Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Probabilistic Approach to Assessing CCRS Capture System Performance Margin

In the aerospace industry, there are standard design principles and/or rule-of-thumb targets that define healthy levels of margins required at each developmental milestone for traditional metrics, such as mass, thermal, and power margins. When the technical resource is “non-traditional” in the sense that guiding margin principles are non-existent, systems engineering judgment is required to internally generate performance targets and methodologies to assess the system against the derived targets. This paper presents a probabilistic approach for assessing complex time-critical operations in order to apply global sensitivity analyses to identify input parameters that should (or should not) serve as design drivers.

Performance Margins↗

Probabilistic Modeling of Aircraft Trajectories for Dynamic Separation Volumes

With a proliferation of new and unconventional vehicles and operations expected in the future, the ab initio airspace design will require new approaches to trajectory prediction for separation assurance and other air traffic management functions. This paper presents an approach to probabilistic modeling of the trajectory of an aircraft when its intent is unknown. The approach uses a set of feature functions to constrain a maximum entropy probability distribution based on a set of observed aircraft trajectories. This model can be used to sample new aircraft trajectories to form an ensemble reflecting the variability in an aircraft's intent. The model learning process ensures that the variability in this ensemble reflects the behavior observed in the original data set. Computational examples are presented.

Lewis, Timothy A.↗

Robust Control Design for Systems With Probabilistic Uncertainty

This paper presents a reliability- and robustness-based formulation for robust control synthesis for systems with probabilistic uncertainty. In a reliability-based formulation, the probability of violating design requirements prescribed by inequality constraints is minimized. In a robustness-based formulation, a metric which measures the tendency of a random variable/process to cluster close to a target scalar/function is minimized. A multi-objective optimization procedure, which combines stability and performance requirements in time and frequency domains, is used to search for robustly optimal compensators. Some of the fundamental differences between the proposed strategy and conventional robust control methods are: (i) unnecessary conservatism is eliminated since there is not need for convex supports, (ii) the most likely plants are favored during synthesis allowing for probabilistic robust optimality, (iii) the tradeoff between robust stability and robust performance can be explored numerically, (iv) the uncertainty set is closely related to parameters with clear physical meaning, and (v) compensators with improved robust characteristics for a given control structure can be synthesized.

Crespo, Luis G.↗

Trades Between Opposition and Conjunction Class Trajectories for Early Human Missions to Mars

Candidate human missions to Mars, including NASA's Design Reference Architecture 5.0, have focused on conjunction-class missions with long crewed durations and minimum energy trajectories to reduce total propellant requirements and total launch mass. However, in order to progressively reduce risk and gain experience in interplanetary mission operations, it may be desirable that initial human missions to Mars, whether to the surface or to Mars orbit, have shorter total crewed durations and minimal stay times at the destination. Opposition-class missions require larger total energy requirements relative to conjunction-class missions but offer the potential for much shorter mission durations, potentially reducing risk and overall systems performance requirements. This paper will present a detailed comparison of conjunction-class and opposition-class human missions to Mars vicinity with a focus on how such missions could be integrated into the initial phases of a Mars exploration campaign. The paper will present the results of a trade study that integrates trajectory/propellant analysis, element design, logistics and sparing analysis, and risk assessment to produce a comprehensive comparison of opposition and conjunction exploration mission constructs. Included in the trade study is an assessment of the risk to the crew and the trade offs between the mission duration and element, logistics, and spares mass. The analysis of the mission trade space was conducted using four simulation and analysis tools developed by NASA. Trajectory analyses for Mars destination missions were conducted using VISITOR (Versatile ImpulSive Interplanetary Trajectory OptimizeR), an in-house tool developed by NASA Langley Research Center. Architecture elements were evaluated using EXploration Architecture Model for IN-space and Earth-to-orbit (EXAMINE), a parametric modeling tool that generates exploration architectures through an integrated systems model. Logistics analysis was conducted using NASA's Human Exploration Logistics Model (HELM), and sparing allocation predictions were generated via the Exploration Maintainability Analysis Tool (EMAT), which is a probabilistic simulation engine that evaluates trades in spacecraft reliability and sparing requirements based on spacecraft system maintainability and reparability.

Mattfeld, Bryan↗

Probabilistic Design of a Mars Sample Return Earth Entry Vehicle Thermal Protection System

The driving requirement for design of a Mars Sample Return mission is to assure containment of the returned samples. Designing to, and demonstrating compliance with, such a requirement requires physics based tools that establish the relationship between engineer's sizing margins and probabilities of failure. The traditional method of determining margins on ablative thermal protection systems, while conservative, provides little insight into the actual probability of an over-temperature during flight. The objective of this paper is to describe a new methodology for establishing margins on sizing the thermal protection system (TPS). Results of this Monte Carlo approach are compared with traditional methods.

Dec, John A.↗

Enabling Dynamic Probabilistic Risk Assessment of Physical Security Using EMRALD and MAAP

The optimization of physical security in nuclear power plants requires sophisticated methodologies that integrate operator actions and plant behavior through advanced simulation tools. To address this, Idaho National Laboratory [JL2.1]has developed the Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF) methodology, an approach that integrates force-on-force simulations, dynamic probabilistic risk assessment, and thermal-hydraulics modeling [JL3.1]to enhance security planning while reducing costs. We developed a tool that produces reduced order models using thermal hydraulic simulations from the Modular Accident Analysis Program (MAAP) [1]. These models can quickly evaluate reactor core behavior during attack simulations, and in so doing, address two barriers of traditional methods: (1) MAAP simulations are computationally intensive, and (2) attack scenarios must be run in a secure environment, which complicates analysis and validation. By precomputing scenario outcomes for a small number of modified parameters, the reduced order model significantly decreases the computational cost and enables offsite review of the results.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Approach to Assessing Capture System Performance Margin in Mars Sample Return's Capture, Containment, and Return System

In the aerospace industry, there are standard design principles and/or rule-of-thumb targets that define healthy levels of margins required at each developmental milestone for traditional metrics, such as mass, thermal, and power margins. When the technical resource is “non-traditional,” in the sense that guiding margin principles are non-existent, systems engineering processes are required to internally generate performance targets and methodologies to assess the system against the derived targets. This paper presents a probabilistic approach for assessing complex time-critical operations which applies global sensitivity analyses to identify input parameters that should drive the design. This approach is used to design a critical payload required for the Mars Sample Return campaign aiming at bringing back rock and atmospheric samples from Mars.

Performance Margins↗

Science Goals in Radiation Protection for Exploration

Space radiation presents major challenges to future missions to the Earth s moon or Mars. Health risks of concern include cancer, degenerative and performance risks to the central nervous system, heart and lens, and the acute radiation syndromes. The galactic cosmic rays (GCR) contain high energy and charge (HZE) nuclei, which have been shown to cause qualitatively distinct biological damage compared to terresterial radiation, such as X-rays or gamma-rays, causing risk estimates to be highly uncertain. The biological effects of solar particle events (SPE) are similar to terresterial radiation except for their biological dose-rate modifiers; however the onset and size of SPEs are difficult to predict. The high energies of GCR reduce the effectiveness of shielding, while SPE s can be shielded however the current gap in radiobiological knowledge hinders optimization. Methods used to project risks on Earth must be modified because of the large uncertainties in projecting health risks from space radiation, and thus impact mission requirements and costs. We describe NASA s unique approach to radiation safety that applies probabilistic risk assessments and uncertainty based criteria within the occupational health program for astronauts and to mission design. The two terrestrial criteria of a point estimate of maximum acceptable level of risk and application of the principle of As Low As Reasonably Achievable (ALARA) are supplemented by a third requirement that protects against risk projection uncertainties using the upper 95% confidence level (CL) in radiation risk projection models. Exploration science goals in radiation protection are centered on ground-based research to achieve the necessary biological knowledge, and in the development of new technologies to improve SPE monitoring and optimize shielding. Radiobiology research is centered on a ground based program investigating the radiobiology of high-energy protons and HZE nuclei at the NASA Space Radiation Laboratory (NSRL) located at DoE s Brookhaven National Laboratory in Upton, NY. We describe recent NSRL results that are closing the knowledge gap in HZE radiobiology and improving exploration risk estimates. Linking probabilistic risk assessment to research goals makes it possible to express risk management objectives in terms of quantitative metrics, which include the number of days in space without exceeding a given risk level within well defined confidence limits, and probabilistic assessments of the effectiveness of design trade spaces such as material type, mass, solar cycle, crew selection criteria, and biological countermeasures. New research in SPE alert and risk assessment, individual radiation sensitivity, and biological countermeasure development are described.

Cucinotta, Francs A.↗

Enabling Dynamic Probabilistic Risk Assessment of Physical Security Using EMRALD and MAAP (Presentation)

The optimization of physical security in nuclear power plants requires sophisticated methodologies that integrate operator actions and plant behavior through advanced simulation tools. Idaho National Laboratory has developed the Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF) methodology, an approach that integrates force-on-force simulations, dynamic probabilistic risk assessment, and thermal hydraulics modeling to enhance security planning while reducing costs. A reduced order model for thermal hydraulic simulations performed by the Modular Accident Analysis Program (MAAP) was developed to evaluate reactor core behavior during attack scenarios. MAAP simulations are computationally intensive and must be run in a secure environment, complicating analysis and validation. By pre-computed scenario outcomes for a small number of modified parameters, the reduced order model significantly decreases the computational cost and enables offsite review of the results.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

EVA/ORU model architecture using RAMCOST

A parametrically driven simulation model is presented in order to provide a detailed insight into the effects of various input parameters in the life testing of a modular space suit. The RAMCOST model employed is a user-oriented simulation model for studying the life-cycle costs of designs under conditions of uncertainty. The results obtained from the EVA simulated model are used to assess various mission life testing parameters such as the number of joint motions per EVA cycle time, part availability, and number of inspection requirements. RAMCOST first simulates EVA completion for NASA application using a probabilistic like PERT network. With the mission time heuristically determined, RAMCOST then models different orbital replacement unit policies with special application to the astronaut's space suit functional designs.

Ntuen, Celestine A.↗

Developing acceptance limits for measured bearing wear of the Space Shuttle Main Engine high pressure oxidizer turbopump

The probabilistic design approach currently receiving attention for structural failure modes has been adapted for obtaining measured bearing wear limits in the Space Shuttle Main Engine high-pressure oxidizer turbopump. With the development of the shaft microtravel measurements to determine bearing health, an acceptance limit was neeed that protects against all known faiure modes yet is not overly conservative. This acceptance criteria limit has been successfully determined using probabilistic descriptions of preflight hardware geometry, empirical bearing wear data, mission requirements, and measurement tool precision as an input for a Monte Carlo simulation. The result of the simulation is a frequency distribution of failures as a function of preflight acceptance limits. When the distribution is converted into a reliability curve, a conscious risk management decision is made concerning the acceptance limit.

Genge, Gary G.↗

Application of Fault Management Theory to the Quantitative Selection of a Launch Vehicle Abort Trigger Suite

The theory of System Health Management (SHM) and of its operational subset Fault Management (FM) states that FM is implemented as a "meta" control loop, known as an FM Control Loop (FMCL). The FMCL detects that all or part of a system is now failed, or in the future will fail (that is, cannot be controlled within acceptable limits to achieve its objectives), and takes a control action (a response) to return the system to a controllable state. In terms of control theory, the effectiveness of each FMCL is estimated based on its ability to correctly estimate the system state, and on the speed of its response to the current or impending failure effects. This paper describes how this theory has been successfully applied on the National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program to quantitatively estimate the effectiveness of proposed abort triggers so as to select the most effective suite to protect the astronauts from catastrophic failure of the SLS. The premise behind this process is to be able to quantitatively provide the value versus risk trade‐off for any given abort trigger, allowing decision makers to make more informed decisions. All current and planned crewed launch vehicles have some form of vehicle health management system integrated with an emergency launch abort system to ensure crew safety. While the design can vary, the underlying principle is the same: detect imminent catastrophic vehicle failure, initiate launch abort, and extract the crew to safety. Abort triggers are the detection mechanisms that identify that a catastrophic launch vehicle failure is occurring or is imminent and cause the initiation of a notification to the crew vehicle that the escape system must be activated. While ensuring that the abort triggers provide this function, designers must also ensure that the abort triggers do not signal that a catastrophic failure is imminent when in fact the launch vehicle can successfully achieve orbit. That is, the abort triggers must have low false negative rates to be sure that real crew‐threatening failures are detected, and also low false positive rates to ensure that the crew does not abort from non‐crew‐threatening launch vehicle behaviors. The analysis process described in this paper is a compilation of over six years of lessons learned and refinements from experiences developing abort triggers for NASA's Constellation Program (Ares I Project) and the SLS Program, as well as the simultaneous development of SHM/FM theory. The paper will describe the abort analysis concepts and process, developed in conjunction with SLS Safety and Mission Assurance (S&MA) to define a common set of mission phase, failure scenario, and Loss of Mission Environment (LOME) combinations upon which the SLS Loss of Mission (LOM) Probabilistic Risk Assessment (PRA) models are built. This abort analysis also requires strong coordination with the Multi‐Purpose Crew Vehicle (MPCV) and SLS Structures and Environments (STE) to formulate a series of abortability tables that encapsulate explosion dynamics over the ascent mission phase. The design and assessment of abort conditions and triggers to estimate their Loss of Crew (LOC) Benefits also requires in‐depth integration with other groups, including Avionics, Guidance, Navigation and Control(GN&C), the Crew Office, Mission Operations, and Ground Systems. The outputs of this analysis are a critical input to SLS S&MA's LOC PRA models. The process described here may well be the first full quantitative application of SHM/FM theory to the selection of a sensor suite for any aerospace system.

Lo, Yunnhon↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

PCEMCAN - Probabilistic Ceramic Matrix Composites Analyzer: User's Guide, Version 1.0

PCEMCAN (Probabalistic CEramic Matrix Composites ANalyzer) is an integrated computer code developed at NASA Lewis Research Center that simulates uncertainties associated with the constituent properties, manufacturing process, and geometric parameters of fiber reinforced ceramic matrix composites and quantifies their random thermomechanical behavior. The PCEMCAN code can perform the deterministic as well as probabilistic analyses to predict thermomechanical properties. This User's guide details the step-by-step procedure to create input file and update/modify the material properties database required to run PCEMCAN computer code. An overview of the geometric conventions, micromechanical unit cell, nonlinear constitutive relationship and probabilistic simulation methodology is also provided in the manual. Fast probability integration as well as Monte-Carlo simulation methods are available for the uncertainty simulation. Various options available in the code to simulate probabilistic material properties and quantify sensitivity of the primitive random variables have been described. The description of deterministic as well as probabilistic results have been described using demonstration problems. For detailed theoretical description of deterministic and probabilistic analyses, the user is referred to the companion documents "Computational Simulation of Continuous Fiber-Reinforced Ceramic Matrix Composite Behavior," NASA TP-3602, 1996 and "Probabilistic Micromechanics and Macromechanics for Ceramic Matrix Composites", NASA TM 4766, June 1997.

Shah, Ashwin R.↗

Design for Reliability and Safety Approach for the NASA New Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new crew launch vehicle called ARES I. The ARES I is being developed by NASA Marshall Space Flight Center (MSFC) in support of the Constellation program. The ARES I consists of three major Elements: A solid First Stage (FS), an Upper Stage (US), and liquid Upper Stage Engine (USE). Stacked on top of the ARES I is the Crew exploration vehicle (CEV). The CEV consists of a Launch Abort System (LAS), Crew Module (CM), Service Module (SM), and a Spacecraft Adapter (SA). The CEV development is being led by NASA Johnson Space Center (JSC). Designing for high reliability and safety require a good integrated working environment and a sound technical design approach. The "Design for Reliability and Safety" approach addressed in this paper discusses both the environment and the technical process put in place to support the ARES I design. To address the integrated working environment, the ARES I project office has established a risk based design group called "Operability Design and Analysis" (OD&A) group. This group is an integrated group intended to bring together the engineering, design, and safety organizations together to optimize the system design for safety, reliability, and cost. On the technical side, the ARES I project has, through the OD&A environment, implemented a probabilistic approach to analyze and evaluate design uncertainties and understand their impact on safety, reliability, and cost. This paper focuses on the use of the various probabilistic approaches that have been pursued by the ARES I project. Specifically, the paper discusses an integrated functional probabilistic analysis approach that addresses upffont some key areas to support the ARES I Design Analysis Cycle (DAC) pre Preliminary Design (PD) Phase. This functional approach is a probabilistic physics based approach that combines failure probabilities with system dynamics and engineering failure impact models to identify key system risk drivers and potential system design requirements. The paper also discusses other probabilistic risk assessment approaches planned by the ARES I project to support the PD phase and beyond.

Safie, Fayssal, M.↗

A Reliable Earth Return System for Safe Recovery of Mars Samples

The objective of a Mars sample return mission is to bring selected Mars surface materials to Earth. Numerous approaches for the Earth-return segment have been analyzed including propulsive or aerocapture return to low-Earth orbit followed by Space Shuttle rendezvous and direct entry. Of these approaches, ballistic entry of a small capsule terminating in a ground landing has been shown to be the lowest risk strategy. Over the past two years, significant work has been performed towards development of a robust direct entry vehicle for Mars sample return. In June 1999, the NASA Planetary Protection Officer provided initial guidance to the former Mars Sample Return Project. The sample return phase of the mission was assigned a restricted Earth return planetary protection classification. The draft mission requirement states that the total mean probability of release of unsterilized Mars material into the Earth;s biosphere must be less than 1.0E-06 (1 in a million). This strict requirement drives the approach and design of the Earth return system. To meet this requirement, selection of the Earth return strategy and development of the Earth return system must be guided by risk, not performance, based decisions. An initial Probabilistic Risk Assessment (PRA) was performed to address the direct entry Earth return system containment assurance reliability and to identify high-risk elements of this system. The results of this PRA identified risk elements that include thermal protection system performance during entry, spin-eject orientation and aerodynamic stability during entry, structural integrity under atmospheric deceleration and impact loads, and tracking/recovery of this system. This initial probabilistic risk quantification demonstrates that, with the proper development program, a prototypical direct entry design can satisfy the containment assurance reliability requirement. Through the current Mars Sample Return Advanced Technology Development effort, an extensive design, analysis, and test program is presently proceeding with the aim of reducing the containment assurance risk of this system. This technology development effort, guided by a continuing PRA, focuses on key risk areas of a direct entry Earth return system including: the thermal protection system, impact dynamics, structural performance, aerodynamic stability, and ground recovery. This development program will culminate in a system validation flight test, 1-2 years prior to launch of the flight system. This flight test would include the launch, entry, and recovery of a full-scale Earth return system, as a scientific validation of the key risk elements to verify nominal design performance. The results of the initial PRA suggested several dominant failure sequences that can be validated in a flight test. These include: demonstrating the thermal protection system reliability and performance during entry, demonstrating the spin-eject orientation and aero-dynamic stability during entry, demonstrating the structural integrity under atmospheric deceleration and impact loads, and demonstrating tracking and recovery of the Earth return system. This single test will directly address over 50% of the total containment assurance risk elements. This presentation will begin by presenting the relative risk of various Earth return strategies. The results of the initial probabilistic risk assessment will be presented followed by a discussion of the development accomplishments and plans for demonstration of a highly reliable direct entry Earth return system.

Braun, R.↗

Reliability evaluation methodology for NASA applications

Liquid rocket engine technology has been characterized by the development of complex systems containing large number of subsystems, components, and parts. The trend to even larger and more complex system is continuing. The liquid rocket engineers have been focusing mainly on performance driven designs to increase payload delivery of a launch vehicle for a given mission. In otherwords, although the failure of a single inexpensive part or component may cause the failure of the system, reliability in general has not been considered as one of the system parameters like cost or performance. Up till now, quantification of reliability has not been a consideration during system design and development in the liquid rocket industry. Engineers and managers have long been aware of the fact that the reliability of the system increases during development, but no serious attempts have been made to quantify reliability. As a result, a method to quantify reliability during design and development is needed. This includes application of probabilistic models which utilize both engineering analysis and test data. Classical methods require the use of operating data for reliability demonstration. In contrast, the method described in this paper is based on similarity, analysis, and testing combined with Bayesian statistical analysis.

Taneja, Vidya S.↗