Search NASA⌕ Search

SEARCH · Search NASA

Results for “QUALITY ASSURANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Capturing, using, and managing quality assurance knowledge for shuttle post-MECO flight design

Ascent initialization values used by the Shuttle's onboard computer for nominal and abort mission scenarios are verified by a six degrees of freedom computer simulation. The procedure that the Ascent Post Main Engine Cutoff (Post-MECO) group uses to perform quality assurance (QA) of the simulation is time consuming. Also, the QA data, checklists and associated rationale, though known by the group members, is not sufficiently documented, hindering transfer of knowledge and problem resolution. A new QA procedure which retains the current high level of integrity while reducing the time required to perform QA is needed to support the increasing Shuttle flight rate. Documenting the knowledge is also needed to increase its availability for training and problem resolution. To meet these needs, a knowledge capture process, embedded into the group activities, was initiated to verify the existing QA checks, define new ones, and document all rationale. The resulting checks were automated in a conventional software program to achieve the desired standardization, integrity, and time reduction. A prototype electronic knowledge base was developed with Macintosh's HyperCard to serve as a knowledge capture tool and data storage.

Peters, H. L.↗

Quality Assurance Surveillance Tool Designed for SLS EM-1 Certificate of Flight Readiness

Exploration Mission-1 (EM-1) is an uncrewed mission that is launching on the Space Launch System (SLS) Block 1 vehicle. This is a critical flight test for the agency's human deep space exploration goals. Exploration Ground Systems (EGS) Quality (SA-F2) is responsible for providing Quality Assurance Surveillance Plans (QASPs) for NASA contracts and facilities. A QASP assures products and services are provided to EGS in accordance with the contract requirements. In order to encapsulate the multiple KSC Safety and Mission Assurance surveillance and audit activities that need to be accomplished specifically for EM-1 Certificate of Flight Reediness (CoFR), a QASP tool needed to be implemented. This tool would be able to intuitively track Work Authorization Documents (WADs) under development by Test Operations Support Contract (TOSC), reviewed and accepted WADs, Government Mandatory Inspection Points (GMIPs), Nonconformances (NCs), Material Review Board (MRB) Status, Corrective Actions, Alterations, Deviations, and Waivers for flight hardware and Ground Support Equipment (GSE). This would help ensure that all SLS EM-1 flight hardware and related GSE surveillances and requirements are being recognized and completed with zero constraints identified for the mission.

Morris, Patrick↗

3D MEMS in Standard Processes: Fabrication, Quality Assurance, and Novel Measurement Microstructures

Three-dimensional MEMS microsystems that are commercially fabricated require minimal post-processing and are easily integrated with CMOS signal processing electronics. Measurements to evaluate the fabrication process (such as cross-sectional imaging and device performance characterization) provide much needed feedback in terms of reliability and quality assurance. MEMS technology is bringing a new class of microscale measurements to fruition. The relatively small size of MEMS microsystems offers the potential for higher fidelity recordings compared to macrosize counterparts, as illustrated in the measurement of muscle cell forces.

Lin, Gisela↗

Fuel Consumption Modeling of a Transport Category Aircraft Using Flight Operations Quality Assurance Data: A Literature Review

Fuel is a major cost expense for air carriers. A typical airline spends 10% of its operating budget on the purchase of jet fuel, which even exceeds its expenditures on aircraft acquisitions. Thus, it is imperative that fuel consumption be managed as wisely as possible. The implementation of Flight Operations Quality Assurance (FOQA) programs at airlines may be able to assist in this management effort. The purpose of the study is to examine the literature regarding fuel consumption by air carriers, the literature related to air carrier fuel conservation efforts, and the literature related to the appropriate statistical methodologies to analyze the FOQA-derived data.

Stolzer, Alan J.↗

SAM Software Quality Assurance Plan Implementation and NQA-1 Assessment

The System Analysis Module (SAM) is an advanced and modern system analysis tool being developed at Argonne National Laboratory under the U.S. DOE Office of Nuclear Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. As a modern-day software, SAM development included efforts to follow best practices in software development. These best practices include version control using git, independent reviews of development activities, and detailed descriptions of developments and bug fixes using the GitLab issue and merge request system. In Fiscal Year 2023 (FY23), the SAM development team set out to formalize a Software Quality Assurance (SQA) program that allowed industry partners to credit the informal steps being taken by the SAM development team to ensure the quality of the software. As part of formalizing an SQA program, a SQA Plan (SQAP) was developed, implemented, and assessed. The SAM SQAP targets compliance with NQA-1-2008/2009 Addenda. The SQAP builds on the MOOSE SQAP and the Argonne SSQAPP while accounting for the needs of the multi-organization SAM development team. Modifications to the SAM repository structure, including a new testing system, updated test cases, and the development of an internal website, facilitate the implementation of the SAM SQAP. The initial assessment of the SAM SQAP indicated that the SAM SQAP was adequately and effectively implemented and additional work was required to improve the compliance of the SAM SQAP with NQA-1 2008/2009 Addenda. Several improvements to the SQAP have already been drafted to address these assessments and future work is planned to further improve the SAM SQAP in support of end-user needs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Quality Assurance Certification of the MCNP-ORIGEN Activation Automation tool

The MCNP-ORIGEN Activation Automation (MOAA) tool couples MCNP and ORIGEN-S, allowing to support ATR and TREAT experiments by predicting their composition and activity before their irradiation takes place. MOAA is developed and maintained by the Irradiation Experiment Neutronics Analysis group (C-150) at INL. This poster presents the motivation behind the development of MOAA, its main workflow, as well as the software quality assurance (SQA) efforts required by LWP-13620, "Managing Information Technology Assets."

07 ISOTOPE AND RADIATION SOURCES↗

Establishing the Quality Assurance programme for the strip sensor production of the ATLAS tracker upgrade including irradiation with neutrons, photons and protons to HL-LHC fluences

The successful pre-production delivery of strip sensors for the new Inner Tracker (ITk) for the upgraded ATLAS detector at the High Luminosity LHC (HL-LHC) at CERN was completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance (QA), a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics K.K (HPK). As well as Quality Control (QC) checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to fluences and doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000 fb -1 . In this paper the procedures are presented and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project.

47 OTHER INSTRUMENTATION↗

Fabrication and quality assurance processes for superhybrid composite fan blades

The feasibility of fabricating full-scale fan blades from superhybrid composites (SHC) for use large, commercial gas turbine engines was evaluated. The type of blade construction selected was a metal-spar/SHC-shell configuration, in which the outer shell was adhesively bonded to a short, internal, titanium spar. Various aspects of blade fabrication, inspection, and quality assurance procedures developed in the investigation are described. It is concluded that the SHC concept is feasible for the fabrication of prototype, full-scale, metal-spar/SHC-shell fan blades that have good structural properties and meet dimensional requirements.

Lark, R. F.↗

Fabrication and quality assurance processes for superhybrid composite fan blades

The feasibility of fabricating full-scale fan blades from superhybrid composites (SHC) for use large, commercial gas turbine engines was evaluated. The type of blade construction selected was a metal-spar/SHC-shell configuration, in which the outer shell was adhesively bonded to a short, internal, titanium spar. Various aspects of blade fabrication, inspection, and quality assurance procedures developed in the investigation are described. It is concluded that the SHC concept is feasible for the fabrication of prototype, full-scale, metal-spar/SHC-shell fan blades that have good structural properties and meet dimensional requirements.

Lark, R. F.↗

Quality Assurance Plan for Federal Guidance Report 16

Federal Guidance Report No. 16 will provide risk coefficients for use in projecting the probability of cancer morbidity or mortality from exposure to environmental radionuclides. The derivation of nuclide-specific risk coefficients involves multiple steps, with each step relying on the accuracy of the previous step as well as the numerical data utilized within each step. Thus, to ensure the quality of the derived risk coefficients, it is necessary to evaluate and confirm the quality and proper implementation of input data at each step of the derivation. The Oak Ridge National Laboratory (ORNL) dosimetry research team currently has two largely independent software codes for deriving radiation dose estimates, dose coefficients, and cancer risk coefficients for internally deposited radionuclides: DCAL and QCAL. The agreement of derived values based on alternate codes is an important step in quality assurance (QA) of the risk coefficients produced in this project. DCAL is an integration of the dosimetric software and numerical databases developed at ORNL over the past 25 years for the EPA’s Office of Radiation and Indoor Air (ORIA). QCAL was developed in 2015 to serve as a substitute for DCAL while DCAL was undergoing revision and to provide QA for the updated version of DCAL. The complex methodology employed in the derivation of cancer risk coefficients presents a challenge for QA, and as such, this report describes the QA steps used by the ORNL dosimetry team in this process as implemented in DCAL and QCAL for Federal Guidance Report No. 16.

61 RADIATION PROTECTION AND DOSIMETRY↗

Fiscal Year 2024 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued in 2024. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The SUMMAR manual was completed this fiscal year and work was started on creating manuals for SE2ANL, SE2RCT, and DASSH. Software verification work was carried out for DIF3D and REBUS in a previous program and the current fiscal year saw the completion of software verification reports for GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The goal for the next fiscal year is to complete the PERSENT software verification work and begin planning the software verification work for DASSH, SE2ANL, and SE2RCT. The code coverage reports for DIF3D and MC2-3 were completed in the previous fiscal year and the goal is to generate code coverage reports for REBUS, GAMSOR, PERSENT, and DASSH in the coming fiscal year. A considerable amount of effort was spent in the current fiscal year working on the continuous integration capability for automated regression testing in GitLab. The first version of the testing was created in the previous fiscal year and applied to DIF3D and its utility programs. That testing was extended this year to cover GAMSOR, REBUS, and PERSENT. To accomplish this, the first version of the new testing methodology had to be updated to make a single output checking methodology viable for all of the ARC software. This will result in a single document to detail the automated regression testing methodology and minor documents to detail the tolerance settings that have been applied to the output for each ARC code. The previous methodology put into place with SVN would have required a separate document for each ARC code to detail the output checking methodology and the tolerance settings for the output from each code. Because some of our industry partners are providing funds to add new capabilities to the ARC software to meet their needs, all of which must be reviewed and approved by the SQA program funded by this project, a summary of that development work is detailed in this report. Overall progress on resolving the QA gaps has been good this year with the most impactful improvement for our industry partners in capability being the creation of a threaded version of DIF3D-VARIANT that allows the DIF3D, REBUS, and GAMSOR run times to be reduced by a factor of 4-6. The most impactful QA gap that was resolved was the software verification of GAMSRC and VARPOW.

97 MATHEMATICS AND COMPUTING↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Software for Optimizing Quality Assurance of Other Software

Software assurance is the planned and systematic set of activities that ensures that software processes and products conform to requirements, standards, and procedures. Examples of such activities are the following: code inspections, unit tests, design reviews, performance analyses, construction of traceability matrices, etc. In practice, software development projects have only limited resources (e.g., schedule, budget, and availability of personnel) to cover the entire development effort, of which assurance is but a part. Projects must therefore select judiciously from among the possible assurance activities. At its heart, this can be viewed as an optimization problem; namely, to determine the allocation of limited resources (time, money, and personnel) to minimize risk or, alternatively, to minimize the resources needed to reduce risk to an acceptable level. The end result of the work reported here is a means to optimize quality-assurance processes used in developing software.

Feather, Martin↗

Quality assurance and risk management: Perspectives on Human Factors Certification of Advanced Aviation Systems

This paper is based on the experience of engineering psychologists advising the U.K. Ministry of Defense (MoD) on the procurement of advanced aviation systems that conform to good human engineering (HE) practice. Traditional approaches to HE in systems procurement focus on the physical nature of the human-machine interface. Advanced aviation systems present increasingly complex design requirements for human functional integration, information processing, and cognitive task performance effectiveness. These developing requirements present new challenges for HE quality assurance (QA) and risk management, requiring focus on design processes as well as on design content or product. A new approach to the application of HE, recently adopted by NATO, provides more systematic ordering and control of HE processes and activities to meet the challenges of advanced aircrew systems design. This systematic approach to HE has been applied by MoD to the procurement of mission systems for the Royal Navy Merlin helicopter. In MoD procurement, certification is a judicial function, essentially independent of the service customer and industry contractor. Certification decisions are based on advice from MoD's appointed Acceptance Agency. Test and evaluation (T&E) conducted by the contractor and by the Acceptance Agency provide evidence for certification. Certification identifies limitations of systems upon release to the service. Evidence of compliance with HE standards traditionally forms the main basis of HE certification and significant non-compliance could restrict release. The systems HE approach shows concern for the quality of processes as well as for the content of the product. Human factors certification should be concerned with the quality of HE processes as well as products. Certification should require proof of process as well as proof of content and performance. QA criteria such as completeness, consistency, timeliness, and compatibility provide generic guidelines for progressive acceptance and certification of HE processes. Threats to the validity of certification arise from problems and assumptions in T&E methods. T&E should seek to reduce the risk of specification non-compliance and certification failure.

Taylor, Robert M.↗

Software Quality Assurance, Software Requirements and Gap Analysis for the MOOSE-Based Open-Source Multiphysics Code Cardinal

Cardinal continuous development and improvement efforts have led to the software being considered as a high-fidelity design and licensing tool for key areas of nuclear reactor relevant physics, including neutron transport, fluid flow, heat transfer, and mechanical processes. The fast development and expansion of the software from a pure R&D framework towards its application in the nuclear industry and regulation require a focus on maintaining and enhancing Cardinal’s software quality through strict adherence to a Software Quality Assurance (SQA) framework. To facilitate compliance with SQA standards, the Cardinal SQA Program has been initiated during Fiscal Year 2023 (FY23).

97 MATHEMATICS AND COMPUTING↗

Diagnostic and quality-assurance tools for low-contrast images obtained from array detectors

We investigate methods of estimating a background image frame for subtraction from a data frame for use when a more suitable measured background frame is not available. We define background as any signal component that is not attributable to the phenomenon currently under investigation. We describe a technique that is based on pixel-by-pixel least-squares regression of images for computing a background frame from available data. We argue that the same technique can be a useful quality-assurance tool for evaluating instrument performance. For example, it can help to separate image structure resulting from the reading process from structure resulting from the characteristics of the detector itself. We demonstrate that background estimation can be nontrivial by comparing the results of different background estimation procedures by using data obtained from a CCD array detector. We investigate the temperature-dependent contributions of the detector and readout electronics to the total signal as a demonstration of the diagnostic capabilities of least-squares image regression.

Hatfield, D. B.↗