Search NASA⌕ Search

SEARCH · Search NASA

Results for “Prompt period”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

92 records · Page 6

Use of Semi-Autonomous Tools for ISS Commanding and Monitoring

As the International Space Station (ISS) has moved into a utilization phase, operations have shifted to become more ground-based with fewer mission control personnel monitoring and commanding multiple ISS systems. This shift to fewer people monitoring more systems has prompted use of semi-autonomous console tools in the ISS Mission Control Center (MCC) to help flight controllers command and monitor the ISS. These console tools perform routine operational procedures while keeping the human operator "in the loop" to monitor and intervene when off-nominal events arise. Two such tools, the Pre-positioned Load (PPL) Loader and Automatic Operators Recorder Manager (AutoORM), are used by the ISS Communications RF Onboard Networks Utilization Specialist (CRONUS) flight control position. CRONUS is responsible for simultaneously commanding and monitoring the ISS Command & Data Handling (C&DH) and Communications and Tracking (C&T) systems. PPL Loader is used to uplink small pieces of frequently changed software data tables, called PPLs, to ISS computers to support different ISS operations. In order to uplink a PPL, a data load command must be built that contains multiple user-input fields. Next, a multiple step commanding and verification procedure must be performed to enable an onboard computer for software uplink, uplink the PPL, verify the PPL has incorporated correctly, and disable the computer for software uplink. PPL Loader provides different levels of automation in both building and uplinking these commands. In its manual mode, PPL Loader automatically builds the PPL data load commands but allows the flight controller to verify and save the commands for future uplink. In its auto mode, PPL Loader automatically builds the PPL data load commands for flight controller verification, but automatically performs the PPL uplink procedure by sending commands and performing verification checks while notifying CRONUS of procedure step completion. If an off-nominal condition occurs during procedure execution, PPL Loader notifies CRONUS through popup messages, allowing CRONUS to examine the situation and choose an option of how PPL loader should proceed with the procedure. The use of PPL Loader to perform frequent, routine PPL uplinks offloads CRONUS to better monitor two ISS systems. It also reduces procedure performance time and decreases risk of command errors. AutoORM identifies ISS communication outage periods and builds commands to lock, playback, and unlock ISS Operations Recorder files. Operation Recorder files are circular buffer files of continually recorded ISS telemetry data. Sections of these files can be locked from further writing, be played back to capture telemetry data that occurred during an ISS loss of signal (LOS) period, and then be unlocked for future recording use. Downlinked Operation Recorder files are used by mission support teams for data analysis, especially if failures occur during LOS. The commands to lock, playback, and unlock Operations Recorder files are encompassed in three different operational procedures and contain multiple user-input fields. AutoORM provides different levels of automation for building and uplinking the commands to lock, playback, and unlock Operations Recorder files. In its automatic mode, AutoORM automatically detects ISS LOS periods, then generates and uplinks the commands to lock, playback, and unlock Operations Recorder files when MCC regains signal with ISS. AutoORM also features semi-autonomous and manual modes which integrate CRONUS more into the command verification and uplink process. AutoORMs ability to automatically detect ISS LOS periods and build the necessary commands to preserve, playback, and release recorded telemetry data greatly offloads CRONUS to perform more high-level cognitive tasks, such as mission planning and anomaly troubleshooting. Additionally, since Operations Recorder commands contain numerical time input fields which are tedious for a human to manually build, AutoORM's ability to automatically build commands reduces operational command errors. PPL Loader and AutoORM demonstrate principles of semi-autonomous operational tools that will benefit future space mission operations. Both tools employ different levels of automation to perform simple and routine procedures, thereby offloading human operators to perform higher-level cognitive tasks. Because both tools provide procedure execution status and highlight off-nominal indications, the flight controller is able to intervene during procedure execution if needed. Semi-autonomous tools and systems that can perform routine procedures, yet keep human operators informed of execution, will be essential in future long-duration missions where the onboard crew will be solely responsible for spacecraft monitoring and control.

Brzezinski, Amy S.↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗