Search NASA⌕ Search

SEARCH · Search NASA

Results for “Optimized Plant Dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Energy Arbitrage: Comparison of Options for use with LWR Nuclear Power Plants

Arbitrage is the opportunistic buying and selling of a commodity during local pricing valleys and peaks respectively to maximize economic value. This report evaluates options for energy arbitrage integrated with existing light water reactor (LWR) nuclear power plants (NPPs) where nuclear energy could be stored in a variety of forms and later recovered to generate electrical power during periods when grid electricity demand and pricing are high. The forms of energy storage examined in this report include the potential value of batteries, hydrogen, and thermal energy storage for coupling with nuclear power. Various large demand response options are also analyzed, including the production of liquid nitrogen via air separation and liquefaction, liquefaction of hydrogen, compressed hydrogen, and the cryogenic capture of CO2. Demand response refers to dispatchable loads that can cycle up or down depending on-grid electricity demand to aid in balancing the grid. Large demand response options could dispatch to aid nuclear power stations in avoiding power turndowns by providing an alternate disposition for electrical energy by producing marketable products (e.g., liquid nitrogen, hydrogen, or captured CO2). Static conditions were chosen and analyzed in this report for each option. Dynamic operation or optimization of energy arbitrage or demand response are out of scope for this report. The analysis is based on storage systems with discharge capacities of 500 MW for which various durations of storage and costs of charging (electricity cost) are examined. While the value of thermal energy to an industrial user for flexible plant operations has been previously proven as a business case, this report evaluates costs of hydrogen energy storage and leading thermal energy storage options, and large demand response loads that could be integrated with LWRs in comparison to utility-scale battery storage for use of off-peak nuclear energy. Compilation of this information will be used by the Idaho National Laboratory (INL) RAVEN/HERON systems integration and economics tool to evaluate thermal energy dispatch to industrial users. Relative ranking of energy storage options was done using a levelized cost of storage (LCOS) metric which calculates a rough breakeven cost for the system, taking into account the capital and operating costs as well as the revenue from arbitrage. Table ES1 below shows the LCOS for each of the energy storage options considered. First, in the table, lithium iron (Fe) phosphate batteries are listed as the base case for comparison against the other options. Next is hydrogen storage where most of the hydrogen analyses assumed the hydrogen to be produced using solid oxide electrolytic cell (SOEC) high temperature steam electrolysis (HTSE). The others used existing models of polymer electrolyte membrane (PEM) low temperature electrolysis to produce hydrogen. HTSE performance parameters and costs were taken from existing INL models. Various means were assumed to convert the hydrogen to electricity, including PEM fuel cells (FCs) and a gas turbine mixed in a 30 vol% mixture with natural gas. Physical storage (pressure vessels) and geological storage (natural underground features) were used to store the hydrogen as noted. Geological storage is more economical, but the locations are limited because of the requirement for pre-existing geological formations that will support storage. Thermal energy storage (TES) options were also analyzed including electro-thermal energy storage (ETES) and four different liquid sensible heat TES storage media as noted (Hitec, Hitec XL, Therminol-66, and Dowtherm A). The ETES process considered was modified using existing public documentation on an Echogen process and uses a separate supercritical CO2 charge and discharge cycle with sand as the heat storage media.

25 ENERGY STORAGE↗

Feasible Actuator Range Modifier (FARM), a Tool Aiding the Solution of Unit Dispatch Problems for Advanced Energy Systems

Integrated energy systems (IESs) seek to minimize power generating costs in future power grids through the coupling of different energy technologies. To accommodate fluctuations in load demand due to the penetration of renewable energy sources, flexible operation capabilities must be fully exploited, and even power plants that are traditionally considered as base-load units need to be operated according to unconventional paradigms. Thermomechanical loads induced by frequent power adjustments can accelerate the wear and tear. If a unit is flexibly operated without respecting limits on materials, the risk of failures of expensive components will eventually increase, nullifying the additional profits ensured by flexible operation. In addition to the bounds on power variations (explicit constraints),the solution of the unit dispatch problem needs to meet the limits on the variation of key process variables, including temperature, pressure and flow rate (implicit constraints).The FARM (Feasible Actuator Range Modifier) module was developed to enable existing optimization algorithms to identify solutions to the unit dispatch problem that are both economically favorable and technologically sustainable. Thanks to the iterative dispatcher–validator scheme, FARM permits addressing all the imposed constraints without excessively increasing the computational costs. In this work, the algorithms constituting the module are described, and the performance was assessed by solving the unit dispatch problem for an IES composed of three units, i.e., balance of plant, gas turbine, and high-temperature steam electrolysis. Finally, the FARM module provides dedicated tools for visualizing the response of the constrained variables of interest during operational transients and a tool aiding the operator at making decisions. These techniques might represent the first step towards the deployment of an ecological interface design (EID) for IES units.

47 OTHER INSTRUMENTATION↗

An Improved Genetic Algorithm approach to the Unit Commitment/Economic Dispatch problem

The deployment of new technologies, the importance of accurately modeling the dynamics of the generating units and the introduction of new policies are making the solution of the Unit Commitment/Economic Dispatch problem more and more complicated.In the present scenario, traditionally followed scheduling criteria might not lead to the optimal fleet configuration any more. In addition, most of the widely used techniques have limited capabilities at modeling the nonlinear dynamics of committed power plants. When realistic power systems comprising of several tens of generating units are modeled, the resulting optimization problem turns to be computationally intensive for the current computing capabilities. In this paper, an improved version of a GA-based optimization algorithm is presented. A detailed methodology aimed at obtaining a more efficient version of the GA, and a more detailed and accurate description of the flexible operation flexibility of the power plants is described.

genetic algorithm↗

Dispatch optimization of a concentrating solar power system under uncertain solar irradiance and energy prices

The integration of thermal energy storage into a concentrating solar power system allows for mitigating some of the risk associated with uncertain solar irradiance and uncertain energy prices. We solve a 48 h dispatch optimization model with continually updated conditional point forecasts of both direct normal irradiance (DNI) and electricity prices with a rolling-horizon scheme at hourly resolution over the course of a year. Joint, conditional forecasts for DNI and prices are formed using an autoregressive moving-average time series model with exogenous weather predictors. We guide dispatch using a mixed-integer programming model, but in order to evaluate performance we use the System Advisor Model (SAM) of the National Renewable Energy Laboratory. SAM is a techno-economic simulation model that accounts for plant thermodynamics with higher fidelity. Our conditional DNI forecasts improve annual revenue by 4%–12% over using historical forecasts based on data from previous years. Conditional price forecasts improve annual revenue by 6%–19% in the real-time market over analogous historical forecasts. Updating these forecasts every six hours, rather than every 24 h, further improves annual revenue by 5%–6%. Here, we also investigate a method that values terminal inventory in our dispatch optimization model, again when used in a rolling-horizon scheme.

14 SOLAR ENERGY↗

Economic Dispatch Model of Nuclear High-Temperature Reactor with Hydrogen Cogeneration in Electricity Market

Hydrogen produced without carbon emissions could be a useful fuel as nations look to decarbonize their electricity, transport, and industry sectors. Using the iodine–sulfur (IS) cycle coupled with a nuclear heat source is one method for producing hydrogen without the use of fossil fuels. An economic dispatch model was developed for a nuclear-driven IS system to determine hydrogen sale prices that would make such a system profitable. The system studied is the HTTR-GT/H2, a design for power and hydrogen cogeneration at the Japan Atomic Energy Agency’s High Temperature Engineering Test Reactor. This study focuses on the development of the economic model and the role that input data plays in the final calculated values. Using a historical price duration curve shows that the levelized cost of hydrogen (LCOH) or breakeven sale price of hydrogen would need to be 98.1 JPY/m3 or greater. Synthetic time histories were also used and found the LCOH to be 67.5 JPY/m3. The price duration input was found to have a significant effect on the LCOH. As such, great care should be used in these economic dispatch analyses to select reasonable input assumptions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Comparative Investigation of System-Level Optimized Power Conversion System Architectures to Reduce LCOE for Large-Scale PV-Plus-Storage Farms

PV-plus-storage (PVS) has become a prevalent configuration for newly commissioned large-scale solar projects. However, the optimal power conversion system (PCS) architecture has not been investigated yet. This paper first validates the limited impact of inverter cost on LCOE and then explores a system-level optimized PCS architecture with extended LCOE reduction to proliferate large-scale dispatchable solar energy. Two state-of-the-art architectures including central inverters (CI), traditional 480/600 V string inverters (SI) are compared with newly proposed medium voltage string inverters (MVSI) and multiport DC transformer (MDCT). With verified layouts and single line diagrams (SLDs) of 20 MW PVS plants, the losses and costs breakdown of different architectures are extracted and the PCS related LCOEs are derived. In this analysis, all electrical bill of materials (EBOS) elements, inverters, battery storage and its associated components, are included, whose losses and costs are obtained from markets, manufacturers, and literature. Besides, the sensitivities of PCS-related LCOEs to Inverter-Loading-Ratio (ILR) are also investigated. Here, the results show that compared with CI and SI with 1.5 kV PV, 4 kV MVSI and 34 kV MDCT present an extended LCOE reduction across all ILR from 1.0 to 3.0, making them economically favorable candidates for PVS farms.

14 SOLAR ENERGY↗

Operation of a High Renewable Penetrated Power System With CSP Plants: A Look-Ahead Stochastic Unit Commitment Model

The integration of variable renewable energy (VRE) generation, i.e., wind power and solar photovoltaic, brings significant uncertainty for the power system operation. Different with VRE techniques, concentrating solar power (CSP) is an appealing renewable generation technology due to its dispatch ability through the use of thermal energy storage and is thus expected to play a significant role in high renewable energy penetrated power systems. In this paper, we propose a look-ahead stochastic unit commitment model to operate power systems with CSP under high renewable energy penetration. It has a three-stage structure. The first stage optimizes the operational decisions in a day-ahead framework based on forecasts; the second stage minimizes the expected generation cost for possible realizations in the real time; and the third stage accounts for look-ahead operation in future operating days. This paper has a dual purpose: first, exploring how CSP plants operate in high renewable penetrated power systems; and second, analyzing the benefits of CSP in accommodating VRE generation. A case study on a modified IEEE RTS-79 system with actual solar and wind power data is provided to validate the proposed method.

14 SOLAR ENERGY↗

Combining Simulation and Optimization to Derive Operating Policies for a Concentrating Solar Power Plant

Optimizing short-term decisions over a rolling horizon and/or using deterministic penalties to capture system stochasticity can lead to myopic policies that fail to consider unplanned events and their long-term adverse effects. We present a methodology that integrates an off-line optimization model with a simulation procedure to determine the profitability of different operating strategies; specifically, the latter is used to generate additional constraints for the former when failures occur according to system component operating lifetimes that (i) are subject to exogenous uncertainty, and (ii) may degrade more quickly under specific operating conditions. We use the feedback provided by the simulation model in a parametric analysis to obtain penalties that can be used in short-term operations scheduling to maximize the long-term revenues obtained by the optimization model. We apply this research to a concentrating solar power plant; our results show that the methodology can be used to choose an operating policy that balances maximizing profit while accounting for maintenance costs. Integrating the optimization model with a simulation procedure reveals that aggressive prices for cycling yield about 55% fewer startups and 30% fewer failures compared to using a more typical start-up operating strategy, and can save hundreds of thousands to millions of dollars in repair costs over the lifetime of the plant.

concentrating solar power↗

Advancements in Development and Testing of Thermal Power Dispatch Simulators

Flexible plant operations and generation (FPOG) offer nuclear power plants (NPPs) the chance to leverage alternative, non-electric revenue streams while ensuring their continued role as reliable, clean, and constant sources of baseload electrical power. The excess thermal energy generated from NPPs during periods of low electricity demand can be channeled as raw materials to numerous industrial processes via a thermal power dispatch (TPD) system. Hydrogen production via high-temperature steam electrolysis (HTSE) is an optimal use case based on technical and economic feasibility. Researchers at Idaho National Laboratory (INL) have conducted previous works that developed and implemented TPD system models within the GSE Solutions Generic Pressurized Water Reactor (GPWR) simulator to support human-in-the-loop (HITL) scenario-based evaluations. The first part of this report documents modifications made to the GPWR TPD model and HMI from the previous iteration in line with a new Sargent and Lundy (S&L) TPD design with an automatic control system. The was done in collaboration with Westinghouse using their three-loop pressurizer water reactor (W3LPWR) simulator which contains an industrial grade automatic control system for the TPD. This was installed in the Human Systems Simulation Laboratory (HSSL) at INL. The second part of the report documents findings from an all-hands-on-deck integration and verification workshop that was conducted in the HSSL over several days. The research team comprised INL human factors and TPD experts, a nuclear engineer from GSE Solutions who implemented the revised TPD model for GPWR, the human-machine interface (HMI) prototyping and human factors team from the University of Idaho, and personnel with operations experience with pressurized water reactors. The workshop provided time and expertise to conduct the final activities to bring the operations, HMI, and simulator into a functional state. The goals of the integration and verification workshop were: 1. to install the revised GPWR TPD model into the HSSL 2. verify the TPD HMI prototype was functional 3. integrate the HTSE Simulink model to GPWR. 3. Issues were identified for resolution, but overall the workshop accomplished its goal to integrated and verify the majority of the intended functional. Future work will resolve the identified issues and use the integrated simulation to support an evaluation and demonstration in the next fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The value of in-reservoir energy storage for flexible dispatch of geothermal power

Geothermal systems making use of advanced drilling and well stimulation techniques have the potential to provide tens to hundreds of gigawatts of clean electricity generation in the United States by 2050. With near-zero variable costs, geothermal plants have traditionally been envisioned as providing “baseload” power, generating at their maximum rated output at all times. However, as variable renewable energy sources (VREs) see greater deployment in energy markets, baseload power is becoming increasingly less competitive relative to flexible, dispatchable generation and energy storage. Herein we conduct an analysis of the potential for future geothermal plants to provide both of these services, taking advantage of the natural properties of confined, engineered geothermal reservoirs to store energy in the form of accumulated, pressurized geofluid and provide flexible load-following generation. We develop a linear optimization model based on multi-physics reservoir simulations that captures the transient pressure and flow behaviors within a confined, engineered geothermal reservoir. We then optimize the investment decisions and hourly operations of a power plant exploiting such a reservoir against a set of historical and modeled future electricity price series. Further, we find that operational flexibility and in-reservoir energy storage can significantly enhance the value of geothermal plants in markets with high VRE penetration, with energy value improvements of up to 60% relative to conventional baseload plants operating under identical conditions. Across a range of realistic subsurface and operational conditions, our modeling demonstrates that confined, engineered geothermal reservoirs can provide large and effectively free energy storage capacity, with round-trip storage efficiencies comparable to those of leading grid-scale energy storage technologies. Optimized operational strategies indicate that flexible geothermal plants can provide both short- and long-duration energy storage, prioritizing output during periods of high electricity prices. Sensitivity analysis assesses the variation in outcomes across a range of subsurface conditions and cost scenarios.

15 GEOTHERMAL ENERGY↗

Modular HF Isolated MV String Inverters Enable a New Paradigm for Large PV Farms

The “Modular HF Isolated MV String Inverters Enable a New Paradigm for Large PV Farms” project focuses on exploring alternative power converter and system-level plant configurations to achieve the lowest cost and highest energy output for a given solar plus storage (e.g., PV + battery) plant, including the use of medium voltage (MV) collection while taking into account detailed models of all elements. To realize this objective, four approaches were utilized (i) employ a novel Medium Voltage String Inverter (MVSI) topology (soft switching solid state transformer – S4T) to convert 1000 Vdc to 4.16 kVac; (ii) plant collection using standard, low-cost overhead MV distribution network; (iii) enable energy storage integration without additional converter cost to achieve dispatchability of the PV resource; and (iv) provide advanced functionality (autonomous operation, track ISO signals for dynamic balancing and ancillary services, and PV farm operation as a virtual grid resource). Subsequently and in alignment with the previously mentioned approaches, the project was structured in five efforts (i) S4T MVSI simulation and design; (ii) system analysis and storage optimization; (iii) financial analysis; (iv) power converter prototype build and test; and (v) regulatory and commercial impact study. The outcomes provided by each effort can be summarized as follows (i) Project explored the use of MV AC distribution architecture for hybrid PV+storage utility-scale PV farms; (ii) Detailed loss and LCOE analysis for AC and DC side BESS architecture, including multiple converter topologies, as well as for proposed MVSI/MDCT systems; (iii) MVSI was built and holds promise but needs lower-cost high-voltage Si-C devices, which does not seem possible in the near term; (iv) MDCT provides a simpler modular building block – validated through HIL and farm level modeling, simulation and experimental validation; (v) 300 kVA MDCT prototype built and tested, technology is being commercialized; and (vi) Regulatory model of utility building PV plants, where PV panels are treated as DC generation (IPP), seems viable and can allow improved grid integration.

14 SOLAR ENERGY↗

Using energy storage systems to extend the life of hydropower plants

Despite their advantages, distributed energy resources (DERs) bring inherent uncertainty and variability into the landscape of modern power systems. As DER penetration grows, conventional generators like hydropower plants have to respond more often to arrest the imbalance in the net load. Hydropower turbines provide their best operational performance with minimal wear and tear when operating at regions of maximum efficiency. However, the current needs for hydropower plants require them to operate under varying load conditions and thus sub-optimal operating points leading to additional stress. To relieve the hydropower plants, this paper proposes a hybridization strategy where a hydropower unit is paired with an energy storage system (ESS) to increase operational flexibility and mitigate damage to the hydro plant. Models are developed to represent the operation of the hybrid system, quantify degradation, and assess economic benefits. Moreover, an innovative controller disaggregates the market dispatch signal into separate control setpoints for the ESS and hydropower unit. In case studies performed on a real-world hydropower facility, it was found that the ESS-based hybridization can extend the life of the hydropower plant by 5% on average. Notably, the economic benefits from reduced maintenance and deferred investment are estimated to be around $3.6 million.

13 HYDRO ENERGY↗

Stochastic Optimization with Risk Aversion for Virtual Power Plant Operations: A Rolling Horizon Control

While the concept of aggregating and controlling renewable distributed energy resources (DERs) to provide grid services is not new, increasing policy support of DER market participation has driven research and development in algorithms to pool DERs for economically viable market participation. Sandia National Laboratories recently undertook a three-year research program to create the components of a real-world virtual power plant (VPP) that can simultaneously participate in multiple markets. Our research extends current state-of-the-art rolling horizon control through the application of stochastic programming with risk aversion at various time resolutions. Our rolling horizon control consists of (1) day-ahead optimization to produce an hourly aggregate schedule for the VPP operator and (2) sub-hourly optimization for real-time dispatch of each VPP subresource. Both optimization routines leverage a two-stage stochastic program (SP) with risk aversion, and integrate the most up-to-date forecasts to generate probabilistic scenarios in real operating time. Our results demonstrate the benefits to the VPP operator of constructing a stochastic solution regardless of the weather. In more extreme weather, applying risk optimization strategies can dramatically increase the financial viability of the VPP. As a result, the methodologies presented here can be further tailored for optimal control of any VPP asset fleet and its operational requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Optimization of Distribution-level Energy Resources [SWR-18-27]

Researchers at NREL have developed a novel real-time control architecture to optimize the operation of DERs at residential, commercial, and industrial levels. The real-time system enables (portions of) feeders to emulate virtual power plants providing services to the rest of the grid, while ensuring satisfaction of electrical limits and maximizing customers’ benefits. This system can be integrated with legacy hardware and/or new advanced systems to optimally manage both individually-controlled DERs and aggregations of DERs. By virtue of the proposed engineering approach, the DERs collectively regulate the powers at an electrical point to respond to grid dispatch signals such as an automatic generation control, a ramping signal, or a 5-minute dispatch. Overall, this architecture allows end customers to minimize their payments and partake in grid operations while guaranteeing power quality in the distribution network.

Dall-Anese, Emiliano↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Powering Data Centers with Clean Energy: A Techno-Economic Case Study of Nuclear and Renewable Energy Dependability

Rising data demands from artificial intelligence (AI) and large language models (LLMs) generating images, videos, and text have prompted increased need for larger and more robust data centers in the United States. Major companies interested in these larger data centers face the choice of linking them to existing regional grids, building stand-alone power supplies onsite, or a combination of both. The request, review, and approval process for new transmission lines to grids in the United States, however, has grown in recent years to times spans rivaling those of new construction for nuclear power plants. Building an islanded power supply for each data center is therefore becoming a prominent option. In this case study, several technologies are modeled in techno-economic simulations for long-term system costs subject to fixed electricity demand from a singular data center. A 250 MWe data center is assumed with additional 50 MWe for resiliency. Techno-economic simulations are conducted using the Holistic Energy Resource Optimization Network (HERON) software, which is a part of the Framework for Optimization of Resources and Economics (FORCE) tool suite. Technologies considered include solar, wind, lithium-ion batteries, and several types of nuclear reactors: large-scale reactors, small modular reactors, and microreactors. A low- and high-cost estimate for each technology is assumed to develop a range of expected economic performance. Low-cost estimates included several clean energy production tax credits. Different combinations of renewable energy generators with nuclear reactors are considered, ranging from a fully renewable-powered data center to a fully nuclear-powered data center. Historic time series of wind and solar availability from the Texas grid are used to train a reduced order model; this model then generates unique time series with similar characteristics of the training dataset. Multiple scenarios of weather and subsequent operations are simulated for each renewable-nuclear combination to determine total costs throughout the project lifetime. Fully renewable-powered configurations required large amounts of installed capacity (GW scale) in the simulations to meet the fixed demand of the data center. This is due to some scenarios in the historical dataset which captured low-wind and low-solar days, requiring over-building of these technologies as well as batteries to compensate for the low amounts of electricity generation. Fully nuclear-powered configurations outperformed the fully renewable and mixed renewable-nuclear configurations in terms of cost, with ranges between $1B and $10B in 2023 USDs compared to $40B+ for fully renewable configurations. Of the nuclear technologies, small modular reactors performed better economically than large-scale nuclear models due to lower projected capital costs, and both performed better than the microreactor models. These results demonstrate the applicability of firm, dispatchable electricity resources from baseload generators like nuclear power plants for operating facilities that run at constant power without daily variability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗