Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Exploring Multidimensional Spatial-Temporal Hydropower Operational Flexibilities by Modeling and Optimizing Water-Constrained Cascading Hydroelectric Systems

Because of unique characteristics such as clean and cost-competitive electricity as well as fast-ramping and storage abilities, the power industry continues to evolve its operation strategies for cascading hydroelectric (CHE) systems for providing enhanced values to the grid, especially under the deeper renewable resource integration. However, existing operation practices of CHEs predate the integration of renewables, which could prohibit the effective utilization of their inherent flexibilities in delivering maximum financial benefits and providing valuable grid services to the power system and electricity market operations. Indeed, modeling and optimizing these resource-limited while flexible CHE assets with uncertainties and imperfect information across multiple spatial-temporal dimensions present significant challenges. To facilitate CHE facility operators in effectively coordinating water usage and hydropower plant operations across multiple timescales, this project aims to fill the existing gaps by developing a suite of accurate water inflow (WI) forecast models as well as enhanced CHE modeling and optimization approaches with proper consideration of their unique characteristics, which would help explore their multidimensional spatial-temporal operational flexibility potentials. The developed approaches could better align reservoir operation strategies with variability and uncertainty of future water availability. They can also promote more effective utilization of multidimensional spatial-temporal hydropower operational flexibility potentials by designing long-term evacuation plans of reservoirs and short-term operation of CHEs, along with their coordination with other types of renewables. The project leverages various resources to facilitate the research and development activities, including actual characteristics data of CHE systems and a library of current and future cases of Portland General Electric (PGE). These realistic data enable the project team to study how to maximize the value of CHEs under current and future portfolios and evaluate opportunities to improve operation practices.

13 HYDRO ENERGY↗

Identification of pressure points in modern power systems using transfer entropy

Power shortages disrupt daily life, economic activity, and essential services. In modern power systems, weather is an increasingly important driver of reliability: high temperatures raise demand and limit transmission capacity, and calm or cloudy periods reduce wind and solar supply. Using a data-driven analysis, this study identifies grid infrastructure whose operating patterns help predict power shortages. The results show that reliability risks often emerge from interacting stresses across generation, transmission, and demand, rather than from single bottlenecks. By clarifying how system stress propagates through the grid, this diagnostic perspective helps explain why shortages occur under specific conditions and can complement traditional planning and operational tools to support adaptive reliability strategies, targeted monitoring, and coordinated infrastructure investments.

power systems↗

Highly reusable space transportation: Approaches for reducing ETO launch costs to $100 - $200 per pound of payload

The Commercial Space Transportation Study (CSTS) suggests that considerable market expansion in earth-to-orbit transportation would take place if current launch prices could be reduced to around $400 per pound of payload. If these low prices can be achieved, annual payload delivered to low earth orbit (LEO) is predicted to reach 6.7 million pounds. The primary market growth will occur in communications, government missions, and civil transportation. By establishing a cost target of $100-$200 per pound of payload for a new launch system, the Highly Reusable Space Transportation (HRST) program has clearly set its sights on removing the current restriction on market growth imposed by today's high launch costs. In particular, achieving the goal of $100-$200 per pound of payload will require significant coordinated efforts in (1) marketing strategy development, (2) business planning, (3) system operational strategy, (4) vehicle technical design, and (5) vehicle maintenance strategy.

Olds, John R.↗

Methods to Reduce Communication Workload for UAM Operations

Implementation of Urban Air Mobility (UAM) operations, or air passenger transportation systems within densely populated metropolitan areas, seeks to mitigate increasing traffic congestion. However, the development and integration of UAM operations into the national airspace system comes with its own unique challenges, such as vehicle requirements, flight planning and scheduling, and coordination between UAM flights and air traffic controllers. In particular, verbal coordination will play an integral part in the determined success of UAM operations and its ability to meet projected high consumer demands. In order to meet demands and higher traffic volumes on UAM routes, verbal communication between the UAM pilot and controller must be streamlined to reduce the controller's workload while helping to maintain safety within a given airspace. One method of reducing verbal workload are Letters Of Agreement (LOAs) that outline responsibilities and procedures for operations in an airspace. These LOAs will specify the operations, procedures, and routes for UAM flights. The proposed study will examine the usability of two route formatting styles for LOAs; (i) Verbal route descriptions and (ii) Tower En Route Control (TECs) routes. Verbal route descriptions will include the route name and associated visual cues on the route. The TEC route versions will include relevant waypoints and charts outlining the route with waypoints marked. The study will be part of a UAM X1 human in the loop (HITL) simulation. Controller participants will handle traditional air traffic including moderate levels of UAM traffic on current and modified helicopter routes within the Dallas Fort-Worth area. Scenarios will be counterbalanced and repeated to test both route formatting versions. After each trial, participants will rate the usability of the LOA used in the previous trial via a subjective questionnaire. We expect that controllers will prefer the LOA with TEC routes due to simplicity and visual elements available.

aerospace human factors↗

Electrification Futures Study: Power Systems Operation with Newly Electrified and Flexible Loads

The Electrification Futures Study (EFS) is a multi-year study designed to analyze the impacts of widespread electrification in the U.S. energy system. In this webinar we present the detailed power systems operational analysis from the final report in the EFS series. For this analysis, we simulate multiple 2050 power systems for the conterminous United States to assess how variations in the magnitude and shape of electricity demand driven by electrification, and the extent of load participation to more-actively provide grid services, might impact the hourly operation, operational costs, and emissions of various power systems in 2050. The impacts of electrification and demand flexibility are overlayed across systems with significantly greater penetrations of variable renewable energy than today. Overall, we find that the high electrification scenarios envisioned in the EFS with significant VRE penetration (66% of annual national generation) can be operated to meet future increased levels of electrified demand. We also find that demand-side flexibility can enhance operational efficiency and reduce overall annual production costs by $5-$10 billion. The complementary relationship between flexible electric vehicle charging loads and solar generation is particularly pronounced, but in the absence of demand-side flexibility electrification can lead to increased wind and solar curtailment. By helping to reduce renewable curtailment, flexibility can also reduce power sector CO2 emissions. The analysis highlights the value of increased integration and coordination of demand- and supply-side resources in future electric system planning and operations—particularly under high electrification futures.

43 PARTICLE ACCELERATORS↗

Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

Richards, Stephen F.↗

Protocols for distributive scheduling

The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

Richards, Stephen F.↗

Mishap Investigation Team (MIT) - Barksdale AFB, Louisiana

The Shuttle Program is organized to support a Shuttle mishap using the resources of the MIT. The afternoon of Feb. 1, 2003, the MIT deployed to Barksdale AFB. This location became the investigative center and interim storage location for crewmembers received from the Lufkin Disaster Field Office (DFO). Working under the leadership of the MIT Lead, the medical team executed a short-term plan that included search, recovery, and identification including coordination with the Armed Forces Institute of Pathology Temporary operations was set up at Barksdale Air Force Base for two weeks. During this time, coordination with the DFO field recovery teams, AFIP personnel, and the crew surgeons was on going. In addition, the crewmember families and NASA management were updated daily. The medical team also dealt with public reports and questions concerning biological and chemical hazards, which were coordinated with SPACEHAB, Inc., Kennedy Space Center (KSC) Medical Operations and the Johnson Space Center (JSC) Space Medicine office. After operations at Barksdale were concluded the medical team transitioned back to Houston and a long-term search, recovery and identification plan was developed.

Stepaniak, Philip↗

Water Power Technologies Office: Multi-Year Program Plan

The U.S. Department of Energy’s Water Power Technologies Office (WPTO) has released its first Multi-Year Program Plan (MYPP), which outlines the Office’s research priorities and plans through 2025. Cover of the WPTO MYPP 2022. The MYPP serves as both a strategic vision and an operational guide to help WPTO manage and coordinate its activities, as well as a vehicle to communicate WPTO’s mission, goals, and plans to water power stakeholders and the public. It details WPTO’s research, development, demonstration, and commercial activities across both hydropower and marine energy for the coming years and outlines how these efforts can help meet the nation’s energy and sustainability goals. The MYPP features key performance goals for 2025, as well as additional objectives running through 2030. All outlined goals contribute to the overarching mission of WPTO to enable research, development, and testing of new technologies to advance marine energy and hydropower systems for a flexible, reliable grid.

13 HYDRO ENERGY↗

GLAST: GeV Astronomy in a Multiwavelength Context

The GLAST Large Area Telescope (LAT), successor to Energetic Gamma-ray Experiment Telescope (EGRET) on the Compton Observatory, will play an important role in multiwavelength studies during the second half of this decade. Operating at energies between 20 MeV and greater than 300 GeV with sensitivity 30 or more times greater than that of EGRET, the Large Area Telescope (LAT) will offer good spatial and time resolution over a large (less than 2 sr) field of view. The LAT will bring insight to the whole range of high-energy gamma-ray phenomena, including bursts, active galactic nuclei, pulsars, supernova remnants, diffuse emission and unidentified sources. In essentially all cases, the maximum scientific return will come from coordinated (although not necessarily simultaneous) multiwavelength observations. Particularly with its planned scanning mode of operation, GLAST will have full sky coverage on relatively short time scales. The LAT team looks forward to cooperating with observers at other wavelengths.

Thompson, David J.↗

Rendezvous, proximity operations and capture quality function deployment report

Rendezvous, Proximity Operations, and Capture (RPOC) is a missions operations area which is extremely important to present and future space initiatives and must be well planned and coordinated. To support this, a study team was formed to identify a specific plan of action using the Quality Function Deployment (QFD) process. This team was composed of members from a wide spectrum of engineering and operations organizations which are involved in the RPOC technology area. The key to this study's success is an understanding of the needs of potential programmatic customers and the technology base available for system implementation. To this end, the study team conducted interviews with a variety of near term and future programmatic customers and technology development sponsors. The QFD activity led to a thorough understanding of the needs of these customers in the RPOC area, as well as the relative importance of these needs.

Lamkin, Stephen L.↗

Utility Microgrid Controller Test Plan

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) DER. In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this first edition report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spacelab: An International Success Story

Spacelab is a European-developed and U.S.-operated space laboratory carried in the cargo bay of the Space Shuttle Orbiter. This story of the Spacelab Development Program traces the program from the origin of the Spacelab concept, describing negotiations and agreements for European participation and the role of Europe and the United States in system development, operational capability development, and utilization planning. It also considers the joint management structure, coordination, and experience in solving management and technical interface problems. The book is not an exhaustive historical treatise, but an informative and readable story of the evolution and technical accomplishments of this unique program in manned space flight and of some of the unusual political and human interest aspects of the program from the viewpoint of one of the key participants.

Lord, Douglas R.↗

Identification and Development of Coordination Procedures Between Upper Class E Traffic Management (ETM) and Surrounding Air Traffic Operations

A recent interest in novel, non-traditional vehicles / missions that plan to operate in Upper Class E (UCE) airspace at or above 60,000 ft has led to efforts by NASA, FAA and the stakeholder communities to research and develop a new concept called Upper Class E Traffic Management (ETM). ETM concept proposes to handle the influx of diverse traffic mix around FL600 and above, utilizing a new traffic management infrastructure, supported by federated service suppliers that are developed by the community stakeholders, for coordinating, monitoring, and executing vehicle operational intent in a designated airspace called ETM Cooperative Area (CA). ETM vehicles are generally expected to reach and operate in ETM CA by first transiting through Class A airspace and potentially through UCE airspace that sits outside of ETM CA. In this paper, a set of use cases have been identified and step-by-step procedures have been developed to handle nominal transitions of ETM vehicles between these operational areas, as well as additional use cases and procedures for authorization and termination of ETM CAs in Class A and/or UCE airspace. The overall research effort in this paper has revealed potential challenges and open questions related to these use cases, especially for the interactions between ETM CA and UCE in both vehicle transition and ETM CA authorization scenarios. The use cases and procedures developed in this paper will inform future ETM integration efforts, as well as research and development into decision support tools needed for the integration.

Upper Class E Traffic Management (ETM)↗

Observation Planning Made Simple with Science Opportunity Analyzer (SOA)

As NASA undertakes the exploration of the Moon and Mars as well as the rest of the Solar System while continuing to investigate Earth's oceans, winds, atmosphere, weather, etc., the ever-existing need to allow operations users to easily define their observations increases. Operation teams need to be able to determine the best time to perform an observation, as well as its duration and other parameters such as the observation target. In addition, operations teams need to be able to check the observation for validity against objectives and intent as well as spacecraft constraints such as turn rates and acceleration or pointing exclusion zones. Science Opportunity Analyzer (SOA), in development for the last six years, is a multi-mission toolset that has been built to meet those needs. The operations team can follow six simple steps and define his/her observation without having to know the complexities of orbital mechanics, coordinate transformations, or the spacecraft itself.

observation planning operations↗

Implementation of a Relay Coordination System for the Mars Network

Mars network relay operations involve the coordination of lander and orbiter teams through long-term and short-term planning, tactical changes and post-pass analysis. Much of this coordination is managed through email traffic and point-to-point file data exchanges. It is often difficult to construct a complete and accurate picture of the relay situation at any given moment, as there is no centralized store of correlated relay data. The Mars Relay Operations Service (MaROS) is being implemented to address the problem of relay coordination for current and next-generation relay missions. The service is provided for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These "relay" sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This paper will discuss the relay coordination problem space, overview the architecture and design selected to meet system requirements, and describe the first phase of system implementation

Allard, Daniel A.↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

Automation of the deep space network

Approaches to automating the radiofrequency system used in the deep space network (DSN) are discussed. The goal is to operate DSN, which communicates with U.S. space probes that travel beyond the moon, in an unattended mode in order to reduce operating costs. The philosophy of a hierachical automation plan, which emphasizes distributed control and the utilization of DSN hardware development engineers to develop automation software, is discussed, and software development as well as common software and common microcontroller hardware are considered. It is planned that a station controller will serve as the operator interface and control and coordinate the operation of three system controllers (RF system, digital system, and antenna system). These systems are described.

Crow, R. B.↗