Search NASA⌕ Search

SEARCH · Search NASA

Results for “Office Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Canopy spectral reflectance along the NGEE-Arctic tram transect, Utqiagvik (Barrow), Alaska, 2015-2017

Full-spectrum (350-2500 nm) canopy spectral reflectance measured in July 2015, 2016 and 2017 along the NGEE-Arctic tram located on the Barrow Environmental Observatory (BEO), Barrow, Alaska. Measurements were made using a SVC HR1024i spectroradiometer mounted on a manually operated instrument cart. Spectra were collected at 137 stop points at 0.5 m intervals along the tram transect, with each measurement calibrated to variable illumination conditions using a Spectralon white plate. Data were collected in July, 2015-2016, and in June, July and September in 2017. Processed spectral data are presented in .csv and .xlsx files for each year and the complete SVC instrument output (.sig) are also included in .zip files. The data package includes some photographs showing the tram transect and spectroradiometer setup and a written protocol with details of equipment used and methods.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research.The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska.Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Long-term carbon emission reduction potential of building retrofits with dynamically changing electricity emission factors

Buildings account for approximately 36% of the United States' total carbon emissions and building retrofits have great potential to reduce carbon emissions. Current research adopts a constant electricity emission factor although it changes over time due to the increase of renewable energy generation. Here, to accurately predict emission reduction potential of building retrofits, this study develops a novel method by using dynamically changing electricity emission factors. Using medium office buildings as an example, we predicted emission reduction of eight building retrofit measures from 2020 to 2050 in five locations in the U.S. with distinct climates and renewable adoption rates. To evaluate emission reduction potential sensitivity to the compositions of electricity generation, five scenarios for renewable energy adoptions are investigated. The results reveal several new phenomena on emission reduction potential of building retrofits for medium offices in the U.S.: (1) it decreases from 2026 to 2050; (2) it has the same trend with coal usage; and (3) it reaches the maximum under the high renewable cost scenario. Based on the results, it is recommended that building retrofits should focus on 1) improving lighting and equipment efficiency; 2) locations with higher coal usage rate, and 3) buildings under the high renewable cost scenario. The new method can also be used for predicting emission reduction potential of the building sector in the U.S. by applying to other building types and regions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Architectural Survey of the U12G Tunnel Historic District, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to demolish six buildings and three storage areas located at the U12g Tunnel portal area in Area 12 of the Nevada National Security Site (NNSS). The buildings are 12-358 (Signal Vault); 12-201800 (Storage Quonset Hut); 12-202555 (Walker Shack); 12-868 (Pipe Assembly); 12-B100933 (Electrical Shop); 12-B100944 (Conference Room); and Storage Area 1; Storage Area 2; and Storage Area 3. The buildings and storage areas were selected for demolition as part of the DOE’s Real Property Efficiency Plan to reduce the footprint of unused and non-operational facilities on the NNSS. They are all vacant and have no proposed uses for current or upcoming NNSS missions. Demolition activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. Identification efforts began with resources proposed for demolition in federal Fiscal Year (FY) 23. Four buildings were proposed to be demolished in FY23 (12-358, 12-868, 12-201800, and 12-202555). These buildings and the U12g Tunnel Historic District (SHPO No. D444) were recorded in Identification, Evaluation, and Finding of Adverse Effect for the Proposed Demolition of Five Buildings in Area 12, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2023). Identification efforts indicated three buildings (12-358, 12-201800, and 12-868) supported nuclear testing in the U12g Tunnel. The fourth building post-dated the use of U12g Tunnel for nuclear testing activities. The report recommended that three of the four buildings (12-358, 12-201800, 12-868) and the U12g Tunnel Historic District may be eligible for the National Register of Historic Places (NRHP). The report also found that the undertaking would have an adverse effect on the three buildings and on the historic district. The Nevada State Historic Preservation Office (SHPO) concurred with the report’s findings (Reed 2023). The U12g Tunnel was determined eligible as a historic district under the Secretary of the Interior’s (SOI) Significance Criterion A, at the local level, in the context of the Cold War as an underground testing environment for the development of nuclear weapons and to assess the effects of a nuclear explosion on materials and equipment with a period of significance from 1959 to 1971. It was also determined eligible under Significance Criterion C for embodying the distinctive characters of a horizontal tunnel complex used for nuclear testing and as a significant and distinguishable entity. The three buildings were determined to be contributing elements of the district. The undertaking was expanded with the addition of two buildings and three storage areas proposed to be demolished and located within U12g Tunnel Historic District in FY24. These five resources (12-B100933, 12-B100944, and Storage Areas 1, 2, and 3) were recorded in Supplemental Identification, Evaluation, and Finding of Effect for Additional Proposed Demolition at U12g Tunnel, Area 12, Nevada national Security Site, Nye County, Nevada (Brannan et al. 2024). Identification efforts indicated that the two buildings and Storage Area 1 supported nuclear testing in the U12g Tunnel. Storage Area 1 and Storage Area 2 post-dated the nuclear testing activities at U12g Tunnel and were not recommended as contributing elements to the district. The report also found that the undertaking would have an adverse effect on the newly identified buildings and one storage area and on the historic district. The SHPO concurred that the expanded undertaking would result in adverse effects to historic properties (Reed 2025). To resolve these adverse effects, NNSA/NFO, in consultation with the SHPO, is following standard mitigation as stipulated in the 2024 Programmatic Agreement DE-GM58-22NA25554 Among the U.S. Department of Energy and the Nevada State Historic Preservation Officer and the Advisory Council on Historic Preservation Concerning the Protection of Historic Properties on the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the NNSS PA). The standard mitigation measures are outlined in Appendix D of the NNSS PA. As such, this architectural survey has been prepared in accordance with Appendix D of the NNSS PA and follows the report format outlined in Appendix F. It includes a historic context that describes the district’s origin, history, and support functions, its significance in the context of nuclear testing on the NNSS, and identifies contributing and non-contributing elements within the district. The report is accompanied by Architectural Resource Assessment (ARA) forms for individual resources and a Historic District Resource Assessment (HDRA) for the U12g Tunnel Historic District. In total, this architectural report identified 32 primary resources within the district boundary. Six of the primary resources were previously identified as contributing elements. An additional 17 resources are recommended as contributing elements to the district for a total of 23 contributing elements. The other nine resources identified are recommended as non-contributing elements to the district.

12-201800↗

OSCAR-Mike: Why not ATAK?

The Office of Nuclear Smuggling Detection and Deterrence (NSDD) is evaluating methods to increase the probability that international partners will detect radioactive materials. One proposed method to accomplish this goal is to improve communications within teams operating in challenging environments. The goal of these improvements would be to enable remote monitoring of detection equipment, share data among end users in the field and subject matter experts, and integrate data from radiation detectors with other types of sensors and camera systems. Accomplishing this goal has the potential to improve the capabilities of currently deployed NSDD equipment. During FY 2021, Oak Ridge National Laboratory demonstrated some core and expanded capabilities of the Android Team Awareness Kit (ATAK), a situational awareness application developed by the US Department of Defense, to enable precision targeting, navigation, and data sharing. During FY 2022, Oak Ridge National Laboratory developed software requirements for an NSDD team awareness kit–based system. The requirements were developed by liaising with NSDD management and subject matter experts to determine NSDD’s needs and by reviewing available software and hardware solutions with US Department of Defense team awareness kit program managers and developers and radiation detection equipment vendors.

97 MATHEMATICS AND COMPUTING↗

Mitigation for Removal of Building 01-103 in the Area 1 Subdock, Nevada National Security Site, Nye County, Nevada

Building 01-103, the Drill Bit Repair Building was originally recorded as SHPO Resource No. B18848 in 2020 during an architectural survey of the Area 1 Subdock (Collins et al. 2022). It was recommended individually eligible for listing in the NRHP under Criteria A and C and contributing to the significance of the Area 1 Subdock Historic District. The SHPO concurred with these determinations in a letter dated April 29, 2022 (Reed 2022). The Drill Bit Repair Building retains all seven aspects of integrity. The location, materials, workmanship, feeling, and association have not changed since its original construction. The design was modified slightly in 1996 with the addition of a removable and non-destructive chain-link fence. Nearby buildings 01-101 and 01-102 were removed (Collins and Menocal 2020) but the other buildings and storage yards remain. Therefore, the integrity of setting has been changed, but not to the degree that the building no longer conveys its significance (see Figures 4 and 5 for comparison). Building 01-103 was constructed in 1985 to coincide with the relocation of the Area 3 Subdock to Area 1. The design for the new Subdock provided a centralized cluster of buildings surrounded by two large storage yards. The buildings included administrative and engineering office space, warehouses, a radiograph building, and Building 01-103 as the drill bit maintenance and repair building, among others. The Drill Bit Repair Building was critical to the success of underground nuclear testing and is eligible under Criterion A for its contribution to broad patterns of history by maintaining specially designed equipment for underground nuclear testing at the NNSS. It is also eligible under Criterion C as it is the only recorded example of a facility built specifically for the maintenance of big-hole drill bits on the NNSS. As it retains both significance and integrity, it remains individually eligible under Criteria A and C. In addition to its individual significance, the Drill Bit Repair Building also contributes to the significance of the Area 1 Subdock Historic District as a representative of a big-hole drilling support facility necessary for underground nuclear testing. The building and the equipment therein were designed specifically for testing at the NNSS, where much of the early technology and methods for big-hole drilling were developed. Its removal will result in not only the demolition of a contributing element but also a change in the physical features of the district’s setting that contribute to its historic significance. The change in setting will diminish the district’s integrity. However, the district still contains numerous examples of other buildings constructed for the purpose of supporting big-hole drilling and remains eligible under Criteria A and C.

54 ENVIRONMENTAL SCIENCES↗

Major Drivers of Long-Term Distribution Transformer Demand

Distribution transformers, used to step-down medium voltage to service-voltage level for end-use electrical consumption, are currently experiencing major shortages. Utilities are experiencing extended lead times for transformers of up to 2 years (a 4x increase on lead times pre-2022) and prices have gone up by as much as 5-6 times in the past 2 years. Current shortages have been attributed to pent-up post-pandemic demand, workforce shortages and low retention rates, component supply chain challenges, and materials shortages (grain-oriented electrical steel, aluminum, and copper). The supply of this equipment is critical for the reliability and growth of the power system, and in meeting administration climate goals in terms of electrification of demand and the growth of renewable energy. This report details some of the initial analysis conducted by the National Renewable Energy Laboratory (NREL), supported by the Department of Energy's Office of Electricity and Office of Policy, in assessing the long-term demand trends for distribution transformers. Expected increased demand is due to a confluence of not only electrification and renewable energy growth, but also in the context of aging electric infrastructure, increased frequency and severity of extreme weather events, and utility-driven investments in reliability and resiliency of the electricity distribution system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sensitivity Analysis Tool for Electrochemical Conversion of CO 2 To CO: User Guide

This is the user guide for the tool described here: Development of technologies that convert carbon dioxide (CO 2 ) into products is part of the U.S. Department of Energy's Office of Fossil Energy and Carbon Management Carbon Conversion Program portfolio. One such technology under development converts CO 2 to value-added products via electrochemical reduction, where catalysts are used on the cathode to promote CO 2 conversion across the electrochemical catalyst (ECC) cell. Broadly, the ECC is integrated with balance of plant (BOP) equipment (e.g., compressors, pumps, heat exchangers, purification units) in system configurations to produce the desired product. To guide research and development (R&D) toward advancements that may make such conversion technologies economically competitive, researchers may use sensitivity analyses related to the ECC system cost and performance, including that of the cathodic and anodic catalysts. This tool is intended to inform developers and Program in assessing proposed R&D on ECC systems early in the development process. Results will guide researchers on where efforts would be best directed. The tool may be accessed here: https://www.netl.doe.gov/energy-analysis/details?id=55293cb1-6881-4181-a2b0-d00b711ce74b.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Leveraging Hydropower Multi-Sensor Data for Inference and Age-Informed Modeling

Increased demand of operational flexibility such as faster ramp up/down in generation, and more frequent start/stops are putting hydropower plants and their associated components in unprecedented stress. Consequently, these plants are at the high risk of extended and more frequent outage to accommodate unscheduled, and unexpected maintenance. Therefore, hydropower plants are in critical need of data driven and age-informed analysis for their regular and unscheduled operation. Yet not all hydropower plants are exhaustively equipped with sensors and/or measurement streams for their respective components – demanding solutions on how to detect, identify, and locate the cause of any event from the unobservable. Idaho National Laboratory (INL) analyzed the anonymized measurements and event records from the Hydropower Research Institute (HRI) to address this issue, as part of the Water Power Technologies Office (WPTO) funded one year multi-lab project. First, we investigated how time series of multiple sensor measurements can be leveraged to identify an event “root cause” as well as to develop an inference (i.e., estimate the unobservable) problem. INL also investigated how individual hydropower components’ reaction or response times vary across the pre-event, during event, and post-event conditions – enabling the hydropower dynamic models to be age-informed. Finally, the impact of clustering multi-sensor time series on short-term vibration prediction is analyzed. INL will present key findings from these analyses and recommend next steps for stakeholder adoption.

13 HYDRO ENERGY↗

Modeled Results of Four Residential Energy Efficiency Measure Packages for Deriving Advanced Building Construction Research Targets

The Advanced Building Construction (ABC) Initiative from the U.S. Department of Energy Building Technologies Office is working to accelerate industrialized construction innovations for decarbonizing buildings. To inform performance and cost targets for research under the ABC Initiative, this analysis used the ResStock™ tool to evaluate the energy savings, utility bill impacts, and carbon emissions impacts of four simulated upgrade packages with specific target performance levels on a large sample of residential dwelling units (approximately 550,000) representative of the U.S. housing stock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Auto Indexer for Percussive Hammers Final Report

Geothermal energy has been underutilized in the U.S., primarily due to the high cost of drilling in the harsh environments encountered during the development of geothermal resources. Drilling depths can approach 5,000 m with temperatures reaching 170 C. In situ geothermal fluids are up to ten times more saline than seawater and highly corrosive, and hard rock formations often exceed 240 MPa compressive strength. This combination of extreme conditions pushes the limits of most conventional drilling equipment. Furthermore, enhanced geothermal systems are expected to reach depths of 10,000 m and temperatures more than 300 °C. To address these drilling challenges, Sandia developed a proof-of-concept tool called the auto indexer under an annual operating plan task funded by the Geothermal Technologies Program (GTP) of the U.S. Department of Energy Geothermal Technologies Office. The auto indexer is a relatively simple, elastomer-free motor that was shown previously to be compatible with pneumatic hammers in bench-top testing. Pneumatic hammers can improve penetration rates and potentially reduce drilling costs when deployed in appropriate conditions. The current effort, also funded by DOE GTP, increased the technology readiness level of the auto indexer, producing a scaled prototype for drilling larger diameter boreholes using pneumatic hammers. The results presented herein include design details, modeling and simulation results, and testing results, as well as background on percussive hammers and downhole rotation.

15 GEOTHERMAL ENERGY↗

High Explosives and Energetics Asset Analysis Tool

The High Explosives and Energetics (HE&E) Asset Analysis Tool is a database and reference for LANL facilities, equipment, staffing and financial information pertinent to the HE&E program. The tool is used for the communication of the current state and investment planning for the program assets. Additional analyses can offer more insights into the dependencies and impacts of the assets within the HE&E portfolio. This tool is developed under collaboration with the HE&E Program Office.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Using Residential and Office Building Archetypes for Energy Efficiency Building Solutions in an Urban Scale: A China Case Study

Building energy consumption accounts for 36% of the overall energy end use worldwide and is growing rapidly as developing countries continue to urbanize. Understanding the energy use at urban scale will lay the foundation for identification of energy efficiency opportunities to be deployed at speed. China has almost half of global new constructions and plays an important role in building suitability. However, an open source national building energy consumption database is not available in China. To provide data support for building energy consumptions, this paper used a simulation method to develop an urban building energy consumption database for a pilot city in Wuhan, China. First, residential, small, and large office building archetype energy models were created in EnergyPlus to represent typical building energy consumption in Wuhan. The baseline reference model simulation results were further validated using survey data from the literature. Second, stochastic simulations were conducted to consider different design parameters and occupants’ energy usage intensity scenarios, such as thermal properties of the building envelope, lighting power density, equipment power density, HVAC (heating, ventilation and air conditioning) schedule, etc. A building energy consumption database was generated for typical building archetypes. Third, data-driven regression analysis was conducted to support quick building energy consumption prediction using key high- level building information inputs. Finally, a web-based urban energy platform and an interface were developed to support further third-party application development. The research is expected to provide fast energy efficiency building design solutions for urban planning, new constructions as well as building retrofits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of Electrochemical Water Filtration System on an Open Loop Cooling Tower at Nissan Manufacturing Plant in Canton, Mississippi

The U.S. Department of Energy Industrial Efficiency and Decarbonization Office’s Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized technologies in the industrial sector to help inform decisions towards accelerating commercialization and deployment. This ITV demonstration investigated the performance of an early-commercial electrochemical water treatment technology on a cooling tower at an automotive plant. Cooling towers are vital equipment for dissipating heat from industrial processes, but they face challenges related to scaling, corrosion, and the growth of biological contaminants. Effective cooling tower water treatment is therefore essential in reducing these contaminants and other total suspended solids (TSS) and total dissolved solids (TDS). Various treatment systems, such as sand-based filters, centrifugal separators, and disc filters are available, each having its advantages and drawbacks. ElectroCell Systems, a filtration technology provider, offers an electrochemistry-based water treatment system that is skid-mounted and can be configured as a side-stream filtration system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

UAS Activity Profile Survey

Commercial vendors, trying to tap into the physical protection of critical infrastructure, are offering nuclear facilities the opportunity to borrow detection counter-unmanned aircraft systems (CUAS) equipment to survey the airspace over and around the facility. However, using one vendor or method of detection (e.g., radio frequency [RF], radar, acoustic, visual) will not necessarily provide a complete airspace profile since no single method can detect all UAS threats. Using several detection technologies, the unmanned aircraft systems (UAS) Team, who supports the U.S. National Nuclear Security Administration (NNSA) Office of International Nuclear Security (INS), would like to offer partners a comprehensive airspace profile of the types and frequency of UAS that fly within and around critical infrastructure. Improved UAS awareness will aid in the risk assessment process.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A step towards the final frontier: Lessons learned from acceptance testing of the first HPE/Cray EX 3000 system at ORNL

Summary In this article, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800‐node supercomputers, Fawbush and Miller, with access to two independent and identical lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom's Meteorological Office's Unified Model and 4‐dimensional variational data assimilation. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Verónica G.↗

Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration

Model predictive control (MPC) has been proven in simulations and pilot case studies to be a superior control strategy for large buildings. MPC can utilize the weather and occupancy schedule forecasts, together with the system model, to predict the future thermal behavior of the building and minimize the overall energy use and maximize thermal comfort. However, these advantages come with the cost of increased modeling effort, computational demands, communication infrastructure, and commissioning efforts. Thus a typical approach is to, often rapidly, simplify the building modeling and MPC optimization problem while paying a price of not reaching the full performance potential. It has been shown that by employing accurate physics-based models, MPC performance can be notably increased closer to its theoretical performance bound. However, implementation of such high-fidelity MPC in real buildings remains a challenge, resulting in a lack of successful field test studies. This work presents the methodology and field test demonstration of a computationally efficient implementation of the white-box MPC in an office building in Belgium. The detailed model of the building is based on first-principle physical equations. The deployment and supervision of MPC operation in a practical setting are supported by an automated cloud-based communication infrastructure. The motivating factor behind the cloud-based architecture is its compatibility with a commercially appealing control as a service concept. The building is equipped with a ground source heat pump (GSHP) and thermally activated building structures (TABS), where the combination of both is also known as GEOTABS. From a control perspective, GEOTABS buildings are particularly challenging systems due to large scale, complex heating, ventilation and air conditioning (HVAC) system, and slow dynamics with time delays. On the other hand, there is an increased potential for energy savings due to the high thermal mass, which acts as thermal storage. The MPC operation is demonstrated during the challenging transient seasons (switching between heating and cooling), and its performance is compared to a traditional rule-based controller (RBC). We provide a proof of concept of real MPC operation for the most difficult seasons with notable GSHP energy use savings equal to 53.5% and thermal comfort improvement by 36.9%. Other MPC applications found in the literature describe tests for only cooling or only heating, and up to now only for a black-box or a grey-box approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗