Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Life Cycle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Mars Science Laboratory Flight Software Boot Robustness Testing Project Report

On the surface of Mars, the Mars Science Laboratory will boot up its flight computers every morning, having charged the batteries through the night. This boot process is complicated, critical, and affected by numerous hardware states that can be difficult to test. The hardware test beds do not facilitate testing a long duration of back-to-back unmanned automated tests, and although the software simulation has provided the necessary functionality and fidelity for this boot testing, there has not been support for the full flexibility necessary for this task. Therefore to perform this testing a framework has been build around the software simulation that supports running automated tests loading a variety of starting configurations for software and hardware states. This implementation has been tested against the nominal cases to validate the methodology, and support for configuring off-nominal cases is ongoing. The implication of this testing is that the introduction of input configurations that have yet proved difficult to test may reveal boot scenarios worth higher fidelity investigation, and in other cases increase confidence in the robustness of the flight software boot process.

Mars Science Laboratory (MSL)↗

Fault Management Practice: A Roadmap for Improvement

Autonomous fault management (FM) is critical for deep space and planetary missions where the limited communication opportunities may prevent timely intervention by ground control. Evidence of pervasive architecture, design, and verification/validation problems with NASA FM engineering has been revealed both during technical reviews of spaceflight missions and in flight. These problems include FM design changes required late in the life-cycle, insufficient project insight into the extent of FM testing required, unexpected test results that require resolution, spacecraft operational limitations because certain functions were not tested, and in-flight anomalies and mission failures attributable to fault management. A recent NASA initiative has characterized the FM state-of-practice throughout the spacecraft development community and identified common NASA, DoD, and commercial concerns that can be addressed in the near term through the development of a FM Practitioner's Handbook and the formation of a FM Working Group. Initial efforts will focus on standardizing FM terminology, establishing engineering processes and tools, and training.

Fesq, Lorraine M.↗

NASA Standing Review Board Handbook: Revision B

This SRB Handbook provides review guidance for the program and project communities and for the SRBs regarding the expectations, processes, products, timelines, and working interfaces with review organizations, Centers, Mission Directorates, Mission Support Organizations, and Management Councils. It provides guidelines for membership selection, review implementation, review products, and reporting of results. The SRB Handbook guidance may be tailored, with the Convening Authorities' approval, to meet the needs of the Agency, Mission Directorates, Centers, and the programs and projects being reviewed. The final review agreement of the SRB, program and project, and Convening Authorities for program and project Life-Cycle Reviews (LCRs) is documented in the terms of reference, as described in Section 4.1 and Appendix H.

Tahani R Amer↗

Model Based Mission Assurance: NASA's Assurance Future

Model Based Systems Engineering (MBSE) is seeing increased application in planning and design of NASA’s missions. This suggests the question: what will be the corresponding practice of Model Based Mission Assurance (MBMA)? Contemporaneously, NASA’s Office of Safety and Mission Assurance (OSMA) is evaluating a new objectives based approach to standards to ensure that the Safety and Mission Assurance disciplines and programs are addressing the challenges of NASA’s changing missions, acquisition and engineering practices, and technology. MBSE is a prominent example of a changing engineering practice. We use NASA’s objectives-based strategy for Reliability and Maintainability as a means to examine how MBSE will affect assurance. We surveyed MBSE literature to look specifically for these affects, and find a variety of them discussed (some are anticipated, some are reported from applications to date). Predominantly these apply to the early stages of design, although there are also extrapolations of how MBSE practices will have benefits for testing phases. As the effort to develop MBMA continues, it will need to clearly and unambiguously establish the roles of uncertainty and risk in the system model. This will enable a variety of uncertainty-based analyses to be performed much more rapidly than ever before and has the promise to increase the integration of CRM (Continuous Risk Management) and PRA (Probabilistic Risk Analyses) even more fully into the project development life cycle. Various views and viewpoints will be required for assurance disciplines, and an over-arching viewpoint will then be able to more completely characterize the state of the project/program as well as (possibly) enabling the safety case approach for overall risk awareness and communication.

Evans, John↗

Lessons Learned--MO&DA at JPL

The basic questions addressed in this paper are how to avoid future surprise growth in Mission Operations and Data Analysis (MO&DA) costs, and how to minimize total MO&DA costs for planetary missions. The context of this paper and its conclusions is in the arena of JPL mission operations support. The fundamental conclusion is that there is no simple, single solution: the entire Project life-cycle must be addressed.

MO&DA↗

Loads and Sizing for Launch Vehicle Conceptual and Preliminary Design

Examples of both “top-down” and “bottom-up” methods for predicting launch and ascent loads, as well as launch vehicle component sizing, are presented. These techniques are most applicable during the conceptual and preliminary design stages, early in the project life-cycle where a lack of fidelity of detail is more acceptable. These techniques are applied to estimate the mass of components from the Saturn V and Space Shuttle launch vehicles, and results are compared to actual values from the flown vehicles

launch vehicles↗

Software Program: Software Management Guidebook

The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

Source record↗

Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

Peffley, Al F.↗

NASA Systems Engineering Handbook

This handbook is intended to provide general guidance and information on systems engineering that will be useful to the NASA community. It provides a generic description of Systems Engineering (SE) as it should be applied throughout NASA. A goal of the handbook is to increase awareness and consistency across the Agency and advance the practice of SE. This handbook provides perspectives relevant to NASA and data particular to NASA. The coverage in this handbook is limited to general concepts and generic descriptions of processes, tools, and techniques. It provides information on systems engineering best practices and pitfalls to avoid. There are many Center-specific handbooks and directives as well as textbooks that can be consulted for in-depth tutorials. This handbook describes systems engineering as it should be applied to the development and implementation of large and small NASA programs and projects. NASA has defined different life cycles that specifically address the major project categories, or product lines, which are: Flight Systems and Ground Support (FS&GS), Research and Technology (R&T), Construction of Facilities (CoF), and Environmental Compliance and Restoration (ECR). The technical content of the handbook provides systems engineering best practices that should be incorporated into all NASA product lines. (Check the NASA On-Line Directives Information System (NODIS) electronic document library for applicable NASA directives on topics such as product lines.) For simplicity this handbook uses the FS&GS product line as an example. The specifics of FS&GS can be seen in the description of the life cycle and the details of the milestone reviews. Each product line will vary in these two areas; therefore, the reader should refer to the applicable NASA procedural requirements for the specific requirements for their life cycle and reviews. The engineering of NASA systems requires a systematic and disciplined set of processes that are applied recursively and iteratively for the design, development, operation, maintenance, and closeout of systems throughout the life cycle of the programs and projects.

Source record↗

Life-Cycle Assessments of Selected NASA Ground-Based Test Facilities

In the past two years, two separate facility-specific life cycle assessments (LCAs) have been performed as summer student projects. The first project focused on 13 facilities managed by NASA s Aeronautics Test Program (ATP), an organization responsible for large, high-energy ground test facilities that accomplish the nation s most advanced aerospace research. A facility inventory was created for each facility, and the operational-phase carbon footprint and environmental impact were calculated. The largest impacts stemmed from electricity and natural gas used directly at the facility and to generate support processes such as compressed air and steam. However, in specialized facilities that use unique inputs like R-134a, R-14, jet fuels, or nitrogen gas, these sometimes had a considerable effect on the facility s overall environmental impact. The second LCA project was conducted on the NASA Ames Arc Jet Complex and also involved creating a facility inventory and calculating the carbon footprint and environmental impact. In addition, operational alternatives were analyzed for their effectiveness at reducing impact. Overall, the Arc Jet Complex impact is dominated by the natural-gas fired boiler producing steam on-site, but alternatives were provided that could reduce the impact of the boiler operation, some of which are already being implemented. The data and results provided by these LCA projects are beneficial to both the individual facilities and NASA as a whole; the results have already been used in a proposal to reduce carbon footprint at Ames Research Center. To help future life cycle projects, several lessons learned have been recommended as simple and effective infrastructure improvements to NASA, including better utility metering and data recording and standardization of modeling choices and methods. These studies also increased sensitivity to and appreciation for quantifying the impact of NASA s activities.

Sydnor, George Honeycutt↗

Consortium for materials development in space interaction with Space Station Freedom

The Consortium for Materials Development in Space (CMDS) is one of seventeen Centers for the Commercial Development of Space (CCDS) sponsored by the Office of Commercial Programs of NASA. The CMDS formed at the University of Alabama in Huntsville in the fall of 1985. The Consortium activities therefore will have progressed for over a decade by the time Space Station Freedom (SSF) begins operation. The topic to be addressed here is: what are the natural, mutually productive relationships between the CMDS and SSF? For management and planning purposes, the Consortium organizes its activities into a number of individual projects. Normally, each project has a team of personnel from industry, university, and often government organizations. This is true for both product-oriented materials projects and for infrastructure projects. For various projects Space Station offers specific mutually productive relationships. First, SSF can provide a site for commercial operations that have evolved as a natural stage in the life cycle of individual projects. Efficiency and associated cost control lead to another important option. With SSF in place, there is the possibility to leave major parts of processing equipment in SSF, and only bring materials to SSF to be processed and return to earth the treated materials. This saves the transportation costs of repeatedly carrying heavy equipment to orbit and back to the ground. Another generic feature of commercial viability can be the general need to accomplish large through-put or large scale operations. The size of SSF lends itself to such needs. Also in addition to processing equipment, some of the other infrastructure capabilities developed in CCDS projects may be applied on SSF to support product activities. The larger SSF program may derive mutual benefits from these infrastructure abilities.

Lundquist, Charles A.↗

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗

Effect of LEO cycling at shallow depths of discharge on MANTECH IPV nickel-hydrogen cells

An individual pressure vessel nickel-hydrogen battery is being considered as an alternate for a nickel-cadmium battery on the Hubble Space Telescope. The space telescope battery will primarily be operating at a shallow depth of discharge (10 percent DOD) with an occasional 40 percent DOD. This shallow DOD raises several issues: (1) What is the cycle life. It is projected to be acceptable; however, there is no reported real time data base for validation. (2) The state of charge of the nickel electrode at the beginning of charge is 90 percent. Will this cause an acceleration of divergence in the battery individual cell voltages. (3) After prolonged cycling at 10 percent DOD, will there be enough capacity remaining to support the 40 percent DOD. (4) Is the state of charge really 90 percent during cycling. There is no reported real time data base at shallow depths of discharge. A data base to address the above issues was initiated.

Smithrick, John J.↗

Effect of LEO cycling at shallow depths of discharge on MANTECH IPV nickel-hydrogen cells

An individual pressure vessel nickel-hydrogen battery is being considered as an alternate for a nickel-cadmium battery on the Hubble Space Telescope. The space telescope battery will primarily be operating at a shallow depth of discharge (10 percent DOD) with an occasional 40 percent DOD. This shallow DOD raises several issues: (1) What is the cycle life. It is projected to be acceptable; however, there is no reported real time data base for validation. (2) The state of charge of the nickel electrode at the beginning of charge is 90 percent. Will this cause an acceleration of divergence in the battery individual cell voltages. (3) After prolonged cycling at 10 percent DOD, will there be enough capacity remaining to support the 40 percent DOD. (4) Is the state of charge really 90 percent during cycling. There is no reported real time data base at shallow depths of discharge. A data base to address the above issues was initiated.

Smithrick, John J.↗

Application of composites to helicopter airframe and landing gear structures

A preliminary design study has indicated that advanced composite helicopter airframe structures can provide significant system cost advantages in the 1980's. A seven percent increase in productivity and a five percent reduction in life cycle cost are projected. Due to their complexity, landing gear structures do not substantially benefit from the use of advanced composites. The most successful concept was found to be all-molded composite modular panels, which provide integral skin/stringer and frame subassemblies. These subassemblies significantly reduce the number of parts relative to present construction. The subassemblies are mechanically jointed together for economical, rapid final assembly and permit field replacement in the event of major damage.

Rich, M. J.↗

Research requirements to reduce civil helicopter life cycle cost

The problem of the high cost of helicopter development, production, operation, and maintenance is defined and the cost drivers are identified. Helicopter life cycle costs would decrease by about 17 percent if currently available technology were applied. With advanced technology, a reduction of about 30 percent in helicopter life cycle costs is projected. Technological and managerial deficiencies which contribute to high costs are examined, basic research and development projects which can reduce costs include methods for reduced fuel consumption; improved turbine engines; airframe and engine production methods; safety; rotor systems; and advanced transmission systems.

Blewitt, S. J.↗

Solar energy system economic evaluation: IBM System 2, Togus, Maine

The economic analysis of the solar energy system, is developed for Torgus and four other sites typical of a wide range of environmental and economic conditions in the continental United States. This analysis is accomplished based on the technical and economic models in the f-chart design procedure with inputs taken on the characteristics of the installed system and local conditions. The results are expressed in terms of the economic parameters of present worth of system cost over a projected twenty year life, life cycle savings, year of positive savings and year of payback for the optimized solar energy system at each of the analysis sites. The sensitivity of the economic evaluation to uncertainties in constituent system and economic variables is also investigated. Results demonstrate that the solar energy system is economically viable at all of the five sites for which the analysis was conducted.

Source record↗