Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Information and problem report usage in system saftey engineering division

Five basic problems or question areas are examined. They are as follows: (1) Evaluate adequacy of current problem/performance data base; (2) Evaluate methods of performing trend analysis; (3) Methods and sources of data for probabilistic risk assessment; and (4) How is risk assessment documentation upgraded and/or updated. The fifth problem was to provide recommendations for each of the above four areas.

Morrissey, Stephen J.↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗

Probabilistic structural analysis: Introductory remarks

The development of probabilistic structural analysis methodology consists of the following program elements: (1) composite load spectra models, (2) computational probabilistic structural analysis methods, and (3) probabilistic constitutive relationships. The development of the probabilistic structural analysis methodology is a joint program of NASA Lewis in-house and sponsored research. The objective of this session is to illustrate recent progress on the application of this methodology to determine the reliability of structural components for rocket propulsion systems. The session contains descriptions of and progress reports on the following specific activities: (1) The NESSUS computer code, (2) approximate methods, (3) advanced methods, (4) composite load spectra applications, (5) probabilistic fracture mechanisms, and (6) probability of failure and risk analysis. Collectively, the progress to date demonstrates that the structural durability of hot engine structural components can be effectively evaluated in a formal probabilistic/reliability framework.

Chamis, Christos C.↗

Probability of Failure and Risk Assessment of Propulsion Structural Components

Due to increasing need to account for the uncertainties in material properties, loading conditions, or geometries, a methodology was developed to determine structural reliability and the assess the risk associated with it. The methodology consists of a probabilistic structural analysis by a probabilistic finite element computer code Nonlinear Evaluation of Stochastic Structures Under Stress (NESSUS) and a generic probabilistic material properties model. The methodology is versatile and is equally applicable to high and cryogenic temperature structures. Results obtained demonstrate that the whole issue of structural reliability and risk can be formally evaluated using the methodology developed which is inclusive of uncertainties in material properties, structural parameters and loading conditions. The methodology is described in some detail with illustrative examples.

Shiao, Michael C.↗

LOFTID Aeroshell Thermal Response Uncertainty Analysis Utilizing the End-to-End Monte Carlo Approach

A probabilistic thermal margin process has been performed to design the flexible thermal protection system (FTPS) and select entry trajectory constraints given an acceptable risk level for the Low-Earth Orbit Flight Test of and Inflatable Decelerator (LOFTID) project. Uncertainties exist in atmospheric entry aeroheating environments and the predicted thermal response of thermal protection system (TPS) material. Entry vehicle TPS is often over-sized to mitigate uncertainty by combining conservative bounding scenarios together. The probabilistic thermal margin process allows engineers to make informed aeroshell design, flight design, and FTPS performance risk trades while preventing excessive FTPS margin from being applied. This paper describes the uncertainty analysis methodology used to carry out a probabilistic thermal margin process used for LOFTID’s aeroshell and explains how the calculated probability of exceeding flight allowable temperatures is used to design the FTPS and establish nominal flight design constraints. This probabilistic thermal margin process had never been applied to entry, decent, and landing design for a flown entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven Andrew Tobin↗

Aviation Safety Risk Modeling: Lessons Learned From Multiple Knowledge Elicitation Sessions

Aviation safety risk modeling has elements of both art and science. In a complex domain, such as the National Airspace System (NAS), it is essential that knowledge elicitation (KE) sessions with domain experts be performed to facilitate the making of plausible inferences about the possible impacts of future technologies and procedures. This study discusses lessons learned throughout the multiple KE sessions held with domain experts to construct probabilistic safety risk models for a Loss of Control Accident Framework (LOCAF), FLightdeck Automation Problems (FLAP), and Runway Incursion (RI) mishap scenarios. The intent of these safety risk models is to support a portfolio analysis of NASA's Aviation Safety Program (AvSP). These models use the flexible, probabilistic approach of Bayesian Belief Networks (BBNs) and influence diagrams to model the complex interactions of aviation system risk factors. Each KE session had a different set of experts with diverse expertise, such as pilot, air traffic controller, certification, and/or human factors knowledge that was elicited to construct a composite, systems-level risk model. There were numerous "lessons learned" from these KE sessions that deal with behavioral aggregation, conditional probability modeling, object-oriented construction, interpretation of the safety risk results, and model verification/validation that are presented in this paper.

Luxhoj, J. T.↗

Root Cause Analysis of the Data Refinement Process – Medical Conditions Capability Resource Tables

The medical system for spaceflight thus far has been designed to support missions in low earth orbit (LEO). Crew capabilities are limited and heavily dependent on the team of medical support staff at Mission Control Center (MCC) to guide diagnosis and management. However, missions to the Moon and Mars will suffer from several constraints that will make this ground support focused approach to care ineffective. In order to update and modify medical system design, NASA has relied on Probabilistic Risk Assessment (PRA) modeling to mitigate medical risk through trade space analysis. Specifically, capability resource tables (CRT’s) were developed to create a dataset of resources required to manage a list of accepted medical conditions significant in exploration spaceflight. With 120 conditions, this dataset contained hundreds of capabilities and thousands of resources with tens of thousands of cells of data. Initially these tables were built in excel for high throughput during development, but ultimately had to be transferred, managed, and modified into the Evidence Library database for modeling purposes. The process of collating and reviewing the Evidence Library revealed numerous errors in the dataset that had to be corrected through iterative changes. Several error types emerged during this process and can be broken into specific classifications defined as “input”, “transcription”, “structural”, “branching”, and “information”. In reviewing these error types through the root cause analysis (RCA) approach, we were able to identify the contributors to these errors which included single data review points, changing product end goals, limited software selection, time constraints and several others. By reviewing and evaluating the underlying causes we can provide possible system improvements that can be implemented for current and future data management in PRA model inputs.

A. Anderson↗

Probabilistic simulation of uncertainties in thermal structures

Development of probabilistic structural analysis methods for hot structures is a major activity at Lewis Research Center. It consists of five program elements: (1) probabilistic loads; (2) probabilistic finite element analysis; (3) probabilistic material behavior; (4) assessment of reliability and risk; and (5) probabilistic structural performance evaluation. Recent progress includes: (1) quantification of the effects of uncertainties for several variables on high pressure fuel turbopump (HPFT) blade temperature, pressure, and torque of the Space Shuttle Main Engine (SSME); (2) the evaluation of the cumulative distribution function for various structural response variables based on assumed uncertainties in primitive structural variables; (3) evaluation of the failure probability; (4) reliability and risk-cost assessment, and (5) an outline of an emerging approach for eventual hot structures certification. Collectively, the results demonstrate that the structural durability/reliability of hot structural components can be effectively evaluated in a formal probabilistic framework. In addition, the approach can be readily extended to computationally simulate certification of hot structures for aerospace environments.

Chamis, Christos C.↗

Probabilistic simulation of uncertainties in thermal structures

Development of probabilistic structural analysis methods for hot structures is a major activity at NASA-Lewis, and consists of five program elements: (1) probabilistic loads, (2) probabilistic finite element analysis, (3) probabilistic material behavior, (4) assessment of reliability and risk, and (5) probabilistic structural performance evaluation. Attention is given to quantification of the effects of uncertainties for several variables on High Pressure Fuel Turbopump blade temperature, pressure, and torque of the Space Shuttle Main Engine; the evaluation of the cumulative distribution function for various structural response variables based on assumed uncertainties in primitive structural variables; evaluation of the failure probability; reliability and risk-cost assessment; and an outline of an emerging approach for eventual hot structures certification. Collectively, the results demonstrate that the structural durability/reliability of hot structural components can be effectively evaluated in a formal probabilistic framework. In addition, the approach can be readily extended to computationally simulate certification of hot structures for aerospace environments.

Chamis, C. C.↗

Overview of the NASA Subsonic Rotary Wing Aeronautics Research Program in Rotorcraft Crashworthiness

This paper provides an overview of rotorcraft crashworthiness research being conducted at NASA Langley Research Center under sponsorship of the Subsonic Rotary Wing (SRW) Aeronautics Program. The research is focused in two areas: development of an externally deployable energy attenuating concept and improved prediction of rotorcraft crashworthiness. The deployable energy absorber (DEA) is a composite honeycomb structure, with a unique flexible hinge design that allows the honeycomb to be packaged and remain flat until needed for deployment. The capabilities of the DEA have been demonstrated through component crush tests and vertical drop tests of a retrofitted fuselage section onto different surfaces or terrain. The research on improved prediction of rotorcraft crashworthiness is focused in several areas including simulating occupant responses and injury risk assessment, predicting multi-terrain impact, and utilizing probabilistic analysis methods. A final task is to perform a system-integrated simulation of a full-scale helicopter crash test onto a rigid surface. A brief description of each research task is provided along with a summary of recent accomplishments.

Jackson, Karen E.↗

Overview of the NASA Subsonic Rotary Wing Aeronautics Research Program in Rotorcraft Crashworthiness

This paper provides an overview of rotorcraft crashworthiness research being conducted at NASA Langley Research Center under sponsorship of the Subsonic Rotary Wing (SRW) Aeronautics Program. The research is focused in two areas: development of an externally deployable energy attenuating concept and improved prediction of rotorcraft crashworthiness. The deployable energy absorber (DEA) is a composite honeycomb structure, with a unique flexible hinge design that allows the honeycomb to be packaged and remain flat until needed for deployment. The capabilities of the DEA have been demonstrated through component crush tests and vertical drop tests of a retrofitted fuselage section onto different surfaces or terrain. The research on improved prediction of rotorcraft crashworthiness is focused in several areas including simulating occupant responses and injury risk assessment, predicting multi-terrain impact, and utilizing probabilistic analysis methods. A final task is to perform a system-integrated simulation of a full-scale helicopter crash test onto a rigid surface. A brief description of each research task is provided along with a summary of recent accomplishments.

Jackson, Karen E.↗

JSC Safety and Mission Assurance Data Analysis Overview

These slides describe the data analysis methods that are used to determine inputs for probabilistic risk models supporting the Space Shuttle Program. Other applications can follow a similar path probably using different data sources. Statistical approaches are different and not addressed here. Topics included here: 1) Prior Distribution; 2) Likelihood Data; 3) Bayesian Updating; and 4) Uncertainty and Error. Note: This is a high-level discussion and is not intended to be a tutorial.

Roelant, Henk↗

Probabilistic Evaluation of Advanced Ceramic Matrix Composite Structures

The objective of this report is to summarize the deterministic and probabilistic structural evaluation results of two structures made with advanced ceramic composites (CMC): internally pressurized tube and uniformly loaded flange. The deterministic structural evaluation includes stress, displacement, and buckling analyses. It is carried out using the finite element code MHOST, developed for the 3-D inelastic analysis of structures that are made with advanced materials. The probabilistic evaluation is performed using the integrated probabilistic assessment of composite structures computer code IPACS. The affects of uncertainties in primitive variables related to the material, fabrication process, and loadings on the material property and structural response behavior are quantified. The primitive variables considered are: thermo-mechanical properties of fiber and matrix, fiber and void volume ratios, use temperature, and pressure. The probabilistic structural analysis and probabilistic strength results are used by IPACS to perform reliability and risk evaluation of the two structures. The results will show that the sensitivity information obtained for the two composite structures from the computational simulation can be used to alter the design process to meet desired service requirements. In addition to detailed probabilistic analysis of the two structures, the following were performed specifically on the CMC tube: (1) predicted the failure load and the buckling load, (2) performed coupled non-deterministic multi-disciplinary structural analysis, and (3) demonstrated that probabilistic sensitivities can be used to select a reduced set of design variables for optimization.

Abumeri, Galib H.↗

Uncertainty Estimation Cheat Sheet for Probabilistic Risk Assessment

Quantitative results for aerospace engineering problems are influenced by many sources of uncertainty. Uncertainty analysis aims to make a technical contribution to decision-making through the quantification of uncertainties in the relevant variables as well as through the propagation of these uncertainties up to the result. Uncertainty can be thought of as a measure of the 'goodness' of a result and is typically represented as statistical dispersion. This paper will explain common measures of centrality and dispersion; and-with examples-will provide guidelines for how they may be estimated to ensure effective technical contributions to decision-making.

Britton, Paul↗

Spaceflight Over the Last Ten Years: Failures and Fix-ups 2013 - 2022 RAMS XV Conference

This project is an overview and analysis of the past ten years (2013 – present) in global spaceflight, highlighting the orbital launches of countries, particularly the failures that occurred, the reasons they occurred, and a breakdown of the related statistics and background information. The analysis is conducted from a perspective of reliability and maintainability engineering and Probabilistic Risk Assessment (PRA) to formulate a quantifiable understanding of the data and how it is pertinent to Safety and Mission Assurance (SMA) in spaceflight. There is a breakdown by country or group, timelines, and number of launches. The failures over the years are categorized, all given a broad analysis of subsystem failures and details of events. A few failures are given a more in-depth analysis of root causes and failure modes determined by their unique or common nature. The data is retrieved from online, publicly available sources.

Quinn Slaugenhoupt↗

Medical Resource Set Bulky Item Trade Space Analysis for Spaceflight Medical Risk

The NASA engineering community utilizes event-driven and fault-tree probabilistic techniques to classify risks in the space environment by taking advantage of the inherent knowledge of complex spaceflight system design and testing to quantify failure risk. In harmonizing the risk of human space flight, answering the question of ‘How do we balance health, performance and resource risks with other engineering risks on long duration space missions?’ remains a deeply challenging and largely qualitative practice. The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is one aspect of the efforts by NASA’s Human Research Program (HRP) to quantitatively assess the impact of health and performance risk. One of MEDPRAT’s key features is its high degree of computational efficiency. Coupled with the HRP High Performance Compute cluster located at NASA’s Glenn Research Center, MEDPRAT runs millions of simulated missions in a matter of minutes. This degree of computational efficiency provides the novel opportunity to explore the relationship between medical set mass, volume, and medical resource size. Of particular interest for future human spaceflight missions are ‘bulky’ items, medical resources like devices, which occupy a large portion of the small, allocated mass and volume for the medical set leaving less room for other resources. This talk will present results showing the quantitative impact of forced inclusion of several bulky items across a variety of medical kit constraints, and the effect that a potential research investment into reducing the bulky item mass and volume may have on risk.

Lauren Mcintyre↗

NASA Tech Briefs, May 2010

Topics covered include: Instrument for Analysis of Greenland's Glacier Mills Cryogenic Moisture Apparatus; A Transportable Gravity Gradiometer Based on Atom Interferometry; Three Methods of Detection of Hydrazines; Crossed, Small-Deflection Energy Analyzer for Wind/Temperature Spectrometer; Wavefront Correction for Large, Flexible Antenna Reflector; Novel Micro Strip-to-Waveguide Feed Employing a Double-Y Junction; Thin-Film Ferro Electric-Coupled Microstripline Phase Shifters With Reduced Device Hysteresis; Two-Stage, 90-GHz, Low-Noise Amplifier; A 311-GHz Fundamental Oscillator Using InP HBT Technology; FPGA Coprocessor Design for an Onboard Multi-Angle Spectro-Polarimetric Imager; Serrating Nozzle Surfaces for Complete Transfer of Droplets; Turbomolecular Pumps for Holding Gases in Open Containers; Triaxial Swirl Injector Element for Liquid-Fueled Engines; Integrated Budget Office Toolbox; PLOT3D Export Tool for Tecplot; Math Description Engine Software Development Kit; Astronaut Office Scheduling System Software; ISS Solar Array Management; Probabilistic Structural Analysis Program; SPOT Program; Integrated Hybrid System Architecture for Risk Analysis; System for Packaging Planetary Samples for Return to Earth; Offset Compound Gear Drive; Low-Dead-Volume Inlet for Vacuum Chamber; Simple Check Valves for Microfluidic Devices; A Capillary-Based Static Phase Separator for Highly Variable Wetting Conditions; Gimballing Spacecraft Thruster; Finned Carbon-Carbon Heat Pipe with Potassium Working Fluid; Lightweight Heat Pipes Made from Magnesium; Ceramic Rail-Race Ball Bearings; Improved OTEC System for a Submarine Robot; Reflector Surface Error Compensation in Dual-Reflector Antennas; Enriched Storable Oxidizers for Rocket Engines; Planar Submillimeter-Wave Mixer Technology with Integrated Antenna; Widely Tunable Mode-Hop-Free External-Cavity Quantum Cascade Laser; Non-Geiger-Mode Single-Photon Avalanche Detector with Low Excess Noise; Using Whispering-Gallery-Mode Resonators for Refractometry; RF Device for Acquiring Images of the Human Body; Reactive Collision Avoidance Algorithm; Fast Solution in Sparse LDA for Binary Classification; Modeling Common-Sense Decisions in Artificial Intelligence; Graph-Based Path-Planning for Titan Balloons; Nanolaminate Membranes as Cylindrical Telescope Reflectors; Air-Sea Spray Airborne Radar Profiler Characterizes Energy Fluxes in Hurricanes; Large Telescope Segmented Primary Mirror Alignment; and Simplified Night Sky Display System.

Source record↗

Valuing Rigor in the Risk Management Process

NASA, as an organization, takes risk management (RM) seriously, and for most projects, the risk management process is exemplar. There can be challenges, though, with defining RM processes. For example, many different risk analysis methodologies are available, they can be applied with varying degrees of rigor, and they can have different value depending on how projects use them. In particular, risk analysis methodologies vary considerably in the level of quantitative detail, with more probabilistic techniques encouraged in some situations. We discussed these processes and methodologies with ten project managers (PM) at the NASA Goddard Space Flight Center (GSFC). Our intent was not to prove with some level of statistical significance that some are more helpful than others, but rather to obtain a general understanding of how projects are identifying, and thinking, about risks. This paper describes some of the available risk processes and methodologies, and provides some insights about the benefits that can gained from their use. We provide an in-depth discussion of one quantitative methodology, Probabilistic Risk Assessments (PRAs), and conclude with a few insights from observed best practices.

Dillon, Robin L.↗