Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Comparative Study of the Standards and Guides of a Management System Applicable to Radioactive Waste - Paper 18292

A Management System may be defined as a set of standardized and interrelated practices that aim to improve effectiveness and produce better results. This system should be structured in such a way as to allow essential information to flow properly within the organization, including technical, administrative, production and human resources information, among others, within an adopted compliance model. There are, currently, several standards and guidelines for structuring a compliance model related to a management system. A system that covers various aspects of management in a single system is usually called integrated. Only the International Atomic Energy Agency - IAEA has a guide with this approach for radioactive waste: GS-G-3.3, 'The Management System for the Processing, Handling and Storage of Radioactive Waste' and GS-G-3.4, 'The Management System for the Disposal of Radioactive Waste'. The objective of this work is to present a comparison between existing standards, even if not specific for the management of radioactive waste, but which are widely used by companies. In due course, the result of this work will be object of proposal for specific standard to be presented to regulatory agency for this type of activity. This study should be useful for countries where there are no specific guidelines by the regulatory agency, adopting the best standard or guide as a conformity standards, creating and establishing a hybrid structure best suited to the safety and security aspects of the local culture. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering and Technology Road-map

Throughout its existence, the Environmental Management (EM) program has required a strong technology component to accomplish its mission, one that is focused on developing technologies to enhance safety, effectiveness, and efficiency. Although the Department of Energy (DOE) has made great progress toward safely disposing of the legacies of the Cold War, much remains to be done. These past accomplishments provide a guide for future success; however, the unique nature of many of the remaining challenges will require a strong and responsive applied research and engineering program. The Engineering and Technology Road-map was developed to address this need and guide the EM Engineering and Technology Program. The Road-map identifies the technical risks and uncertainties that the EM program faces over the next ten years; the strategies EM will use to reduce those risks; and the planned outcomes of implementing those strategies. Input for this Road-map was provided by EM Federal Project Directors, Stakeholders, Site Contractors, National Laboratories and the National Academy of Science. To accomplish this work, EM has designated federal Strategic Initiative Managers who will work with Federal Project Directors to develop, refine and implement a detailed scope and schedule for each initiative, as well as identify the point at which the technologies developed will be inserted into EM cleanup projects. The starting point for the Road-map was technical project risk and uncertainty. Risks are defined as known technical issues that could prevent project success. Uncertainties are indefinite or unpredictable technical aspects of a project. Risks included in the Road-map were identified in three ways: 1) By the Projects - EM's operations are performed within a culture of disciplined project management, based on DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. As such, technical risks and uncertainties affecting each cleanup project are identified early in the project life cycle, are captured in project risk assessments, and often lead to applied technology development activities. 2) By reviews and assessments - EM utilizes experts to review the progress of its major cleanup projects and to assess the maturity of evolving technologies. These reviews include External Technical Reviews and Technology Readiness Assessments. They transcend the project's baseline and often identify opportunities for reducing technical risk through development and deployment of innovative or enhanced technologies. 3) By the sites - EM periodically asks EM sites to identify technical risks and uncertainties in the form of technical needs. The Road-map divides EM risks into six program areas: Waste Processing, Groundwater and Soil Remediation, Deactivation and Decommissioning (D and D) and Facility Engineering, Spent Nuclear Fuel, Challenging Materials, and Integration. Tables 1-6 show those risks and uncertainties, as well as the 13 strategic initiatives established to address those risks. In conclusion, the Engineering and Technology Road-map presents an integrated approach to reducing the technical risks and uncertainties facing the EM program in a manner consistent with its disciplined approach to project management. The risks include challenges in waste processing, groundwater and soil remediation, deactivation and decommissioning, spent nuclear fuel, challenging materials, and integration. The EM Engineering and Technology Program will address these risks, and will use applied research and engineering to improve technologies and processes at sites across the country. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Generation System Analysis Model Recently Added Features and Future Plans - Abstract

The Nuclear Waste Policy Act of 1982, as amended (NWPA 1982), established the federal government’s responsibility to accept spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste owners and generators for ultimate disposition. SNF generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWM system are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWM system. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. Recent major enhancements that have been implemented into NGSAM since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort and buffer car acquisition. • Addition of heavy haul and barge routes for some sites, as well as support for user-defined inter-modal routes. • Updates to the logic that checks the thermal maps prior to package transport. • Addition of an allocation method that predicts when reactor sites will pack assemblies from their pools for dry storage and allocates packages to those reactor sites in the preceding periods, favoring direct transport packages and reducing the number of packages that reactor sites pack for dry storage at their ISFSIs. • Addition of reactor site family operational limits, which are used to limit the number of loads from the pool and from dry storage at a given reactor site per year. • Support has been added for multiple canister loading maps and packages having multiple compatible transportation overpacks. • Updates in the handling of non-commercial fuel, including a new database containing data to support the updates. • Support for repackaging at reactor sites. • Implementing additional output reports or modifying existing reports. • User edits can now be created and edited via the NGSAM website. • Ability to load packages for dry storage at ISF pools. • Same-type package blending at DOE sites. • Support for multi-mode transloading at reactor sites. These new features have improved NGSAM capabilities and/or improve the user experience with the model and will be discussed in more detail. The initial NGSAM requirements for advanced reactor fuels, reprocessing, treatment, and conditioning are preliminary and are described at a high level in this paper: analysts will provide more specific requirements to the NGSAM team in the future. Additionally, there are many data needs associated with modeling advanced reactors in NGSAM, but many of the data or plans are still in progress and/or yet to be fully defined. However, this document describes an initial exploration of the data relevant to this program. Advanced reactor data will likely require revision as concepts evolve and new considerations are made. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by DOE. No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Panel Session 23: Start-up of Three Major DOE Treatment Facilities - SWPF, IWTU and DFLAW

This panel focused on the DOE-EM planning to complete construction and start up three major treatment facilities in the next 18 months. This included the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste treatment Unit (IWTU) at Idaho and the Direct Feed Low-Activity Waste (DFLAW) at Hanford. DOE Site Managers from SC, ID and WA introduced each facility then the DOE Contractor provided the details on their biggest challenges in regulatory issues, construction, start-up and operations of each facility. Panelists with presentations: Lessons in Managing Risks in First of a Kind Nuclear Construction and Start-Up (Pamela Marks); Integrated Waste Treatment Unit (Connie Flohr); IWTI-Fluor (Frederick Hughes); Startup and Commissioning (Tom Fletcher)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On use of ZPR research reactors and associated instrumentation and measurement methods for reactor physics studies

The French atomic and alternative energies -CEA- is strongly involved in research and development programs concerning the use of nuclear energy as a clean and reliable source of energy and consequently is working on the present and future generation of reactors on various topics such as ageing plant management, optimization of the plutonium stockpile, waste management and innovative systems exploration. Core physics studies are an essential part of this comprehensive R and D effort. In particular, the Zero Power Reactor (ZPR) of CEA: EOLE, MINERVE and MASURCA play an important role in the validation of neutron (as well photon) physics calculation tools (codes and nuclear data). The experimental programs defined in the CEA's ZPR facilities aim at improving the calculation routes by reducing the uncertainties of the experimental databases. They also provide accurate data on innovative systems in terms of new materials (moderating and decoupling materials) and new concepts (ADS, ABWR, new MTR (e.g. JHR), GENIV) involving new fuels, absorbers and coolant materials. Conducting such interesting experimental R and D programs is based on determining and measuring main parameters of phenomena of interest to qualify calculation tools and nuclear data 'libraries'. Determining these parameters relies on the use of numerous and different experimental techniques using specific and appropriate instrumentation and detection tools. Main ZPR experimental programs at CEA, their objectives and challenges will be presented and discussed. Future development and perspectives regarding ZPR reactors and associated programs will be also presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Legacy Waste Removal from Standpipes and Bunkers at Whiteshell Laboratories, Canada - 19040

In 1963 Atomic Energy of Canada Limited (AECL) founded the Whiteshell Nuclear Research Establishment (now Whiteshell Laboratories, WL) in Pinawa, Manitoba to conduct nuclear research. In 1997 AECL made a business decision to discontinue research programs and operations at WL. One of the major decommissioning tasks at WL is to remove radioactive waste from 171 in-ground standpipes and 7 Intermediate Level Waste bunkers located in the Waste Management Area (WMA). Veolia Nuclear Solutions, through its subsidiary Kurion (Canada) Inc., has been selected to design, fabricate, and commission a remote waste access and conditioning system to remediate the waste from the standpipes and ILW bunkers at WL. The agreement builds on Veolia Nuclear Solutions' successfully deploying similar technologies at other projects. This paper describes the bunkers and standpipes structures, the types of wastes stored, the potential hazards (flammable gas and pyrophoric materials), and the equipment proposed by Kurion for safely extracting, sorting, segregating and packaging this waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US DOE Perspectives on Advisory Board Effectiveness - 13539

Federal missions on the Oak Ridge Reservation began with the Manhattan Project, and continues today with major facilities supporting the Nation's Science and National Security missions. While most of the land area on the Oak Ridge Reservation is free of environmental impacts from these activities, significant legacy contamination is associated with specific facilities and past waste management areas. In 1989, the Oak Ridge Reservation (ORR) was placed on National Priorities List, and DOE established its Office of Environmental Management that same year. Three years later, in 1992, the Federal Facility Agreement for the reservation was signed. Three years afterward, the Oak Ridge Site Specific Advisory Board was established to augment ongoing public involvement activities related to Oak Ridge Reservation cleanup activities. One of the early and most impactful decisions the board made was to organize the End Use Working Group. This broad-based group of board members, DOE representatives, and members of the public was formed in 1997 to study future uses for contaminated areas of the reservation. The group was instrumental in building consensus in the Oak Ridge community regarding the long-term end state of reservation lands. The group's recommendations were a fundamental input into Record's of Decision subsequently developed to establish cleanup requirements across the ORR, and they continue to influence decisions being made today. In developing its recommendations on end states, the End Use Working Group came to the realization that long-term stewardship of contaminated areas of the reservation would be necessary, in some cases in perpetuity. It was from this concept that the Oak Ridge SSAB's 15-year involvement in stewardship would begin. A stewardship committee formed by the End Use Working Group wrote Volume 1 of the Stakeholder Report on Stewardship. This document-and its companion Volume 2, which was written a year later-form a crucial foundation for stewardship planning in Oak Ridge and have been referenced around the DOE complex as other sites consider stewardship planning. From these two broad-based initiatives, the board's focus has evolved to increasingly hone in on more specific, project-based recommendations and initiatives. The Oak Ridge Reservation Site Specific Advisory Board has been a highly effective forum for soliciting community input on Oak Ridge Reservation cleanup. Experience in Oak Ridge indicates that the utility of Board recommendations is far higher when the Board is asked to focus on broad programmatic issues, and less useful when the Board attempts to provide advice and recommendations on matters related to technical or project management issues. In Oak Ridge the Board has helped shape the program on many levels including definition of end-state cleanup objectives, budget development, program sequencing, waste management, and decisions concerning preservation of history related to missions implemented on the Oak Ridge Reservation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Next Generation System Analysis Model: Capabilities for Simulating a Waste Management System - 19131

The U.S. Department of Energy (DOE) Office of Nuclear Energy Office of Spent Fuel and Waste Disposition's Integrated Waste Management System (IWMS) program is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWMS are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The system architecture analyses consider alternative disposition pathways for commercial spent nuclear fuel (SNF) being stored dry in at-reactor Independent Spent Fuel Storage Installations (ISFSIs) or wet in spent-fuel pools. One method for evaluating these alternatives is simulating the movement of SNF throughout the system components. Successfully simulating a system on the scale of a national waste management system requires - accurate baseline information (e.g., historic fuel discharges from reactors and dry storage loadings at reactor sites), - modeling all logistic interactions between components of the proposed system, and - tracking and reporting all relevant details regarding the simulation's execution. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWMS. It is based on the Performance Analysis Tool, a simulation platform that has been used to model logistics for the Department of Defense and the Federal Emergency Management Agency. Using existing, government-owned software allows NGSAM developers to modify the software at the level of source code and to develop flexible usability and modeling solutions for developing and running simulations of the IWMS. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. NGSAM is designed with the flexibility to model and track the behavior of virtually any IWMS architecture assumptions or design considerations. For example, NGSAM can model multiple interim storage facilities or repositories or none at all. Similarly, all assumptions regarding shipment schedules, operating schedules, and reactor operation assumptions can be modeled and adjusted in NGSAM with relative ease. The development of NGSAM was targeted to waste management system analysts as the primary users. With that in mind, analysts from ORNL, Sandia National Laboratories (SNL), and Argonne National Laboratory (ANL) were intimately involved in the development process. That involvement extended beyond merely defining requirements. System analysts have been involved with design decisions and software benchmarking and tests, and they have provided subject-matter expertise where necessary. The result is a high degree of interaction between professional software developers and system analysts, with a multitude of benefits to both groups. This paper explores some of the underlying methodology of the agile software development process used in the creation of NGSAM. It illustrates the capabilities of NGSAM. Some example use cases are discussed as well, with relevant results providing context for how NGSAM is used by system analysts to gain a greater understanding of alternative waste management system architectures. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed-to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Reactors Spent Fuel & Waste Science and Technology Program

Based on the higher interest in Advanced Reactor (AR) deployment (e.g., ARDP ) for potential new fuel cycles, the Spent Fuel & Waste Science and Technology (SFWST) Program has begun to evaluate the possible implications of long-term management and final disposition of potential Advance Reactor spent nuclear fuels (SNF) that would be generated in potential advanced reactors. Safely managing and dispositioning the potential future AR SNF, and any other associated radioactive wastes, is the primary focus of this initial preliminary assessment of those. This paper summarizes three primary tasks the Spent Fuel & Waste Science and Technology (SFWST) Program is executing (or collaborating on) related to the back end of the nuclear fuel cycle (BENFC) for potential future advanced reactors: 1. Advanced Reactors Spent Fuel and Waste Streams: Strategies for the BENFC This set of activities define a high-level strategy for how to systematically approach, identify, and close research and development (R&D) gaps/potential issues associated with long-term management and final disposition of AR SNF and other possible AR waste streams. This task involves summarizing advanced reactor concepts, their likely SNF and other waste forms, and identifying previous experience with similar materials, for example from DOE-managed SNF, with closely related characteristics to the potential future AR SNF. Technical R&D gaps between the breadth of detailed understanding for safe storage, transportation and disposal of the existing light water reactor SNF fuel cycle (e.g., see NASEM, 2022) and potential future fuel cycles based on advanced reactors would then be identified. 2. Characterization and Packaging Options of Advanced Reactor SNF These activities evaluate characteristics and packaging options for advanced reactor spent fuel forms. The fuel forms are categorized into three types: (1) tri-structural isotropic (TRISO), (2) metallic, and (3) fuel salt. Emphasis is given to TRISO and metallic SNF and additional waste streams from such AR as driven by the near-term anticipated operation of the Xe-100 and the Natrium reactors as advanced-reactor demonstrations1. Preliminary information for the spent-fuel salt discharged from molten-salt reactors (MSRs) is examined to provide a baseline for future efforts. All calculations and assumptions in this work are based on publicly available information. The following characteristics are calculated or estimated for use in the preliminary assessments: SNF volume and mass, radiation/activity levels through time, thermal conditions through time, potential radionuclide source terms, chemical interactions and evolutions, disposal inventories, and waste-form lifetime. Using those characteristics, calculations to determine the applicability of existing canister designs were performed. These evaluations included geometric (e.g., dimension, volume) and mass/weight considerations, known operational approaches and loading procedures, physical and chemical considerations/conditions for storage environments, as-loaded radiation, thermal, and criticality analyses to identify constraints for storage, transportation, and disposal. 3. Back-End Management of Advanced Reactors (BEMAR) The DOE NE-8 organization has defined an Integrated Project Team to evaluate the Back End Management of Advanced Reactors (BEMAR) (includes DOE staff from a range of organizations (e.g., NE-81, NE-82, OCED) and national laboratory technical staff within the DOE NE-81 and NE-82 programs). This BEMAR group works directly with advance reactors developers to assess for the DOE the technical feasibility of storage, transportation, and disposal of AR SNF based on the characteristics provided by the developers to DOE (much of which is proprietary). The BEMAR is also tasked to develop rough-order-of-magnitude cost estimates to compare the waste management system for individual advanced reactors to existing light-water reactor management practices. To accomplish this, the BEMAR group is implementing a Systems Engineering approach.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A PROPOSED FRAMEWORK FOR PLANNING DEACTIVATION AND DECOMMISSIONING ENGINEERING AND DESIGN ACTIVITIES TO MEET THE REQUIREMENTS OF DOE ORDER 413.3A, PROGRAM AND PROJECT MANAGEMENT FOR THE ACQUISITION OF CAPITAL ASSETS

This paper provides guidance in applying the requirements of DOE O 413.3A to Deactivation and Decommissioning (D&D) projects. A list of 41 engineering and design activities relevant to D&D projects was generated. For several activities in this list, examples of the level of development and/or types of deliverables that might be expected at the completion of the conceptual, preliminary and final project design phases described in the Order are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Systems Experience at the Oak Ridge National Laboratory--A Summary of Lessons Learned

Oak Ridge National Laboratory (ORNL) has a long history in the development of remote systems to support the nuclear environment. ORNL, working in conjunction with Central Research Laboratories, created what is believed to be the first microcomputer-based implementation of dual-arm master-slave remote manipulation. As part of the Consolidated Fuel Reprocessing Program, ORNL developed the dual-arm advanced servomanipulator focusing on remote maintainability for systems exposed to high radiation fields. ORNL also participated in almost all of the various technical areas of the U.S. Department of Energy s Robotics Technology Development Program, while leading the Decontamination and Decommissioning and Tank Waste Retrieval categories. Over the course of this involvement, ORNL has developed a substantial base of working knowledge as to what works when and under what circumstances for many types of remote systems tasks as well as operator interface modes, control bandwidth, and sensing requirements to name a few. By using a select list of manipulator systems that is not meant to be exhaustive, this paper will discuss history and outcome of development, field-testing, deployment, and operations from a lessons learned perspective. The final outcome is a summary paper outlining ORNL experiences and guidelines for transition of developmental remote systems to real-world hazardous environments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Study on Shielding Requirements for Radioactive Waste Transportation in a Mo-99 Production Plant - 13382

Brazil is currently planning to produce {sup 99}Mo from fission of low enriched uranium (LEU) targets. The planned end of irradiation activity of {sup 99}Mo is about 185 TBq (5 kCi) per week to meet the present domestic demand of {sup 99m}Tc generators. The radioactive wastes from the production plant will be transferred to a waste treatment facility at the same site. The total activity of the actinides, fission and activation products present in the wastes can be predicted based on the yields of fission and activation data for the irradiation conditions, such as composition and mass of uranium targets, irradiation time, neutron flux, production schedule, etc., which were in principle already established by the project management. The transportation of the wastes from the production plant to the treatment facility will be done by means of special shielded packages. An assessment of the shielding required for the packages has been done and the results are presented here, aiming at contributing to the design of the waste management facility for the {sup 99}Mo production plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fit for Purpose Remote Technology Decommissioning Solutions - 18630

The Magnox Decommissioning Project is actively progressing clean-up and decommissioning of 12 reactor sites across England, Scotland and Wales. Funded and directed by the United Kingdom's Nuclear Decommissioning Authority (NDA) and managed by the Cavendish Fluor Partnership (CFP), the Magnox Decommissioning Project introduces a wide range of radiological and industrial hazards warranting deployment of remote technologies to safely de-inventory, decontaminate and decommission a vast array of nuclear facilities. The Magnox Decommissioning Project encompasses 22 former Magnox nuclear power production reactors across 10 reactor sites and five research/test reactors at two former research sites. Decommissioning activities have been underway at some sites for nearly 20 years with early focus on retrieving and stabilising wastes and draining and stabilising spent fuel ponds. The Magnox decommissioning strategy invokes a programme perspective to drive consistency in tackling similar decommissioning and waste challenges across multiple sites. Programme central teams have worked with technology suppliers to foster learning from industry experience to develop and deploy tooling and robotics. The programme approach has also facilitated learning from one site to the next. In many cases, this central programme approach has promoted an evolution of technologies resulting in optimisation of simple remote tooling. In other instances, collaboration with suppliers is producing state-of-the-art technologies to tackle more unique challenges including, most recently, early demonstration of laser cutting for reactor vessel dismantling. This paper will outline the programme management approach and the scalable optioneering process Magnox employs to select the engineered controls and technologies used in decommissioning and waste management activities. It will provide an overview of the broad range of remote tooling and robotics deployed across the 12 Magnox sites by exploring some specific examples. Lastly, the paper will summarise key lessons learned in the now extensive history of selecting and using remote technologies to decommission Magnox nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cigeo Design Options, Risks and Opportunities Management: A Continuous Project Management Goal - 20015

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo, the French HLW and IL-LLW Deep Geological Repository. If licensed in the coming years, Cigeo's progressive construction, industrial operation and closure will last over more than a century. Such a duration, associated with the requirements in terms of reversibility, lead to the choice of an incremental design that allows, for next operator generations, to integrate improvements derived from scientific and technical progress as well as from experience feedback from its operation. This incremental design approach, associated with a permanent risks and opportunities management process, will continue after licensing of Cigeo as a tool for the governance of the reversibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 17408

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 18488

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗