Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR SITES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chute Silo ILW Project Berkeley - 16649

Magnox, a Tier 1 Site Licensed Company (SLC), is the management and operations contractor responsible for the decommissioning of twelve of the Nuclear Decommissioning Authority's (NDA) nuclear sites in the UK. Aquila Nuclear Engineering is a specialist Tier 3, turnkey engineering company based in the UK, delivering mission critical engineering solutions to Europe's nuclear and nuclear medicine industries. Berkeley Nuclear Power Station, Berkeley, England started generating electricity in 1962, ceasing operation 27 years later in 1989. The Chute Silo ILW Project at this Reactor Site had been set up to retrieve irradiated control rods and charge chutes disposed of within a subterranean vault (silo). The project involved in-silo size reduction of waste in to 30-35 waste baskets. The waste basket was then to be retrieved via a pintle grab and hoist mechanism in to a Transfer Flask (through a silo and a Transfer Flask gamma gate). The Transfer Flask was then to transit along existing crane rails, out of the silo building and over the top of an Import/Export Facility. A Ductile Cast Iron Container (DCIC) was to be imported into Import/Export Facility and inspected/prepared to receipt the waste basket from the Transfer Flask. Once filled, the DCIC was then to be sealed and exported to an on-site storage facility. Due to an issue with the Magnox Tier 2 Framework holder in delivering a cost effective and viable solution for their Chute Silo ILW Retrieval Project, Magnox took the ground breaking decision to 'self-perform'. This involved dividing the larger project into several smaller packages. Two of these packages - for the shielded Transfer Flask and the Import/Export facility - were put out for competitive tendering directly to the Tier 3 Supply Chain. The work completed by the Tier 2 Company was shared with the Tier 3's, but Magnox expressly requested the Tier 2 proposals were scrutinised and that far more cost effective, robust and simpler solutions were provided for within the Tier 3 Tenders. Aquila won both work packages and delivered them with significant and demonstrable cost savings, on time and under budget. This was achieved by the collaborative arrangements between Aquila and Magnox, the methodologies of both company's project teams and the innovation and 'fitness for purpose' of Aquila's design pragmatism. The original Tier 2 Framework holder's price to Magnox for the Chute Silo ILW Project was between UK Pounds 2-3 M. Aquila delivered the equivalent scope for under UK Pounds 1 M. Aquila's original programme was maintained despite the award of additional scope and (Magnox) delays on site. Aquila came under the original target price for each discrete phase of the project. The above was achieved because of: - the collaborative arrangements between Aquila and Magnox; - the methodologies of both company's project teams; - the design features put forward by Aquila (welcomed and adopted by Magnox). In 2014 Aquila Nuclear Engineering received formal recognition of its achievements on this project by winning an NDA Supply Chain Award for 'Best example of supplier 'going the extra mile''. Points highlighted in the award were: - improved customer focus, leading to stronger relationships - encouraging challenge and innovation - continuous suggestions for improvement - UK Pounds 1 million savings and three months programme reduction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 17138

The U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) is laying the groundwork for implementing an integrated nuclear waste management system. This includes preparing for future large-scale transport of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) since transport will be a necessary component of an integrated waste management system. This paper provides an overview of the progress to date, and discussion of the path forward, for the current DOE-NE effort related to designing and fabricating prototype rail-cars for rail transport of SNF from commercial nuclear power reactor sites when a receiving site becomes operational. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 18518

The U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) is laying the groundwork for implementing an integrated nuclear waste management system. This includes preparing for future large-scale transport of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) since transport will be a necessary component of an integrated waste management system. This paper provides an overview of the progress to date, and discussion of the path forward related to designing, fabricating and testing prototype railcars for rail transport of SNF from commercial nuclear power reactor sites when a receiving site becomes operational. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safely Managing CNL's Shutdown Prototype Power Reactors - 30 years of Experience - 19157

Canadian Nuclear Laboratories (CNL) has over 30 years of experience managing three prototype power reactors from shutdown through storage with surveillance and into preparation from final decommissioning. CNL is responsible for the safe storage with surveillance of three prototype power reactors; Nuclear Power Demonstration (NPD), Gentilly-1(G1) and Douglas Point (DP). Each of the Canadian prototype power reactor sites have been maintained using different post shutdown management strategies, which were based on the site location, configuration, and intended designation of the respective sites. This paper will discuss the post shutdown strategies employed at the three sites, including details of their shutdown strategy, current conditions, and experience gained from the period of storage with surveillance. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consolidated Storage Facilities: Camel's Nose or Shared Burden? - 13112

The Blue Ribbon Commission (BRC) made a strong argument why the reformulated nuclear waste program should make prompt efforts to develop one or more consolidated storage facilities (CSFs), and recommended the amendment of NWPA Section 145(b) 2 (linking 'monitored retrievable storage' to repository development) as an essential means to that end. However, other than recommending that the siting of CSFs should be 'consent-based' and that spent nuclear fuel (SNF) at stranded sites should be first-in-line for removal, the Commission made few recommendations regarding how CSF development should proceed. Working with three other key Senators, Jeff Bingaman attempted in the 112. Congress to craft legislation (S. 3469) to put the BRC recommendations into legislative language. The key reason why the Nuclear Waste Administration Act of 2012 did not proceed was the inability of the four senators to agree on whether and how to amend NWPA Section 145(b). A brief review of efforts to site consolidated storage since the Nuclear Waste Policy Amendments Act of 1987 suggests a strong and consistent motivation to shift the burden to someone (anyone) else. This paper argues that modification of NWPA Section 145(b) should be accompanied by guidelines for regional development and operation of CSFs. After review of the BRC recommendations regarding CSFs, and the 'camel's nose' prospects if implementation is not accompanied by further guidelines, the paper outlines a proposal for implementation of CSFs on a regional basis, including priorities for removal from reactor sites and subsequently from CSFs to repositories. Rather than allowing repository siting to be prejudiced by the location of a single remote CSF, the regional approach limits transport for off-site acceptance and storage, increases the efficiency of removal operations, provides a useful basis for compensation to states and communities that accept CSFs, and gives states with shared circumstances a shared stake in storage and disposal in an integrated national program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the DOE nuclear fuels storage and transportation planning project - 15444

The US Department of Energy (DOE) Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. The purpose of the NFST is to make progress on this important national issue within existing legislative and budgetary authorizations. The objective of the NFST is to develop and begin implementation of an integrated plan to (1) implement interim storage; (2) improve the overall integration of storage as a planned part of the waste management system; (3) prepare for the large-scale transportation of spent nuclear fuel and high-level radioactive waste, with an initial focus on removing SNF from the shutdown reactor sites; and (4) develop foundational information, resources, and capabilities needed to support the aforementioned objectives and future implementation decisions and actions. An over-arching goal is to develop options for decision-makers on the design of an integrated waste management system. The planning activities are divided into four major topical areas: (1) Consent-Based Siting, (2) Storage, (3) Transportation, and (4) Strategic Crosscuts. This paper provides an overview of the NFST and its activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Waste Policy in the United States

The current U.S. reactor fleet produces 2,100–2,400 ton/yr of spent nuclear fuel (SNF). After 50-plus years of nuclear power generation, 58,000 tons of SNF has accumulated in temporary storage at the reactor sites. How did we get where we are, and where do we go from here?

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

An integrated approach for determining plutonium mass in spent fuel assemblies with nondestructive assay

There are a variety of reasons for quantifying plutonium (Pu) in spent fuel. Below, five motivations are listed: (1) To verify the Pu content of spent fuel without depending on unverified information from the facility, as requested by the IAEA ('independent verification'). New spent fuel measurement techniques have the potential to allow the IAEA to recover continuity of knowledge and to better detect diversion. (2) To assure regulators that all of the nuclear material of interest leaving a nuclear facility actually arrives at another nuclear facility ('shipper/receiver'). Given the large stockpile of nuclear fuel at reactor sites around the world, it is clear that in the coming decades, spent fuel will need to be moved to either reprocessing facilities or storage sites. Safeguarding this transportation is of significant interest. (3) To quantify the Pu in spent fuel that is not considered 'self-protecting.' Fuel is considered self-protecting by some regulatory bodies when the dose that the fuel emits is above a given level. If the fuel is not self-protecting, then the Pu content of the fuel needs to be determined and the Pu mass recorded in the facility's accounting system. This subject area is of particular interest to facilities that have research-reactor spent fuel or old light-water reactor (LWR) fuel. It is also of interest to regulators considering changing the level at which fuel is considered self-protecting. (4) To determine the input accountability value at an electrochemical processing facility. It is not expected that an electrochemical reprocessing facility will have an input accountability tank, as is typical in an aqueous reprocessing facility. As such, one possible means of determining the input accountability value is to measure the Pu content in the spent fuel that arrives at the facility. (5) To fully understand the composition of the fuel in order to efficiently and safely pack spent fuel into a long-term repository. The NDA of spent fuel can be part of a system that cost-effectively meets the burnup credit needs of a repository. Behind each of these reasons is a regulatory structure with MC&A requirements. In the case of the IAEA, the accountable quantity is elemental plutonium. The material in spent fuel (fissile isotopes, fission products, etc.) emits signatures that provide information about the content and history of the fuel. A variety of nondestructive assay (NDA) techniques are available to quantify these signatures. The effort presented in this paper is investigation of the capabilities of 12 NDA techniques. For these 12, none is conceptually capable of independently determining the Pu content in a spent fuel assembly while at the same time being able to detect the diversion of a significant quantity of rods. For this reason the authors are investigating the capability of 12 NDA techniques with the end goal of integrating a few techniques together into a system that is capable of measuring Pu mass in an assembly. The work described here is the beginning of what is anticipated to be a five year effort: (1) two years of modeling to select the best technologies, (2) one year fabricating instruments and (3) two years measuring spent fuel. This paper describes the first two years of this work. In order to cost effectively and robustly model the performance of the 12 NDA techniques, an 'assembly library' was created. The library contains the following: (a) A diverse range of PWR spent fuel assemblies (burnup, enrichment, cooling time) similar to that which exists in spent pools today and in the future. (b) Diversion scenarios that capture a range of possible rod removal options. (c) The spatial and isotopic detail needed to accurately quantify the capability of all the NDA techniques so as to enable integration. It is our intention to make this library available to other researchers in the field for inter-comparison purposes. The performance of each instrument will be quantified for the full assembly library for measurements in three different media: air, water and borated water. The 12 NDA techniques being researched are the following: Delayed Gamma, Delayed Neutrons, Differential Die-Away, Lead Slowing Down Spectrometer, Neutron Multiplicity, Nuclear Resonance Fluorescence, Passive Prompt Gamma, Passive Neutron Albedo Reactivity, Self-integration Neutron Resonance Densitometry, Total Neutron (Gross Neutron), X-Ray Fluorescence, {sup 252}Cf Interrogation with Prompt Neutron Detection.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Laser size reduction of contaminated Magnox Pond skips - 15166

The Magnox Pond Program Team at Hinkley Point A Power Station have successfully demonstrated the use of an automated Computer Numeric Controlled (CNC) dry milling process to efficiently decontaminate radioactive pond skips that were once used to store and transport Magnox spent fuel assemblies between reactor sites and Sellafield for reprocessing. This decontamination process has ensured ILW skips meet metal melt recycling criteria, and even Out of Scope levels, while at the same time producing dry swarf that is easily disposed of as ILW. However, the dry milling method requires the skips to be size reduced to a very simple flat geometry to simplify the milling operation. Several size reduction techniques (mechanical and thermal) have been evaluated. Based on the advantages of remote handling, high cutting speed, flexibility with complex geometries, reduced secondary waste production and significantly reduced worker exposure, robotically operated fibre delivered laser cutting was chosen. This paper describes the development, installation and operation of an automated laser cutting system commissioned at Hinkley Point A to size reduce contaminated skips in to five flat sections. It was demonstrated that a complete skip can be remotely size reduced in less than 60 minutes. This successful demonstration, coupled with CNC milling, has the potential to save an estimated British Pounds 30 million across the Magnox sites alone, with much higher saving potentials for skips stored at Sellafield, enabling this new size reduction process to meet cost reduction objectives of the UK's Nuclear Decommissioning Authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Used Nuclear Fuel Management in Asia

Used fuel discharged from nuclear reactors are presently stored in wet pools or in dry cask at-reactor and/or away-from- reactor sites. Only a few countries reprocess their civilian used fuel, notably France, Russia, and UK. No country has yet operated a geologic repository to dispose of civilian used fuel or high-level radioactive wastes (HLW). As a result, the management and disposal of used fuel and HLW are viewed as the Achilles' heel of nuclear power. Figure 1 shows the used fuel inventory in the United States (US) and East Asian nuclear power programs. The inventory is estimated based on that in 2010 and the projected growth of nuclear power in these programs to 2020 and 2030. Figure 1 indicates that in 2010, the US had about 63,900 tons of used fuel from light-water reactors (LWR), more than the statutory limit of what was supposed to go into the now-abandoned Yucca Mountain Repository, and accounting for more than 33% of global used LWR fuel total. Currently, about 2,000 tons of used fuel are generated in the existing US LWRs annually. Russia had 25,100 tons of used fuel in 2010. Based on a modest growth of nuclear power, its used fuel inventory is expected to increase to about 31,800 and 38,000 tons by 2020 and 2030, respectively. The nuclear energy programs in East Asia (China, Japan, ROK, and Taiwan) account for 19% of global used LWR fuel inventory in 2010. China's used fuel inventory in 2010 was relatively small at 1,900 tons, but is expected to grow rapidly to {approx}12,400 and {approx}31,000 tons in 2020 and 2030, respectively, based on its expanding nuclear power program (from the current installed capacity of 21.8 GW to {approx}60 and {approx}200 GW in 2020 and 2030, respectively). Besides PWRs, China also operates 2 Candu reactors which each produces roughly 8 times more used fuel in tons than a PWR of the same power. The used Candu fuel inventory would increase from 950 tons in 2010 to 2,850 and 4,750 tons in 2020 and 2030, respectively. Used fuel in Japan, ROK, and Taiwan are US-obligated. Japan's future trends of used fuel inventory are uncertain due to the unknown numbers and timing of the currently-shutdown nuclear power plants that would be allowed for restart, and the uncertain future of Japan's reprocessing at Rokkasho. Under two scenario cases (a no-nuke/no-reprocessing and a 80%-nuke with reprocessing), the Japanese used fuel inventory could be capped from 2020 to 2030 to {approx}21,500 tons for the first case, and to {approx}22,500 tons for the second. The ROK's used PWR fuel inventory would increase from 4,900 tons in 2010 to about 8,800 and 14,000 tons in 2020 and 2030, respectively. Its used Candu fuel inventory would also increase from 5,900 tons in 2010 to about 9,700 and 13,500 tons in 2020 and 2030, respectively. The Taiwan used fuel inventory should be kept at current level as nuclear power is being phase out. Its growth should be modest from 3,000 tons in 2010 to about 4,300 and 5,000 tons in 2020 and 2030, respectively even if the 4. nuclear power station would start and the operation of existing LWRs is extended. Used fuel inventory in other East Asian countries (DPRK, Vietnam, etc.) should be small, if any before 2030.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Next Generation System Analysis Model: Capabilities for Simulating a Waste Management System - 19131

The U.S. Department of Energy (DOE) Office of Nuclear Energy Office of Spent Fuel and Waste Disposition's Integrated Waste Management System (IWMS) program is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWMS are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The system architecture analyses consider alternative disposition pathways for commercial spent nuclear fuel (SNF) being stored dry in at-reactor Independent Spent Fuel Storage Installations (ISFSIs) or wet in spent-fuel pools. One method for evaluating these alternatives is simulating the movement of SNF throughout the system components. Successfully simulating a system on the scale of a national waste management system requires - accurate baseline information (e.g., historic fuel discharges from reactors and dry storage loadings at reactor sites), - modeling all logistic interactions between components of the proposed system, and - tracking and reporting all relevant details regarding the simulation's execution. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWMS. It is based on the Performance Analysis Tool, a simulation platform that has been used to model logistics for the Department of Defense and the Federal Emergency Management Agency. Using existing, government-owned software allows NGSAM developers to modify the software at the level of source code and to develop flexible usability and modeling solutions for developing and running simulations of the IWMS. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. NGSAM is designed with the flexibility to model and track the behavior of virtually any IWMS architecture assumptions or design considerations. For example, NGSAM can model multiple interim storage facilities or repositories or none at all. Similarly, all assumptions regarding shipment schedules, operating schedules, and reactor operation assumptions can be modeled and adjusted in NGSAM with relative ease. The development of NGSAM was targeted to waste management system analysts as the primary users. With that in mind, analysts from ORNL, Sandia National Laboratories (SNL), and Argonne National Laboratory (ANL) were intimately involved in the development process. That involvement extended beyond merely defining requirements. System analysts have been involved with design decisions and software benchmarking and tests, and they have provided subject-matter expertise where necessary. The result is a high degree of interaction between professional software developers and system analysts, with a multitude of benefits to both groups. This paper explores some of the underlying methodology of the agile software development process used in the creation of NGSAM. It illustrates the capabilities of NGSAM. Some example use cases are discussed as well, with relevant results providing context for how NGSAM is used by system analysts to gain a greater understanding of alternative waste management system architectures. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed-to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development, Testing and Validation of a Waste Assay System for the Measurement and Characterisation of Active Spent Fuel Element Debris From UK Magnox Reactors - 12533

This paper describes the development, testing and validation of a waste measurement instrument for characterising active remote handled radioactive waste arising from the operation of Magnox reactors in the United Kingdom. Following operation in UK Magnox gas cooled reactors and a subsequent period of cooling, parts of the magnesium-aluminium alloy cladding were removed from spent fuel and the uranium fuel rods with the remaining cladding were removed to Sellafield for treatment. The resultant Magnox based spent fuel element debris (FED), which constitutes active intermediate level waste (ILW) has been stored in concrete vaults at the reactor sites. As part of the decommissioning of the FED vaults the FED must be removed, measured and characterised and placed in intermediate storage containers. The present system was developed for use at the Trawsfynydd nuclear power station (NPS), which is in the decommissioning phase, but the approach is potentially applicable to FED characterisation at all of the Magnox reactors. The measurement system consists of a heavily shielded and collimated high purity Germanium (HPGe) detector with electromechanical cooling and a high count-rate preamplifier and digital multichannel pulse height analyser. The HPGe based detector system is controlled by a software code, which stores the measurement result and allows a comprehensive analysis of the measured FED data. Fuel element debris is removed from the vault and placed on a tray to a uniform depth of typically 10 cm for measurement. The tray is positioned approximately 1.2 meters above the detector which views the FED through a tungsten collimator with an inverted pyramid shape. At other Magnox sites the positions may be reversed with the shielded and collimated HPGe detector located above the tray on which the FED is measured. A comprehensive Monte Carlo modelling and analysis of the measurement process has been performed in order to optimise the measurement geometry and eliminate interferences from radioactive sources and FED in the immediate vicinity of the measurement position. The detector system has been calibrated and high activity radioactive sources of Cs-137, Co-60 and Na-22 have been used to validate the measurement process. The data acquisition and analysis software code has been tested and validated in keeping with the software quality assurance requirements of both ISO:9001-2008 - TICK-IT in the UK and NQA-1. The measurement and analysis system has been comprehensively tested with high activity sources, is flexible and may be applicable to a wide range of remote handled radioactive waste measurement applications. It is due to be installed at Trawsfynydd NPS later this year. This paper describes the Waste Tray Assay System (WTAS) that has been developed for the measurement of Magnox FED waste. The WTAS has been tested with a range of radioactive sources and its operation has been simulated with benchmarked MCNP Monte Carlo calculations. The measurement software has been validated as has the operation of the system for a range of strong radioactive sources. A system based on the design is due for installation and operation in 2012. The system has application to the measurement of Magnox Fuel Element Debris (FED) waste at other Magnox reactor sites. The major design objective of the WTAS that has been achieved is the ability of the assay system to determine the content of Cs-137, and in turn to enable the fissile burden to be assessed using a radionuclide fingerprint, in the presence of higher and highly variable quantities of Co-60, typically from nimonic springs. The approach can be used in other Magnox FED waste configurations where the detector is located above the FED waste sorting tray and where the collimation is fixed below the detector and at a distance above the tray. In this case, which has also been investigated, there are different shielding problems and mechanical support issues. The extensive use of MCNP Monte Carlo modelling to simulate the geometry of the sorting cell and the distribution of radioactive sources has helped to ensure that all of the detector shielding requirements are addressed and suitable Cs-137 and Co-60 discrimination can be achieved. The WTAS in its present form or in other configurations has relevance to the measurement of other active ILW and highly active RH waste. Examples include high activity RH LLW and RH TRU (Transuranic) waste as defined in the United States arising from both commercial nuclear and Department of Energy (DOE) operations. The analysis is able to analyse a range of radionuclides beyong those expected in the Magnox FED cases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of travel logistics for transportation of used nuclear fuel in the continental United States - 15179

The US DOE Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that consider all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management strategy is the transportation of spent nuclear fuel to an away from reactor interim storage facility. Transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. chosen as hypothetical locations for a future interim storage facility were evaluated using Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of this evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses that include an interim storage facility, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating Public Dose Along Hypothetical Spent Nuclear Fuel Transportation Routes

In the future, it will be necessary to transport large quantities of spent nuclear fuel (SNF) from nuclear power plant sites to an interim storage facility (ISF) or a repository when such a facility is available. Because it is impossible to shield all of the radiation from this material, the general public will receive a very small, but quantifiable, dose from this transportation campaign. This paper describes the estimated collective effective radiation dose to the public due to SNF shipments under routine conditions and compares the estimated dose figures to the natural background radiation dose. To determine the estimated collective effective dose to the public, this analysis uses the US Department of Energy's (DOE) Stakeholder Tool for Assessing Radioactive Transportation (START), a geographic information system (GIS) routing tool, and a set of unit dose factors (UDFs) which were developed to calculate the estimated dose to the public along transportation routes. The estimated doses of radiation to which the public would be exposed during shipments of SNF is expected to be a consideration, along with many other factors, when making routing decisions. In all cases studied in this paper, estimated doses to the public will be orders of magnitude lower than the natural background radiation dose and will meet all US federal regulatory requirements for radiation dose/exposure to members of the public. The sample routes analyzed in this paper are expected to be representative of future SNF shipment routes in terms of length and mode of transportation, although they do not represent actual routes or destinations. This paper considers four routes from two shutdown reactor sites to two destinations. It must be noted that the specified origin sites are not necessarily the first sites under consideration for a de-inventory process. Further, the destination sites reviewed in this report are only to illustrate estimated dose figures along different routes and should not be taken as potential sites for an ISF or repository. For illustrative purposes only, the shortest distance rail route was found between each origin and destination point, and the collective effective dose to the public from the SNF cask was estimated along each route. This paper is not intended to make recommendations for routing decisions, but rather is intended to inform further discussion about the transportation of SNF and other radioactive materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Nuclear Divers in Decommissioning of Spent Fuel Pools/Ponds in the United Kingdom - 17431

Magnox Ltd. (Operated by the Cavendish Fluor Partnership) has initiated decommissioning of spent fuel pools/ponds utilizing divers. This decommissioning technique is being employed to disassemble and size reduce underwater equipment and furniture, as well as the collection of sludge and debris prior to draining of the pool. This technique has proven to be highly effective at reducing the radiological exposure to the workforce over previously implemented methods and is expected to significantly reduce overall decommissioning durations and costs. The decommissioning of the UK Nuclear Decommissioning Authority's (NDA) Dungeness A power station spent fuel ponds was initiated in 2015 to eliminate the mobile hazards and prepare the facilities for entry into a Care and Maintenance period. This dual reactor site has two spent fuel ponds each containing 1000 m{sup 3} of water, with the fuel removed since April 2012, which will utilize divers to remove solid wastes from the ponds prior to drain down. This technique has overcome many challenges to implementation including regulatory approval and high airborne contamination. The use of divers for decommissioning was a new technique for the Magnox Sites and required early engagement with the UK Office for Nuclear Regulation (ONR) and the Health and Safety Executive (HSE). The use of plasma arc cutting underwater required the pond area to be classified as an airborne contamination area. The implementation of local ventilation has controlled this hazard. The initial demonstration dives at Dungeness A were completed in April 2016 and the decommissioning dives are expected to be completed in March 2017. This is a substantial improvement to the project schedule and will allow the project completion 5 1/2 years ahead of the Licence Condition milestone. This technique is planned to be implemented at two further NDA Magnox power stations over the next three years. This paper provides the accomplishments and lessons learned to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Fuel Cycle Treatment, Recycling, and Disposal of Nuclear Waste

Nuclear waste, in the form of used and spent nuclear fuel, is currently being stored in the U.S., mostly at reactor sites to await future direct disposal or treatment to permit recycle of re-usable components and minimization of wastes requiring geologic disposal. The used fuel is currently accumulating at a rate of over 2,000 tons per year and a total of over 60,000 tons is in storage. New dry storage capacity is estimated to cost {approx} $0.6 B per year. Technologies have been developed and deployed worldwide to treat only a portion of the nuclear waste that is generated. Recent research, development, and systems analysis studies have shown that nuclear waste treatment could be done at the rate of generation in a safe, environmentally friendly, and cost-effective manner. These studies continue to show that major benefits can be obtained by allowing the used fuel assemblies to remain in safe storage for 30 years or longer before treatment. During this time, the radioactivity and decay heat generation decrease substantially, such that the separations process can be simplified and made less costly, waste gases containing {sup 85}Kr can be released below regulatory limits, and the solid fission product wastes containing {sup 137}Cs and {sup 90}Sr require decay storage for a much shorter time-period before geologic disposal. In addition, the need for separating curium from americium and for extra purification cycles for the uranium and uranium-plutonium-neptunium products is greatly diminished. Moreover, during the 30+ years of storage prior to treatment, the quality of the recyclable fuel is only degraded by less than 5 percent. The 30+ year storage period also enables recycle of long-lived transuranic actinides to be accomplished in existing light water reactors without waiting on and incurring the cost of the development, licensing, and deployment of future Gen IV reactors. Overall, the safety, environmental, and cost benefits of treating the longer aged used nuclear wastes are substantial.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗