Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Open and Extensible Control & Analytics Platform for Synchrophasor Data (Final Report)

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project was to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

99 GENERAL AND MISCELLANEOUS↗

Developing and Extending a Cyberinfrastructure Model

Increasingly, research and education institutions are realizing the strategic value and challenge of deploying and supporting institutional cyberinfrastructure (CI). Cyberinfrastructure is composed of high performance computing systems, massive storage systems, visualization systems, and advanced networks to interconnect the components within and across institutions and research communities. CI also includes the professionals with expertise in scientific application and algorithm development and parallel systems operation. Unlike ?regular? IT infrastructure, the manner in which the components are configured and skills to do so are highly specific and specialized. Planning and coordinating these assets is a fundamental step toward enhancing an institution?s research competitiveness and return on personnel, technology, and facilities investments. Coordinated deployment of CI assets has implications across the institution. Consider the VC for Research whose new faculty in the Life Sciences are now asking for simulation systems rather than wet labs, or the Provost who lost another faculty candidate to a peer institution that offered computational support for research, or the VC for Administration who has seen a spike in power and cooling demands from many of the labs and office spaces being converted to house systems. These are just some of the issues that research institutions are wrestling with as research becomes increasingly computational, data-intensive and interdisciplinary. This bulletin will discuss these issues and will present an approach for developing a cyberinfrastructure model that was successfully developed at one institution and then deployed across institutions.

99 GENERAL AND MISCELLANEOUS↗

Automated Signal Timing Plan Reconstruction Using High-Resolution Event-Based Controller Data for Digital Twins

Transportation digital twins are essential tools for evaluating emerging technologies such as connected and automated vehicles, adaptive traffic signal control, and mobility optimization strategies. Realistic digital twins require accurate emulation of real-world signal controllers and detailed signal timing plans. However, signal timing plans are often unavailable or difficult to access, forcing researchers and modelers to rely on assumed fixed timings or halt their analysis. To overcome this challenge, we present a method that directly estimates signal timing plan parameters using high-resolution, event-based data from traffic signal controllers. The proposed method extracts key parameters, including cycle length, offset, phase sequence, coordinated phases, phase-specific minimum and maximum green durations, vehicle extensions, and splits under coordination. A rule-based deterministic signal timing reconstruction algorithm based on traffic signal operation rules, such as those outlined in the Signal Timing Manual, is developed and validated. We evaluate this method, which uses high-resolution controller event logs and verified signal timing plans, on 94 signalized intersections in Nashville, Tennessee, demonstrating their ability to generate accurate, simulation-ready signal timing plans for tools such as SUMO and Vissim.

Saroj, Abhilasha [ORNL] (ORCID:0000000191178063)↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

Impacts of Integrating Topology Reconfiguration and Vehicle-to-Grid Technologies on Distribution System Operation

Autonomous electric vehicles (AEVs) provide unique opportunities to cope with the uncertainties of distributed energy generation in distribution networks. But the effects are limited by both inherent radial topology and the behaviors of decentralized AEVs. As such, we investigate the potential benefits of dynamic distribution network reconfiguration (DDNR), taking into account AEVs' spatial-temporal availability and their charging demand. We propose a mixed integer programming model to optimally coordinate the charging/discharging of AEVs with DDNR, while satisfying AEVs' original travel plan. Numerical studies based on a test system overlaying the IEEE 33-node test feeder and Sioux Falls transportation network show that DDNR and AEV complement each other, which improves the operation of the distribution system. We also conduct sensitivity analyses on inputs including renewable fluctuation and AEVs penetration level.

33 ADVANCED PROPULSION SYSTEMS↗

Direct Feed Low Activity Waste Integrated Permitting - 16642

An overall Hanford permitting strategy for the U. S. Department of Energy (DOE) Office of River Protection (ORP) is being developed to support the Direct Feed Low- Activity Waste (DFLAW) Program. The strategy identifies new permits and modifications of existing permits, as well as major regulatory approvals to support the startup and operation of nuclear systems necessary to feed low activity tank waste, pretreat the waste, operate the Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to treat tank waste, and dispose of waste streams. Types of permits include hazardous waste, toxic air, and radiological air licenses. Four different Contractors manage operations at Tank Farms, WTP, Utilities/Infrastructure, and Waste Disposal. Due to this complexity and the number of interfaces required, the need to have a strategic overview of all permits was evident. Approximately 25 permits and 4 major regulatory approvals are identified to implement DFLAW. The strategy will help guide integrated planning, scheduling and sequencing of permits and regulatory approvals to support DOE ORP's overall schedule for construction, commissioning and operation of DFLAW. Development of the strategy included extensive collaboration and coordination of an Integrated Permitting Team with staff and management representation from DOE, CH2M Hill Plateau Remediation Contractor (CHPRC), Washington River Protection Solutions LLC (WRPS), and Bechtel National Inc. (BNI). Information sessions and briefings have been conducted with the Washington State Department of Ecology (Ecology) and Washington State Department of Health (DOH) in the development of this overall strategy. Additionally, interface meetings are held with Ecology and DOH on specific projects early in the design phase to validate the permitting approach, identify key issues and information, and discuss requirements and assumptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint

During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the WesternInterconnection there are many balancing areas, which will result in challenges if there is significant wind and solar energy development in the region. A recent proposal to the Western Electricity Coordinating Council suggests a regional energy imbalance service (EIS). To evaluate this EIS, a number of analyses are in process or are planned. This paper describes one part of an analysis of theEIS's implication on operating reserves under several alternative scenarios of the market footprint and participation. We improve on the operating reserves method utilized in the Eastern Wind Integration and Transmission Study and apply this modified approach to data from the Western Wind and Solar Integration Study.

17 WIND ENERGY↗

Post-Service Examination of PWR Baffle Bolts, Part I. Examination and Test Plan

In support of extended service and current operations of the US nuclear reactor plants, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Light Water Reactor Sustainability (LWRS) Program, is coordinating with Ginna Nuclear Power Plant, The Westinghouse Electric Company, LLC, and ATI Consulting, the selective procurement of baffle bolts that were withdrawn from service in 2011 and currently stored on site at Ginna. The goal of this program is to perform detailed microstructural and mechanical property characterization of baffle former bolts following in-service exposures. This report outlines the selection criteria of the bolts and the techniques to be used in this study. The bolts available are the original alloy 347 steel fasteners used in holding the baffle plates to the baffle former structures within the lower portion of the pressurized water reactor vessel. Of the eleven possible bolts made available for this work, none were identified to have specific damage. The bolts, however, did show varying levels of breakaway torque required in their removal. The bolts available for this study varied in peak fluence (highest dose within the head of the bolt) between 9.9 and 27.8x10 21 n/cm 2 (E>1MeV). As no evidence for crack initiation was determined for the available bolts from preliminary visual examination, two bolts with the higher fluence values were selected for further post-irradiation examination. The two bolts showed different breakaway torque levels necessary in their removal. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long-term irradiation behavior and compared to results obtained in high flux experimental reactor conditions. The two bolts selected for the ORNL study will be shipped to Westinghouse with bolts of interest to their collaborative efforts with the Electric Power Research Institute. Westinghouse will section the ORNL bolts into samples specified in this report and return them to ORNL. Samples will include bend bars for fracture toughness and crack propagation studies along with thin sections from which specimens for bend testing, subscale tensile and microstructural analysis can be obtained. Additional material from the high stress concentration region at the transition between the bolt head and shank will also be preserved to allow for further investigation of possible crack initiation sites.

42 ENGINEERING↗

Evaluating the Feasibility to Use Microgrids as a Resiliency Resource

Regulated electricity utilities are required to provide safe and reliable service to their customers at a reasonable cost. To balance the objectives of reliable service and reasonable cost, utilities build and operate their systems to operate under typical historic conditions. As a result, when abnormal events such as major storms or disasters occur, it is not uncommon to have extensive interruptions in service to the end-use customers. Because it is not cost effective to make the existing electrical infrastructure 100% reliable, society has come to expect disruptions during abnormal events. However, with the increasing number of abnormal weather events, the public is becoming less tolerant of these disruptions. One possible solution is to deploy microgrids as part of a coordinated resiliency plan to minimize the interruption of power to essential loads. This paper evaluates the feasibility of using microgrids as a resiliency resource, including their possible benefits and the associated technical challenges. A use-case of an operational microgrid is included.

Schneider, Kevin↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coordinated Scheduling for Interdependent Electric Power and Natural Gas Infrastructures

The extensive installation of gas-fired power plants in many parts of the world has led electric systems to depend heavily on reliable gas supplies. The use of gas-fired generators for peak load and reserve provision causes high intraday variability in withdrawals from high-pressure gas transmission systems. Such variability can lead to gas price fluctuations and supply disruptions that affect electric generator dispatch, electricity prices, and threaten the security of power systems and gas pipelines. These infrastructures function on vastly different spatio-temporal scales, which prevents current practices for separate operations and market clearing from being coordinated. Here in this article, we apply new techniques for control of dynamic gas flows on pipeline networks to examine day-ahead scheduling of electric generator dispatch and gas compressor operation for different levels of integration, spanning from separate forecasting, and simulation to combined optimal control. We formulate multiple coordination scenarios and develop tractable physically accurate computational implementations. These scenarios are compared using an integrated model of test networks for power and gas systems with 24 nodes and 24 pipes, respectively, which are coupled through gas-fired generators. The analysis quantifies the economic efficiency and security benefits of gas-electric coordination and dynamic gas system operation.

03 NATURAL GAS↗

IBRD Operational Decision Framework

The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon completion of the Operational Decision Framework, another joint LLNL/SNL working group conducted a day-long review. Identified modifications were made to the document, resulting in the included product.

99 GENERAL AND MISCELLANEOUS↗

Multi-Time Scale Coordinated Control and Scheduling of Inverter-Based TCLs With Variable Wind Generation

To address microgrid tie flow errors caused by wind generation variability, here we propose and develop a multi-time scale coordinated control and scheduling strategy for inverter-based thermostatically controlled loads (TCLs). First, in hour-time scale, inverter-based TCLs with adjusting temperature set-point are modeled as virtual generators to compensate tie flow deviations in the day-ahead plan. Next, in minute-time scale, virtual batteries representing operating behaviors of inverter-based TCLs with frequency control are scheduled determined by the control of virtual generators in hour-time scale. The virtual batteries are scheduled to smooth out tie flow errors corresponding to day-ahead plan and hour-time scale schedules. The multi-time scale control methods are coordinated to employ the response potential of inverter-based TCLs and response curve-based methods are proposed to control inverter-based TCLs considering the customer privacy. The multi-time scale stochastic schedules which are based on response curves of inverter-based TCLs are coordinated to accommodate wind generation variability. Simulation results demonstrate that the microgrid tie flow errors are effectively mitigated by the proposed multi-time scale coordinated control and scheduling of inverter-based TCLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enabling Modular Autonomous Feedback‐Loops in Materials Science through Hierarchical Experimental Laboratory Automation and Orchestration

Abstract Materials acceleration platforms (MAPs) operate on the paradigm of integrating combinatorial synthesis, high‐throughput characterization, automatic analysis, and machine learning. Within a MAP, one or multiple autonomous feedback loops may aim to optimize materials for certain functional properties or to generate new insights. The scope of a given experiment campaign is defined by the range of experiment and analysis actions that are integrated into the experiment framework. Herein, the authors present a method for integrating many actions within a hierarchical experimental laboratory automation and orchestration (HELAO) framework. They demonstrate the capability of orchestrating distributed research instruments that can incorporate data from experiments, simulations, and databases. HELAO interfaces laboratory hardware and software distributed across several computers and operating systems for executing experiments, data analysis, provenance tracking, and autonomous planning. Parallelization is an effective approach for accelerating knowledge generation provided that multiple instruments can be effectively coordinated, which the authors demonstrate with parallel electrochemistry experiments orchestrated by HELAO. Efficient implementation of autonomous research strategies requires device sharing, asynchronous multithreading, and full integration of data management in experimental orchestration, which to the best of the authors’ knowledge, is demonstrated for the first time herein.

36 MATERIALS SCIENCE↗

ARM FY2025 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility is dedicated to delivering high-quality radar data that significantly advance our understanding of cloud and precipitation processes, improving climate models. With radars operating across diverse frequencies, scanning modes, and global climate conditions, extensive staffing is essential for effective management. Due to current staffing constraints, achieving the expected level of operational excellence requires a more strategic approach. To address this challenge, ARM has developed an operational radar plan for the upcoming Fiscal Year 2025 (FY25) based on budget and staffing considerations. This report summarizes the Fiscal Year 2024 (FY24) ARM radar-related activities and outlines the strategic plan for FY25. It presents a comprehensive radar plan that includes detailed activities, priorities, and a projected timeline aligned with the ARM radar roadmap. Key tasks, detailed in Table 1, cover various radar operational stages and coordinated efforts among ARM teams.

54 ENVIRONMENTAL SCIENCES↗

openECA Platform and Analytics Alpha Test Results

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

openECA Platform and Analytics Beta Demonstration Results

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

HLW Return from France to Germany - 15 Years of Experience in Public Acceptance and Technical Aspects - 12149

Since in 1984 the national reprocessing concept was abandoned the reprocessing abroad was the only existing disposal route until 1994. With the amendment of the Atomic Energy Act in 2001 spent fuel management changed completely since from 1 June 2005 any delivery of spent fuel to reprocessing plants was prohibited and the direct disposal of spent fuel became mandatory. Until 2005 the total amount of spent fuel to be reprocessed abroad added up to 6080 t HM, 5309 t HM thereof in France. The waste generated from reprocessing - alternatively an equivalent amount of radioactive material - has to be returned to the country of origin according to the commercial contracts signed between the German utilities and COGEMA, now AREVA NC, in France and BNFL, now INS in UK. In addition the German and the French government exchanged notes with the obligation of both sides to enable and support the return of reprocessing residues or equivalents to Germany. The return of high active vitrified waste from La Hague to the interim storage facility at Gorleben was demanding from the technical view i. e. the cask design and the transport. Unfortunately the Gorleben area served as a target for nuclear opponents from the first transport in 1996 to the latest one in 2011. The protection against sabotage of the railway lines and mass protests needed highly improved security measures. In France and Germany special working forces and projects have been set up to cope with this extraordinary situation. A complex transport organization was established to involve all parties in line with the German and French requirements during transport. The last transport of vitrified residues from France has been completed successfully so far thus confirming the efficiency of the applied measures. Over 15 years there was and still is worldwide no comparable situation it is still unique. Summing up, the exceptional project handling challenge that resulted from the continuous anti-nuclear civil disobedience in Germany over the whole 15-year long project running time could be faced efficiently. It has to be concluded that despite of all problems the anti-nuclear activities have caused so far, all transports of vitrified HLW have always been completed successfully by adapting the commonly established safety, security and public acceptance measures to the special conditions and needs in Germany and coordinating the activities of all parties involved but at the expense of high costs for industry and government and a challenging operational complexity. Apart from an anticipatory project planning a good communication between all involved industrial parties and the French and the German government was the key to the effective management of such shipments and to minimize the radiological, economic, environmental, public and political impact. The future will show how efficiently the gained experience can be used for further return projects which are to be realized since no reprocessed waste has yet been returned from UK and neither the medium-level nor the low-level radioactive waste has been transferred from France to Germany. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗