Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning Scheduling Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Schedule Risks Due to Delays in Advanced Technology Development

This paper discusses a methodology and modeling capability that probabilistically evaluates the likelihood and impacts of delays in advanced technology development prior to the start of design, development, test, and evaluation (DDT&E) of complex space systems. The challenges of understanding and modeling advanced technology development considerations are first outlined, followed by a discussion of the problem in the context of lunar surface architecture analysis. The current and planned methodologies to address the problem are then presented along with sample analyses and results. The methodology discussed herein provides decision-makers a thorough understanding of the schedule impacts resulting from the inclusion of various enabling advanced technology assumptions within system design.

Reeves, John D. Jr.↗

Effective Schedule and Cost Management as a Product Development Lead

The presentation will be given at the 26th Annual Thermal Fluids Analysis Workshop (TFAWS 2015) hosted by the Goddard SpaceFlight Center (GSFC) Thermal Engineering Branch (Code 545). This course provides best practices, helpful tools and lessons learned for staying on plan and day-to-day management of Subsystem flight development after getting Project approval for your Subsystem schedule and budget baseline.

Schedule↗

Astronomy sortie mission definition study. Addendum: Follow-on analyses

Results of design analyses, trade studies, and planning data of the Astronomy Sortie Mission Definition Study are presented. An in-depth analysis of UV instruments, nondeployed solar payload, and on-orbit access is presented. Planning data are considered, including the cost and schedules associated with the astronomy instruments and/or support hardware. Costs are presented in a parametric fashion.

Source record↗

Definition of technology development missions for early Space Station satellite servicing. Volume 2: Technical

Volume 2 contains the Technical Report of the approach and results of the Phase 2 study. The phase 2 servicing study was initiated in June 1983, and is being reported in this document. The scope of the contract was to: (1) define in detail five selected technology development missions (TDM); (2) conduct a design requirement analysis to refine definitions of satellite servicing requirements at the space station; and (3) develop a technology plan that would identify and schedule prerequisite precursor technology development, associated. STS flight experiments and space station experiments needed to provide onorbit validation of the evolving technology.

Cable, D. A.↗

Enhanced project management tool

A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

Maluf, David A.↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

LDEF/Shuttle capabilities for environmental testing in space

The Long Duration Exposure Facility (LDEF) is being developed to accommodate experiments which require a free-flying exposure in space and which benefit from postflight laboratory analysis of the retrieved experiment hardware. The first LDEF mission, which is planned for a 6- to 12-month stay in space is scheduled in the late 1970s during the Shuttle Orbital Flight Test Program. The LDEF is a simple reusable structure which is three-axis gravity gradient stabilized when free flying in space. The experiments on the LDEF are totally self-contained in trays mounted to the structure. After the LDEF is either revisited or retrieved by the Shuttle, the trays with experiments will be returned to the experimenters for postflight inspection. Attention is given to the fabrication of a second LDEF for a long-term mission planned in 1979, aspects of LDEF orbit life time, the radiation environment, questions of solar exposure, the thermal environment, and the vacuum (atomic particle) environment.

Clark, L. G.↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd-generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

System Architecture Modeling for Technology Portfolio Management using ATLAS

Strategic planners and technology portfolio managers have traditionally relied on consensus-based tools, such as Analytical Hierarchy Process (AHP) and Quality Function Deployment (QFD) in planning the funding of technology development. While useful to a certain extent, these tools are limited in the ability to fully quantify the impact of a technology choice on system mass, system reliability, project schedule, and lifecycle cost. The Advanced Technology Lifecycle Analysis System (ATLAS) aims to provide strategic planners a decision support tool for analyzing technology selections within a Space Exploration Architecture (SEA). Using ATLAS, strategic planners can select physics-based system models from a library, configure the systems with technologies and performance parameters, and plan the deployment of a SEA. Key parameters for current and future technologies have been collected from subject-matter experts and other documented sources in the Technology Tool Box (TTB). ATLAS can be used to compare the technical feasibility and economic viability of a set of technology choices for one SEA, and compare it against another set of technology choices or another SEA. System architecture modeling in ATLAS is a multi-step process. First, the modeler defines the system level requirements. Second, the modeler identifies technologies of interest whose impact on an SEA. Third, the system modeling team creates models of architecture elements (e.g. launch vehicles, in-space transfer vehicles, crew vehicles) if they are not already in the model library. Finally, the architecture modeler develops a script for the ATLAS tool to run, and the results for comparison are generated.

Thompson, Robert W.↗

Investigation of air transportation technology at the Massachusetts Institute of Technology, 1988-1989

There are four areas of research being pursued in 1988 under sponsorship of the FAA/NASA Joint University Research Program, and one area which has been completed. The four active areas were: (1) Automatic Speech Recognition (ASR) in Air Traffic Control. The purpose of this research effort is to demonstrate the feasibility of using ASR technology within the ATC environment and to address the problems involved, especially the relevant human factors issues. (2) A Rule-Based Planning and Scheduling System. Planning denotes the formulation of a detailed scheme, program, or method worked out beforehand for the accomplishment of a goal. It involves the analysis of the desired goal and its division into sub-goals which are subsequently treated in the same way until a set of primitive objectives is obtained. (3) Modeling of Ice Accretion on Aircraft in Glaze Icing Conditions. The work in aircraft icing over the past year has focused on the fundamental aspects of glaze ice accretion, with the goal of improving analytical ice accretion models. Over the past year, studies have been conducted on the generation of surface roughness on accreting ice surfaces with the goal of providing a deterministic surface roughness in the ice accretion models. (4) Cockpit Display of Hazardous Weather Information. Information transfer and display issues associated with the dissemination of hazardous weather warnings are studied in the context of windshear alerts.

Simpson, Robert W.↗

Control of Technology Transfer at JPL

Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

Jet Propulsion Laboratory (JPL)↗

Enabling Autonomous Rover Science through Dynamic Planning and Scheduling

This paper describes how dynamic planning and scheduling techniques can be used onboard a rover to autonomously adjust rover activities in support of science goals. These goals could be identified by scientists on the ground or could be identified by onboard data-analysis software. Several different types of dynamic decisions are described, including the handling of opportunistic science goals identified during rover traverses, preserving high priority science targets when resources, such as power, are unexpectedly over-subscribed, and dynamically adding additional, ground-specified science targets when rover actions are executed more quickly than expected. After describing our specific system approach, we discuss some of the particular challenges we have examined to support autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations.

planning↗

On orbit mission planning using the shuttle trajectory and launch window expert system

With the Space Transportation System (STS) entering the operational era, the need for standardized, automated, mission planning computer tools has become apparent. In order to support an increased flight rate without an increase in manpower, quicker and more efficient methods are needed to perform standard tasks. The Shuttle Trajectory and Launch Window Expert System (STALEX) was developed to automate many aspects of early mission planning for space shuttle missions carrying geosynchronous communications satellites. Most of the commercial Shuttle missions planned for the next 3 years will carry at least one of this type of satellite. The applications of STALEX include payload deployment scheduling, launch window analysis, orbital trajectory determination, and landing opportunity selection.

Ahlf, P. R.↗

AdaNET research project

The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.

Digman, R. Michael↗

X-37 C/SiC Ruddervator Subcomponent Test Program

Completed thermal-mechanical and mechanical load testing: a) 6 re-entry heating tests (3 with loading to 50% DLL), 3 hypersonic cruise tests with loading to 50% DLL and 4 high-temperature modal survey tests. b) 9 tests to 100% DLL. High-temperature modal survey results were inconclusive due to exceeding capability of some accelerometers. Overall good correlation between analysis and measured results for windward and leeward surface temperatures. Generally poor correlation between analysis and measured results for spindle area temperatures. Excellent test-to-test repeatability in strain and deflection data for 100% DLL testing. In-situ thermography images taken before and after thermal testing showed only minor changes in initial defects. Final detailed thermography tests scheduled for completion in Oct 09. In process of completing test documentation and test data analysis. Final reports complete by Dec 09. All analysis, test data, test plans, reports, photos, etc. will be made available to the technical community via the CMC Wiki.

Hudson, Larry D.↗

Cruise-Efficient Short Takeoff and Landing (CESTOL): Potential Impact on Air Traffic Operations

The National Aeronautics and Space Administration (NASA) is investigating technological and operational concepts for introducing Cruise-Efficient Short Takeoff and Landing (CESTOL) aircraft into a future US National Airspace System (NAS) civil aviation environment. CESTOL is an aircraft design concept for future use to increase capacity and reduce emissions. CESTOL provides very flexible takeoff, climb, descent and landing performance capabilities and a high-speed cruise capability. In support of NASA, this study is a preliminary examination of the potential operational impact of CESTOL on airport and airspace capacity and delay. The study examines operational impacts at a subject site, Newark Liberty Intemational Airport (KEWR), New Jersey. The study extends these KEWR results to estimate potential impacts on NAS-wide network traffic operations due to the introduction of CESTOL at selected major airports. These are the 34 domestic airports identified in the Federal Aviation Administration's Operational Evolution Plan (OEP). The analysis process uses two fast-time simulation tools to separately model local and NAS-wide air traffic operations using predicted flight schedules for a 24-hour study period in 2016. These tools are the Sen sis AvTerminal model and NASA's Airspace Concept Evaluation System (ACES). We use both to simulate conventional-aircraft-only and CESTOL-mixed-with-conventional-aircraft operations. Both tools apply 4-dimension trajectory modeling to simulate individual flight movement. The study applies AvTerminal to model traffic operations and procedures for en route and terminal arrival and departures to and from KEWR. These AvTerminal applications model existing arrival and departure routes and profiles and runway use configurations, with the assumption jet-powered, large-sized civil CESTOL aircraft use a short runway and standard turboprop arrival and departure procedures. With these rules, the conventional jet and CESTOL aircraft are procedurally separated from each other geographically and in altitude during tenninal airspace approach and departure operations, and each use a different arrival runway. AvTeminal implements its unique Focal-point Scheduling Process to sequence, space and delay aircraft to resolve spacing and overtake conflicts among flights in the airspace and airport system serving KEWR. This Process effectively models integrated arrival and departure operations. AvTerminal assesses acceptance rates and delay magnitude and causality at selected locations, including en route outer boundary fixes, tenninal airspace arrival and departure boundary fixes, terminal airspace arrival merge and departure diverge fixes, and runway landing and takeoff runways. The analysis compares the resulting capacity impacts, flight delays and delay sources between CESTOL and conventional KEWR operations. AvTerminal quantitative results showed that CESTOL has significant capability to increase airport arrival acceptance rates (35-40% at KEWR) by taking advantage of otherwise underused airspace and runways where available. The study extrapolates the AvTerminal-derived KEWR peak arrival and departure acceptance rates to estimate capacity parameter values for each of the OEP airports in the ACES modeling of traffic through the entire NAS network. The extrapolations of acceptance rates allow full, partial or no achievement of CESTOL capacity gains at an OEP airport as determined by assessments of the degree to which local procedures allow leveraging of CESTOL capabilities. These assessments consider each OEP airport's runway geometries, runway system configurations, airport and airspace operations, and potential CESTOL traffic loadings. The ACES modeling, simulates airport and airspace spacing constraints imposed by airport runway system, terminal and en route air traffic control and traffic flow management operations using airport acceptance rates representing conventional-aircraft-only and CESTOL-mixed operations. CEOL aircraft are assumed to have Mach 0.8, and alternatively Mach 0.7, cruise speeds to examine compatibility with conventional aircraft operations in common airspace. The ACES results provides estimates of CESTOL delay impact NAS-wide and at OEP airports due to changes in OEP airport acceptance rates and changes in en route airspace potential conflict rates. Preliminary results show meaningful nationwide delay reductions (20%) due to CESTOL operations at 34 major domestic airports.

Couluris, G. J.↗

MaROS Strategic Relay Planning and Coordination Interfaces

The Mars Relay Operations Service (MaROS) is designed to provide planning and analysis tools in support of ongoing Mars Network relay operations. Strategic relay planning requires coordination between lander and orbiter mission ground data system (GDS) teams to schedule and execute relay communications passes. MaROS centralizes this process, correlating all data relevant to relay coordination to provide a cohesive picture of the relay state. Service users interact with the system through thin-layer command line and web user interface client applications. Users provide and utilize data such as lander view periods of orbiters, Deep Space Network (DSN) antenna tracks, and reports of relay pass performance. Users upload and download relevant relay data via formally defined and documented file structures including some described in Extensible Markup Language (XML). Clients interface with the system via an http-based Representational State Transfer (ReST) pattern using Javascript Object Notation (JSON) formats. This paper will provide a general overview of the service architecture and detail the software interfaces and considerations for interface design.

Allard, Daniel A.↗