Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Marine Energy Technology Development Risk Management Framework

Over the past decades, the global marine energy industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed a Marine Energy Risk Management Framework in 2015, with this revision published in 2024. This risk management framework shall be utilized on all DOE Water Power Technologies Office (WPTO) projects that require system testing in the open water. By addressing uncertainties, the Marine Energy Risk Management Framework increases the likelihood of successful development of marine energy converter technology. It covers projects of any technology readiness level technology performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This risk framework is not a substitute for other risk management procedures that may be required for marine operations, such as installations at sea, hoisting and rigging, safe diver operations, and other safety requirements. This risk framework is intended to meet DOE's risk management expectations for marine energy technology research and development efforts from WPTO. It also provides an overview of other relevant risk management tools and documentation.

16 TIDAL AND WAVE POWER↗

Near-term Brayton Module Status

The integration of subsystem components and the testing of a Parabolic Dish Module (PDM) to convert solar energy to grid compatible electric power is examined. System components are selected on a basis of current and projected performance efficiencies, technology readiness, future production probabilities and prices, current cost and availability. Potential for a near-term, 8 kW derivative of the PDM is adjudged to be superior to that of a 20 kW system. The PDM is suited to both grid connected and standalone applications, and it may be fired by solar, fossil, or solar/fossil hydrid means.

Davis, S. B.↗

The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII): Towards the First Flight

The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII) is a balloon-borne, far-infrared direct detection interferometer with a baseline of 8 m and two collectors of 50 cm. It is designed to study galactic clustered star formation by providing spatially-resolved spectroscopy of nearby star clusters. It is being assembled and tested at NASA Goddard Space Flight Center for a first flight in Fall 2016. We report on recent progress concerning the pointing control system and discuss the overall status of the project as it gets ready for its commissioning flight.

Rizzo, Maxime J.↗

Technology plan for the Terrestrial Planet Finder coronagraph

This document details the technology plan for the first of the TPF missions, the Terrestrial Planet Finder Coronagraph (TPF-C). TPF-C is currently in the first (or pre-Phase A) stage of the NASA project life cycle, and is undertaking a suite of technology development projects to demonstrate technological readiness leading to its Mission Concept Review, currently planned for late FY2006. Contained in these pages is an overview of planned pre-Phase A technology development activities, as well as activities planned through Phase C/D.

Lawson, Peter R.↗

Design of an Excavation Robot: Regolith Advanced Surface Systems Operations Robot (RASSOR) 2.0

To continue on a sustainable and flexible path, NASA needs to address the challenge of collecting and moving large amounts of regolith at the destination. Acquiring the water resources on Mars will require mining significant quantities of regolith and this is not possible with the state-of-the-art low mass excavation systems. Low gravity environments (Mars = 3/8 G) and launch mass restrictions limit the traction and the resulting reaction force of the vehicle, making current terrestrial techniques impractical. This project addressed this challenge by developing a completely new technology that can mine large quantities of regolith on Mars. Recent measurements by the “Curiosity” rover on Mars have found that the regolith contains ~ 2% water by weight globally, ~4% in Jezero Crater (Human Architecture Team’s reference landing site), and much more at the poles(Leshin et al, 2013). RASSOR 2.0 is a planetary excavator, which has a mass of 66 kg, with a 0.38 kg vehicle mass per kilogram, per hour of excavation rate and power usage of 4 W per kg of regolith excavation rate. A single RASSOR 2.0 can excavate a minimum of 2.7 metric tons of regolith per day.This is accomplished by using counteracting excavation forces on two opposing digging implements called bucket drums and an autonomous mining control system. This work has addressed several major research areas outlined in the NASA Technology Area (TA) 04 Robotics & Autonomous Systems and TA 07 Human Destination Systems roadmaps. This project started at Technology Readiness Level (TRL) 4 as a low fidelity “proof of concept” prototype which has successfully demonstrated basic regolith simulant excavation functionality in a lab-scale gravity off load test. The foundational technology described here was awarded US patent number: US 9027265 for a “Zero horizontal reaction force excavator” on May 12, 2015.

RASSOR↗

LISA EDU Status

LISA will be the first space-based gravitational wave observatory, enabling orders of magnitude greater sensitivity than the state-of-the-art LIGO facility. L3Harris is developing an engineering development unit (EDU) telescope in support of NASA, ESA and the LISA Consortium. The LISA EDU telescope validates a flight-like telescope design and reduces risks associated with stability, materials, assembly, integration, and testing. Mission requirements are unlike any other and require picometer-level stability across the entire telescope’s beam path, even in the presence of temperature variation and jitter. As a result, an all-glass telescope design was developed. The brittle structure represents a new state of the art for stable telescopes, but also introduces challenges with managing assembly, manufacturability, and survivability. From 2019-2024, the LISA EDU project has increased manufacturing readiness and technology readiness for the optical telescope element.

Brian VanRensselaer↗

Neutronics Analysis of TREAT Multi-SERTTA Calibration Test Vehicle (Multi-SERTTA CAL)

Transient testing is a necessary step in the performance evaluation of Accident Tolerant Fuels (ATF) developed as part of the Fuel Cycle Research and Development Advanced Fuels Campaign initiated and supported by the United States Department of Energy (DOE-NE). These advanced fuels are expected to be used in future reactors or replace the current fuel design used in existing power reactors for enhanced performance and safety. Upon completion of a process proscribed by the National Environmental Policy Act, the Transient Reactor Test (TREAT) facility, located at Idaho National Laboratory (INL), was chosen by DOE-NE to provide the desired specialized testing. TREAT has successfully operated from start-up in 1959 to 1994 when it was placed on operational stand-by. Careful preparations are being made for operational readiness and TREAT is projected to resume testing no later than 2018. Past TREAT testing primarily focused on sodium-cooled reactor fuels (SRF). Test vehicle designs varied to accommodate testing needs ranging from separate effects tests to integral tests approaching simulation of actual reactor environment conditions including forced convection cooling. The current focus on light water reactor (LWR) ATF requires design of new experiment vehicles to accommodate the water/steam environment and associated complexities regarding desired energy deposition into the specimen and proper containment. The first set of experiments in TREAT restart is expected to be conducted with the Multi-SERTTA (Static Environment Rodlet Transient Test Apparatuses). Difficult to quantify and calculate integral and time dependent effects inherent in transient testing limit predictive modeling capability; therefore, calibration testing in TREAT prior to the actual experiment is necessary to empirically determine the effectiveness of core-to-specimen power coupling in order to achieve the desired energy deposition into the test specimen during a nuclear power transient. This has been done in the past, in part, by evaluating the difference in energy deposition into dosimeter wires subjected to various TREAT time dependent power conditions. These calibration tests were typically conducted in a test vehicle neutronically similar to the actual test vehicle, but more simplistic in design in order to quickly retrieve and analyze dosimeter wires and minimize containment structure costs due to several trials. Prior calibration testing for SRF experiments could be conducted without coolant as sodium has no notable neutronic effect on the core-to-specimen power coupling factor (PCF). Such is not the case with LWR fuel where water serves as both moderator and coolant. This presents a design challenge as the calibration test vehicle must retain heated, high-pressure water to preserve neutronic equivalence representative of near prototypic reactor conditions while allowing for quick retrieval of dosimeters. The solution to this challenge comes in the form of a thin walled dry well positioned through the center of the basic Multi-SERTTA design. Test vehicle reactivity worth and PCF are two important factors with respect to ascertainment of neutronic equivalence. Similarity in test vehicle reactivity worth is desired to avoid the need to change operational core rod positions in TREAT which could significantly alter neutron flux distribution and consequently power distribution throughout the core and into the test specimen. The geometry and composition of various materials within the experiment containment structure can also significantly alter the quality of neutron signal delivery from the core to the test specimen. Introduction of an Inconel tube, albeit very thin, is expected to impact PCF. Simple modifications to the CAL design may compensate for the anticipated change. Evaluation of these factors and proposed modifications through neutronics analysis serves to inform experiment design and is a valuable tool towards achieving the optimal CAL design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Fuels Campaign 2019 Accomplishments

The mission of the Advanced Fuels Campaign (AFC) is to perform or support research, development, and demonstration (RD&D) activities to identify and mature innovative fuels and cladding materials and associated technologies with the potential to improve the performance and safety of current and future reactors; increase the efficient utilization of nuclear energy resources; contribute to enhancing proliferation resistance of the nuclear fuel cycle; and address challenges related to waste management and ultimate disposal. AFC pursues its mission objectives using a goal-oriented, science-based approach that seeks to establish a fundamental understanding of fuel and cladding behaviors under conditions that arise during fabrication, normal steady-state irradiation, off-normal transient scenarios, and storage/disposal. This approach includes advancing the theoretical understanding of fuel behavior, conducting fundamental and integral experiments, and supporting the mechanistic, multi-scale modeling of nuclear fuels to inform and guide fuel development projects, advance the technological readiness of promising fuel candidates, and ultimately support fuel qualification and licensing initiatives. In the area of advanced tools for the modeling and simulation of nuclear fuels, the AFC works in close partnership with the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, participating with NEAMS in developing mechanistic fuel behavior models and providing experimental data to inform and validate its most advanced tools. Specifically, AFC objectives in thecoming five year horizon include: 1. support the industry-led development of Accident Tolerant Fuel (ATF) technologies with improved reliability and performance under normal operations and enhanced tolerance during hypothetical accident scenarios, with implementation of lead test rods/assemblies of one or more ATF concepts in commercial reactor(s) by or before 2022 and batch reloads of near-term concept(s) in the 2023-2026 timeframe; 2. lead research and development on innovative fuel and cladding technologies for applications to future advanced reactors, especially fast-spectrum reactors, including reactors that utilize both once-through and recycle scenarios; 3. continue the development and demonstration of a multi-scale,science-based approach to fuel development and testing, andcontribute to the establishment of a state-of-the-art R&D infrastructure necessary to accelerate the development of new fuel concepts; and collaborate with NEAMS on the development and validation of multi-scale, multi-physics, and increasingly predictive fuel performance models and codes. 4. collaborate with NEAMS on the development and validation of multi-scale, multi-physics, and increasingly predictive fuel performance models and codes.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Automated Medical Inventory System (AMIS) to Enable Earth-Independent Medical Operations

BACKGROUND: Inventory of medical consumables and durables (medications, treatment aids, diagnostic equipment, etc.) aboard the International Space Station is a manual process whereby crewmembers reach out to their flight surgeon to relay when items are used. Performing a full medical system inventory is time intensive. However, as exploration progresses to long duration missions with little to no resupply or evacuation capabilities, maintaining an accurate account of inventory and location for medical systems across the mission will become increasingly critical. A new system must be developed for future exploration missions to meet the need for a crew-facing, real time method of managing medical inventory. OVERVIEW: NASA’s Exploration Medical Integrated Product Team (XMIPT) is funding the AMIS project to mature the technology readiness level and to conduct a flight demonstration of a medical inventory capability. AMIS will leverage lessons learned from a Medical Consumables Tracking project previously demonstrated aboard the ISS in 2016 and 2017. Key components of AMIS include a database, supporting hardware and software, and interfaces to power, communications, or other vehicle or medical systems. Some medical inventory capability may be provided by the vehicle inventory management system which relies upon RFID-based technology and can track larger items such as medical kits or medical hardware. AMIS will augment these capabilities to enable tracking of individual medical kit contents. Efforts are underway to characterize the optimal solution trade space by comparing system specifications (e.g. mass and volume, etc.) across maintenance and operational use cases (e.g. crew time saved, total inventory automated, etc). DISCUSSION: The contents of a Mars Medical System have not been fully defined which poses challenges to defining an inventory system and requires assumptions regarding medical kit contents and medical system design. Other important considerations include minimizing crew time required, avoiding access restrictions to medical inventory in the event of an emergency, and ensuring that data is accessible to other medical system elements to enable crew autonomy in provision of medical care.

Automated Medical Inventory System↗

Challenging Technology, and Technology Infusion into 21st Century

In preparing for the space exploration challenges of the next century, the National Aeronautics and Space Administration (NASA) Center for Integrated Space Micro-Systems (CISM) is chartered to develop advanced spacecraft systems that can be adapted for a large spectrum of future space missions. Enabling this task are revolutions in the miniaturization of electrical, mechanical, and computational functions. On the other hand, these revolutionary technologies usually have much lower readiness levels than those required by flight projects. The mission of the Advanced Micro Spacecraft (AMS) task in CISM is to bridge the readiness gap between advanced technologies and flight projects. Additional information is contained in the original extended abstract.

Chau, S. N.↗

DOE SNF Packaging Demonstration Project: Worktable and Canister Loading Sleeve Design [Slides]

This presentation is a briefing for summer interns and others outside the project, to give them a summary of ongoing design activities. The DOE SNF Packaging Demonstration Project is an effort to develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed spent nuclear fuel (SNF) for road ready dry storage (RRDS). The project is to remotely load and seal two types of DOE-managed SNF from the CPP-603 facility into DOE Standard Canisters, place the sealed DOE Standard Canisters into commercial vendor over-canisters (equivalent to commercial MPCs), seal and place the over-canisters into commercial vendor storage overpacks, and place the storage system (over-canister and storage overpack) onto the CPP-2707 cask pad.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of SNF, most of which are located at the INL site. “Road-ready dry storage” is a management concept where SNF is packaged into dry, sealed canisters, which are then placed in on-site storage in anticipation of later removal. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE SNF for road-ready dry storage. In support of establishing a large-scale road-ready dry storage program at the INL site, the demonstration will package a select amount of DOE-managed SNF into DOE Standard Canisters. The closure process for the DOE Standard Canisters will include fuel and basket loading, welding, inspection, leak testing, and if needed, repair. As a follow-up to previous discussion on the design of the DOE Closure Leak Test Assembly, this report describes recent fabrication and testing efforts performed at INL. DOE Standard Canisters are sealed by two sequential gas tungsten arc welds. Both are performed by remotely operated and semi-autonomous welding systems. The first weld is a circumferential pipe weld that completes assembly of the canister body and lid assembly. The second and final closure weld connects the vent plug to the vent port with an identical butt joint to the circumferential pipe weld. After the second weld is performed on the vent port, these welds are helium leak tested using an inside-out technique. In addition to the commercially available vacuum and leak detector systems, the DOE Standard Canister Closure Leak Test Assembly was designed for both remote and manual operation. This report describes fabrication and performance testing associated with the inside-out technique. INL staff designed and tested systems to accomplish these tasks. Hardware fabrication occurred at INL facilities. Forthcoming work includes design optimization, integration to existing systems, and implementation to packaging demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dish-STARS Commercialization (Final Report)

The goal of this project is to aggressively support the near-term commercialization of a new technology platform – based on the integration of solar concentrators and micro- and meso-channel process technology (MMPT) – that was evaluated and identified as a strong candidate for near-term commercialization at EERE’s inaugural Lab-Corps program during early FY2016. Known as STARS, for Solar Thermochemical Advanced Reactor System, or Dish-STARS TM when paired with parabolic dish concentrators, STARS is a promising energy-related technology developed at the Pacific Northwest National Laboratory (PNNL) that efficiently converts solar energy into chemical energy. Combined with economies through hardware mass production, the efficiency of Dish-STARS TM provides a near-term opportunity for the production of renewable electricity, fuels and chemicals. The project supported the cooperative development of Dish-STARSTM by PNNL and industry partners including California Gas Company (SoCalGas) and the startup company, STARS Technology Corporation (STC), which was founded by the PNNL Lab-Corps team that evaluated STARS on behalf of EERE. Under this project, the team advanced the Technology Readiness Level 6 (TRL 6) STARS reaction system, developed under the previous DOE SunShot project, to TRL 7 through on-sun testing in California by PNNL. The advances made in this project enabled STC to accelerate commercial development and initiate work towards a major technology demonstration in California for a hydrogen filling station application.

14 SOLAR ENERGY↗

NASA Power: Global Solar Insolation, Meteorological Parameter Data, and Web Services to Support Sustainable Building Design and Operations

The buildings industry is currently striving to adopt green solutions to make infrastructure more energy-efficient in order to meet the 2050 net-zero climate goals. This planning requires reliable environmental datasets that are crucial in designing, building, and maintaining our world’s-built environment, as well as other energy-related processes and investments. This webinar for the National Institute of Building Sciences provides an overview of NASA’s Prediction Of Worldwide Energy Resources (POWER) Project that informs decision-making and development for sustainable building design and operations by enabling public open discovery, efficient access, and convenient distribution of NASA’s Earth Observations and global atmospheric model datasets. POWER’s datastore is comprised of solar radiation and surface meteorology parameters, spanning nearly 40 years of hourly data, that are easily accessible via several access methods and tools to support three focus areas: 1) renewable energy deployment and management, 2) sustainable infrastructure, and 3) agroclimatology applications. POWER and NASA Earth Science both plan future data parameters, updated tools, and improved observations that could directly support U.S. and international sustainable development goals, climate strategies, and building information modeling. To this end, solar data from several NASA projects and meteorological data from NASA assimilation models have already been reformatted and disseminated to the public via a user-friendly web GIS-enabled based data portal through the POWER Project. POWER data is analysis-ready and accessible through an Application Programming Interface (API), ArcGIS Image Services, and the project’s Data Access Viewer enhanced (DAVe), an interactive online tool. The POWER DAVe also features data consistent with ASHRAE Climate Design Conditions and has developed web image services showing Building Climate Zones and their variability. Through those tools, the data can be downloaded into multiple formats that support the infrastructure community, including CSV and Energy Plus Weather (EPW). POWER’s entire data product catalog is available through Amazon Web Services (AWS) Open Data Registry (ODR) via a free and publicly accessible Simple Storage Service (S3). This webinar provides a full overview of the NASA POWER Project's data and services developed in collaboration with the sustainable infrastructure community. Examples of how the renewable energy and building communities have utilized POWER data products to make decisions and a preview of future data product expansion, including climate projections, and web services will also be provided. Additionally, use case stories from our broad community of users will be presented.

Paul W. Stackhouse↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Projects without a purpose: Why a top down strategy to resilience matters

Energy resilience is a key focus of the current administration and Department of Defense (DoD) leaders, and is in the title of every energy conference session. Most case studies and success stories focus on resilience projects hardening systems or microgriding critical infrastructure. Some case studies focus on unique financing approaches to bring private sector innovation and increased investment to military installations. Many times, what initially look like innovative resilience projects, end as isolated systems or stranded infrastructure. This article will explore how the DoD can make greater strides advancing resilience objectives and ultimately developing projects that support installation mission readiness by first focusing on top down strategies. The Army established energy and water security/resilience requirements, developed a comprehensive measurement framework, is evolving integrated planning approaches in collaboration with local communities, and is supporting project development activities across third-party and appropriated programs. The Army’s multi-year strategic energy and water security planning activities can provide helpful guidance to both the lifecycle of programs or individual projects, and ensure resilience projects both have and achieve a purpose.

Army↗

Direct Coal -to-Liquids (CTL) for Jet Fuel Using Biomass-Derived Solvents

Battelle has demonstrated a novel and potentially breakthrough technology for a direct coal-to-liquids (CTL) process for producing jet fuel using biomass-derived coal solvents (bio-solvents). The Battelle process offers a significant reduction in capital and operating costs and a substantial reduction in greenhouse gas (GHG) emissions, without requiring carbon capture and storage (CCS). The results of the project are the advancement of three steps of the hybrid coal/biomass-to-jet fuel process to the technology readiness level (TRL) of 5. The project objectives were achieved over two phases. In Phase 1, all three major process steps were explored and refined at bench-scale, including: (1) biomass conversion to high hydrogen-donor bio-solvent; (2) coal dissolution in biomass-derived bio-solvent, without requiring molecular H 2 , to produce a synthetic crude (syncrude); and (3) two-stage catalytic hydrotreating/hydrogenation of syncrude to jet fuel and other distillates. In Phase 2, all three subsystems of the CTL process were scaled up to a pre-pilot scale, and an economic analysis was carried out. A total of over 40 bio-solvents were identified and prepared. The most unique attribute of Battelle’s bio-solvents is their ability to provide much-needed hydrogen to liquefy coal and thus increase its hydrogen content so much that the resulting syncrude is liquid at room temperature. Based on the laboratory-scale testing with bituminous coals from Ohio and West Virginia, a total of 12 novel bio-solvent met the goal of greater than 80% coal solubility, with 8 bio-solvents being as good as or better than a well-known but expensive hydrogen-donor solvent, tetralin. The Battelle CTL process was then scaled up to 1 ton/day (1TPD) at a pre-pilot facility operated in Morgantown, WV. These tests were conducted, in part, to produce enough material for syncrude-upgrading testing. To convert the Battelle-CTL syncrude into a form suitable as a blending stock for jet turbine fuel, a two-step catalytic upgrading process was developed at laboratory scale and then demonstrated at pre-pilot scale facility in Pittsburg, PA. Several drums of distillate products were produced, which were then distilled into unblended (neat) synthetic jet fuel and diesel products for a detailed characterization. Based on a detailed characterization of the synthetic jet fuel, a 20% synthetic, 80% commercial jet fuel blend was prepared, which met all specifications. An analysis of the synthetic diesel product showed that it has the promise of being a drop-in fuel as super-low (less than 15 ppm)-sulfur diesel fuel. A detailed economic analysis showed that the Battelle liquefaction process is economical at between 1000 metric tons/day (MT/day) and 2000 MT/day. The unit capital cost for Battelle CTL process for making jet fuel is 50K USD/daily bbl compared to 151K USD/daily bbl for indirect CTL, based on 2011 dollars. The jet-fuel selling cost at the refinery, including a 12% capital cost factor (which included profit), for the Battelle CTL process is 61USD/bbl (1.45 USD/gallon). This is competitive with crude oil price of 48 USD/bbl. At the same time, the GHG emissions of 3.56 MT CO 2 /MT fuel were lower than the GHG emissions of 3.79 MT CO 2 /MTfuel for petroleum-based fuels and 7.77 MT CO 2 /MT fuel for indirect CTL. Thus, the use of bio-solvents completely eliminates the need for carbon capture in the case of Battelle CTL process. The superior economics and low GHG emissions for the Battelle CTL process has thus sparked worldwide interest and some potential commercialization opportunities are emerging.

01 COAL, LIGNITE, AND PEAT↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗