Search NASA⌕ Search

SEARCH · Search NASA

Results for “Next Generation Libraries”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

92 records · Page 6

Montana Community-Scale Solar Strategy Project (Final Technical Report)

Grid-tied solar photovoltaic (PV) development began gradually in Montana, initially taking root in the early 2000s, largely in the form of small residential systems, rarely larger than two kilowatts. Utility support for solar technology through public benefit funding triggered the installation of the state’s first solar PV installations on community-owned facilities including schools, libraries, fire stations and local government buildings in the mid-2000s. By 2016, solar PV installations totaled approximately 28 megawatts of installed capacity, generating less than 0.05% of electricity sold in Montana. Montana’s solar fleet in 2016 included 17 megawatts of utility-scale solar farms, and three shared solar projects developed by rural electric cooperatives that ranged from 25 to 50 kilowatts in size. However, with only 3,000 households utilizing solar PV, either through an on-site installation or participation in a shared solar project, the potential benefits and reach of solar technology was limited. The Montana Solar Community Project (MSCP) was developed by the Montana Energy Office (MEO) at the Department of Environmental Quality in order to implement a “community-scale” solar energy strategy for the state that would cost-effectively expand Montanans’ access to solar PV. This project defines three types of community-scale solar projects: shared solar, community-sited solar, and group purchasing programs. The MSCP project conducted research and stakeholder engagement that helped to inform and develop model community-scale initiatives and an overarching community-scale solar strategy for Montana. Specifically, the project included a solar market assessment, stakeholder meetings across Montana, development of a menu of community-scale solar options, a study of solar potential on schools, community solar market research, and community-scale project implementation support. MSCP activities were successful in implementing solar projects and supporting solar development in communities across Montana. Project activities realized 280 kW of newly installed solar from two solarize programs, a shared solar array at a rural electric cooperative, and a solar array atop a Bozeman high school. The community-scale project implementation support and Solar on Schools components of the project resulted directly in the analysis and design of nearly 2 MW of distributed solar systems across the state. The Solar on Schools analysis alone produced solar designs for 25 schools, representing 920.8 kW of solar potential. Many of the deliverables from this project provide guidance on future development of community-scale solar in Montana, and resulted in a number of important conclusions about community-scale solar in Montana. There is strong interest in community-scale solar in Montana, as noted during stakeholder meetings, in response to solar market research surveys, and as seen by applications for implementation support grants provided by MEO. Project activities also suggest that Montanans demonstrated a desire and need for more information about solar energy technology, solar financing options, and the state’s policy and regulatory framework. Additionally, the project found that schools will be key partners for future community-scale solar programs. In addition to being excellent hosts for solar arrays, schools have the opportunity to use the installation of a solar array to develop educational materials and curricula to educate Montana’s future leaders about these technologies, which can be shared and replicated across the state. Project activities laid a clear path forward for solar energy in Montana. Certain activities have concrete next steps. For example, numerous solar arrays were designed for schools and other public buildings around the state. Many of those designs will be used as soon as funding becomes available. Other activities have less developed next steps, though lay the foundation for future work. The solar market assessment, solar market research, and community stakeholder meetings are good examples. These documents can be used as stepping stones to increase renewable energy education, increase stakeholder outreach, and support communities as they seek to develop community-scale solar projects.

14 SOLAR ENERGY↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗