Search NASA⌕ Search

SEARCH · Search NASA

Results for “PERSONNEL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Optimal return-to-launchsite abort trajectories for an HL-20 Personnel Launch System vehicle

The Personnel Launch System (PLS) being studied by NASA is a system to complement the Space Shuttle and provide alternative access to space. The PLS consists of a manned spacecraft launched by an expendable launch vehicle (ELV). A candidate for the manned spacecraft is the HL-20 lifting body. In the event of an ELV malfunction during the initial portion of the ascent trajectory, the HL-20 will separate from the rocket and perform an unpowered return-to-launchsite (RTLS) abort. This paper describes an investigation of the RTLS abort scenario using optimal control theory. The objective of the abort trajectory is to maximize final altitude at a point near the runway. The assumption is then made that there exists a control history to steer the vehicle to any final altitude lower than the final optimal altitude. With this selection of cost function, and with this assumption, the feasibility of an RTLS abort at different times along the ascent trajectory can be determined. The method of differential inclusions, which allows the determination of optimal states and eliminates the need for determining the optimal controls, is used to determine the optimal trajectories.

Dutton, Kevin E.↗

21st century space transportation system design approach - HL-20 personnel launch system

This article provides an introduction to and overview of the research that was conducted on the HL-20 lifting body. The concept has been defined as an option for a personnel launch system (PLS) that is intended to carry six to eight Space Station Freedom crew persons. In this role the HL-20 will complement the Space Shuttle operation and ensure the ability to transport people to and from Earth orbit after the year 2000. The research covers a broad range of disciplines, including aerodynamics, aerodynamic heating and thermal protection systems, structural design, subsystem definition, trajectory and guidance system development for entry and abort, production and operations, and human factors. This article also presents the lifting-body heritage, design features of the concept, and HL-20/PLS mission requirements.

Stone, Howard W.↗

HL-20 operations and support requirements for the Personnel Launch System mission

The processing, mission planning, and support requirements were defined for the HL-20 lifting-body configuration that can serve as a Personnel Launch System. These requirements were based on the assumption of an operating environment that incorporates aircraft and airline support methods and techniques that are applicable to operations. The study covered the complete turnaround process for the HL-20, including landing through launch, and mission operations, but did not address the support requirements of the launch vehicle except for the integrated activities. Support is defined in terms of manpower, staffing levels, facilities, ground support equipment, maintenance/sparing requirements, and turnaround processing time. Support results were drawn from two contracted studies, plus an in-house analysis used to define the maintenance manpower. The results of the contracted studies were used as the basis for a stochastic simulation of the support environment to determine the sufficiency of support and the effect of variance on vehicle processing. Results indicate the levels of support defined for the HL-20 through this process to be sufficient to achieve the desired flight rate of eight flights per year.

Morris, W. D.↗

Modeling personnel turnover in the parametric organization

A model is developed for simulating the dynamics of a newly formed organization, credible during all phases of organizational development. The model development process is broken down into the activities of determining the tasks required for parametric cost analysis (PCA), determining the skills required for each PCA task, determining the skills available in the applicant marketplace, determining the structure of the model, implementing the model, and testing it. The model, parameterized by the likelihood of job function transition, has demonstrated by the capability to represent the transition of personnel across functional boundaries within a parametric organization using a linear dynamical system, and the ability to predict required staffing profiles to meet functional needs at the desired time. The model can be extended by revisions of the state and transition structure to provide refinements in functional definition for the parametric and extended organization.

Dean, Edwin B.↗

CAMELOT 2: Personnel transport between Earth and Mars

A summary of the second phase of a design study fo a cycling spacecraft for regular and frequency personnel transport between Earth and a Mars base is presented. The first-phase study, called project CAMELOT, was a mission analysis and configuration design and was completed by the Space Systems Design class at the University of Michigan in the winter term, 1987. In the second phase, the configuration and component design has been developed by the Space Systems Design class in the winter term, 1988, beyond the initial configuration study. Analysis has led to numerous design modifications and improvements, as well as providing more detailed system definition. Major components of the second phase study include innovative detailed designs such as an interface between the rotating and non-rotating portions of the spacecraft, an elevator system that changes orientation to eliminate Coriolis forces, an electromagnetic radiation shield that significantly reduces the mass of the spacecraft, and a detailed assembly sequence and cost analysis. In addition, modifications to the propulsion and the power generation subsystems, taxi-docking facilities, and internal layout design have led to a more efficient, more reliable, and more comfortable vehicle. Finite-element stress and dynamic analysis has verified much of the system and indicates the validity of the design. Computer simulation of many moving components, including torus rotation, elevator and interface operations, and attitude control mechanisms further validate and support the various systems.

Source record↗

Optimal RTLS abort trajectories for an HL-20 personnel launch vehicle

The primary objective of this study was to determine whether Return To Launch Site (RTLS) abort at T seconds along the launch trajectory of the Personnel Launch System (PLS) is possible using optimal control theory. The secondary objective is to assess effects of bank angle constraint, lift coefficient constraint, free and fixed final boundary conditions, etc. of the vehicle. The PLS is a complementary system to the Space Shuttle.

Dutton, Kevin↗

Optimal control theory determination of feasible return-to-launch-site aborts for the HL-20 Personnel Launch System vehicle

The personnel launch system (PLS) being studied by NASA is a system to complement the space shuttle and provide alternative access to space. The PLS consists of a manned spacecraft launched by an expendable launch vehicle (ELV). A candidate for the manned spacecraft is the HL-20 lifting body. In the event of an ELV malfunction during the initial portion of the ascent trajectory, the HL-20 will separate from the rocket and perform an unpowered return to launch site (RTLS) abort. This work details an investigation, using optimal control theory, of the RTLS abort scenario. The objective of the optimization was to maximize final altitude. With final altitude as the cost function, the feasibility of an RTLS abort at different times during the ascent was determined. The method of differential inclusions was used to determine the optimal state trajectories, and the optimal controls were then calculated from the optimal states and state rates.

Dutton, Kevin E.↗

A study to determine methods of improving the subsonic performance of a proposed Personnel Launch System (PLS) concept

An investigation has been conducted in the Langley 7- by 10-Foot High Speed Wind Tunnel to determine the longitudinal and lateral directional aerodynamic characteristics of a series of personnel launch system concepts. This series of configurations evolved during an effort to improve the subsonic characteristics of a proposed lifting entry vehicle (designated the HL-20). The primary purpose of the overall investigation was to provide a vehicle concept which was inherently stable and trimable from entry to landing while examining methods of improving subsonic aerodynamic performance.

Spencer, Bernard, Jr.↗

DARPA/USAF/USN J-UCAS X-45A System Demonstration Program: A Review of Flight Test Site Processes and Personnel

The Joint Unmanned Combat Air Systems (J-UCAS) program is a collaborative effort between the Defense Advanced Research Project Agency (DARPA), the US Air Force (USAF) and the US Navy (USN). Together they have reviewed X-45A flight test site processes and personnel as part of a system demonstration program for the UCAV-ATD Flight Test Program. The goal was to provide a disciplined controlled process for system integration and testing and demonstration flight tests. NASA's Dryden Flight Research Center (DFRC) acted as the project manager during this effort and was tasked with the responsibilities of range and ground safety, the provision of flight test support and infrastructure and the monitoring of technical and engineering tasks. DFRC also contributed their engineering knowledge through their contributions in the areas of autonomous ground taxi control development, structural dynamics testing and analysis and the provision of other flight test support including telemetry data, tracking radars, and communications and control support equipment. The Air Force Flight Test Center acted at the Deputy Project Manager in this effort and was responsible for the provision of system safety support and airfield management and air traffic control services, among other supporting roles. The T-33 served as a J-UCAS surrogate aircraft and demonstrated flight characteristics similar to that of the the X-45A. The surrogate served as a significant risk reduction resource providing mission planning verification, range safety mission assessment and team training, among other contributions.

Cosentino, Gary B.↗

Aerodynamic Characteristics of a Proposed Personnel Launch System (PLS) Lifting-Body Configuration at Mach Numbers from 0.05 to 20.3. Supplement

A wind-tunnel investigation was performed to determine the aerodynamic characteristics of a proposed lifting-body personnel launch system (PLS) configuration over a Mach range of 0.05 to 20.3. The test configuration had a low-aspect-ratio body with a flat undersurface and three fins on the upper aft body. Data are presented with a minimum of analysis. All of the experimental data were placed in a structured data base using the R:BASE system. This is the CD-ROM that is available for this report.

Cruz, Christopher I.↗

Microdosimeter Instrument (MIDN-II) for Personnel Dosimetry

This group of collaborators has been funded, by the National Space Biomedical Research Institute (NSBRI) and the U. S. National Aeronautics and Space Administration (NASA) as of February, 2009 to develop a prototypic dosimeter/microdosimeter instrument that measures in real time the radiation risk to personnel in a time varying radiation field of possibly unknown composition. The microdosimetric detectors will be solid-state devices more compact, more rugged than conventional microdosimetric proportional counters used previously in space and will consume less power. The proposed detector will be based on the heritage of the MIDN-MidSTAR microdosimeter launched on the MidSTAR spacecraft on March, 2007, the only solid-state microdosimeter ever flown in space. The system will be suitable for measurements in spacesuits, spacecrafts, remote rovers, or other dynamic or static environments. Measurements as a function of time will not only provide the instantaneous and average absorbed physical dose but also corresponding microdosimetric spectra, dose rates, the dose equivalents, and the dose equivalent rates. Values of the dose equivalents are used to establish relative risks for humans exposed to radiation and to determine regulatory limits. Because these parameters will be available to the astronauts and mission control in real time, these systems can be used not only to quantify exposures and limits, but also to allow appropriate actions to be taken to reduce radiation exposures and their consequences. Earlier prototypes have been used successfully to characterize beams of energetic protons and heavier ions including carbon, oxygen, silicon, titanium, and iron at the NASA Space Radiation Laboratory at Brookhaven National Laboratory. The initial design will be presented and discussed and spectra will be presented.

Pisacane, V. L.↗

Workmanship Standards Personnel Training and Certification Explained

This slide presentation reviews the standards that NASA requires for workmanship and discusses the rationale and the NASA-STD-8739.x standard series. The training and certification of inspectors and operators is to guarantee that workmanship is qualified for NASA applications. The NASA workmanship standard documents review the standards for: Polymeric Applications, Surface Mount Technology, Soldered Electrical Connections, Crimp, Cable and Harnesses, Fiber Optic Terminations, including ANSI and IPC standards for Electrostatic Discharge Safety, Space Applications Electronic Hardware and Requirements for Soldered Electrical and Electronic Assemblies. It also reviews the certification requirements for appropriate personnel. It also reviews the various levels of trainers for the various requirements. There is also a review of calibration requirements for training equipment. Some variations on the curriculum are allowed. NASA requires operators and inspectors to be certified by their employer to ensure that oversight is being performed.

Plante, Jeannette F.↗

Personnel Data Analysis and Retrieval of Phase 1 Move To LC-39 Area

As a technology major from Jackson State University (JSU) I was called in as a summer intern at Kennedy Space Center (KSC) to work in the NASA Engineering, Control and Data Systems (NE-C) Division supporting the Spaceport Command and Control System (SCCS) at the Space Station Processing Facility (SSPF). I was given a two-part project; the first consisted of lending support relocating SCCS Computer Equipment and Project Personnel to the Launch Control Center (LCC). This task involved me using a Microsoft Office data processing tool to assist with the analysis and information management of logistics worth millions of dollars. With the assistance of two other interns, I was responsible for collecting data on equipment used, on a daily basis, by over 200 KSC employees. The many network servers, enterprise switches, desktop computers, and fiber optics had to be handled in an equally prompt and precise manner in order to ensure a minimal amount of equipment down time; which is critical in ensuring a properly secured networking environment. The second part of my project was to assist KSC in developing a more cost effective way of maintaining and taking full advantage of the functionality of some new kiosk units. Since KSC currently has no expert on the servicing and maintenance of the units, I, as a computer technology major, was given the opportunity to assess the hardware and software of the machines. The goal was to learn to establish a secure and remote environment for the kiosks; a goal highly valuing convenience by preserving valuable man-hours saved by not having to travel to each individual kiosk location. In addition, I was to leave a clear and precise plan for future users and administrators of the devices to follow.

Davis, Derrick D.↗

Ensuring Safety of Government Personnel During Suborbital Spaceflight

The NASA Suborbital Crew (SubC) project is focused on enabling flights by NASA civil servants, such as scientists and engineers conducting research, on suborbital vehicles. A broader goal is ensuring that commercial human spaceflight is both viable and safe. Within the Commercial Crew Program (CCP), the SubC project is exploring game-changing methods to perform safety assessments to enable NASA personnel to fly on suborbital missions. Commercial suborbital space flight capabilities are anticipated to be more accessible, affordable, and available than missions to the International Space Station and could provide additional opportunities for testing and qualification of space flight hardware, human-tended microgravity research, and further cutting-edge research enabled by the space environment. Although NASA currently permits human tended suborbital payloads for non-civil servants under auspices of NASA’s Flight Opportunities Program, the SubC effort will enable civil servant scientists, researchers, and even engineers to accompany their experiments and tests into the space microgravity environment. Figure 1 illustrates how the SubC program complements other microgravity experimental platforms. The targeted scope for SubC includes end-to-end suborbital capabilities reaching ~80km with several minutes of sustained microgravity (Table 1). The NASA SubC project office is working with the Federal Aviation Administration’s Office of Commercial Space Transportation (FAA-AST) and the commercial suborbital space transportation industry to develop an efficient and holistic approach to a safety review and eventual government participation in suborbital flight. The current FAA certification process for suborbital launches is congressionally mandated to only consider public safety. NASA is responsible for understanding the risks to its employees should they fly on a commercially available suborbital flight. The SubC project is employing a Safety Case approach, applied to commercial suborbital providers, which is not a traditional certification process as was used for the SpaceX Dragon and Boeing Starliner vehicles. Rather, it is an assessment using elements of NASA’s Risk-Informed Safety Case and the Armstrong Flight Research Center’s Airworthiness Assessment process.

Elizabeth C Blome↗

Ensuring Safety of Government Personnel During Suborbital Spaceflight

The NASA Suborbital Crew (SubC) office is focused on enabling flights by NASA civil servants, such as scientists and engineers conducting research, on suborbital vehicles. A broader goal is ensuring that commercial human spaceflight is both viable and safe. Within the Commercial Crew Program (CCP), the SubC office is exploring game-changing methods to perform safety assessments to enable NASA personnel to fly on suborbital missions. Commercial suborbital space flight capabilities are anticipated to be more accessible, affordable, and available than missions to the International Space Station and could provide additional opportunities for testing and qualification of space flight hardware, human-tended microgravity research, and further cutting-edge research enabled by the space environment. Although NASA currently supports human tended suborbital payloads for non-civil servants under auspices of NASA’s Flight Opportunities Program, the SubC effort will enable civil servant scientists, researchers, and engineers to accompany their experiments and tests into the space microgravity environment.

Risk Management↗