Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Mission design overview for the Mars Exploration Rover Mission

In the summer of 2003, NASA will launch the next wave of robotic explorers towards the planet Mars. Specifically designed to 'follow the water', two identical rovers wil be delivered to the surface of Mars to remotely conduct geologic and atmospheric investigations.

Mars Exploration Rover mission design↗

Mission design of a Pioneer Jupiter Orbiter

The Mission analysis and design work performed in order to define a Pioneer mission to orbit Jupiter is described. This work arose from the interaction with a science advisory 'Mission Definition' team and led to the present mission concept. Building on the previous Jupiter Orbiter-Satellite Tour development at JPL a magnetospheric survey mission concept is developed. The geometric control of orbits which then provide extensive local time coverage of the Jovian system is analyzed and merged with the various science and program objectives. The result is a 'flower-orbit' mission design, yielding three large apoapse excursions at various local times and many interior orbits whose shape and orientation is under continual modification. This orbit design, together with a first orbit defined by delivery of an atmospheric probe, yields a mission of high scientific interest.

Friedman, L. D.↗

Mission Design for the Mars Environmental Survey

The purpose of this paper is to discuss some of the pertinent mission design issues associated with MESUR. Some details are given on the mission aspects of the network architecture studies. In addition, there is a description of the design trades that have been performed for pathfinder and the resulting reference mission design.

Mars↗

OSIRIS-REx Touch-and-Go (TAG) Mission Design for Asteroid Sample Collection

The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRIS-REx) mission is a NASA New Frontiers mission launching in September 2016 to rendezvous with the near-Earth asteroid Bennu in October 2018. After several months of proximity operations to characterize the asteroid, OSIRIS-REx flies a Touch-And-Go (TAG) trajectory to the asteroid's surface to collect at least 60 g of pristine regolith sample for Earth return. This paper provides mission and flight system overviews, with more details on the TAG mission design and key events that occur to safely and successfully collect the sample. An overview of the navigation performed relative to a chosen sample site, along with the maneuvers to reach the desired site is described. Safety monitoring during descent is performed with onboard sensors providing an option to abort, troubleshoot, and try again if necessary. Sample collection occurs using a collection device at the end of an articulating robotic arm during a brief five second contact period, while a constant force spring mechanism in the arm assists to rebound the spacecraft away from the surface. Finally, the sample is measured quantitatively utilizing the law of conservation of angular momentum, along with qualitative data from imagery of the sampling device. Upon sample mass verification, the arm places the sample into the Stardust-heritage Sample Return Capsule (SRC) for return to Earth in September 2023.

OSIRIS-REX TOUCH-AND-GO (TAG) MISSION DESIGN FOR A↗

Orbit Transfers for Dawn's Ceres Operations: Navigation and Mission Design Experience at a Dwarf Planet

Dawn, a mission belonging to NASA’s Discovery Program, was launched on September 27, 2007 to explore two objects in the main asteroid belt in order to yield insights into important questions about the formation and evolution of the solar system. Successfully completing all mission objectives at Vesta, Dawn arrived at dwarf planet Ceres in March 2015 and continued its journey to a series of four near circular polar science orbits. Dawn became the first mission to orbit around two extraterrestrial targets; such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn’s flight team at NASA’s Jet Propulsion Laboratory. Failure of the second reaction wheel assembly, shortly before leaving Vesta, added another challenge for Dawn’s flight team. This paper discusses the mission design and navigational experience and challenges during Dawn’s Ceres operations.

Han, Dongsuk↗

Overview of the Mission Design Reference Trajectory for NASA's Asteroid Redirect Robotic Mission

The National Aeronautics and Space Administration's (NASA's) recently cancelled Asteroid Redirect Mission was proposed to rendezvous with and characterize a 100 m plus class near-Earth asteroid and provide the capability to capture and retrieve a boulder off of the surface of the asteroid and bring the asteroidal material back to cislunar space. Leveraging the best of NASA's science, technology, and human exploration efforts, this mission was originally conceived to support observation campaigns, advanced solar electric propulsion, and NASA's Space Launch System heavy-lift rocket and Orion crew vehicle. The asteroid characterization and capture portion of ARM was referred to as the Asteroid Redirect Robotic Mission (ARRM) and was focused on the robotic capture and then redirection of an asteroidal boulder mass from the reference target, asteroid 2008 EV5, into an orbit near the Moon, referred to as a Near Rectilinear Halo Orbit where astronauts would visit and study it. The purpose of this paper is to document the final reference trajectory of ARRM and the challenges and unique methods employed in the trajectory design of the mission.

low thrust↗

Use of Concurrent Engineering in Space Mission Design

In recent years, conceptual-phase (proposal level) design of space missions has been improved considerably. Team structures, tool linkage, specialized facilities known as design centers and scripted processes have been demonstrated to cut proposal-level engineering design time from a few months to a few weeks.

concurent Engineering-Space Mission Design↗

Jovian plasma modeling for mission design

The purpose of this report is to address uncertainties in the plasma models at Jupiter responsible for surface charging and to update the jovian plasma models using the most recent data available. The updated plasma environment models were then used to evaluate two proposed Europa mission designs for spacecraft charging effects using the Nascap-2k code. The original Divine/Garrett jovian plasma model (or "DG1", T. N. Divine and H. B. Garrett, "Charged particle distributions in Jupiter's magnetosphere," J. Geophys. Res., vol. 88, pp. 6889-6903,1983) has not been updated in 30 years, and there are known errors in the model. As an example, the cold ion plasma temperatures between approx.5 and 10 Jupiter radii (Rj) were found by the experimenters who originally published the data to have been underestimated by approx.2 shortly after publication of the original DG1 model. As knowledge of the plasma environment is critical to any evaluation of the surface charging at Jupiter, the original DG1 model needed to be updated to correct for this and other changes in our interpretation of the data so that charging levels could beproperly estimated using the Nascap-2k charging code. As an additional task, the Nascap-2k spacecraft charging tool has been adapted to incorporate the so-called Kappa plasma distribution function--an important component of the plasma model necessary to compute the particle fluxes between approx.5 keV and 100 keV (at the outset of this study,Nascap-2k did not directly incorporate this common representation of the plasma thus limiting the accuracy of our charging estimates). The updating of the DG1 model and its integration into the Nascap-2k design tool means that charging concerns can now be more efficiently evaluated and mitigated. (We note that, given the subsequent decision by the Europa project to utilize solar arrays for its baseline design, surface charging effects have becomeeven more of an issue for its mission design). The modifications and results of those modifications to the DG1 model to produce the new DG2 model presented here and the steps taken to integrate the DG2 predictions into Nascap-2k are described in this report.

Voyager 2↗

Mission Design Overview for Mars 2003/2005 Sample Return Mission

In May 2003, a new and exciting chapter in Mars exploration will begin with the launch of the first of three spacecraft that will collectively contribute toward the goal of delivering samples from the Red Planet to Earth. This mission is called Mars Sample Return (MSR) and will utilize both the 2003 and 2005 launch opportunities with an expected sample return in October 2008. NASA and CNES are major partners in this mission. The baseline mission mode selected for MSR is Mars orbit rendezvous (MOR), analogous in concept to the lunar orbit rendezvous (LOR) mode used for Apollo in the 1960s. Specifically, MSR will employ two NASA-provided landers of nearly identical design and one CNES-provided orbiter carrying a NASA payload of rendezvous sensors, orbital capture mechanisms, and an Earth entry vehicle (EEV). The high-level concept is that the landers will launch surface samples into Mars orbit, and the orbiter will retrieve the samples in orbit and then carry them back to Earth. The first element to depart for Mars will be one of the two landers. Currently, it is proposed that an intermediate class launch vehicle, such as the Boeing Delta 3 or Lockheed Martin Atlas 3A, will launch this 1800-kg lander from Cape Canaveral during the May 2003 opportunity. The lander will utilize a Type-1 transfer trajectory with an arrival at Mars in mid-December 2003. Landing will be aided by precision approach navigation and a guided hypersonic entry to achieve a touchdown accuracy of 10 km or better. Although the exact landing site has not yet been determined, it is estimated that lander resource constraints will limit the site to between 15 degrees north and south latitudes. Following touchdown, the lander will deploy a six-wheeled, 60-kg rover carrying an extensive suite of instruments designed to aid in the analysis of the local terrain and collection of core samples from selected rocks. The surface mission is currently designed around a concept called the surface traverse. Each traverse will involve the rover exploring a selected area of terrain up to 100 meters from the lander, the collection of rock core samples, and the delivery of the samples from the traverse back to a sample canister on the lander. Planning estimates indicate that up to three traverses may be possible during the expected 90-sol lifetime of the lander. The canister that will receive the samples from the rover will be attached to the top stage of a small solid-fueled rocket mounted to the deck of the lander. This rocket is called the Mars Ascent Vehicle (MAV) and consists of three stages weighing a total of about 140 kg. After the conclusion of the surface mission, the MAV will lift-off and insert the sample canister into a near-circular orbit with an altitude of about 600 km and inclination of 45 degrees. The sample canister will wait in this orbit until it is retrieved by the orbiter sometime in early 2007. In August 2005, the second lander and a CNES-provided orbiter weighing 2700 kg will depart for Mars. Currently, it is proposed that a single Ariane 5 provided by CNES will launch both of these two elements onto a Type-2 transfer trajectory. Although the orbiter and lander will be launched together, they will separate shortly after injection and will fly to Mars as two independent spacecraft. However, both spacecraft will perform a maneuver between 10 and 15 days after launch so that their arrival times at Mars differ by between 12 and 24 hours. This scheme will reduce the operational complexity at the encounter date. A set of four 60-kg surface probes will ride piggyback on the orbiter to Mars. These CNES-provided probes are called Netlanders and will serve as surface stations for scientific investigations independent of the Mars Sample Return goals. Starting approximately one month prior to arrival at Mars, the orbiter will begin to release the Netlanders one at a time. Each release cycle will take several days, and will include time for precision navigation to execute one or two maneuvers that will target the Netlanders to their proper landing site. All four deployment cycles will be completed prior to 10 days before arrival. Both the orbiter and lander will arrive in late-July 2006. Upon arrival, the lander will perform a precision landing and surface mission similar in concept to the one that was executed during the 2003 opportunity. Although the landing site for the 2005 opportunity has not been selected, it is expected to be different from the 2003 site to enhance the diversity of the collected samples. The orbiter's arrival at Mars will be highlighted by the first use of aerocapture to insert a spacecraft into a capture orbit around another planet. The choice of aerocapture, as opposed to a propulsive orbit insertion, was considered mission enabling due to a reduction of over 2000 m/s in mission AV. Aerocapture will be targeted to produce a 250 km x 1400 km capture orbit with an inclination of 45 degrees. Current analysis indicates that achieving this goal will require approximately six minutes of flight deep in the atmosphere with a targeted periapsis of approach of about 43 km. After factoring into account the penalty for carrying a heat shield to survive aerocapture, the net savings compared to a propulsive orbital insertion amounts to several hundred kilograms.

Lee, Wayne J.↗

Jovian Plasma Modeling for Mission Design

The purpose of this report is to address uncertainties in the plasma models at Jupiter responsible for surface charging and to update the jovian plasma models using the most recent data available. The updated plasma environment models were then used to evaluate two proposed Europa mission designs for spacecraft charging effects using the Nascap-2k code. The original Divine/Garrett jovian plasma model (or "DG1", T. N. Divine and H. B. Garrett, "Charged particle distributions in Jupiter's magnetosphere," J. Geophys. Res., vol. 88, pp. 6889-6903,1983) has not been updated in 30 years, and there are known errors in the model. As an example, the cold ion plasma temperatures between approx.5 and 10 Jupiter radii (Rj) were found by the experimenters who originally published the data to have been underestimated by approx.2 shortly after publication of the original DG1 model. As knowledge of the plasma environment is critical to any evaluation of the surface charging at Jupiter, the original DG1 model needed to be updated to correct for this and other changes in our interpretation of the data so that charging levels could beproperly estimated using the Nascap-2k charging code. As an additional task, the Nascap-2k spacecraft charging tool has been adapted to incorporate the so-called Kappa plasma distribution function--an important component of the plasma model necessary to compute the particle fluxes between approx.5 keV and 100 keV (at the outset of this study,Nascap-2k did not directly incorporate this common representation of the plasma thus limiting the accuracy of our charging estimates). The updating of the DG1 model and its integration into the Nascap-2k design tool means that charging concerns can now be more efficiently evaluated and mitigated. (We note that, given the subsequent decision by the Europa project to utilize solar arrays for its baseline design, surface charging effects have becomeeven more of an issue for its mission design). The modifications and results of those modifications to the DG1 model to produce the new DG2 model presented here and the steps taken to integrate the DG2 predictions into Nascap-2k are described in this report

Garrett, Henry B.↗

Human Landing System Storable Propellant Architecture: Mission Design, Guidance, Navigation, and Control

In preparation of the NextSTEP-2 Appendix H awards, NASA’s Human Landing System (HLS) Program (HLSP) went through an abbreviated Design Analysis Cycle (DAC), or miniDAC, to characterize and quantify how a storable propellant design would affect and improve overall system performance of the Government reference design. As part of that miniDAC, HLSP ran multiple trade studies and assessments, including aspects of Mission Design, Flight Mechanics (FM), and Guidance, Navigation, and Control (GN&C). The storable propellant designs were assessed through the baseline mission targeting the Near Rectilinear Halo Orbit (NRHO) and several alternate staging orbits. This paper focuses on the FM and GN&C trades and assessments completed as part of the miniDAC as well as the GN\&C elements of the miniDAC Master Equipment List (MEL) developed for the storable propellant lander configurations.

Landers↗

Lunar Orbit Stability for Small Satellite Mission Design

The irregular nature of the lunar gravity field will severely affect the orbit lifetime and behavior of future lunar small satellite missions. These spacecraft need stable orbits that do not require large deltaV budgets for station-keeping maneuvers. The initial classical elements of any lunar orbit are critical to address its stability and to comply with mission requirements. This publication identifies stable regions according to different initial conditions at the time of lunar orbit insertion (LOI). High fidelity numerical simulations with two different gravity models were performed. We focus in low altitude orbits where the dominant force in orbit propagation is the existence of unevenly distributed lunar mass concentrations. These orbits follow a periodic oscillation in some of the classical elements that is particularly useful for mission design. A set of orbital maintenance strategies for various mission concepts is presented.

Lunar Science↗

Entry, Descent, and Landing Mission Design for the Crew Exploration Vehicle Thermal Protection System Qualification Flight Test

The TORCH team was challenged to generate the lowest cost mission design solution that meets the CEV aerothermal test objectives on a sub-scale flight article. The test objectives resulted from producing representative lunar return missions and observing the aerothermal envelopes of select surface locations on the CEV. From these aerothermal envelopes, two test boxes were established: one for high shear and one for high radiation. The unique and challenging trajectory design objective for the flight test was to fly through these aerothermal boxes in shear, pressure, heat flux, and radiation while also not over testing. These test boxes, and the max aerothermal limits, became the driving requirements for defining the mission design.

Ivanov, Mark↗