Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability and Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

US Veteran Gets a Facelift

Idaho National Laboratory's Advanced Test Reactor (ATR) has received replacement instrumentation and control systems - the process distributed control system (DCS) and the console display system (CDS), which included a replacement annunciator subsystem. The new systems offer the latest software and technology advancements, ensuring the availability of the reactor for future energy research. ATR, a pressurized, light water moderated 250 MW materials test reactor, became operational in 1965. In the early 1990s, after nearly thirty years of analogue/pneumatic controls, the laboratory upgraded ATR to digital-based instrumentation and control systems. By 2007, the equipment and technology used in these digital systems were reaching the end of their lifecycle. The systems component failure rates were on a rise, while vendor support and parts availability were declining. With current projections and plans for operating ATR into 2040, modernization of the reactor's infrastructure is necessary to maintain reliability and efficiency. As a result, the Idaho National Laboratory and the U.S. Department of Energy (DOE) invested more than $13 million in a four-year project to replace ATR's instrumentation and control systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Latching micro optical switch

An optical switch reliably maintains its on or off state even when subjected to environments where the switch is bumped or otherwise moved. In addition, the optical switch maintains its on or off state indefinitely without requiring external power. External power is used only to transition the switch from one state to the other. The optical switch is configured with a fixed optical fiber and a movable optical fiber. The movable optical fiber is guided by various actuators in conjunction with a latching mechanism that configure the switch in one position that corresponds to the on state and in another position that corresponds to the off state.

42 ENGINEERING↗

2011 Annual Report [WESTERN AREA POWER ADMINISTRATION]

Western’s achievements for 2011 are reported and include: Experienced a banner water year – meaning more hydropower delivered; Changed energy scheduling— to better support intermittent renewable resources; Maintained reliability— ensuring maximum use of the grid by reducing the frequency and duration of planned and unplanned outages; Connected communities— providing customers energy products and related services at cost-based rates; Managed transmission projects.

13 HYDRO ENERGY↗

Western Grid Can Handle High Renewables in Challenging Conditions

Fact sheet outlining the key findings of Phase 3 of the Western Wind and Solar Integration Study (WWSIS-3). NREL and GE find that with good system planning, sound engineering practices, and commercially available technologies, the Western grid can maintain reliability and stability during the crucial first minute after grid disturbances with high penetrations of wind and solar power.

16 TIDAL AND WAVE POWER↗

Western Wind and Solar Integration Study Phase 3: Technical Overview

Technical fact sheet outlining the key findings of Phase 3 of the Western Wind and Solar Integration Study (WWSIS-3). NREL and GE find that with good system planning, sound engineering practices, and commercially available technologies, the Western grid can maintain reliability and stability during the crucial first minute after grid disturbances with high penetrations of wind and solar power.

16 TIDAL AND WAVE POWER↗

Energy Systems Integration: Data Call -- Become a Data Partner

This project aims to advance the understanding of costs associated with integrating PV onto the electric power distribution system while maintaining reliable grid operations. We have developed a bottom-up framework for calculating these costs as a function of PV penetration levels on specific feeders. This framework will used to inform and improve utility planning decisions, increase the transparency and speed associated with the interconnection process, and provide policymakers with more information on the total cost of energy from PV.

14 SOLAR ENERGY↗

Renewable Energy Zone (REZ) Transmission Planning Process

A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Inertia and the Power Grid: A Guide Without the Spin

This fact sheet summarizes the report “Inertia and the Power Grid: A Guide Without the Spin” (NREL/TP-6A20-73856), which provides an overview of inertia’s role in the evolving power system. It describes the sources of inertia in the grid, the intrinsic interplay of inertia and other grid services, the factors that impact the amount of and need for inertia, and the changes that can be made to maintain reliability as it declines. The guide is intended for nontechnical audiences.

grid frequency↗

Target Control and Protection Systems Lessons from SNS Operations

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory has been in operations since 2006 and proposes a project to build a Second Target Station (STS) to effectively double potential scientific output. The SNS target controls operate in a harsh environment which includes high radiation, exposure to gaseous radionuclides, and activated liquid mercury and mercury vapor. These conditions necessitate protective interlocks and credited controls for protection functions to ensure proper response to off-normal conditions. In order to inform the design of target controls for the STS, we have examined lessons learned during SNS operations regarding the design and implementation of the control and protection systems for the first target station (FTS). This paper will examine various aspects of the performance of the target control and protection systems including reliability, maintainability and sustainability given the challenging environment created by 1.4 MW operations. Specific topics include distributed control of various target subsystems, response to loss of power, selection of nuclear grade instrumentation, and applying these lessons to the design for the STS project.

Humphreys, Dana↗

The Future of Robotics/Remote Handling Solutions for the Nuclear Industry - 17347

The nuclear industry is seeing a resurgence of development and utilization of advanced integrated systems; fused sensor arrays; autonomous, remote and hybrid operations; and augmented reality display and control system interfaces. A new age of 'robotics' and remote handling technologies. For many years the use of robotics in nuclear applications has been done sparingly due to technical limitations, perceived and real reliability issues, perceived and real risk concerns, and cost. Although robotics have been used successfully on a variety of projects globally, the underuse of this technology, particularly within the nuclear industry both public and private, is overwhelming. As the number of complex, high hazard projects in the nuclear industry increases, the use of robotics for maintenance, inspection, repair, decommissioning, and remediation activities will become increasingly vital in the future. The risks associated with direct human exposure are high and thus eliminating the risk, or managing it to acceptable levels by using robotics/remote handling as well as other technologies is critical to success as more extreme environment operations and tasks are undertaken. Recent and ongoing advances in technology now allows us to safely and effectively remove the direct / in-situ human element from these type of activities. All the while delivering the same or better outcomes when considering the alternatives when limited or no direct / in-situ human intervention would be allowed. The biggest obstacles the nuclear industry faces center on the cost, reliability, maintainability, effectiveness and appropriate uses of robotics/remote handling solutions in a nuclear (radiation and/or contamination) environment. In order to mitigate these concerns, a sound approach to the use of robotics needs to be addressed. This approach must include: 1. A better understanding of what technology is available and how it can be utilized across multiple sectors, e.g. Commercial Off-the-Shelf (COTS) technology modified / adapted for the nuclear sector; 2. How to implement technology in an integrated pragmatic approach that is cost effective by combining technological know-how / subject matter expertise (SME) with the equivalent subject matter expertise in regulatory, operational and maintenance requirements and limitations, such that a more complete set of functional and operational requirements can be jointly developed in the process. 3. The integration of requirements (project, site, regulatory, etc.), risk management (human factors) and technology, i.e. a marriage between political, programmatic, and technological factors. As the development of robotic/remote handling technology progresses and the successful implementation on projects is demonstrated, the better off the industry will be. This paper provides an overview of the fundamental issues facing the nuclear industry with regard to effective and successful technology selection, maturation, deployment, and integrated risk management, and offers suggestions on how we may overcome these persistent issues now and in the future. Robotic systems and solution experts that are focused on the integration of proven technologies - and that are an integrated part of the project team from its onset - are a necessity for successful planning during nuclear operations. The approach to nuclear operations should always be, 'what is the simplest, most effective way we can approach a particular project need?'. Understanding and implementing the right technologies is where the true value will be recognized. The integration of systems, which includes more than just robotics, is key when developing schemes for these types of complex operations. Often times during planning, the remote handling needs of the job are set aside to be evaluated at a later time due to risk concerns and lack of knowledge. The issue is, experts in the area of robotics or remote handling are rarely involved in the upfront planning. As a result, unnecessary constraints, risks, and obstacles are imposed on project teams to deliver. If done intelligently, this should be introduced at the forefront of planning. Using this type of sound approach leads to effective task organization for the end user. By developing an overall philosophy that leverages proven technologies with implementation expertise; i.e. solutions versus products, is a recipe for success. This is the area that is under-appreciated in the industry and one that needs to be recognized on a much broader scale. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Establishing no credible risk of inadvertent criticality for the K-25 demolition project - 14310

Demolition of the K-25 Gaseous Diffusion Plant required establishing a non-credible risk of inadvertent criticality because a Criticality Accident Alarm System (CAAS) could not be reliably maintained operable as the building was being torn down. Preparation for, and demolition of, the facility was a multi-year long effort with significant changes in approach. The most significant change was to demolish the facility with as much of the process gas equipment and piping left in the facility as possible, rather than removing all process gas equipment and piping from the facility prior to demolishing the building structure only. The contractor had to adapt their approach to accommodate these changes. The normal approach to demolition was to remove all process gas equipment and piping prior to demolition, using Nuclear Criticality Safety (NCS) controls based on the double contingency principle, while CAAS coverage was intact. Then, the building structure was demolished with no requirement for a CAAS. This was the method used to demolish the K-33 Building, for example. In the case of K-25 demolition, all equipment and piping that met the Environmental Management Waste Management Facility (EMWMF) disposal cell Waste Acceptance Criteria (WAC) was left in the building and removed as part of the building demolition process. This resulted in significant quantities of fissionable material remaining in the building and being handled during demolition. The NCS Organization worked closely with several groups during preparation activities. A Data Management organization was established to specifically identify every piece of process gas equipment and piping in the facility so that it could be accounted for and characterized. Deactivation and Decommissioning (D and D) personnel conducted internal visual inspections, by remote camera, of all process gas equipment and piping larger than 3' diameter, to reveal any large deposits that would require removal. Non-Destructive Assay (NDA) of the vast majority of equipment and piping was required to quantify the amount of fissionable material remaining. Finally, all process gas equipment and piping larger than 3'' diameter was internally filled with foam, which was credited by NCS with immobilizing the remaining fissionable material such that large migration and accumulation could not occur during demolition activities. NCS personnel worked closely with all of these groups in order to acquire the data and information needed to establish a non-credible risk of inadvertent criticality during building demolition. Good communication and a close working relationship between NCS, the various D and D/characterization personnel, and the Department of Energy (DOE) ensured the success of the modified approach to building demolition. The same successful approach is currently underway in the K-27 Building as well. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Overview of Renewable Energy Desk Activities for Power Grid Operations and Planning

This document summarizes how grid operators can address gaps in their planning and operations to maintain reliability as they pursue clean energy goals. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage variable renewable energy resource operation. Establishing such a desk in the control room can be a key step in the modernization effort. A renewable energy desk in a control room is a specialized hub focused solely on monitoring, predicting, and managing the influx of energy from renewable sources.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Best practices: Organizational execution

This article, the fourth and final installment in the DOE–IDEA series, focuses on organizational execution and how strong management practices, teamwork, and preparedness contribute to successful district energy systems. It highlights case studies from Ashley Energy and Cornell University to illustrate effective operational strategies. Ashley Energy demonstrates the importance of emergency preparedness and rapid response. After a major flood disrupted its plant, the organization restored service in under 72 hours by relying on pre-established plans, vendor relationships, and trained staff. The case emphasizes proactive contingency planning, understanding insurance processes, and empowering skilled personnel to improvise during crises. Cornell University’s example highlights the role of collaboration and transparency in long-term success. Its district energy system benefits from strong data sharing, real-time energy monitoring, and active involvement of faculty and students in system planning and innovation. This culture of teamwork and data-driven decision-making supports sustainability goals and continuous system improvement. Overall, the article shows that effective organizational execution—through preparedness, collaboration, and data transparency—is essential for maintaining reliable, efficient, and sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Providing Experimental Infrastructure for Accelerating Advanced Reactor Demonstrations through the National Reactor Innovation Center

A suite of experimental infrastructure projects has been developed by the National Reactor Innovation Center to accelerate advanced reactor demonstrations and facilitate their development, addressing crucial gaps in data, materials characterization, and modeling. First, the Molten Salt Thermophysical Examination Capability (MSTEC) provides a specialized platform for post-irradiation characterization of molten salt reactor fuel, coolant salts, and structural materials, essential for supporting the design and operation of advanced reactors and future commercial molten salt reactor development and licensing. The Virtual Test Bed (VTB) complements these efforts by leveraging advanced modeling and simulation tools to evaluate reactor performance and safety. Serving as a library of reference models, the VTB offers a database of multiphysics reactor models, facilitating rapid safety evaluations and includes continuous software quality assurance, crucial for accelerating deployment while maintaining reliability. Additionally, the Helium Component Test Facility (HeCTF) addresses the need for high-temperature helium-cooled reactor component testing. As the first-of-its-kind facility in the United States, HeCTF emulates high-temperature gas reactor conditions, reducing time and cost associated with component validation, thereby accelerating reactor development. Finally, In-cell Thermal Creep Frames provide a unique solution for obtaining thermal creep data from irradiated materials, critical for materials qualification and licensing. Developed by the National Reactor Innovation Center, these compact frames enable the examination of previously irradiated materials, overcoming traditional limitations and enhancing the understanding of mechanical properties crucial for reactor development. Collectively, these experimental infrastructure projects form a comprehensive framework aimed at expediting advanced reactor demonstrations, fostering innovation, and ensuring the viability of next-generation nuclear energy solutions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗