SEARCH · Search NASA
Results for “Particle accelerator design”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Experimental Study of Fixed Plate Insert for Window Protection
Evidenced from experiments to date, NorthStar can expect that potentially significant changes in the target cooling passages are likely due to disk shape changes by thermal distortions or breakage. In the bulk of the target the result will be increased He flow in some channels and decreased flow in others.
Accelerators as tools for discovery, innovation, and everyday life, and why LANL is doing C-band [Slides]
This report provides information about accelerators, from the different types to ways they are used in everyday life.
LAMP Manufacturing Survey [Slides]
The LANL Accelerator Strategy Office (ASO) requires the support of AOT-MDE to perform a trade study on the current manufacturing capabilities required to modernize the Los Alamos Neutron Science Center (LANSCE). The purpose of the study will be to identify and potentially minimize cost and schedule risks that could impact the LANSCE Modernization Project (LAMP).
LAMP Manufacturing Survey (Final Report)
This report presents the results of a market manufacturing survey performed for fabricating radiofrequency quadrupoles (RFQ) and Drift Tube Linear Accelerator (DTL) components needed for the Los Alamos Neutron Science Center (LANSCE) Modernization Project (LAMP). A review on existing RFQs and DTLs with their parameters, a summary of specific capabilities needed to manufacture them, the common issues during the fabrication process, their consequences, and resolutions to these problems is presented in this report. The goal of this study is to identify potential collaborators and companies capable of manufacturing the necessary accelerator equipment, while minimizing cost and schedule risks that could impact the future modernization of the LANSCE facility.
Numerical Analysis and Flow Induced Vibration Studies in Pressurized Helium Gas Cooling Channels
Los Alamos National Laboratory (LANL) is working with NorthStar Medical Radioisotopes (NMR) on their efforts to produce Mo-99 from the irradiation of Mo-100 targets. The NMR target consists of an Inconel window that allows the electron beam to penetrate and irradiate a stack of Mo-100 discs. The irradiation process generates large amounts of heat and is cooled using pressurized helium gas flowing at 400 g/s. LANL provides both numerical analysis support and experimental support. Computational fluid dynamics (CFD) simulations for both 300 g/s and 400 g/s are performed on the NMR target to analyze the helium flow through the NMR system. The pressure drop, the mass flow rate through each of the disc and window channels and the force applied on the first disc are some of the quantities estimated using CFD. These results will be combined with Monte Carlo N-Particle (MCNP) estimates of heat flux into the system from the electron beam to perform conjugate heat transfer analysis (CHT). The experiments presented in this report focus on the effect of the flow induced vibrations from helium flowing through the coolant gaps between the discs. There is concern that the flow induced vibrations may lead to excessive mass loss of the enriched Mo-100 discs, and the goal would be to mitigate the mass loss. This work presents benchtop tests of flow through a subset of the target stack which involves high speed imaging and displacement measurements used to estimate disc vibration, as well as mass loss.
LAMP Basis of Estimate Evaluation
The purpose of this document is to present the evaluation summary of the initial cost proposal of the mechanical beamline components and associated labor for the LANSCE Modernization Project (LAMP).
Commissioning of Phase 1 of the LANL RFQ Test Stand - Beam Characterization
A series of numerical start-to-end simulations of Phase 1 of the 750 keV RFQ Test Stand which includes the ion source (H+ duoplasmatron), a 1-Solenoid LEBT, an emittance scan station and a Faraday cup were performed to find a mechanism for the characterization of the proton beam extracted from the duoplasmatron.
RF Power Estimates for LAMP Drift-Tube Linac
The LANSCE Modernization Project (LAMP) concept includes a drift-tube proton linac (DTL) from 3 MeV to 100 MeV consisting of 6 tanks. This technical note provides estimates of RF power required for the LAMP DTL tanks using DTLfish modeling.
Delivery of H - / H + Beams to Area A
We explore the relative merits of transporting the beam from the H + ion source and from the H - ion source to Area-A for low current applications. Transporting the H - beam to Area-A using the laser neutralization approach has some risk associated with it and will require some development. Alternative method of delivering H - beam to Area-A includes replacing LDBM00 bending magnet with kicker for sharing beam between Line D and modified Line A. Transporting the H + beam to Area-A will have significant impact on the operation the IPF facility and maintaining high pulse rate to IPF will require major modifications to the transition region of the accelerator and Drift Tube Linac.
Parallel Simulation of Beam Dynamics in Particle Accelerators [Slides]
Particle accelerators are among the most versatile and important tools of scientific discovery. The Nation's accelerators are responsible for a wealth of advances in materials science, chemistry, the biosciences, particle physics, and nuclear physics. They also have important applications to national security, the environment, energy, medicine, and on the quality of people's lives. LANL has a long history of making pioneering contributions to Accelerator Science including key contributions to the field of Computational Accelerator Physics. These include the development of early beam dynamics codes with space charge (such as PARMILA and PARMELA), the development of rf cavity codes and magnet codes (including Poisson and Superfish), and the development and distribution of codes to the accelerator community through the Los Alamos Accelerator Code Group. LANL researchers also helped pioneer the development of massively parallel space-charge codes. In project t22_accelsim we have moved beyond electrostatic models of collective effects (i.e., solving the Poisson equation in the bunch frame) to fully electromagnetic models based on the Lienard-Wiechert formalism. This approach enables the large-scale simulation of radiation production and collective effects in high brightness electron beams. This is highly relevant to LANL given its future goal of developing an X-ray Free Electron Laser (XFEL). It also directly impacts a LANL LDRD project to develop an undulator-based non-invasive beam profile monitor for beams created in laser-plasma accelerator systems.
Demonstration of Simultaneous Variable Energy 200-MeV to 800-MeV Operations [Slides]
Abstract not provided.
LANSCE Operation and Stripper Foil Performance [Slides]
Abstract not provided.
X-Ray Development Photos April 2023
The follow three slides are pictures from the deployment of the UCSB x-ray detectors across the DTL tanks. Pictures were taken at the beginning of April.
Energy and transverse acceptance calculation of the 750 keV RFQTS with Parmteqm
Using the code Parmteq and a model of the 750 keV test stand RFQ produced by Kress, labeled ‘as11c’, I calculate the effect on RFQ beam transmission in the following cases: 1. Varying input energy spread, 2. Transverse mismatch of the input beam, 3. Varying input emittance of matched beam, and 4. Injection offset of beam centroid. For this model, the RFQ transmission is 96.3%, input energy 35 keV, and beam current 35 mA.
LANSCE Facility Longevity Assessment
This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.
Resilient GaN-based Power Module with Improved Diagnostic for Future Accelerator
Los Alamos Neutron Science Center (LANSCE) and Dual-Axis Radiographic Hydrodynamic Test facility (DARHT) play a pivotal role in advancing scientific research and national security initiatives. As a premier facility for neutron science, LANSCE and DARHT provide invaluable insights into fundamental research, materials science, nuclear physics, high-energy physics, material science, and medical imaging. Existing (DC) power supply and pulse modulation technologies used in LANSCE and DARHT face limitations in terms of reliability, maintainability, and diagnostics which hinder the progress of these cutting-edge facilities. By proposing improvements to LANL accelerator facilities’ performance and addressing component failure, we aim to enhance scientific outcomes and minimize disruptions, allowing for more efficient and productive research activities while ensuring the continuity of valuable contributions to the user community. This proposal aims to revolutionize (DC) power supply and pulse power systems for future particle accelerators via the development of a resilient GaN-based power module with improved diagnostic and redundant submodules.
Intelligent Optimization of the Digital Low Level RF Control System for LANSCE LINAC
The LINAC at the Los Alamos Neutron Science Center (LANSCE) accelerates protons from 750 keV to its final energy at 800 MeV via 48 radio frequency (RF) modules. However, the startup and recovery process of the low-level RF (LLRF) systems, the primary controls for the RF modules, cost significant time for the beam operation, while the process itself is highly prone to human errors. With the new conversion from the analog LLRF (aLLRF) to digital LLRF (dLLRF) system under the recent LANSCE Modernization Project, new approaches with the new dLLRF capabilities can be achieved to address this issue. We propose to develop an intelligent optimization scheme that can significantly lower the downtime caused by the LLRF systems. This directly address the MFR problem statement that asks for “innovative engineering improvements to ancillary systems such as RF and pulsed power that improve reliability, maintainability, and/or performance.”