Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Evaluating Extravehicular Activity Access Options for a Lunar Surface Habitat

NASA’s upcoming return to the moon includes a plan for longer duration lunar missions that prioritize science and surface exploration. The current Artemis Base Camp reference proposes a Surface Habitat (SH) that will support 2 to 4 crewmembers with adequate capability for living and working for 30 days or more. An important aspect of the SH’s design will be its ability to support a high frequency of Extravehicular Activities (EVAs) for scientific purposes. There are multiple airlock designs that can support EVA access from inside the SH out to the lunar surface. This paper explores three unique options for EVA access: a traditional airlock, a suitlock, and a suitport-airlock.A traditional airlock is accessed by use of a hatch, crewmembers don and doff their EVA suits inside the airlock, and it must be depressurized and repressurized for every EVA. A suitlock is also depressurized and repressurized for every EVA but thesuits are donned through a suitport attached to the airlock bulkhead. A suitport-airlock is access through suitports that are attached to the airlock bulkhead as well, but the suitport-airlock stays in vacuum, and it does not have to be depressurized and repressurized for each EVA. This study also evaluated the use of an Airlock Airsave System in the cases of a traditional airlock and suitlock. This system captures a fraction of the airlock gas instead of venting all of the gas pre-EVA. The captured gas isthen used to partially repressurize the airlock post-EVA.In this study, each option is evaluated based on seven different areas of analysis. The metrics include overhead time for EVAs, dust mitigation, consumables for resupply mass, systems mass, system power, safety and mission assurances, and programmatic considerations. The EVA access options are evaluated and compared under each area of analysis. While the baseline case assumes the SH is at 8.2 psia, the authors also investigate the impact of a 10.2 psia habitat as an alternative in this analysis. Following the conclusion of the analysis, the authors recommend the usage of a Suitport-Airlock for Lunar SH missions and detail the reasoning behind the recommendation.

EVA↗

Evaluating Extravehicular Activity Access Options for a Lunar Surface Habitat

NASA’s upcoming return to the moon includes a plan for longer duration lunar missions that prioritize science and surface exploration. The current Artemis Base Camp reference proposes a Surface Habitat (SH) that will support 2 to 4 crewmembers with adequate capability for living and working for 30 days or more. An important aspect of the SH’s design will be its ability to support a high frequency of Extravehicular Activities (EVAs) for scientific purposes. There are multiple airlock designs that can support EVA access from inside the SH out to the lunar surface. This paper explores three unique options for EVA access: a traditional airlock, a suitlock, and a suitport-airlock. A traditional airlock is accessed by use of a hatch, crewmembers don and doff their EVA suits inside the airlock, and it must be depressurized and repressurized for every EVA. A suitlock is also depressurized and repressurized for every EVA but the suits are donned through a suitport attached to the airlock bulkhead. A suitport-airlock is accessed through suitports that are attached to the airlock bulkhead as well, but the suitport-airlock stays in vacuum, and it does not have to be depressurized and repressurized for each EVA. This study also evaluated the use of an Airlock Airsave System in the cases of a traditional airlock and suitlock. This system captures a fraction of the airlock gas instead of venting all of the gas pre-EVA. The captured gas is then used to partially repressurize the airlock post-EVA. In this study, each option is evaluated based on seven different areas of analysis. The metrics include overhead time for EVAs, dust mitigation, consumables for resupply mass, systems mass, system power, safety and mission assurances, and programmatic considerations. The EVA access options are evaluated and compared under each area of analysis. While the baseline case assumes the SH is at 8.2 psia, the authors also investigate the impact of a 10.2 psia habitat as an alternative in this analysis. Following the conclusion of the analysis, the authors recommend the usage of a Suitport-Airlock for Lunar SH missions and detail the reasoning behind the recommendation.

EVA↗

Space Mission Options for Reconnaissance and Mitigation of Asteroid 2024 YR4

Near-Earth asteroid 2024 YR 4 was discovered on 2024-12-27 and its probability of Earth impact in December 2032 peaked at about 3% on 2025-02-18. Additional observations ruled out Earth impact by 2025-02-23. However, the probability of lunar impact in December 2032 then rose, reaching about 4% by the end of the apparition in May 2025. James Webb Space Telescope (JWST) observations on 2025-03-26 estimated the asteroid's diameter at 60 +/- 7 m. Studies of 2024 YR 4 's potential lunar impact effects suggest lunar ejecta could increase micrometeoroid debris flux in low Earth orbit up to 1000 times above background levels over just a few days, possibly threatening astronauts and spacecraft. In this work, we present options for space missions to 2024 YR 4 that could be utilized if lunar impact is confirmed. We cover flyby & rendezvous reconnaissance, deflection, and robust disruption of the asteroid. We examine both rapid-response and delayed launch options through 2032. We evaluate chemical and solar electric propulsion, various launch vehicles, optimized deep space maneuvers, and gravity assists. Re-tasking extant spacecraft and using built spacecraft not yet launched are also considered. The best reconnaissance mission options launch in late 2028, leaving only approximately three years for development at the time of this writing in August 2025. Deflection missions were assessed and appear impractical. However, kinetic robust disruption missions are available with launches between April 2030 and April 2032. Nuclear robust disruption missions are also available with launches between late 2029 and late 2031. Finally, even if lunar impact is ruled out there is significant potential utility in deploying a reconnaissance mission to characterize the asteroid.

Asteroid Disruption↗

A Real-Options Approach for NASA Strategic Technology Selection

In this paper, we examine the use of real options valuation in the context of prioritizing advanced technologies for NASA funding. Further, we offer a set of computational procedures that quantifies the option value of each technology.

real options technology selection option pricing↗

Demonstration of Airline-Based Airborne Reroute Operations using Trajectory Option Sets and Third-Party Tools

A concept that enables advanced airborne reroute operations is proposed, built on NextGen capabilities called Airborne Reroute (ABRR) and Trajectory Option Set (TOS). The concept introduces new third-party services / tools for the airline dispatchers to generate airline-preferred trajectories in response to convective weather events. The airborne TOS routes are sent to the traffic flow managers, who can evaluate the feasibility of the trajectory options with the help of their own third-party services / tools which have been built for this concept. A virtual demonstration study was conducted to elicit feedback from air traffic and airline subject-matter-experts. The feedback was generally positive, both in the benefits of the concept and the feasibility / need for the new tools to enable the concept but their feedback was mixed on the feasibility of the new tools to be third-party services instead of being integrated into their core tools. Nevertheless, this concept explores and demonstrates an evolutionary pathway toward a service-oriented future that shifts the responsibilities and the capabilities of air traffic operations from the air traffic service providers to the airline industry and third-party vendors.

airborne reroutes↗

Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 3: Detailed data. Part 1: Catalog of initiatives, functional options, and future environments and goals

The following areas were discussed in relation to a study of the commonality of space vehicle applications to future national needs: (1) index of initiatives (civilian observation, communication, support), brief illustrated description of each initiative, time periods (from 1980 to 2000+) for implementation of these initiatives; (2) data bank of functional system options, presented in the form of data sheets, one for each of the major functions, with the system option for near-term, midterm, and far-term space projects applicable to each subcategory of functions to be fulfilled; (3) table relating initiatives and desired goals (public service and humanistic, materialistic, scientific and intellectual); and (4) data on size, weight and cost estimations.

Bekey, I.↗

The Liquid Hydrogen Option for the Subsonic Transport: A status report

Continued subsonic air transport design studies include the option for a liquid hydrogen fuel system as an aircraft fuel conservation measure. Elements of this option discussed include: (1) economical production of hydrogen; (2) efficient liquefaction of hydrogen; (3) materials for long service life LH2 fuel tanks; (4) insulation materials; (5) LH2 fuel service and installations at major air terminals; (6) assessment of LH2 hazards; and (7) the engineering definition of an LH2 fuel system for a large subsonic passenger air transport.

Korycinski, P. F.↗

Evaluation of options for process sequences

A methodology is being developed to ease the comparative evaluation of competing options in the process sequence for the manufacture of photovoltaic solar energy utilization systems. This evaluation will largely involve process economic analyses but will place equal emphasis on other characteristics, including energy consumption and environmental effects of the process options. Early analyses have been performed for the energy consumption in the arc furnace reduction of SiO2, for the costs and energy consumption in CZ crystal pulling and various slicing processes, and for the total energy consumption of process sequence through the completed module.

Wolf, M.↗

Multirole cargo aircraft options and configurations

A future requirements and advanced market evaluation study indicates derivatives of current wide-body aircraft, using 1980 advanced technology, would be economically attractive through 2008, but new dedicated airfreighters incorporating 1990 technology, would offer little or no economic incentive. They would be economically attractive for all payload sizes, however, if RD and T costs could be shared in a joint civil/military arrangement. For the 1994-2008 cargo market, option studies indicate Mach 0.7 propfans would be economically attractive in trip cost, aircraft price and airline ROI. Spanloaders would have an even lower price and higher ROI but would have a relatively high trip cost because of aerodynamic inefficiencies. Dedicated airfreighters using propfans at Mach 0.8 cruise, laminar flow control, or cryofuels, would not provide any great economic benefits. Air cushion landing gear configurations are identified as an option for avoiding runway constraints on airport requirements and/or operational constraints are noted.

Conner, D. W.↗

Interplanetary trajectory options for project Galileo

The paper explores interplanetary trajectory options for project Galileo. The classes of trajectory options studied include direct earth-Jupiter trajectories for combined and split orbiter/probe missions, Mars powered swingbys, earth-Venus-earth gravity assists, and earth-deep space delta V-earth gravity assists.

Nock, K. T.↗

Prototype solar power satellite options

The choice of options for the prototype solar power satellite is addressed relative to risk and cost. Emphasis is placed on the reduction of the risk of failure. Risk is the program cost multiplied by the reduction in probability of program success due to the risky action. Four classes of risk are identified. It is suggested that prototyping would reduce the technical risk as well as reduce the effects of the other three types of risk by allowing them to be quantified earlier. Prototype demonstration requirements addressed include electromagnetic power link feasibility demonstration, component integration verification, construction technology verification, and cost performance verification. Specific prototype requirements are listed and prototyping options are given in tabular form.

Sperber, B. R.↗

Architectural options for space stations in the context of the space infrastructure

The role of space stations in the space element infrastructure anticipated for the end of the 20th century is discussed. Various architectures for space stations designed to function as part of the infrastructure are examined with respect to a set of potential objectives for the stations. Architectural options are described that range from a minimum station of low capability and cost to an expensive station with a full operations capability and high growth potential. The capabilities, growth potentials, and likely costs of the options are compared, and the association between functional capabilities and likely cost is considered. It is concluded that the cost of a space station is intimately related to its architecture and that a larger initial investment must be made to satisfy more ambitious objectives.

Bekey, I.↗

Technical draft study report for TOPEX satellite options study, volume 1

The use of two spacecraft for adaptation to the TOPEX mission, namely the P80-1 and the GPS phase 2 are considered. The mission involved three mission options, each option varying in payload definition, payload weight, orbital altitude and payload power requirements. The P80-1 spacecraft is an Air Force Space Test Program satellite which carries a number of payloads to an orbital altitude of 400 n.mi. at a minimum inclination of 72.5 deg, and which has an orbital life capability of three years. The GPS phase 2 spacecraft is the operational satellite for the Global Positioning NAVSTAR navigation constellation provided for all service (and commercial) use.

Source record↗

Population Control of Self-Replicating Systems: Option C

From the conception and development of the theory of self-replicating automata by John von Neumann, others have expanded on his theories. In 1980, Georg von Tiesenhausen and Wesley A. Darbro developed a report which is a "first' in presenting the theories in a conceptualized engineering setting. In that report several options involving self-replicating systems are presented. One of the options allows each primary to generate n replicas, one in each sequential time frame after its own generation. Each replica is limited to a maximum of m ancestors. This study involves determining the state vector of the replicas in an efficient manner. The problem is cast in matrix notation, where F = fij is a non-diagonalizable matrix. Any element fij represents the number of elements of type j = (c,d) in time frame k+1 generated from type i = (a,b) in time frame k. It is then shown that the state vector is: bar F(k)=bar F (non-zero) X F sub K = bar F (non-zero) xmx J sub kx m sub-1 where J is a matrix in Jordan form having the same eigenvalues as F. M is a matrix composed of the eigenvectors and the generalized eigenvectors of F.

Mccord, R. L.↗

Space station needs, attributes and architectural options. Volume 1: Executive summary NASA

The uses alignment plan was implemented. The existing data bank was used to define a large number of station requirements. Ten to 20 valid mission scenarios were developed. Architectural options as they are influenced by communications operations, subsystem evolvability, and required technology growth are defined. Costing of evolutionary concepts, alternative approaches, and options, was based on minimum design details.

Source record↗

Space station needs, attributes, and architectural options: Space station program cost analysis

This report documents the principal cost results (Task 3) derived from the Space Station Needs, Attributes, and Architectural Options study conducted for NASA by the McDonnell Douglas Astronautics Company. The determined costs were those of Architectural Options (Task 2) defined to satisfy Mission Requirements (Task 1) developed within the study. A major feature of this part of the study was the consideration of realistic NASA budget constraints on the recommended architecture. Thus, the space station funding requirements were adjusted by altering schedules until they were consistent with current NASA budget trends.

Cowls, R. S.↗

Space Station Systems Analysis Study. Volume 2: Program options, book 1, parts 1 and 2

Program options are defined and requirements are determined for integrating crew, mass, volume, and electrical power for a space construction base which incorporates the space shuttle external tanks. Orbits, stabilization, flight control hardware, as well as modules and aids for orbital assembly and servicing are considered. The effectiveness of various program options for life science and radio astronomy missions, for the solar terrestrial observatory, and for public service platforms is assessed. Technology development items are identified and costs are estimated.

Source record↗

Thermal management system options for high power space platforms

Thermal Management System (TMS) design options for a high power (75kWe), low earth orbit, multimodule space platform were investigated. The approach taken was to establish a baseline TMS representative of current technology, and to make incremental improvements through successive subsystem trades that lead to a candidate TMS. The TMS trades included centralized and decentralized transport, single-phase and two-phase transport, alternate working fluids, liquid loop and heat pipe radiators, deployed fixed, body mounted and steerable radiators, and thermal storage. The subsystem options were evaluated against criteria such as weight, TMS power requirement, reliability, system isothermality penalty, and growth potential.

Sadunas, J. A.↗