The Orion GN and C Data-Driven Flight Software Architecture for Automated Sequencing and Fault Recovery

The Orion Crew Exploration Vehicle (CET) is being designed to include significantly more automation capability than either the Space Shuttle or the International Space Station (ISS). In particular, the vehicle flight software has requirements to accommodate increasingly automated missions throughout all phases of flight. A data-driven flight software architecture will provide an evolvable automation capability to sequence through Guidance, Navigation & Control (GN&C) flight software modes and configurations while maintaining the required flexibility and human control over the automation. This flexibility is a key aspect needed to address the maturation of operational concepts, to permit ground and crew operators to gain trust in the system and mitigate unpredictability in human spaceflight. To allow for mission flexibility and reconfrgurability, a data driven approach is being taken to load the mission event plan as well cis the flight software artifacts associated with the GN&C subsystem. A database of GN&C level sequencing data is presented which manages and tracks the mission specific and algorithm parameters to provide a capability to schedule GN&C events within mission segments. The flight software data schema for performing automated mission sequencing is presented with a concept of operations for interactions with ground and onboard crew members. A prototype architecture for fault identification, isolation and recovery interactions with the automation software is presented and discussed as a forward work item.

King, Ellis↗

Explaining Soft-Goal Conflicts through Constraint Relaxations

Recent work suggests to explain trade-offs between soft goals in terms of their conflicts, i. e., minimal unsolvable soft-goal subsets. But this does not explain the conflicts themselves: Why can a given set of soft-goals not be jointly achieved? Here we approach that question in terms of the underlying constraints on plans in the task at hand, namely resource availability and time windows. In this context, a natural form of explanation for a soft-goal conflict is a minimal constraint relaxation under which the conflict disappears (“if the deadline was 1 hour later, it would work”). We explore algorithms for computing such explanations. A baseline is to simply loop over all relaxed tasks and compute the conflicts for each separately. We improve over this by two algorithms that leverage information – conflicts, reachable states – across relaxed tasks. We show that these algorithms can exponentially outperform the baseline in theory, and we run experiments confirming that advantage in practice.

Planning↗

Argumentation for coordinating shared activities

an increasing need for space missions to be able to collaboratively (and competitively) develop plans both within and across missions. In addition, interacting spacecraft that interleave onboard planning and execution must reach consensus on their commitments to each other prior to execution. In domains where missions have varying degrees of interaction and different constraints on communication and computation, the missions will require different coordination protocols in order to efficiently reach consensus with in their imposed deadlines. We describe a Shared Activity Coordination (SHAC) framework that provides a decentralized algorithm for negotiating the scheduling of shared activities over the lifetimes of multiple agents and a foundation for customizing protocols for negotiating planner interactions. We investigate variations of a few simple protocols based on argumentation and distributed constraints satisfaction techniques and evaluate their abilities to reach consistent solutions according to computation, time, and communication costs in an abstract domain where spacecraft propose joint measurements.

Mars↗

Optimization Model and Algorithm for Capacity Planning and Operation of Reliable and Carbon-neutral Power Systems with High Penetration of Renewable Generation

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Optimized Trajectory Correction Burn Placement for NRHO Orbit Maintenance

NASA's future Artemis missions plan to utilize a near rectilinear halo orbit (NRHO) in the lunar vicinity to facilitate access to the lunar surface and place other critical assets to support human exploration. This exploration architecture requires a vehicle to remain in the NRHO for long periods of time ranging from several days, to weeks, to months, and even years. Consequently, periodic orbit maintenance burns become essential to ensure the spacecraft follows the desired reference trajectory in an efficient yet effective manner despite crew activity, navigation uncertainty, maneuver execution errors, disturbance accelerations, orbit insertion dispersions, and other system limitations. This work introduces a targeting algorithm that can be utilized to analyze a variety of targeting constraints and parameters that maximizes overall performance. Techniques associated with robust trajectory optimization are used to identify the optimized number and placement for NRHO trajectory correction (NTC) burns that accounts for the mission schedule, both a primary and backup navigation system, targeting strategies and burn plan configurations, vehicle venting, thruster selection, and integrated GN\&C performance. A notional scenario extracted from the NASA Artemis III mission is used to motivate and demonstrate these concepts and performance results.

Linear Covariance Analysis↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

Demand Capacity Balancing at Vertiports for Urban Air Mobility

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

An integrated approach to space station power system autonomous control

Space Station electrical power management must be accomplished autonomously in order to decrease both airborne and ground support costs. Attention is presently given to the augmentation of terrestrial utility algorithmic decision aids for power dispatching for space station use, using expert systems to direct power demand analyses and the integration of results into operational decisions. Functions to be thus managed encompass power scheduling, energy allocation, failure cause diagnoses, goal proposal and plan preparation, consequence evaluation, and execution plan selection. The operating states of the system are normal, preventive, emergency, and restorative.

Dolce, James L.↗

Heuristic Area Cost Estimation for Observational Coverage Schedulers

This paper presents a comparison of heuris- tics used to estimate the amount of time it would take for a spacecraft to image an area using Boustrophedon decomposition (Choset and Pignon 1998). Machine learning tech- niques are used to characterize algorithmic performance of coverage algorithms. It is shown that an ordinary least-squares linear model is among the most accurate in a set of constant and linear order regression models both in terms of memory consumption and schedule duration. These are demonstrated using the ASPEN planning system (Fukunaga et al. 1997) on the Eagle Eye domain.

Knight, Russell↗

Area Coverage Planning with 3-axis Steerable, 2D Framing Sensors

Existing algorithms for Agile Earth Observing Satellites((Lemaitre et al. 2002)) were largely created for 1D line sensors that acquire images in linear swaths. However, imaging satellites increasingly use 2D framing sensors (cameras) that capture discrete rectangular images. We describe tiling step-stare approaches that are more suited to rectangular image footprints than are 1D swath-based algorithms. Optimal area planning for these 2D framing instruments is an NPcomplete problem and intractable for large areas, so we present four approximation algorithms. Strategies are compared against a prior 2D framing instrument algorithm (Knight 2014) in three computational experiments. The impact of observer agility on schedule makespan is examined. Makespans vary more as observer agility decreases toward a critical point, then vary less after the critical point, suggesting a possible problem phase transition.

Chien, Steve↗

A two-level structure for advanced space power system automation

The tasks to be carried out during the three-year project period are: (1) performing extensive simulation using existing mathematical models to build a specific knowledge base of the operating characteristics of space power systems; (2) carrying out the necessary basic research on hierarchical control structures, real-time quantitative algorithms, and decision-theoretic procedures; (3) developing a two-level automation scheme for fault detection and diagnosis, maintenance and restoration scheduling, and load management; and (4) testing and demonstration. The outlines of the proposed system structure that served as a master plan for this project, work accomplished, concluding remarks, and ideas for future work are also addressed.

Loparo, Kenneth A.↗

Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft

This 2-year report describes the progress made to date on the project to package and distribute the planning and scheduling toolkit for the SWAS astronomical spacecraft. SWAS was scheduled to be launched on a Pegasus XL vehicle in fall 1995. Three separate failures in the launch vehicle have delayed the SWAS launch. The researchers have used this time to continue developing scheduling algorithms and GUI design. SWAS is expected to be launched this year.

Kleiner, Steven C.↗

NAS Demand Predictions, Transportation Systems Analysis Model (TSAM) Compared with Other Forecasts

The current work incorporates the Transportation Systems Analysis Model (TSAM) to predict the future demand for airline travel. TSAM is a multi-mode, national model that predicts the demand for all long distance travel at a county level based upon population and demographics. The model conducts a mode choice analysis to compute the demand for commercial airline travel based upon the traveler s purpose of the trip, value of time, cost and time of the trip,. The county demand for airline travel is then aggregated (or distributed) to the airport level, and the enplanement demand at commercial airports is modeled. With the growth in flight demand, and utilizing current airline flight schedules, the Fratar algorithm is used to develop future flight schedules in the NAS. The projected flights can then be flown through air transportation simulators to quantify the ability of the NAS to meet future demand. A major strength of the TSAM analysis is that scenario planning can be conducted to quantify capacity requirements at individual airports, based upon different future scenarios. Different demographic scenarios can be analyzed to model the demand sensitivity to them. Also, it is fairly well know, but not well modeled at the airport level, that the demand for travel is highly dependent on the cost of travel, or the fare yield of the airline industry. The FAA projects the fare yield (in constant year dollars) to keep decreasing into the future. The magnitude and/or direction of these projections can be suspect in light of the general lack of airline profits and the large rises in airline fuel cost. Also, changes in travel time and convenience have an influence on the demand for air travel, especially for business travel. Future planners cannot easily conduct sensitivity studies of future demand with the FAA TAF data, nor with the Boeing or Airbus projections. In TSAM many factors can be parameterized and various demand sensitivities can be predicted for future travel. These resulting demand scenarios can be incorporated into future flight schedules, therefore providing a quantifiable demand for flights in the NAS for a range of futures. In addition, new future airline business scenarios are investigated that illustrate when direct flights can replace connecting flights and larger aircraft can be substituted, only when justified by demand.

Viken, Jeff↗

Utilizing Traveler Demand Modeling to Predict Future Commercial Flight Schedules in the NAS

The current work incorporates the Transportation Systems Analysis Model (TSAM) to predict the future demand for airline travel. TSAM is a multi-mode, national model that predicts the demand for all long distance travel at a county level based upon population and demographics. The model conducts a mode choice analysis to compute the demand for commercial airline travel based upon the traveler s purpose of the trip, value of time, cost and time of the trip,. The county demand for airline travel is then aggregated (or distributed) to the airport level, and the enplanement demand at commercial airports is modeled. With the growth in flight demand, and utilizing current airline flight schedules, the Fratar algorithm is used to develop future flight schedules in the NAS. The projected flights can then be flown through air transportation simulators to quantify the ability of the NAS to meet future demand. A major strength of the TSAM analysis is that scenario planning can be conducted to quantify capacity requirements at individual airports, based upon different future scenarios. Different demographic scenarios can be analyzed to model the demand sensitivity to them. Also, it is fairly well know, but not well modeled at the airport level, that the demand for travel is highly dependent on the cost of travel, or the fare yield of the airline industry. The FAA projects the fare yield (in constant year dollars) to keep decreasing into the future. The magnitude and/or direction of these projections can be suspect in light of the general lack of airline profits and the large rises in airline fuel cost. Also, changes in travel time and convenience have an influence on the demand for air travel, especially for business travel. Future planners cannot easily conduct sensitivity studies of future demand with the FAA TAF data, nor with the Boeing or Airbus projections. In TSAM many factors can be parameterized and various demand sensitivities can be predicted for future travel. These resulting demand scenarios can be incorporated into future flight schedules, therefore providing a quantifiable demand for flights in the NAS for a range of futures. In addition, new future airline business scenarios are investigated that illustrate when direct flights can replace connecting flights and larger aircraft can be substituted, only when justified by demand.

Viken, Jeff↗

Autonomous Precision Landing and Hazard Avoidance Technology (ALHAT) Project Status as of May 2010

This paper includes the current status of NASA s Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) Project. The ALHAT team has completed several flight tests and two major design analysis cycles. These tests and analyses examine terrain relative navigation sensors, hazard detection and avoidance sensors and algorithms, and hazard relative navigation algorithms, and the guidance and navigation system using these ALHAT functions. The next flight test is scheduled for July 2010. The paper contains results from completed flight tests and analysis cycles. ALHAT system status, upcoming tests and analyses is also addressed. The current ALHAT plans as of May 2010 are discussed. Application of the ALHAT system to landing on bodies other than the Moon is included

Striepe, Scott A.↗

Self-Directed Cooperative Planetary Rovers

The project is concerned with the development of decision-theoretic techniques to optimize the scientific return of planetary rovers. Planetary rovers are small unmanned vehicles equipped with cameras and a variety of sensors used for scientific experiments. They must operate under tight constraints over such resources as operation time, power, storage capacity, and communication bandwidth. Moreover, the limited computational resources of the rover limit the complexity of on-line planning and scheduling. We have developed a comprehensive solution to this problem that involves high-level tools to describe a mission; a compiler that maps a mission description and additional probabilistic models of the components of the rover into a Markov decision problem; and algorithms for solving the rover control problem that are sensitive to the limited computational resources and high-level of uncertainty in this domain.

Zilberstein, Shlomo↗

Efficient Spectral Endmember Detection Onboard the EO-1 Spacecraft

Spaceflight and planetary exploration place severe constraints on the available bandwidth for downlinking large hyperspectral images. In addition, communications with spacecraft often occur intermittently, so mission-relevant hyperspectral data must wait for analysis on the ground before it can inform spacecraft activity planning. Onboard endmember detection can help alleviate these problems. It enables novelty detection and target identification for scheduling follow-up activities such as additional observation by narrow field of view instruments. Additionally, endmember analysis can facilitate data summary for downlink. This work describes a planned experiment of selective downlink by the EO-1 autonomous spacecraft. Here an efficient superpixel endmember detection algorithm keeps to the limited computational constraints of the flight processor. Tests suggest the procedure could enable significant improvements in downlink efficiency.

Endmember Detection↗

SEDSAT 1 Technologies

The original goals of this project were to support the development of SEDSAT 1 for a tethered launch in July of 1997. This specifically required: (1) Monitoring development progress against a comprehensive delivery plan; (2) Incremental development and release of CDS and SEASIS software; (3) Supporting the integration of version 1.0 SEASIS software that will allow minimal autonomous operation without a software reload. These algorithms would include image quality evaluation, attitude determination, and autonomous earth imaging; and (4) Developing software requirements and design for ground segment software, concentrating on command and data download capability; and interface to external development efforts for a more comprehensive software suite to be used after the initial mission. Because of an unfavorable space shuttle safety review of the SEDS-3 tether deployer, and cost and schedule problems in upgrading the deployer, the mission was changed to an independent launch of SEDSAT. The original plan was to do a tether-less deployment from the space shuttle. Since this would have resulted in an unacceptable orbital lifetime, the mission was changed again to a tethered launch from a Delta II in June 1998. As a result of Marshall Space Flight Center's redirection of the SEDS-3 mission away from a tether launch, the whole question of a tether endmass had to be reconsidered. The net result of these multiple changes was twofold. First, we completed work needed to define some aspects of ground software on SEDSAT 1 that would remain constant no matter the launch mode. Second, we developed a set of concepts for using SEDSAT 1 technology to support alternative endmass missions on SEDS-3. Both of these are included.

Maier, Mark W.↗