Search NASA⌕ Search

SEARCH · Search NASA

Results for “ROVER PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

X-Hab 2026: LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems

This document details the timeline of the LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems project, initiated by the Fall 2025 semester class and completed by the Spring 2026 semester class. This project focuses on developing a fully autonomous system composed of a mobile surface rover and an induction charging station with a robotic arm, both controlled by their own NVIDIA Jetson Orin Nano. Structural improvements to the rover suspension system and body eliminated excessive camber, reduced stress and strain on the plexiglass body, and improved maneuverability and durability of the rover. The charging station robotic arm was fully redesigned to increase reach while minimizing weight and increasing misalignment tolerance during docking on uneven terrain. Electrical system improvements addressed previous torque and power limitations of both the rover and charging station arm. High-torque servo motors were selected based on updated calculations which incorporated terrain slope and Factor of Safety, enabling zero-point turning for the rover and increased payload capacity of the charging station arm. Significant progress was made in autonomy and perception. The rover now employs 3D LiDAR and SLAM mapping for localization, mapping, and path planning. The Battery Monitoring System (BMS) was created to coordinate battery management between the rover and charging station. The BMS provides continuous monitoring of battery state of charge, temperature, current, and will enable the autonomous initiation, execution, and termination of the charging cycle via Bluetooth communication. Testing of the WIBOTIC induction charging system demonstrated reliable power transfer under both aligned and misaligned conditions. This project demonstrated the ability of an autonomously navigating surface rover to independently plan a path to the charging station, dock, and the charging station to autonomously deploy a robotic charging arm and initiate charging of the rover. This work details the progress made to demonstrate the feasibility of autonomous surface rover navigation and recharging systems.

Megan Steele↗

Lunar surface operations. Volume 4: Lunar rover trailer

The purpose of the project was to design a lunar rover trailer for exploration missions. The trailer was designed to carry cargo such as lunar geological samples, mining equipment and personnel. It is designed to operate in both day and night lunar environments. It is also designed to operate with a maximum load of 7000 kilograms. The trailer has a ground clearance of 1.0 meters and can travel over obstacles 0.75 meters high at an incline of 45 degrees. It can be transported to the moon fully assembled using any heavy lift vehicle with a storage compartment diameter of 5.0 meters. The trailer has been designed to meet or exceed the performance of any perceivable lunar vehicle.

Shields, William↗

A Simulated Drilling Mission to Search for Bio-molecular Signatures of Life on Mars Performed in the Atacama Desert (Chile): Demonstrating Drilling, Sample Handling, and Life-Detection Instruments Remotely Operated with Mission-like Protocols

The search for evidence of life on Mars requires accessing materials that are protected from the oxidizing and irradiated conditions at the surface. Mars rovers Curiosity and Perseverance have performed shallow (few cm) drilling to access relevant samples. The upcoming ExoMars mission will acquire samples from up to 2 meters depth. Field experiments in Mars analog sites help prepare for this and other future deep drilling missions. In Sept. 2019 the ARADS (Atacama Rover Astrobiology Drilling Studies project (Glass et al. 2022) conducted a rover-based drilling mission to search for bio-molecular evidence of life in a Mars analog site in Atacama Chile.

Carol R. Stoker↗

Development of Life Support System Technologies for Human Lunar Missions

With the Preliminary Design Review (PDR) for the Orion Crew Exploration Vehicle planned to be completed in 2009, Exploration Life Support (ELS), a technology development project under the National Aeronautics and Space Administration s (NASA) Exploration Technology Development Program, is focusing its efforts on needs for human lunar missions. The ELS Project s goal is to develop and mature a suite of Environmental Control and Life Support System (ECLSS) technologies for potential use on human spacecraft under development in support of U.S. Space Exploration Policy. ELS technology development is directed at three major vehicle projects within NASA s Constellation Program (CxP): the Orion Crew Exploration Vehicle (CEV), the Altair Lunar Lander and Lunar Surface Systems, including habitats and pressurized rovers. The ELS Project includes four technical elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems and Habitation Engineering, and two cross cutting elements, Systems Integration, Modeling and Analysis, and Validation and Testing. This paper will provide an overview of the ELS Project, connectivity with its customers and an update to content within its technology development portfolio with focus on human lunar missions.

Barta, Daniel J.↗

Pressurized Lunar Rover (PLR)

The objective of this project was to design a manned pressurized lunar rover (PLR) for long-range transportation and for exploration of the lunar surface. The vehicle must be capable of operating on a 14-day mission, traveling within a radius of 500 km during a lunar day or within a 50-km radius during a lunar night. The vehicle must accommodate a nominal crew of four, support two 28-hour EVA's, and in case of emergency, support a crew of six when near the lunar base. A nominal speed of ten km/hr and capability of towing a trailer with a mass of two mt are required. Two preliminary designs have been developed by two independent student teams. The PLR 1 design proposes a seven meter long cylindrical main vehicle and a trailer which houses the power and heat rejection systems. The main vehicle carries the astronauts, life support systems, navigation and communication systems, lighting, robotic arms, tools, and equipment for exploratory experiments. The rover uses a simple mobility system with six wheels on the main vehicle and two on the trailer. The nonpressurized trailer contains a modular radioisotope thermoelectric generator (RTG) supplying 6.5 kW continuous power. A secondary energy storage for short-term peak power needs is provided by a bank of lithium-sulfur dioxide batteries. The life support system is partly a regenerative system with air and hygiene water being recycled. A layer of water inside the composite shell surrounds the command center allowing the center to be used as a safe haven during solar flares. The PLR 1 has a total mass of 6197 kg. It has a top speed of 18 km/hr and is capable of towing three metric tons, in addition to the RTG trailer. The PLR 2 configuration consists of two four-meter diameter, cylindrical hulls which are passively connected by a flexible passageway, resulting in the overall vehicle length of 11 m. The vehicle is driven by eight independently suspended wheels. The dual-cylinder concept allows articulated as well as double Ackermann steering. The primary power of 8 kW is supplied by a dynamic isotope system using a closed Brayton cycle with a xenon-hydrogen mixture as the working fluid. A sodium-sulfur battery serves as the secondary power source. Excess heat produced by the primary power system and other rover systems is rejected by radiators located on the top of the rear cylinder. The total mass of the PLR 2 is 7015 kg. Simplicity and low total weight have been the driving principles behind the design of PLR 1. The overall configuration consists of a 7-m-long, 3-m-diameter cylindrical main vehicle and a two-wheeled trailer. The cylinder of the main body is capped by eight-section, faceted, semi-hemispherical ends. The trailer contains the RTG power source and is not pressurized. The shell of the main body is constructed of a layered carbon fiber/foam/Kevlar sandwich structure. Included in the shell is a layer of water for radiation protection. The layer of water extends from the front of the rover over the crew compartment and creates a safe haven for the crew during a solar flare-up. The carbon fiber provides the majority of the strength and stiffness and the Kevlar provides protection from micrometeoroids. The Kevlar is covered with a gold foil and multi-layer insulation (MLI) to reduce radiation degradation and heat transfer through the wall. A thin thermoplastic layer seals the fiber and provides additional strength.

Creel, Kenneth↗

Early lunar rover mission studies

Results of lunar mission studies aimed at developing mission goals and high level requirements are reported. A mission concept to meet the mission requirements was developed and the design of mission hardware was to follow. Mission concepts not only included operations analysis and plans but also fabrication and test planning, quality control measures, and project organization. The design of mission concepts and hardware identified issues that are not easily resolved. Although none of the issues identified appear to be unresolvable, many will be difficult to resolve within Space Exploration Initiative constraints. These issues discussed which appear to have the potential for negative project impact are rover mobility, power, imaging, telemanagment, and remote control.

Gillespie, Vernon P.↗

Terrain Model Registration for Single Cycle Instrument Placement

This paper presents an efficient and robust method for registration of terrain models created using stereo vision on a planetary rover. Our approach projects two surface models into a virtual depth map, rendering the models as they would be seen from a single range sensor. Correspondence is established based on which points project to the same location in the virtual range sensor. A robust norm of the deviations in observed depth is used as the objective function, and the algorithm searches for the rigid transformation which minimizes the norm. An initial coarse search is done using rover pose information from odometry and orientation sensing. A fine search is done using Levenberg-Marquardt. Our method enables a planetary rover to keep track of designated science targets as it moves, and to hand off targets from one set of stereo cameras to another. These capabilities are essential for the rover to autonomously approach a science target and place an instrument in contact in a single command cycle.

Deans, Matthew↗

Application of the Core Flight System to a Lunar Rover

Resource Prospector (RP) is a lunar mission sponsored by NASAs Advanced Exploration Systems (AES) division, that aims to study in-situ resource utilization (ISRU) feasibility and technologies on the surface of the moon. The RP missions lunar surface segment includes a rover equipped with with a suite of instruments specifically designed to measure and map volatiles both at the surface and in the subsurface. Of particular interest is the quantity and state of volatiles in permanently shadowed regions. To conduct the mission, ground system operators will remotely drive the rover, directing it to waypoints along the surface in order to achieve measurement objectives. At selected locations, an onboard drill will be deployed to collect material and obtain direct measurements of the subsurface constituents. RP is currently planned for launch in 2022. RP is managed at NASA Ames Research Center. The RP Rover is being designed and developed by NASA Johnson Space Center (JSC) in partnership with NASA Ames. NASA Kennedy Space Center (KSC) is responsible for the Honeybee drilling system and science payload.In order to better understand the technical challenges and demonstrate capability, in 2015 the RP project developed a rover testbed (known as RP15). In this mission in a year, a rover was designed, developed, and outfitted with science instruments and a drill. The rover was operated from a remote operations center, and operated in an outdoor lunar rock yard at Johnson space center. The study was a resounding success meeting all objectives. The RP Rover software architecture and development processes were based on the successful Lunar Atmosphere and Dust Environment Explorer spacecraft. This architecture is built on the Core Flight System software and an interface to MatlabSimulink auto-generated software components known as the Simulink Interface Layer (SIL). The application of this lunar satellite inspired framework worked well for the rover application, and is currently being planned for the mission. This presentation provides an overview of the architecture and processes, and describes some of the changes and challenges for the rover application.

CFS↗

Application of CFS to a Lunar Rover: Resource Prospector (RP)

Resource Prospector (RP) is a lunar mission sponsored by NASA's Advanced Exploration Systems (AES) division, that aims to study in-situ resource utilization (ISRU) feasibility and technologies on the surface of the moon. The RP mission's lunar surface segment includes a rover equipped with with a suite of instruments specifically designed to measure and map volatiles both at the surface and in the subsurface. Of particular interest is the quantity and state of volatiles in permanently shadowed regions. To conduct the mission, ground system operators will remotely drive the rover, directing it to waypoints along the surface in order to achieve measurement objectives. At selected locations, an onboard drill will be deployed to collect material and obtain direct measurements of the subsurface constituents. RP is currently planned for launch in 2022. RP is managed at NASA Ames Research Center. The RP Rover is being designed and developed by NASA Johnson Space Center (JSC) in partnership with NASA Ames. NASA Kennedy Space Center (KSC) is responsible for the Honeybee drilling system and science payload. In order to better understand the technical challenges and demonstrate capability, in 2015 the RP project developed a rover testbed (known as RP15). In this mission in a year, a rover was designed, developed, and outfitted with science instruments and a drill. The rover was operated from a remote operations center, and operated in an outdoor lunar rock yard at Johnson space center. The study was a resounding success meeting all objectives. The RP Rover software architecture and development processes were based on the successful Lunar Atmosphere and Dust Environment Explorer spacecraft. This architecture is built on the Core Flight System software and an interface to Matlab/Simulink auto-generated software components known as the Simulink Interface Layer (SIL). The application of this lunar satellite inspired framework worked well for the rover application, and is currently being planned for the mission. This presentation provides an overview of the architecture and processes, and describes some of the changes and challenges for the rover application.

RP↗

Extended mission/lunar rover, executive summary

The design project selected to be undertaken by the 1991/92 Aerospace Design Group was that of conceptually designing an Extended Mission Rover for use on the Lunar Surface. This vehicle would serve the function as a mobile base of sorts, and be able to provide future astronauts with a mobile 'shirt-sleeve' self-sufficient living and working environment. Some of the proposed missions would be planetary surface exploration, construction and maintenance, hardware set-up and in-situ resource experimentation. The need for this type of vehicle has already been declared in the Stafford Group's report on the future of America's Space Program, entitled 'America at the Threshold: America's Space Exploration Initiative'. In the four architectures described within the report, the concept of a pressurized vehicle occurred multiple times. The approximate time frame that this vehicle would be put into use is 2010-2030.

Source record↗

Vision Science And Technology At NASA

Report presents results of workshop-type conference on vision science and technology (VST) at the National Aeronautics and Space Administration. Describes VST needs of wide-ranging NASA projects, including planetary rover, automatic rendezvous and docking, study of global change, and hypersonic civilian transport aircraft.

Watson, A. B.↗

Design issues for Mars planetary rovers

The paper presents some of the design issues and vehicle requirements that need to be addressed for the Mars planetary rovers. Some of the designs currently being investigated, including the JPL rover, the Martin Marietta vehicle, and the French Space Agency's VAP project, are examined. The rover must satisfy such mission requirements as surveying the terrain, preparing the landing sites, loading and unloading components for base operations, and aiding in the recovery of in situ materials.

Lee, Gordon K. F.↗

Analyzing MER Uplink Reports

The MER project includes two rovers working simultaneously on opposite sides of Mars each receiving commands only once a day. Creating this uplink is critical, since a failed uplink means a lost day and a waste of money. Examining the process of creating this uplink, I tracked the use of the system developed for requesting observations as well as the development, from stage to stage, in forming an activity plan. I found the system for requesting observations was commonly misused, if used at all. There are half a dozen reports to document the creation of the uplink plan and often there are discrepancies among them. Despite this, the uplink process worked very well and MER has been one of the most successful missions for NASA in recent memory. Still it is clear there is room for improvement.

Savin, Stephen C.↗

Mars 2020 Entry, Descent, and Landing System Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Mars 2020 Entry, Descent, and Landing Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. In addition to performing the critical function of landing the rover on the Martian surface, the EDL timeline behavior must co-exist in a non-partitioned software and system environment with other high-level functions that accomplish the goals for the rest of the mission. Due to the criticality of EDL, the potential for loss of mission, and a need for complete system autonomy, the standard for how the EDL Timeline interacts with other functions in the system is highly constrained. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Mars Space Suit Materials Testing Using SHERLOC Calibration Target Data: The Max-CF Project

The Mars 2020/“Perseverance” rover carries a suite of space suit materials as part of the SHERLOC* calibration target [1]. The materials are periodically analyzed by SHERLOC as part of a regular calibration routine and are generating a rich data set regarding their degradation in the martian surface environment. The Maximization of Calibration Fabrics (Max-CF) project will effectively turn SHERLOC data into a measure of space suit material service lifetimes by exposing a second set of materials in a Mars chamber, replicating SHERLOC measurements using the analogous ACRONM** instrument at JSC, and then performing materials testing to include tensile testing. These data can be used to inform space suit design and/or materials development, improving crew safety for future Mars missions. This will partially address NASA’s Strategic Knowledge Gap 8 (Mars Surface Technology) which identifies a need to develop technologies to “sustain humans on the surface of Mars [and] enable human mobility and exploration” [2]. This abstract describes the overall Max-CF project and progress on the laboratory-based study to date.

M Fries↗