is less than half of the X-band requirement at 10 Gb/day. These benefits can be obtained only with a suitable investment in reception facilities for Ka-band or optical frequencies.

Hemmati, H.↗

High energy astrophysics 21st century workshop 'Space Capabilities in the 21st Century'

An overview of 20th-century NASA accomplishments and of the infrastructure and technology that NASA plans to have in place in the 21st century is presented. Attention is given to the Great Observatories Program, AXAF, the Space Infrared Telescope Facility, the Cosmic Background Explorer, the Small Explorers Program, the Large Area Modular Array of Reflectors, and the X-Ray Background Survey Spectrometer. Also discussed are earth-to-orbit communication links, transportation in the 1990s, the evolution of the space infrastructure, and the Space Station Freedom. Consideration is given to the possibilities of the 21st-century infrastructure, with emphasis on exploration on Mars and the moon. Topics addressed include telecommunications, navigation, information management, and 21st-century space science.

Rhome, Robert C.↗

Deep space telecommunications, navigation, and information management - Support of the Space Exploration Initiative

The principal challenges in providing effective deep space navigation, telecommunications, and information management architectures and designs for Mars exploration support are presented. The fundamental objectives are to provide the mission with the means to monitor and control mission elements, obtain science, navigation, and engineering data, compute state vectors and navigate, and to move these data efficiently and automatically between mission nodes for timely analysis and decision making. New requirements are summarized, and related issues and challenges including the robust connectivity for manned and robotic links, are identified. Enabling strategies are discussed, and candidate architectures and driving technologies are described.

Hall, Justin R.↗

Maven Orbital Trajectory Analysis: Design and Implementation of Lander Relay Support

NASA’s successful Mars Atmosphere and Volatile Evolution Mission (MAVEN), currently engaged in a survey of the Martian atmosphere and its evolution over time, has successfully completed a series of orbit changes, including a two-month aerobraking campaign, to satisfy additional mission roles. Launched on 18 November 2013, it entered Martian orbit on 22 September 2014. Having finished its primary one-year mission, the NASA Mars Program Office (MPO) started discussions with the MAVEN project on feasible options for extending the mission lifetime along with providing support for various Mars lander functions. MAVEN is the latest of the three active NASA Mars orbiters, with no others planned for the foreseeable future. Given that the landers need orbital relay support for years to come, and the MRO and Odyssey orbiters are aging, MAVEN’s role in providing critical orbital relay support has become increasingly important. After several years of studies, MPO directed the MAVEN project in 2018 to reduce its orbit size to provide better telecommunications relay support for Martian surface landers and to support Mars 2020 EDL under the constraint that MAVEN will have enough fuel to operate until 2030. As a part of this effort, the recent aerobraking campaign was one of several steps crucial to accomplishing this goal. This paper discusses the challenges of the entire mission design and its distillation into a concrete set of targeted objectives. With the successful orbit change, MAVEN will be able to provide support for the Mars 2020 relay activities from EDL through surface operations beyond 2030. This effort can serve as an excellent example for future missions having similar needs and requirements.

Jakosky, B. M.↗