Search NASA⌕ Search

SEARCH · Search NASA

Results for “Radiological Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Causal Analysis of the Inadvertent Contact with an Uncontrolled Electrical Hazardous Energy Source (120 Volts AC)

On September 25, 2013, a Health Physics Technician (HPT) was performing preparations to support a pneumatic transfer from the HFEF Decon Cell to the Room 130 Glovebox in HFEF, per HFEF OI 3165 section 3.5, Field Preparations. This activity involves an HPT setting up and climbing a portable ladder to remove the 14-C meter probe from above ball valve HBV-7. The HPT source checks the meter and probe and then replaces the probe above HBV-7, which is located above Hood ID# 130 HP. At approximately 13:20, while reaching past the HBV-7 valve position indicator switches in an attempt to place the 14-C meter probe in the desired location, the HPT’s left forearm came in contact with one of the three sets of exposed terminals on the valve position indication switches for HBV 7. This resulted in the HPT receiving an electrical shock from a 120 Volt AC source. Upon moving the arm, following the electrical shock, the HPT noticed two exposed electrical connections on a switch. The HPT then notified the HFEF HPT Supervisor, who in turn notified the MFC Radiological Controls Manager and HFEF Operations Manager of the situation. Work was stopped in the area and the hazard was roped off and posted to prevent access to the hazard. The HPT was escorted by the HPT Supervisor to the MFC Dispensary and then preceded to CFA medical for further evaluation. The individual was evaluated and released without any medical restrictions. Causal Factor (Root Cause) A3B3C01/A5B2C08: - Knowledge based error/Attention was given to wrong issues - Written Communication content LTA, Incomplete/situation not covered The Causal Factor (root cause) was attention being given to the wrong issues during the creation, reviews, verifications, and actual performance of HFEF OI-3165, which covers the need to perform the weekly source check and ensure placement of the probe prior to performing a “rabbit” transfer. This resulted in the hazard not being identified and mitigated in the procedure. Work activities with in HFEF-OI-3165 placed the HPT in proximity of an unmitigated hazard directly resulting in this event. Contributing Factor A3B3C04/A4B5C04: - Knowledge Based Error, LTA Review Based on Assumption That Process Will Not Change - Change Management LTA, Risks/consequences associated with change not adequately reviewed/assessed Prior to the pneumatic system being out of service, the probe and meter were not being source checked together. The source check issue was identified and addressed during the period of time when the system was out of service. The corrective actions for this issue resulted in the requirement that a meter and probe be source checked together as it is intended to be used. This changed the activity and required an HPT to weekly, when in use, remove and install the probe from above HBV-7 to meet the requirement of LRD 15001 Part 5 Article 551.5. Risks and consequences associated with this change were not adequately reviewed or assessed. Failure to identify the hazard associated with this change directly contributed to this event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Learning Team Breach of a Posted Barricade to Connect an Instrument to Power

On February 15, 2017, a DESHF-STO HPFC (health physics field coordinator) was asked by an NEN-1 employee if they could move an instrument, a radiation dosimetry system, from A166A to another lab at TA-35 Building 2. The HPFC walked the job down and discovered the instrument was connected to power. The instrument had not been connected to power previously. See photo 1. The instrument is located within an RCA (radiological control area). Entry to connect the instrument to power the instrument requires contacting RP. RP personnel had not been contacted as required as stated in the RCA posting.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

RCT: Module 2.11, Radiological Work Coverage, Course 8777

Radiological work is usually approved and controlled by radiation protection personnel by using administrative and procedural controls, such as radiological work permits (RWPs). In addition, some jobs will require working in, or will have the potential for creating, very high radiation, contamination, or airborne radioactivity areas. Radiological control technicians (RCTs) providing job coverage have an integral role in controlling radiological hazards. This course will prepare the student with the skills necessary for RCT qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and will provide in-the-field skills.

61 RADIATION PROTECTION AND DOSIMETRY↗

Mercury Speciation and Quantification of Hanford 241-AP-107 Tank Waste Feed and Treated Samples

This report describes the second phase of a multi year project to adapt and develop an analytical technique for the low-level determination of total mercury (HgT), elemental mercury (Hg0), and monomethyl mercury (MeHg, hereafter referred to as methyl mercury) in Hanford tank waste. The focus of Phase II was to quantify the mercury (Hg) species total, elemental, and methyl mercury from a raw sample and treated (i.e., filtered and cesium-decontaminated) waste samples originating from Hanford waste tank 241-AP 107. The focus of Phase I work was to determine if mercury species can be preconcentrated from aqueous Hanford tank waste solution onto a solid adsorbent while simultaneously eliminating or very significantly reducing the parent radionuclide activity. This was demonstrated by developing protocols for the preparation, separation, and collection of total mercury and methyl mercury onto solid adsorbents, then measuring the adsorbents for radiological content at Pacific Northwest National Laboratory’s (PNNL’s) Radiochemical Processing Laboratory (RPL) on the Hanford Site. During Phase II, the Hanford tank waste material was preserved, separated (through distillation or digestion), then collected as either solid adsorbents or into liquid distillate form at the RPL and transferred to the PNNL Marine Sciences Laboratory (MSL) in Sequim, Washington, for analysis and quantification. Quantification of total, elemental, and methyl mercury was conducted under radiological control at the MSL using the ultra trace analytical capabilities available there.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Neutron and Gamma Radiation Monitoring at The Ion Beam Laboratory Building 720 Sandia/NM

Neutron and gamma radiation spectra and dose rates were measured in and around the Ion Beam Laboratory, Building 720, at Sandia/NM. Measurements were made to support the testing of an enhanced target yielding 14 MeV neutrons from the deuterium-tritium (D-T) fusion reaction. The target room has thick concrete walls but an unshielded ceiling. Neutron and gamma radiation in and around the facility appear to be the result of skyshine. Estimates of neutron/gamma dose rates (per 10 9 source neutrons/s) at six (6) monitoring locations were made. Results indicated the need for enhanced radiological controls due to increased neutron production rates.

61 RADIATION PROTECTION AND DOSIMETRY↗

Physical Sciences Vistas Issue 3 2021

In this issue, highlights of our contributions to mission operations include descriptions of the following. • How exact and scrupulous planning in concert with sophisticated science enabled a first-ever direct measurement of a radionuclide with a half-life as short as six days. The work, which included operations at the Los Alamos Neutron Science Centers (LANSCE) Weapons Neutron Research Facility and the Isotope Production Facility’s hot cell facility, is a boon for both astrophysics and weapons science. • An introduction to Christie Davis and her role in ensuring the Lab’s execution of simultaneous excellence. • A look at progress by AOT’s Target and Experimental Support Team in reclaiming long-dormant space in a radiological controlled area for new work improving target systems for the Lujan Center. • A story showcasing a cross-organizational effort to minimize the directorate’s legacy and environmental footprint. Staff from across the Lab joined together to ensure the safe and efficient disposal of Rocky Flats legacy waste stored in a transportainer at the Target Fabrication Facility. • How the Lab’s Utilities and Infrastructure experts collaborated with stakeholders in our directorate to safety execute preventive maintenance on the LANSCE mesa’s large electrical substation. The Safe Conduct of Research principles provided a common framework for the planning and process. • A description of the resources called upon and the procedures undertaken by MPA to inventory the division’s time-sensitive chemicals, including the careful and conscientious response of an alert team member when something seemed amiss.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RCT Continuing Training: 3rd Quarter 2022 Online Presentation

This presentation focuses on "Continuing training for Radiological Control Technicians (RCTs) designed to meet the training requirements of DOE-HDBK-1122-2009." The report contains learning objectives and modules with directions on how to navigate through the modules and course.

61 RADIATION PROTECTION AND DOSIMETRY↗

Godiva-IV Dosimetry Exercise 2022 (IER-538 CED4A Report)

This report presents the final results of IER 538, The International Nuclear Accident Dosimeter (NAD) Intercomparison Exercise with Godiva-IV. The purpose of the exercise, held in August of 2022, was to test participants’ NADs and dosimetry personnel to the dose estimation requirements established by ANSI/HPS-N13.3 Dosimetry for Criticality Accidents and DOE-STD-1098-2017, Radiological Control. Two prompt critical bursts of the Godiva critical assembly were used to simulate criticality accidents, and NADs from participating laboratories were placed at known locations around Godiva, mounted on either BOttle Manikin ABsorptions (BOMABs) phantoms (to simulate doses received by people) or plates (to simulate doses in free air). Similar exercises have been held in 2016 and 2018 using National Criticality Experiments Research Center’s (NCERC’s) Flattop and Godiva assemblies.

61 RADIATION PROTECTION AND DOSIMETRY↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗

Characterization of Measured Activity and Collection Efficiency of Tritium Smears

Tritium particulate collection efficiency varies as a function of smear media. The use of porous smear materials leads to an increase in the measured tritium activity as a function of time when the measurement is performed with liquid scintillation counters. Operational inclusion of the efficiency differences and the time dependence of the tritium smear activity is necessary to preclude inadvertently releasing materials or areas. Thomas Jefferson National Laboratory Radiological Control Department identified a contaminated stainless steel containment vessel which previously housed a target containing more than 1000 Ci of tritium. The item was systematically sectioned and surveyed to compare three smear types: water-wetted cotton swabs, water-wetted paper smears, and ethanol-wetted Styrofoam wipes (NUC-Wipes trademarked). The total activity of each section was determined using repeated decontamination. The time dependence of the measured activity was also studied. The measured activity of both paper smears and cottons swabs showed significant time dependence. The cotton swabs also showed significantly reduced collection efficiency. Given the widespread use of both of these media in routine contamination surveys, site operational limits were derived using fitted curves for time dependence and average efficiency results. The use of these more restrictive limits allows for rapid measurement of tritium smears while ensuring regulatory compliance.

Stavola, Adam↗

RCT: Module 2.14 Personnel Decontamination [Slides]

In our work environment, one of the major concerns of radiological control is the prevention of personnel contamination. When personnel contamination has been identified, it is the responsibility of the RCTs to perform or oversee the decontamination of the individual using the best methods available. n this course we will address the methods used to detect personnel contamination, the factors that determine decontamination actions, the responsibilities of the RCTs, and the approved methods for decontamination of personnel. This course will prepare the student with the skills necessary for RCT qualification.

61 RADIATION PROTECTION AND DOSIMETRY↗

RCT Module 2.09: Environmental Monitoring [Slides]

Environmental monitoring plays a large role in the field of radiological control. It is used to estimate human population doses, determine the impact a site has on the environment, monitor for unplanned releases as well as quantifying planned releases, and gives us useful data in determining pathway data. This course will prepare the student with the skills necessary for RCT qualification.

54 ENVIRONMENTAL SCIENCES↗

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

43 PARTICLE ACCELERATORS↗

X-ray Security Imaging on Personal Dosimetry [Slides]

Federal regulations mandate that personal dosimetry devices — like optically stimulated luminescence (OSLs) — must be worn by all US Department of Energy (DOE) and associated radiation workers to track their occupational dose. Unfortunately, the inadvertent passage of OSLs through x-ray security scanners can compromise their validity. With the advent of high energy, advanced resolution security technology used in airports, this once insignificant issue now requires that Radiological Control (RadCon) be able to accurately discern non-occupational dose to effected OSLs. This presentation will discuss the principles, methods, and, rather surprising, models for establishing the corrective dose estimates at the Idaho National Laboratory (INL), and its implication across the DOE.

61 RADIATION PROTECTION AND DOSIMETRY↗

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

Makovec, Alajos↗

Testing a Hazmatpac Can with Locking Ring as a Secondary Shipping Container for Radium-224/Lead-212 Generators

A Hazmatpac can, paint can style shipping container with locking ring, was tested for use as an alternative shipping configuration for shipment of radium- 224 /lead- 212 generators. 224 Ra ( t 1/2 = 3.63 d) decays by alpha emission to radon-220 ( t 1/2 = 55.6 s). The potential for the radioactive radon gas to escape the generator column and the shipping container is of particular concern for the safe delivery of 224 Ra/ 212 Pb generators to customers. The purpose of this study was to evaluate whether the Hazmatpac can is a suitable shipping configuration, capable of containing the radon gas that may escape the generator column during transit. A 17.3 mCi 224 Ra/ 212 Pb generator was built and packaged into a Hazmatpac can. The can was smeared by a Radiological Control Technician (RCT) every day for seven days to analyze for radioactive contamination on the outside of the can. Over the course of the study, no radioactive contamination was found on the outside of the can. Therefore, the Hazmatpac can was approved as an alternative shipping configuration for shipment of 224 Ra/ 212 Pb generators.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Understanding Biases in Sample Preparation Techniques for Coupled Scanning Electron Microscopy and MAMA PuO 2 Morphological Analysis

In this project, the scanning electron microscopy (SEM) sampling method used during the statistical design study (SDS) was investigated to determine if any sampling biases were present in the analyzed data. Using standard particle size distribution powders from the National Institute of Standards and Technology (NIST 1984 standard reference material) with the origin wet dispersion method, it was determined that a bias to smaller particles was present. This was supported by theoretical calculations using Stokes’ law to determine the settling rate of spherical particles of roughly the same size and mass as those found in the SDS. Based on the theoretical calculations, it was determined that the settling rate for each of the 76 powder sets in the SDS could be unique based on specific particle shape and mass distributions, making a universal correction factor/formula not applicable. Therefore, priority shifted to developing an improved wet dispersion method that significantly reduced the particle settling rate for all particle size and shapes. This was achieved by replacing the original solvent (isopropyl alcohol) with a heavy liquid (lithium heteropolytungstates), which dramatically slowed the settling rate and allowed for the capture of a suitable homogeneous aliquot. SEM imaging and Morphological Analysis for Material Attribution (MAMA) software analysis were conducted on the NIST standard, and the SEM/MAMA data were compared to data captured by a dynamic image analysis particle size analyzer. The resulting data confirmed that the new wet dispersion method does indeed deliver an improved representative aliquot to the SEM stub. For instance, in the NIST certificate, the average particle size is ~17.1 µm ± 2.2 µm with a normal distribution. The initial wet dispersion method resulted in a drastically reduced average particle size of 6.1 µm in addition to a non-representative heavy bi-modal distribution whereas the improved LST wet dispersion method resulting in an average particle size that was much closer to the NIST certificate (12.7 µm) with a similar normal distribution. Although the improved method was still short of the NIST certificate average, atomic force microscopy analysis determined that the resulting ~20-25% reduction in size was due to particles sinking into the carbon sticky tape used for SEM imaging. It is believed that that this bias can be calibrated in a much more predicable manner than the original settling rate bias. In addition, the matching normal distribution curves between the NIST certificate and the heavy liquid method indicate a much-improved representative aliquot has been sampled and imaged. A surrogate CeO 2 powder was used to reflect PuO 2 more accurately and to aid in implementing radiological controls and shielding. The resulting data sets from the SEM/MAMA method and the particle size analyzer give almost identical average particle sizes and particle distribution statistics. Future work will re-analyze several select runs from the SDS to determine if morphological signatures can be found with the improved sampling method.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Corporate Functional Management Evaluation of the LLNL Radiation Safety Organization

A Corporate Assess, Improve, and Modernize review was conducted at Lawrence Livermore National Laboratory (LLNL) to evaluate the LLNL Radiation Safety Program and recommend actions to address the conditions identified in the Internal Assessment conducted July 23-25, 2007. This review confirms the findings of the Internal Assessment of the Institutional Radiation Safety Program (RSP) including the noted deficiencies and vulnerabilities to be valid. The actions recommended are a result of interviews with about 35 individuals representing senior management through the technician level. The deficiencies identified in the LLNL Internal Assessment of the Institutional Radiation Safety Program were discussed with Radiation Safety personnel team leads, customers of Radiation Safety Program, DOE Livermore site office, and senior ES&H management. There are significant issues with the RSP. LLNL RSP is not an integrated, cohesive, consistently implemented program with a single authority that has the clear roll and responsibility and authority to assure radiological operations at LLNL are conducted in a safe and compliant manner. There is no institutional commitment to address the deficiencies that are identified in the internal assessment. Some of these deficiencies have been previously identified and corrective actions have not been taken or are ineffective in addressing the issues. Serious funding and staffing issues have prevented addressing previously identified issues in the Radiation Calibration Laboratory, Internal Dosimetry, Bioassay Laboratory, and the Whole Body Counter. There is a lack of technical basis documentation for the Radiation Calibration Laboratory and an inadequate QA plan that does not specify standards of work. The Radiation Safety Program lack rigor and consistency across all supported programs. The implementation of DOE Standard 1098-99 Radiological Control can be used as a tool to establish this consistency across LLNL. The establishment of a site wide ALARA Committee and administrative control levels would focus attention on improved processes. Currently LLNL issues dosimeters to a large number of employees and visitors that do not enter areas requiring dosimetry. This includes 25,000 visitor TLDs per year. Dosimeters should be issued to only those personnel who enter areas where dosimetry is required.

99 GENERAL AND MISCELLANEOUS↗