SEARCH · Search NASA
Results for “Project Development”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
DOE Office of Legacy Management Geospatial Data Lifecyle and Data Curation Project Development.
Abstract not provided.
Project Development for Testing a High Temperature Full Load Centrifugal Particle Receiver at the NSTTF.
Abstract not provided.
Project Development for Testing a High Temperature Full Load Centrifugal Particle Receiver at the NSTTF.
Abstract not provided.
Accelerator Physics at NSLS-II: Research Accomplishments in 2018
Scientific support for user operations is the main mission of the NSLS-II Accelerator Physics group. At the same time, NSLS-II accelerator physicists were working in 2018 on the following research and development projects: development of HLA common tools for beam studies and operations; online optimization of Injector and Storage Ring (Facility Improvement Project); development of a new operation mode for timeresolved experiments; high-brightness upgrade options for NSLS-II; ultra-fast electron diffraction (LDRD); APS upgrade project and the electron-ion collider project at BNL (MOUs). A summary of the research accomplishments of the NSLS-II Accelerator Physics group is presented in this report.
Energy By Design: Science-Based Wind Energy Siting to Avoid Environmental Impact In the Continental United States (Final Technical Report)
The United States has abundant wind resources, such that only about 3% of the resource would need to be developed to achieve the goal of producing 20% of electricity in the United States by 2030. Inappropriately sited wind development may result in conflicts with wildlife that can delay or derail development projects, increase projects costs, and may degrade important conservation values. The most cost-effective approach to reducing such conflicts is through landscape-scale siting early in project development. To support landscape scale siting that avoids sensitive areas for wildlife, we compiled a database on species distributions, wind resource, disturbed areas, and land ownership. This database can be viewed and obtained via http://wind.tnc.org/awwi. Wind project developers can use this web tool to identify potentially sensitive areas and areas that are already disturbed and are therefore likely to be less sensitive to additional impacts from wind development. The United States goal of producing 20% of its electricity from wind energy by the year 2030 would require 241 GW of terrestrial nameplate capacity. We analyzed whether this goal could be met by using lands that are already disturbed, which would minimize impacts to wildlife. Our research shows that over 14 times the DOE goal could be produced on lands that are already disturbed (primarily cropland and oil and gas fields), after taking into account wind resource availability and areas that would be precluded from wind development because of existing urban development or because of development restrictions. This work was published in the peer reviewed science journal PLoS ONE (a free online journal) and can be viewed here: http://www.plosone.org/article/info%3Adoi%2F10.1371%2Fjournal.pone.0017566. Even projects that are sited appropriately may have some impacts on wildlife habitat that can be offset with offsite compensatory mitigation. We demonstrate one approach to mapping and quantifying mitigation costs, using the state of Kansas as a case study. Our approach considers a range of conservation targets (species and habitat) and calculates mitigation costs based on actual costs of the conservation actions (protection and restoration) that would be needed to fully offset impacts. This work was published in the peer reviewed science journal PLoS ONE (a free online journal) and can be viewed here: http://www.plosone.org/article/info%3Adoi%2F10.1371%2Fjournal.pone.0026698.
Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100
Natel Energy is a low-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-head, high-flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state-ofthe-art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or above tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.
Codes and Standards Requirements for Deployment of Emerging Fuel Cell Technologies
The objective of this NREL report is to provide information on codes and standards (of two emerging hydrogen power fuel cell technology markets; forklift trucks and backup power units), that would ease the implementation of emerging fuel cell technologies. This information should help project developers, project engineers, code officials and other interested parties in developing and reviewingpermit applications for regulatory compliance.
U.S. DOE Intermountain Clean Energy Application Center
The Intermountain Clean Energy Application Center helped promote, assist, and transform the market for combined heat and power (CHP), including waste heat to power and district energy with CHP, in the intermountain states of Arizona, Colorado, New Mexico, Utah, and Wyoming. We accomplished these objectives through a combination of the following methods, which proved in concert to be a technically and economically effective strategy: o Identifying and facilitating high-impact CHP projects o Helping industrial, commercial, institutional, federal, and other large energy users in evaluating the economic and technical viability of potential CHP systems o Disseminating essential information about CHP including benefits, technologies, applications, project development, project financing, electric and gas utility incentives, and state policies o Coordinating and collaborating on CHP advancement with regional stakeholders including electric utilities, gas utilities, state energy offices, municipal development and planning personnel, trade associations, industry groups, non-profits, energy users, and others Outcomes of the project included increased understanding of and deployment of efficient and well-designed CHP systems in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Increased CHP deployment helps the United States to enhance energy efficiency, strengthen the competitiveness of American industries, promote economic growth, foster a robust and resilient energy infrastructure, reduce emissions of air pollutants and greenhouse gases, and increase the use of market-ready advanced technologies. Specific outcomes included direct assistance to energy-intensive industrial facilities and other businesses, workshops and CHP tours, communication materials, and state policy education, all contributing to implementation of CHP systems in the intermountain region.
2024 OES-Environmental 2024 State of the Science Report, Chapter 5: Stakeholder Engagement for Marine Renewable Energy
Stakeholder engagement is a critical piece of any new development project that affects public or private interests. Effective, thoughtful engagement and participatory activities early in the planning process of a project can help planners and project developers understand local concerns, adjust designs to avoid negative environmental impacts, select the best site for a project, answer questions, reduce delay, enhance opportunities and benefits, and build support for a project (Cuppen et al. 2016; Portman 2009; Wiersma & DevineWright 2014). On the other hand, cursory or inadequate engagement that is viewed as “checking the box” or tokenism is unlikely to be effective, and can result in project failures, diminished trust, strong opposition, or costly, drawn-out processes (Butcher & MacLennan 2020; Garard & Kowarsch 2017; Gill & Rand 2022; Jolivet & Heiskanen 2010; Pizzi et al. 2021; Sterling et al. 2017).
Heavy Duty Vehicle Futures Analysis.
This report describes work performed for an Early Career Research and Development project. This project developed a heavy-duty vehicle (HDV) sector model to assess the factors influencing alternative fuel and efficiency technology adoption. This model builds on a Sandia light duty vehicle sector model and provides a platform for assessing potential impacts of technological advancements developed at the Combustion Research Facility. Alternative fuel and technology adoption modeling is typically developed around a small set of scenarios. This HDV sector model segments the HDV sector and parameterizes input values, such as fuel prices, efficiencies, and vehicle costs. This parameterization enables sensitivity and trade space analyses to identify the inputs that are most associated with outputs of interest, such as diesel consumption and greenhouse gas emissions. Thus this analysis tool enables identification of the most significant HDV sector drivers that can be used to support energy security and climate change goals.
U.S. DOE Southwest CHP TAP Final Report
The objective of the Department of Energy’s Southwest Combined Heat and Power Technical Assistance Partnership (Southwest CHP TAP) is to provide essential support to continue the market penetration of CHP’s suite of technologies and to substantially contribute to the national goal of 40 GW of new CHP installations by 2020. The CHP TAP work is designed to assist CHP installations by providing technology and fuel-neutral technical assistance to potential end-users, and, to a lesser degree, providing education and engagement to a variety of stakeholders including end-users (commercial, industrial, institutional and more), electric and gas utilities, trade associations, non-profit organizations, and policymakers. This assistance includes evaluating the economic, energy savings, reliability, and environmental value of proposed CHP systems and conveying this value to encourage CHP installations. The CHP TAPs represent multi-state regions and are DOE’s CHP experts providing fact-based, unbiased information on CHP, including technologies, project development, project financing, local electric and natural gas utility interfaces, and related best practice policies. CHP applications (including WHP) can be both stand-alone as well as in District Energy or Microgrid configurations and the CHP TAPs will encourage the installation of CHP in these various configuration types as appropriate.
Enabling Particulate Materials Processing Science for High-Consequence, Small-Lot Precision Manufacturing
This Laboratory Directed Research and Development project developed and applied closely coupled experimental and computational tools to investigate powder compaction across multiple length scales. The primary motivation for this work is to provide connections between powder feedstock characteristics, processing conditions, and powder pellet properties in the context of powder-based energetic components manufacturing. We have focused our efforts on multicrystalline cellulose, a molecular crystalline surrogate material that is mechanically similar to several energetic materials of interest, but provides several advantages for fundamental investigations. We report extensive experimental characterization ranging in length scale from nanometers to macroscopic, bulk behavior. Experiments included nanoindentation of well-controlled, micron-scale pillar geometries milled into the surface of individual particles, single-particle crushing experiments, in-situ optical and computed tomography imaging of the compaction of multiple particles in different geometries, and bulk powder compaction. In order to capture the large plastic deformation and fracture of particles in computational models, we have advanced two distinct meshfree Lagrangian simulation techniques: 1.) bonded particle methods, which extend existing discrete element method capabilities in the Sandia-developed , open-source LAMMPS code to capture particle deformation and fracture and 2.) extensions of peridynamics for application to mesoscale powder compaction, including a novel material model that includes plasticity and creep. We have demonstrated both methods for simulations of single-particle crushing as well as mesoscale multi-particle compaction, with favorable comparisons to experimental data. We have used small-scale, mechanical characterization data to inform material models, and in-situ imaging of mesoscale particle structures to provide initial conditions for simulations. Both mesostructure porosity characteristics and overall stress-strain behavior were found to be in good agreement between simulations and experiments. We have thus demonstrated a novel multi-scale, closely coupled experimental and computational approach to the study of powder compaction. This enables a wide range of possible investigations into feedstock-process-structure relationships in powder-based materials, with immediate applications in energetic component manufacturing, as well as other particle-based components and processes.
Synthetic Aperture Radar Initial Development and Project Scope
Development of a proof-of-concept solution consisting of a network of radars to identify and discriminate an object based on its fixed position and reports on its movement with the resolution of a few centimeters. This includes scaling the solution, addressing other critical requirements (multi-look radar to overcome occlusions and obstructions, interference), and also the ability to scale up to large warehouses. Finally, improved higher-dimensional resolution will be developed.
Coal Power Plant Reinvestment Visualization Tool
This tool, available at https://energycommunities.gov/coal-power-plant-reinvestment-visualization-tool/, serves as a public database and map for the purposes of enabling state and local economic development officials, project developers, and power plant owners to identify and pursue opportunities for plant and community reinvestment. The Coal Power Plant Reinvestment Visualization Tool focuses on coal power plants that have been closed or set-to-retire, alongside key infrastructure characteristics that are relevant for potential redevelopment reinvestment opportunities, including the opportunity to query these data based off pre-defined or user-set queries to identify opportunities for coal power facility reinvestment to support solar, wind, manufacturing, and nuclear. These Data for visualization and query include, but are not limited to: • Electric Transmission Lines • EPA Brownfield Sites (assessed with Federal funding) • Petroleum Terminals • Ports • Railroads • Others The tool will be updated periodically to provide relevant information to enable state and local economic development officials, project developers, and power plant owners to identify and pursue opportunities for economic revitalization and community reinvestment. Within this application data are focused on U.S. power plants with coal generation, where at least one on-site generator utilizes or utilized coal as a fuel source, including planned retirements through 2058 (EIA, 2024). Additional information on energy communities and revitalization opportunities can be accessed on the Interagency Working Group on Coal & Power Plant Communities & Economic Revitalization Energy Communities website (https://energycommunities.gov).
Long-duration Energy Storage Technology Analysis and Development
This project develops a new low-cost and flexible long-duration energy storage (LDES) technology based on simultaneous regeneration technology. In lieu of the technology development, the project team also conducts a complete cost analysis for LDES based on various currently available technologies, as well as grid economic and environmental benefits analysis for LDES. There are three tasks in this project: Task 1. Fe-H2 flow cell fabrication, testing, demonstration; Task 2. Dynamic modeling, simulation and control architecture of power system; Task 3. Cost and grid analysis.
Geothermal FIT Design: International Experience and U.S. Considerations
Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmissioncapacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date, a variety of FIT design options could reduce geothermalpower plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).
Efforts to Streamline Permitting of Geothermal Projects in the United States
Geothermal permitting timelines in the United States can be a deterrent to new investment, with geothermal project development taking as long as seven to ten years. The Energy Policy Act of 2005 (EPAct 2005) in part aimed to streamline aspects of the geothermal permitting process on federally managed public lands. This article summarizes the general regulatory process for developing geothermal projects in the United States and thereafter discusses efforts proposed or undertaken by the U.S. Congress, U.S. Forest Service, U.S. Bureau of Land Management, state governments, and project developers to increase permitting efficiency.