Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power system operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Impact of Spatial Variation in Flexibility on System Operations in Electric Power Systems

With the expansion of renewable energy resources in the electric power systems, having flexibility in the setup will allow to maintain the system's reliability and prevailing operations. Such flexibility can be extracted from utility operated and/or consumer owned devices, such as, storage devices, electric vehicles, etc. For the demand side, generally consumer preferences, incentives, etc. enact on the availability of the flexibility; besides, both the spatial and temporal dimension dictates the degree of the flexibility. Consequently, the optimal dispatch of the grid resources might appear intractable as the considerable amount of flexibility are obliquely stemming from the ungovernable consumer devices. Thus characterizing the consequences of diverged feasible flexibility in the system is crucial for operations. In this paper, a procedure is developed to quantify the degree of flexibility of power systems in terms of resource dispatch reconfiguration. Specifically, we develop optimization problems to attain equivalent resource configurations for the power systems to evaluate the spatial volatility of the network and asses the flexibility of the system. The developed process is then validated using numerical simulations for IEEE-30 bus test system.

Sadnan, Rabayet↗

Overview of the Habitat Demonstration Unit Power System Integration and Operation at Desert RATS 2010

A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.

Colozza, Anthony J.↗

Common Electric Power Transmission System Model JSON Schema Specification

The Common Electric Power Transmission System Model (CTM) is an intuitive, extensible, language-agnostic, and error-resistant specification of electric power network components parameter names and units, and relation between components, intended for use by the research community developing new computational methods for power systems operations and simulation. Power system datasets following the CTM specification can be read as dictionaries and manipulated in that form in most programming languages (e.g., Python, Julia, C++). This standard data structure in CTM makes it easy to work in multiple power systems domains (e.g., economic operation, reliability assessment, electricity markets, stability assessment, etc.) without requiring conversions between use-case-specific file formats with information loss in the process. This repository specifies CTM as a JSON Schema, provides documentation, derivate (code-generated) implementations of CTM, and example data and usage of the schema for important use cases.

Aravena Solis, Ignacio↗

Open-Source Steady-State Models for Integration of Wave Energy Converter into Microgrids

This paper proposes a software framework, WEC-Grid, for integrating wave energy converters (WECs) into power flow software, such as Siemens PSS®E, to aid the integration of alternative energy sources into Microgrids. While integrating alternative sources such as WECs presents specific challenges such as cost, power quality, and power variability, wave energy is a promising renewable energy resource. Evaluating the integration of WECs into the power grid is a complex and nuanced problem that requires seamless communication between a WEC model and power flow software. The presented WEC-Grid software framework bridges and extends the functionality of WEC-Sim, an open-source WEC modeling package for MATLAB, through a wave-to-wire (W2W) electro-mechanical power conversion and processing model. WEC-Grid acts as a software wrapper, handler, and communication layer between the W2W modeler and power flow software. The software is designed to represent each grid system as a class object, allowing power system operators to perform power system duties such as contingency planning and dispatch operations. The integration of WECs with PSS®E’s power flow calculations workflow is demonstrated with an IEEE RTS case study.

16 TIDAL AND WAVE POWER↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Error-Level-Controlled Synthetic Forecasts for Renewable Generation

Renewable energy resources, including solar and wind energy, play a significant role in sustainable energy systems. However, the inherent uncertainty and intermittency of renewable generation pose challenges to the safe and efficient operation of power systems. Recognizing the importance of short-term (hours ahead) renewable generation forecasting in power systems operation, it becomes crucial to address the potential inaccuracies in these forecasts. To systematically evaluate the performance of controllers in the presence of imperfect forecasts, we generate synthetic forecasts using actual renewable generation profiles (one from solar and one from wind). These synthetic forecasts incorporate different levels of statistical error, allowing us to control and manipulate the accuracy of the predictions. The primary objective is to employ synthetic forecasts with controlled yet realistic error levels to systematically investigate how controllers adapt to variations in forecast accuracy, providing valuable insights into their robustness and effectiveness under real-world conditions.

Array↗

Renewable energy integration and system operation challenge: control and optimization of millions of devices

The electric power infrastructure, originally designed and built on large-scale power plants, is evolving into a more resilient power generation and delivery system in which millions of smaller units of distributed energy generation resources units will be installed in sub-transmission and distribution networks. In order to control, manage and optimize the future grid, a hierarchical design is presented in this chapter which enables the distributed control on grid edge while inheriting the existing centralized control structure. This layered design of large-scale power system operation and control uses the following principle: reactive power control is treated as a primary control for voltage stability, and the real power control is primarily a grid-level control but can also be a supplementary control for voltage support in the case of insufficient reactive power control capacity. For the purpose of active control and operation at the distribution level, a recursive power network model is derived from nodal injection and branch power flow models. Based on the model, the proposed algorithms of hierarchical control, grid-edge inference and dynamic hosting allowance are developed and presented for multi-level controlled operation. And, a co-simulation architecture of integrated T&D system is presented to validate and demonstrate the feasibility and scalability of proposed algorithms.

Xu, Ying↗

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Readiness Assessments Supporting a Nuclear-enabled NASA Mission

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Preparations, Documentation, Readiness Assessments and Conduct of Operations Supporting a Nuclear-enabled NASA Mission Kelly L. Lively, Eric S. Clarke, Robert P. Gomez Idaho National Laboratory, Idaho Falls, ID 83415 208-533-7388; Kelly.Lively@inl.gov Abstract. The Radioisotope Power Systems (RPS) Program, located at Idaho National Laboratory (INL), is responsible for assembling, testing, and delivering plutonium oxide-fueled RPSs for use in powering missions in remote, harsh environments such as deep space. An informative presentation will be given discussing the preparations, documents, readiness assessments, human capital and conduct of operations involved in performing nuclear operations to support providing these systems to end users for the Department of Energy (DOE). DOE is the start-up authority for performing nuclear operations. Readiness for start-up is determined through independent assessment against established acceptance criteria to ensure activities can be performed safely and within a well defined nuclear safety envelope. There is also an RPS Program approval element requiring additional readiness review before nuclear operations can begin. The programmatic readiness review is performed to ascertain readiness to proceed with nuclear operations from the perspective of product quality. The assessments and reviews are conducted in series in the following order of progression: Management Self Assessment (MSA), Contractor Readiness Assessment (CRA), DOE Readiness Assessment (DOE RA) and lastly, the Programmatic Production Readiness Review (PRR). The CRA, DOE RA, and PRR requires an independent technical review team. Twelve assessment criteria are reviewed and a selection of the criteria is identified for review on a graded approach. Typically, the assessments/review criteria requires, at a minimum, review of operating instructions to ensure technical safety requirements are adequately identified, review of training records to ensure personnel are adequately trained to perform the specified work scope, personnel are interviewed to determine adequacy of level of knowledge for work scope, and a high-fidelity performance of the operation to ensure the operating instructions and conduct of operations are adequate to perform the work scope. As each assessment/review is conducted a formal report delineating any issues in the form of findings, observations, and noteworthy practices will be issued. Before start-up approval is obtained all issues must be resolved to the satisfaction of the individual teams. Start-up notification is formally communicated by memorandum from DOE. Programmatic approval is documented in a Segmented Readiness Review where vested Program representatives in the RPS community (to include DOE NE 75 and DOE ID representatives) ensure personnel, documentation, and materials are in place to perform the activity. The four assessments/reviews can be completed in a 16-week period of time, provided ample resources and a relatively small work scope is identified. RPS assembly and testing operations to support the Mars 2020 Mission, the next planned space mission using a nuclear power system, will require about of year of assessments/reviews before the nuclear operations are performed. Keywords: INL, Operations, Assessments, DOE

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Electric Power Industry Challenges Due to Increasing Shares of Inverter-Based Resources in Power Systems

The large-scale integration of variable renewable energy technologies around the world is forcing electric power systems into an unprecedented transition. This paper reports on power grid modernization and reliability issues related to the planning and operation of power systems with high levels of variable renewable energy. The contents of this paper stem from recent qualitative research in the form of a summary of an industry survey. The technical feedback from the interviewed 37 industry experts helped us identify 12 key areas of potential concern, which are discussed throughout this paper.

power system operation↗

Contingency Analysis Post-Processing With Advanced Computing and Visualization

Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

Chen, Yousu↗

Implications of Power Plant Idling and Cycling on Water Use Intensity

Survey data from the Energy Information Administration (EIA) was combined with data from the Environmental Protection Agency (EPA) to explore ways in which operations might impact water use intensity (both withdrawals and consumption) at thermoelectric power plants. Two disparities in cooling and power systems operations were identified here that could impact water use intensity: 1) Idling Gap—where cooling systems continue to operate when their boilers and generators are completely idled; and 2) Cycling Gap—where cooling systems operate at full capacity, while their associated boiler and generator systems cycle over a range of loads. Analysis of the EIA and EPA data indicated that cooling systems operated on average 13% more than their corresponding power system (Idling Gap), while power systems operated on average 30% below full load when the boiler was reported as operating (Cycling Gap). Regression analysis was then performed to explore whether the degree of power plant idling/cycling could be related to the physical characteristics of the plant, its environment or time of year. While results suggested that individual power plants’ operations were unique, weak trends consistently pointed to a plant’s place on the dispatch curve as influencing patterns of cooling system, boiler, and generator operation. This insight better positions us to interpret reported power plant water use data as well as improve future water use projections.

54 ENVIRONMENTAL SCIENCES↗

Enabling Power System Transformation Globally: A System Operator Research Agenda for Bulk Power System Issues

The primary objective of a power system is to safely provide reliable energy services to society at an affordable cost. In many countries, this objective has been supplemented by another: meeting the energy demand with sustainable resources, which has culminated in the energy transition to low-carbon and zero-carbon energy systems. This transition, occurring rapidly around the world, is characterized by the increasing penetration of variable renewable energy (VRE), inverter-based resources (IBRs), and distributed energy resources (DERs).

costs↗

Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operations (SUMMER-GO): Project Final Report

The Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operation (SUMMER-GO) project was recently completed through a collaboration among the National Renewable Energy Laboratory, Maxar, the Electric Reliability Council of Texas (ERCOT), the University of Texas at Dallas, the University of California Berkeley, and the University of Colorado Boulder. The project made significant advances in probabilistic solar power forecasting, both through the development of Bayesian model averaging methods for ensemble forecasting and in bringing these and other advancements into practice with Maxar's delivery of operational forecasts to ERCOT. In addition to creating more reliable solar power forecasts, the project developed methods for their utilization in power system operations. These include the development of risk-aware unit commitment and economic dispatch algorithms and methods to reformulate probabilistic forecasts to be used in these power system operational models. Dynamic power system reserve methods were also developed, which have been shown in silico to create economic savings and reliability improvements on an ERCOT-like system as well as financial savings in the ERCOT system through more granular consideration of the uncertainty associated with solar power forecasts. Finally, a situational awareness tool to help grid operators better understand solar power forecast uncertainty in daily operations was developed and extensively vetted.

14 SOLAR ENERGY↗

Statistical Characterization of Solar Photovoltaic Power Variability at Small Timescales: Preprint

Integrating large amounts of variable and uncertain solar photovoltaic power into the electricity grid is a growing concern for power system operators in a number of different regions. Power system operators typically accommodate variability, whether from load, wind, or solar, by carrying reserves that can quickly change their output to match the changes in the solar resource. At timescales inthe seconds-to-minutes range, this is known as regulation reserve. Previous studies have shown that increasing the geographic diversity of solar resources can reduce the short term-variability of the power output. As the price of solar has decreased, the emergence of very large PV plants (greater than 10 MW) has become more common. These plants present an interesting case because they are largeenough to exhibit some spatial smoothing by themselves. This work examines the variability of solar PV output among different arrays in a large (50 MW) PV plant in the western United States, including the correlation in power output changes between different arrays, as well as the aggregated plant output, at timescales ranging from one second to five minutes.

14 SOLAR ENERGY↗