Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability & Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

NASA Methodology for Physics of Failure-Based Reliability Assessments Handbook

At the intersection of mission, technology, and place is NASA’s need to modernize for a digital-forward future. Therefore, NASA’s Reliability & Maintainability (R&M) Enterprise Data Sharing team is working to leverage both Digitization and Digital Transformation to develop and share best practices and methodologies across NASA. One such cutting edge methodology is Physics of Failure. Therefore NASA OSMA's R&M office is developing a Reliability Physics of Failure Handbook in order to keep our engineers current and on the cutting edge of analysis methodologies to help ensure NASA’s optimize and achieve continued success.

Reliability Engineering↗

NASA Physics of Failure (PoF) Handbook Update

At the intersection of mission, technology, and place is NASA’s need to modernize for a digital-forward future. Therefore, NASA’s Reliability & Maintainability (R&M) Enterprise Data Sharing team is working to leverage both Digitization and Digital Transformation to develop and share best practices and methodologies across NASA. One such cutting edge methodology is Physics of Failure. Therefore NASA OSMA's R&M office is developing a Reliability Physics of Failure Handbook in order to keep our engineers current and on the cutting edge of anlayis methodologies to help ensure NASA’s optimize and achieve continued success.

Digital transformation↗

Comparison Modeling of System Reliability for Future NASA Projects

A National Aeronautics and Space Administration (NASA) supported Reliability, Maintainability, and Availability (RMA) analysis team developed a unique RMA analysis methodology using cut set and importance measure analysis in order to comparison model proposed avionics computing architectures. In this paper we will present this efficient application of the RMA analysis methodology for importance measures that includes Reliability Block Diagram (RED) Analysis, Comparison modeling, Cut Set Analysis, and Importance Measure Analysis. We will also demonstrate that integrating RMA early in the system design process as a key to success by providing a fundamental decision metric supporting design selection. The RMA analysis methodology presented in this paper and applied to the avionics architectures enhances the usual way of predicting the need for redundancy based on failure rates or subject matter expert opinion. Using the REDs and the minimal cut sets, along with the Fussell-Vesely (FV) factors, importance measures are calculated for each functional element in the architectures. This paper presents an application of the FV importance measures and presents an improved methodology for using importance measures in success space (instead of failure space) to compare architectures. These importance measures are used to determine which functional element would be most likely to cause a system failure, thus, quickly identifying the path to increase the overall system reliability by either procuring more reliable functional elements or adding redundancy. This application of the RMA analysis methodology, using RBD analysis, cut set analysis, and the importance measure analysis, allows the avionics design team to better understand and compare the vulnerabilities in each of the architectures, enabling them to address the deficiencies in the design architectures more efficiently, while balancing the need to design for optimum weight and space allocations.

Gillespie, Amanda M.↗

Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Production Facility System Reliability Analysis Report

This document describes the reliability, maintainability, and availability (RMA) modeling of the Los Alamos National Laboratory (LANL) design for the Closed Loop Helium Cooling System (CLHCS) planned for the NorthStar accelerator-based 99 Mo production facility. The current analysis incorporates a conceptual helium recovery system, beam diagnostics, and prototype control system into the reliability analysis. The results from the 1000 hr blower test are addressed.

Accelerator Design, Technology, and Operations↗

Designing for Maintainability and System Availability

The final goal for a delivered system (whether a car, aircraft, avionics box or computer) should be its availability to operate and perform its intended function over its expected design life. Hence, in designing a system, we cannot think in terms of delivering the system and just walking away. The system supplier needs to provide support throughout the operating life of the product. Here, supportability requires an effective combination of reliability, maintainability, logistics and operations engineering (as well as safety engineering) to have a system that is available for its intended use throughout its designated mission lifetime. Maintainability is a key driving element in the effective support and upkeep of the system as well as providing the ability to modify and upgrade the system throughout its lifetime. This paper then, will concentrate on maintainability and its integration into the system engineering and design process. The topics to be covered include elements of maintainability, the total cost of ownership, how system availability, maintenance and logistics costs and spare parts cost effect the overall program costs. System analysis and maintainability will show how maintainability fits into the overall systems approach to project development. Maintainability processes and documents will focus on how maintainability is to be performed and what documents are typically generated for a large scale program. Maintainability analysis shows how trade-offs can be performed for various alternative components. The conclusions summarize the paper and are followed by specific problems for hands-on training.

Lalli, Vincent R.↗

EDOS operations concept and development approach

The Earth Observing System (EOS) Data and Operations System (EDOS) is being developed by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) for the capture, level zero processing, distribution, and backup archiving of high speed telemetry data received from EOS spacecraft. All data received will conform to the Consultative Committee for Space Data Standards (CCSDS) recommendations. The major EDOS goals are to: (1) minimize EOS program costs to implement and operate EDOS; (2) respond effectively to EOS growth requirements; and (3) maintain compatibility with existing and enhanced versions of NASA institutional systems required to support EOS spacecraft. In order to meet these goals, the following objectives have been defined for EDOS: (1) standardize EDOS interfaces to maximize utility for future requirements; (2) emphasize life-cycle cost (LCC) considerations (rather than procurement costs) in making design decisions and meeting reliability, maintainability, availability (RMA) and upgradability requirements; (3) implement data-driven operations to the maximum extent possible to minimize staffing requirements and to maximize system responsiveness; (4) provide a system capable of simultaneously supporting multiple spacecraft, each in different phases of their life-cycles; (5) provide for technology insertion features to accommodate growth and future LCC reductions during the operations phase; and (6) provide a system that is sufficiently robust to accommodate incremental performance upgrades while supporting operations. Operations concept working group meetings were facilitated to help develop the EDOS operations concept. This provided a cohesive concept that met with approval of responsible personnel from the start. This approach not only speeded up the development process by reducing review cycles, it also provided a medium for generating good ideas that were immediately molded into feasible concepts. The operations concept was then used as a basis for the EDOS specification. When it was felt that concept elements did not support detailed requirements, the facilitator process was used to resolve discrepancies or to add new concept elements to support the specification. This method provided an ongoing revisal of the operations concept and prevented large revisions at the end of the requirement analysis phase of system development.

Knoble, G.↗

Reliable Protection for an Inverter-Based Resources Dominant Grid: Technology Development and Field Demonstration

The project aimed to address the challenges posed by the rapid growth of inverter-based resources (IBR) such as solar, wind, and battery storage, which have fundamentally changed fault behavior, system strength, and protection performance in bulk power systems. Traditional protection schemes, designed for synchronous generator-dominated grids, are inadequate under high IBR penetration. Overall, the project materially advances protection modeling and simulation capabilities needed to maintain reliable grid protection under high IBR penetration. The results build utility confidence in operating power systems safely and reliably across a wide range of generation mixes, supporting grid modernization goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guest Editorial

Energy Systems Integration (ESI) is the process of coordinating the operation and planning of energy systems across multiple pathways and/or geographical scales to deliver reliable, cost-effective energy services with minimal impact on the environment. Energy systems have evolved from individual systems with little or no dependencies into a complex set of integrated systems at scales that include customers, cities, and regions. This evolution has been driven by political, economic, and environmental objectives. As we try to meet the globally recognized imperative to reduce carbon emissions through the deployment of large renewable energy capacities while also maintaining reliability and competitiveness, flexible energy systems are required. This flexibility can be attained through integrating various systems: by physically linking energy vectors, namely electricity, heat, and fuels; by coordinating these vectors across other infrastructures, namely water, data, and transport; by institutionally coordinating energy markets; and, spatially, by increasing market footprint with granularity all the way down to the customer level. Smart grids and ESI are related, in particular, the coupling between electricity, consumers, data and transport. This special section focuses on the aspects of ESI where electricity is coupled to water, heat and fuels and where this coupling brings challenges and/or opportunities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mission Reliability Estimation for Repairable Robot Teams

A mission reliability estimation method has been designed to translate mission requirements into choices of robot modules in order to configure a multi-robot team to have high reliability at minimal cost. In order to build cost-effective robot teams for long-term missions, one must be able to compare alternative design paradigms in a principled way by comparing the reliability of different robot models and robot team configurations. Core modules have been created including: a probabilistic module with reliability-cost characteristics, a method for combining the characteristics of multiple modules to determine an overall reliability-cost characteristic, and a method for the generation of legitimate module combinations based on mission specifications and the selection of the best of the resulting combinations from a cost-reliability standpoint. The developed methodology can be used to predict the probability of a mission being completed, given information about the components used to build the robots, as well as information about the mission tasks. In the research for this innovation, sample robot missions were examined and compared to the performance of robot teams with different numbers of robots and different numbers of spare components. Data that a mission designer would need was factored in, such as whether it would be better to have a spare robot versus an equivalent number of spare parts, or if mission cost can be reduced while maintaining reliability using spares. This analytical model was applied to an example robot mission, examining the cost-reliability tradeoffs among different team configurations. Particularly scrutinized were teams using either redundancy (spare robots) or repairability (spare components). Using conservative estimates of the cost-reliability relationship, results show that it is possible to significantly reduce the cost of a robotic mission by using cheaper, lower-reliability components and providing spares. This suggests that the current design paradigm of building a minimal number of highly robust robots may not be the best way to design robots for extended missions.

Trebi-Ollennu, Ashitey↗

A high-speed linear algebra library with automatic parallelism

Parallel or distributed processing is key to getting highest performance workstations. However, designing and implementing efficient parallel algorithms is difficult and error-prone. It is even more difficult to write code that is both portable to and efficient on many different computers. Finally, it is harder still to satisfy the above requirements and include the reliability and ease of use required of commercial software intended for use in a production environment. As a result, the application of parallel processing technology to commercial software has been extremely small even though there are numerous computationally demanding programs that would significantly benefit from application of parallel processing. This paper describes DSSLIB, which is a library of subroutines that perform many of the time-consuming computations in engineering and scientific software. DSSLIB combines the high efficiency and speed of parallel computation with a serial programming model that eliminates many undesirable side-effects of typical parallel code. The result is a simple way to incorporate the power of parallel processing into commercial software without compromising maintainability, reliability, or ease of use. This gives significant advantages over less powerful non-parallel entries in the market.

Boucher, Michael L.↗

Enhanced Bank of Kalman Filters Developed and Demonstrated for In-Flight Aircraft Engine Sensor Fault Diagnostics

In-flight sensor fault detection and isolation (FDI) is critical to maintaining reliable engine operation during flight. The aircraft engine control system, which computes control commands on the basis of sensor measurements, operates the propulsion systems at the demanded conditions. Any undetected sensor faults, therefore, may cause the control system to drive the engine into an undesirable operating condition. It is critical to detect and isolate failed sensors as soon as possible so that such scenarios can be avoided. A challenging issue in developing reliable sensor FDI systems is to make them robust to changes in engine operating characteristics due to degradation with usage and other faults that can occur during flight. A sensor FDI system that cannot appropriately account for such scenarios may result in false alarms, missed detections, or misclassifications when such faults do occur. To address this issue, an enhanced bank of Kalman filters was developed, and its performance and robustness were demonstrated in a simulation environment. The bank of filters is composed of m + 1 Kalman filters, where m is the number of sensors being used by the control system and, thus, in need of monitoring. Each Kalman filter is designed on the basis of a unique fault hypothesis so that it will be able to maintain its performance if a particular fault scenario, hypothesized by that particular filter, takes place.

Kobayashi, Takahisa↗

2022 Summer Resource Adequacy in the ERCOT Region

This report is a 2022 update to the National Energy Technology Laboratory (NETL) report that examined the potential system performance of the Electric Reliability Council of Texas (ERCOT) system during the summer of 2021. Anticipated summer reserve margins in ERCOT have risen year-over-year from the 15.7 percent reported in ERCOT’s Final Seasonal Assessment of Resource Adequacy (SARA) for Summer 2021 to 22.8 percent in the Final SARA for Summer 2022, driven mostly by increases in wind and solar generation. Using data from ERCOT’s 2022 Summer SARA, Capacity, Demand and Reserves (CDR) reports, and historical performance data obtained from ERCOT and Hitachi Energy Velocity Suite, six economic dispatch scenarios using PROMOD were developed to assess the risk to ERCOT of a load shedding event for Summer 2022. The results suggests that ERCOT may be facing a very tight resource adequacy situation, with the potential for a serious shortfall during the summer peak, usually the end of July through mid-August, if demand and generator outage rates significantly exceed peak levels. Under these conditions, ERCOT will need to call on its operating tools, including Energy Emergency Alerts (EEA) and calls to conserve electricity, to maintain reliability and continue serving load. Those measures alone may not be sufficient to avert a shedding of load.

24 POWER TRANSMISSION AND DISTRIBUTION↗

System and component development for long-duration energy storage using particle thermal energy storage

Energy storage, at various scales, will be required to maintain reliable power supply from variable renewable resources, and improve grid resilience. Long-duration energy storage (10-100 h) can substitute baseload coal power generation and increase levels of renewable power supply. Thermal energy storage (TES) has siting flexibility and the ability to store a large capacity of energy, and thus it has the potential to meet the needs of long-duration energy storage. Here, a novel TES system was developed by using solid particles as storage media and charging/discharging electricity from renewable power connected via the electric grid. The particle TES uses low-cost silica sand at 30-40$/Ton that is stable at high temperatures of >1,000 degrees C. Thus, the particle TES system has an overall low storage cost and high thermal-power efficiency. Key components of the system were conceptually designed and modeled for their performance. Conversion of electricity to thermal energy using electric heating can achieve a >98% charging efficiency, and the conversion of thermal energy back to electricity uses an air-Brayton combined power cycle with >52% thermal-to-electricity efficiency at >1,170 degrees C to achieve a >50% roundtrip efficiency after subtracting estimated plant parasitic losses. Laboratory-scale prototypes were fabricated and tested to verify their design approaches and operations relevant to product-scale components.

25 ENERGY STORAGE↗

Using concentrating-solar-power plants as economic carbon-free capacity resources

Deep decarbonization of electricity systems raises concerns about the need for generating capacity that can maintain reliable energy supply. Given this concern, we explore the ability of concentrating-solar-power plants with thermal energy storage to provide a carbon-free source of such capacity. We develop an approach to assessing the capacity contribution of concentrating-solar-power plants that considers future systems. Such considerations are important, because of potential differences in net-load patterns compared to today (e.g., due to higher renewable-energy penetrations). Using historical data spanning an 18-year period, we demonstrate that concentrating-solar-power plants with thermal energy storage can provide this necessary capacity with little impact on their financial viability. We examine the impact of myopic decisions and imperfect foresight of future system conditions on the operation of concentrating-solar-power plants and the resultant impact on their capacity contributions. We find that imperfect foresight can have limited impacts on such a use of concentrating-solar-power plants, so long as proper forecasting techniques are developed and used. Overall, our work shows that concentrating-solar-power plants with thermal energy storage may have a role to play in delivering reliable electricity supply in a decarbonized energy system.

14 SOLAR ENERGY↗

Creating markets for captured carbon: Retrofit of Abbott Power Plant and Future Utilization of Captured CO 2

The successful implementation of CCUS requires the confluence of technology, regulatory, and financial factors. One of the factors that impact this confluence is the ability to utilize and monetize captured CO 2 . The generally accepted utilization approach has been CO 2 -based Enhanced Oil Recovery (EOR), yet this is not always feasible and/or a preferable approach. There is a need to be able to explore a multitude of utilization approaches in order to identify a portfolio of potential utilization mechanisms. This portfolio must be adapted based on the economy of the region. In response to this need, the University of Illinois has formed a Carbon Dioxide Utilization and Reduction (COOULR) Center. The open nature of the university, coupled with a university policy to reduce CO 2 emissions, provides a model for the issues communities will face when attempting to reduce emissions while still maintaining reliable and affordable power. This Center is one of the key steps in the formation of a market for captured CO 2 . Furthermore, the goal of the Center is to not only evaluate technologies, but also demonstrate at a large pilot scale how communities may be able to adjust to the need to reduce GHG emissions.

20 FOSSIL-FUELED POWER PLANTS↗

The value of integrating a geothermal district heating system into a microgrid

As electrical grids increasingly rely on variable renewable energy, maintaining reliability and cost efficiency becomes more complex. To address these challenges, this study analyzed the integration of geothermal district heating as a grid-responsive thermal resource within a microgrid in Tuttle, Oklahoma. Building energy modeling using EnergyPlus estimated annual district heating demand at 2.9 GWh, with a peak load of 2.8 MW th . Techno-economic analyses were conducted to meet the heating demand under three geothermal scenarios, varying by production depth, flow rate, and thermal output, each supplemented by natural gas peaking boilers. In parallel, equivalent electrical load profiles were developed using typical coefficients of performance (COPs) for air-source heat pumps and electric boilers to establish an electrified baseline scenario. A complete end-use electrical load profile was also developed for the microgrid using Cambium dataset. The modeling results demonstrated reliable and economic operation of the geothermal systems over 30 years, with COPs ranging from 2.6 to 8.9 and the lowest levelized heating cost at $\$$54.6/MWh. Geothermal integration reduced electricity consumption by up to 94.7 % compared to the non-geothermal base case, yielding annual energy savings of up to $\$$803 k. Avoided grid costs ranged from $\$$65 k–$\$$147 k per year, with individual events avoiding up to $\$$4,863 per hour. Grid-responsive operation further reduced wholesale energy costs by 53–56 %. These findings demonstrate geothermal heating, traditionally treated as a non-grid-responsive thermal resource, can be reconfigured to support dynamic grid services, offering a scalable pathway to enhance reliability and reduce costs in renewable-rich microgrids and district heating networks.

15 GEOTHERMAL ENERGY↗