Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk assessment (PRA)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Methods for the Enhancement of Security Probabilistic Risk Assessments

The US Department of Energy is exploring the methods associated with probabilistic risk assessment (PRA) and how they could be used to enhance physical security evaluations for nuclear facilities. A brief review of both international and US Nuclear Regulatory Commission physical security assessment methods is presented. From this review, and with an understanding of the technical elements associated with a traditional nuclear safety PRA, several observations are made pertaining to where physical security analysis methods could be enhanced. These observations principally support and enhance the answers within a physical security context to the risk triplet: (1) What can go wrong? (2) What is the likelihood? and (3) What are the consequences? Finally, benefits and technical challenges toward the development of a full security PRA are presented.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in the initial fire modeling and operational costs for the model maintenance and evaluations required during normal plant operations. The tasks for Fiscal Year (FY) 2021 include first testing the FRI3D modeling capabilities by importing an industry fire model into FRI3D and making a 3D model of a complex/high-risk significant area. (For this work, the switchgear room was chosen.) Then, the second task of FY 2021 is to develop a dynamic fire PRA process that can help optimize traditional fire PRA models. The switchgear room model will be used for the dynamic fire PRA work. This report describes the work and insights learned when using FRI3D software to model both a Nuclear Regulatory Report (NUREG) example models and a full industry switchgear room.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Joint Cyber/Safety Risk in Nuclear Power Systems

This report presents an analysis of the Emergency Core Cooling System (ECCS) for a generic Boiling Water Reactor (BWR)-4 NPP. The Electric Power Research Institute (EPRI) developed Hazards and Consequences Analysis for Digital Systems (HAZCADS) process is applied to the ECCS and its subsystems to identify unsafe control actions (UCAs) which act as possible cyber events of concern. The analysis is performed for two design basis events: Small-break Loss of Coolant Accident (SLOCA) and general transients (TRANS), such as unintended reactor trip. In previous work, HAZCADS UCAs were combined with other cyber-attack analysis to develop a risk-informed approach; however, this was for a single system. This report explores advanced systems engineering modeling approaches to model the interactions between digital assets across multiple systems which may be targeted by cyber adversaries. The complex and interdependent design of digital systems has the potential to introduce emergent cyber properties that are generally not covered by hazard analyses nor formal nuclear Probabilistic Risk Assessment (PRA). The R&D and supporting analysis presented here explores approaches to predict and manage how interdependent system properties effect risk. To show the potential impact of a successful cyber-attack to formal PRA event tree probabilities, HAZCADS analysis was also used. HAZCADS was also used to model the automatic depressurization system (ADS) automatic actuation. This analysis extended to an integrated system analysis for common-cause failure (CCF). In this aspect, the HAZCADS analysis continued by analyzing plant design details for system connectivity in support of critical plant functions. A dependency matrix was developed to depict the integrated functionality of the interconnected systems. Areas of potential CCF are indicated. Future work could include adversary attack development to show how CCF could be caused, resulting in PRA events. Across the multiple systems that comprise the ECCS, the analysis shows that the change in such probabilities was very different between systems. This indicates that some systems have a larger potential risk impact from successful cyber-attack or digital failure, which indicates a need for these systems to have a higher priority for design and defensive measures. Furthermore, we were able to establish that a risk analysis using any arbitrary threat model establishes an ordering of components with regard to cyber-risk. This ordering can be used to influence the overall system design with an eye to lowering risk, or as a way to understand real-time risk to operational systems based on a current threat landscape. Expert knowledge of both the analysis process and the system being analyzed is required to perform a HAZCADS analysis. The need for a tiered risk analysis is demonstrated by the results of this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Utilization of the LMP Methodology in Support of the VTR Conceptual Safety Design Report

The Versatile Test Reactor (VTR) is a fast spectrum test reactor currently being developed in the United States under the direction of the US Department of Energy (DOE), Office of Nuclear Energy. The VTR is utilizing a risk-informed performance-based (RIPB) approach for design support and authorization by the DOE, derived from recent efforts by the US industry led Licensing Modernization Project (LMP). This document contains an overview of the implementation of the LMP approach in support of the VTR Conceptual Safety Design Report (CSDR). The work reported here is the result of studies supporting a VTR conceptual design, cost, and schedule estimate for DOE-NE to make a decision on procurement. As such, it is preliminary. The VTR RIPB authorization approach utilizes information from the probabilistic risk assessment (PRA), coupled with deterministic analyses, to aid in decision-making regarding the identification and categorization of safety basis events (SBEs), the classification of structures, systems, and components (SSCs), and the evaluation of defense-in-depth (DID) adequacy. As part of initial reactor design efforts, a VTR conceptual design PRA was developed to support the RIPB process, which focused on at-power internal events, with scoping analyses for seismic and sodium fire hazards. In addition to supporting numerous design studies, preliminary results from the RIPB approach and the VTR conceptual design PRA were utilized as the basis of the VTR CSDR. The initial identification and categorization of SBEs, SSC classification, and DID evaluation were contained within the CSDR, which was submitted to DOE in 2019 as part of the CD-1 submittal package. Following review, DOE approved the CSDR in April 2020 and the CD-1 package in late 2020. Valuable experience was gained through the implementation of the RIPB approach for design and authorization during the VTR conceptual design phase, which is summarized in this document. To the extent possible, this experience has been shared with the advanced reactor industry, through publications and participation in licensing tabletops, in addition to informing DOE:NE advanced reactor regulatory development efforts. Furthermore, the approval of the CSDR by the DOE as part of CD-1 represents a significant milestone in the use of RIPB approaches for advanced reactor licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulatory Treatment of Non-Core Sources of Radioactivity for Advanced Reactor Designs

The recent resurgence in advance (non-light water) reactor development has been paralleled by the development of risk-informed performance-based (RIPB) licensing pathways. Specifically, the creation of the RIPB Licensing Modernization Project (LMP) approach and subsequent endorsement by the U.S. Nuclear Regulatory Commission (NRC) now provides advanced reactor vendors with a defined RIPB method to develop an affirmative safety case for licensing. In addition, the Technology Inclusive Content of Applications Project (TICAP) has published guidance on developing a license application based on the LMP approach. To support the utilization of risk information as part of advanced reactor design and licensing efforts, the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) Joint Committee on Nuclear Risk Management (JCNRM) has developed a probabilistic risk assessment (PRA) standard for advanced reactors. The standard, which was formerly approved by the American National Standards Institute (ANSI) in 2021 and recently endorsed by the NRC in trial use Regulatory Guide (RG) 1.247, is an integral standard, covering from initiating events to offsite consequence. A major feature of the standard is that it permits the inclusion of any source of radioactivity material at the site within the plant PRA. Therefore, non-core sources of radioactivity, such as fuel storage, fuel processing, and purification systems, can be included within a single comprehensive plant PRA. For those advanced reactor vendors utilizing a RIPB licensing approach, there is an opportunity to include the non-core sources of radioactivity within the RIPB framework for licensing decision-making, such as the categorization of events, classification of structures, systems, and components (SSCs), and evaluation of the adequacy of defense-in-depth (DID). For advanced reactor designs that contain multiple non-core sources of radioactivity, or for monolithic plant sites that include associated fuel facilities, this approach could potentially simplify licensing applications through the use of a single, uniform, and consistent decision-making framework across all radioactive sources at the site. In addition, a RIPB approach could provide additional insights regarding plant behavior, flexibility regarding licensing decision-making, and potentially allow the use of risk information as part of the plant oversight process. Risk-informing these aspects of advanced reactor licensing would also be consistent with the NRC’s risk policy statement. However, there is diverse regulation and guidance regarding the licensing of non-core sources of radioactivity and generally limited experience using RIPB approaches for the evaluation as part of licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Plan for Development and Application of Risk Assessment Approach for Transportation Package Approval of an MNPP for Domestic Highway Shipment

For nuclear reactors, Probabilistic Risk Assessment (PRA) has been conducted since the 1970s [e.g., see WASH-1400 (NRC 1975), NUREG-1150 (NRC 1990), and NUREG-1935 (Chang et al. 2012)]. PRA has also been used to assess a dry cask storage system at a nuclear power plant [see NUREG-1864 (NRC 2007)]. PRA techniques have also been applied to the transportation of spent nuclear fuel, most notably in NUREG/CR-4829 (Fischer et al. 1987), NUREG/CR-6672 (Sprung et al. 2000), and NUREG-2125 (NRC 2014). Additional guidance is provided in International Atomic Energy Agency (IAEA) IAEA-TECDOC-1346 (2003). Transportation PRA was also used in the evaluations of transportation impacts in reports such as the Repository Final Environmental Impact Statement (DOE 2002) and the Repository Final Supplemental Environmental Impact Statement (DOE 2008).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Light Water Reactor Sustainability Program: Use of Time Distributions to Predict Operator Procedure Performance in Dynamic Human Reliability Analysis

The Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) framework affords software capable of conducting human reliability analysis (HRA) using a dynamic approach built around operating procedures (OPs) from nuclear power plants (NPPs). Previous HUNTER reports document the development of this software tool, the coupling of HUNTER to the simulator code, the collection of operator performance data by using simulators to calibrate HUNTER models, and linking HUNTER to probabilistic risk assessment (PRA) software. The present report largely addresses two topics. The first is a new function in HUNTER called the HUNTER Procedure Performance Predictor (P3). HUNTER P3 uses HUNTER’s built in Monte Carlo tools featuring human performance variability to identify potential error traps in procedures. The second topic is time distribution analysis to generate time inputs for dynamic HRA. The current analysis was performed to investigate time distributions for task primitives, which are the minimum task unit of analysis used in dynamic HRA modeling. Using the time distribution data, the elapsed time for human actions in an extended loss of AC power (ELAP) scenario is then investigated. Time data and prediction are essential for modeling procedure performance.

99 GENERAL AND MISCELLANEOUS↗

Implications of Safety and Operational Features of Small, Advanced Reactors for the Evaluation of Important Human Actions

The design and operational characteristics of non-light water reactors are likely to change the role of human actions in safety function management and the types of human actions that are deemed important. The objectives of this report are to: • Identify the implications of small, advanced reactor design characteristics on human performance and the changing role of human actions in the management of safety functions. • Identify the methods that may be used to identify important human actions. • Identify how HFE safety reviewers can help ensure that the methods adequately model human actions to identify those that are important to safety. We identified the implications of small, advanced reactor characteristics on the role of personnel in safety function management. Then we addressed how designers can identify which human actions are important to safety using both probabilistic risk assessment (PRA) and deterministic analyses. PRA identifies important human actions using risk-importance criteria. Deterministically identified important human actions include those identified by analyses of situations such as transients and accidents and defense in depth. In all cases, the acceptability of the analyses is dependent on the modeling, quantification, and criterion selection to determine which human actions are important. How well the designers address these processes determines the acceptability of their methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Success Path Method: Introduction to the Success Path Method Software Tool©

As part of its commitment to advancing safety and reliability assessment methodologies, Argonne National Laboratory pioneered the use of an evaluation method called the Success Path Method (SPM) to improve risk management for offshore oil and gas operations. The development of the SPM at Argonne has been driven by the need to improve existing risk assessment methodologies by focusing on the steps necessary for success rather than failure modes alone. This is particularly important for industrial environments like offshore facilities that perform multiple functions under a continuously evolving set of operational conditions – such as water depth and temperature, currents, and weather conditions. In these dynamic environments, the traditional Probabilistic Risk Assessment (PRA) approach is far too complex as it focuses on what can go wrong – which comprises an infinite failure space that must be fully explored and understood. By shifting the focus to a finite space of success paths, the SPM enables operators and decision makers to prioritize a manageable number of steps that must go right to ensure success. Building on its five decades of experience in safety assessments for the nuclear industry, Argonne made major adaptations to existing risk assessment methods utilizing features similar to fault trees that are traditionally used in PRA to map all pathways in which the system can malfunction. In contrast, SPM identifies the components and processes that must function correctly to achieve specific outcomes – such as preventing the uncontrolled release of hydrocarbons during drilling operations. The SPM framework integrates equipment, procedures, software, processes, and human actions to ensure that physical barriers meet critical safety functions in dynamic operational conditions. This approach helps identify failure modes and improve operational risk management by narrowing the focus to key success elements, which in turn reduces uncertainty and helps users understand, manage, and respond to failures.

97 MATHEMATICS AND COMPUTING↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 ENGINEERING↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 - ENGINEERING↗

Risk management for the Space Exploration Initiative

Probabilistic Risk Assessment (PRA) is a quantitative engineering process that provides the analytic structure and decision-making framework for total programmatic risk management. Ideally, it is initiated in the conceptual design phase and used throughout the program life cycle. Although PRA was developed for assessment of safety, reliability, and availability risk, it has far greater application. Throughout the design phase, PRA can guide trade-off studies among system performance, safety, reliability, cost, and schedule. These studies are based on the assessment of the risk of meeting each parameter goal, with full consideration of the uncertainties. Quantitative trade-off studies are essential, but without full identification, propagation, and display of uncertainties, poor decisions may result. PRA also can focus attention on risk drivers in situations where risk is too high. For example, if safety risk is unacceptable, the PRA prioritizes the risk contributors to guide the use of resources for risk mitigation. PRA is used in the Space Exploration Initiative (SEI) Program. To meet the stringent requirements of the SEI mission, within strict budgetary constraints, the PRA structure supports informed and traceable decision-making. This paper briefly describes the SEI PRA process.

Buchbinder, Ben↗

Risk Management of NASA Projects

Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

Sarper, Hueseyin↗

Methods and Techniques for Risk Prediction of Space Shuttle Upgrades

Since the Space Shuttle Accident in 1986, NASA has been trying to incorporate probabilistic risk assessment (PRA) in decisions concerning the Space Shuttle and other NASA projects. One major study NASA is currently conducting is in the PRA area in establishing an overall risk model for the Space Shuttle System. The model is intended to provide a tool to predict the Shuttle risk and to perform sensitivity analyses and trade studies including evaluation of upgrades. Marshall Space Flight Center (MSFC) and its prime contractors including Pratt and Whitney (P&W) are part of the NASA team conducting the PRA study. MSFC responsibility involves modeling the External Tank (ET), the Solid Rocket Booster (SRB), the Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME). A major challenge that faced the PRA team is modeling the shuttle upgrades. This mainly includes the P&W High Pressure Fuel Turbopump (HPFTP) and the High Pressure Oxidizer Turbopump (HPOTP). The purpose of this paper is to discuss the various methods and techniques used for predicting the risk of the P&W redesigned HPFTP and HPOTP.

Hoffman, Chad R.↗

The Use of Probabilistic Methods to Evaluate the Systems Impact of Component Design Improvements on Large Turbofan Engines

Probabilistic Structural Analysis (PSA) is now commonly used for predicting the distribution of time/cycles to failure of turbine blades and other engine components. These distributions are typically based on fatigue/fracture and creep failure modes of these components. Additionally, reliability analysis is used for taking test data related to particular failure modes and calculating failure rate distributions of electronic and electromechanical components. How can these individual failure time distributions of structural, electronic and electromechanical component failure modes be effectively combined into a top level model for overall system evaluation of component upgrades, changes in maintenance intervals, or line replaceable unit (LRU) redesign? This paper shows an example of how various probabilistic failure predictions for turbine engine components can be evaluated and combined to show their effect on overall engine performance. A generic model of a turbofan engine was modeled using various Probabilistic Risk Assessment (PRA) tools (Quantitative Risk Assessment Software (QRAS) etc.). Hypothetical PSA results for a number of structural components along with mitigation factors that would restrict the failure mode from propagating to a Loss of Mission (LOM) failure were used in the models. The output of this program includes an overall failure distribution for LOM of the system. The rank and contribution to the overall Mission Success (MS) is also given for each failure mode and each subsystem. This application methodology demonstrates the effectiveness of PRA for assessing the performance of large turbine engines. Additionally, the effects of system changes and upgrades, the application of different maintenance intervals, inclusion of new sensor detection of faults and other upgrades were evaluated in determining overall turbine engine reliability.

Packard, Michael H.↗

Reducing the Risk of Human Space Missions with INTEGRITY

The INTEGRITY Program will design and operate a test bed facility to help prepare for future beyond-LEO missions. The purpose of INTEGRITY is to enable future missions by developing, testing, and demonstrating advanced human space systems. INTEGRITY will also implement and validate advanced management techniques including risk analysis and mitigation. One important way INTEGRITY will help enable future missions is by reducing their risk. A risk analysis of human space missions is important in defining the steps that INTEGRITY should take to mitigate risk. This paper describes how a Probabilistic Risk Assessment (PRA) of human space missions will help support the planning and development of INTEGRITY to maximize its benefits to future missions. PRA is a systematic methodology to decompose the system into subsystems and components, to quantify the failure risk as a function of the design elements and their corresponding probability of failure. PRA provides a quantitative estimate of the probability of failure of the system, including an assessment and display of the degree of uncertainty surrounding the probability. PRA provides a basis for understanding the impacts of decisions that affect safety, reliability, performance, and cost. Risks with both high probability and high impact are identified as top priority. The PRA of human missions beyond Earth orbit will help indicate how the risk of future human space missions can be reduced by integrating and testing systems in INTEGRITY.

Jones, Harry W.↗