Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

RAPSO Resource Allocation Planning and Scheduling ↗

Optimal Renewable Resource Allocation and Load Scheduling of Resilient Communities

This paper presents a methodology for enhancing community resilience through optimal renewable resource allocation and load scheduling in order to minimize unserved load and thermal discomfort. The proposed control architecture distributes the computational effort and is easier to be scaled up than traditional centralized control. The decentralized control architecture consists of two layers: The community operator layer (COL) allocates the limited amount of renewable energy resource according to the power flexibility of each building. The building agent layer (BAL) addresses the optimal load scheduling problem for each building with the allowable load determined by the COL. Both layers are formulated as a model predictive control (MPC) based optimization. Simulation scenarios are designed to compare different combinations of building weighting methods and objective functions to provide guidance for real-world deployment by community and microgrid operators. The results indicate that the impact of power flexibility is more prominent than the weighting factor to the resource allocation process. Allocation based purely on occupancy status could lead to an increase of PV curtailment. Further, it is necessary for the building agent to have multi-objective optimization to minimize unserved load ratio and maximize comfort simultaneously.

model predictive control↗

Enabling Limited Resource-Bounded Disjunction in Scheduling

We describe three approaches to enabling a severely computationallylimited embedded scheduler to consider a smallnumber of alternative activities based on resource availability.We consider the case where the scheduler is so computationallylimited that it cannot backtrack search. The first twoapproaches precompile resource checks (called guards) thatonly enable selection of a preferred alternative activity if sufficientresources are estimated to be available to schedule theremaining activities. The third approach mimics backtrackingby invoking the scheduler multiple times with the alternativeactivities. We present an evaluation of these techniques onMars mission scenarios (called sol types) from NASA’s nextplanetary rover where these techniques are being evaluatedfor inclusion in an onboard scheduler.

Vaquero, Tiago↗

Experience in using commercial clouds in CMS

Historically high energy physics computing has been performed on large purpose-built computing systems. In the beginning there were single site computing facilities, which evolved into the Worldwide LHC Computing Grid (WLCG) used today. The vast majority of the WLCG resources are used for LHC computing and the resources are scheduled to be continuously used throughout the year. In the last several years there has been an explosion in capacity and capability of commercial and academic computing clouds. Cloud resources are highly virtualized and intended to be able to be flexibly deployed for a variety of computing tasks. There is a growing interest amongst the cloud providers to demonstrate the capability to perform large scale scientific computing. In this presentation we will discuss results from the CMS experiment using the Fermilab HEPCloud Facility, which utilized both local Fermilab resources and Amazon Web Services (AWS). The goal was to work with AWS through a matching grant to demonstrate a sustained scale approximately equal to half of the worldwide processing resources available to CMS. We will discuss the planning and technical challenges involved in organizing the most IO intensive CMS workflows on a large-scale set of virtualized resource provisioned by the Fermilab HEPCloud. We will describe the data handling and data management challenges. Also, we will discuss the economic issues and cost and operational efficiency comparison to our dedicated resources. At the end we will consider the changes in the working model of HEP computing in a domain with the availability of large scale resources scheduled at peak times.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Scalable Circuit Cutting and Scheduling in a Resource-constrained and Distributed Quantum System

Despite quantum computing's rapid development, current systems remain limited in practical applications due to their limited qubit count and quality. Various technologies, such as superconducting, trapped ions, and neutral atom quantum computing technologies are progressing towards a fault tolerant era, however they all face a diverse set of challenges in scalability and control. Recent efforts have focused on multi-node quantum systems that connect multiple smaller quantum devices to execute larger circuits. Future demonstrations hope to use quantum channels to couple systems, however current demonstrations can leverage classical communication with circuit cutting techniques. This involves cutting large circuits into smaller subcircuits and reconstructing them post-execution. However, existing cutting methods are hindered by lengthy search times as the number of qubits and gates increases. Additionally, they often fail to effectively utilize the resources of various worker configurations in a multi-node system. To address these challenges, we introduce FitCut, a novel approach that transforms quantum circuits into weighted graphs and utilizes a community-based, bottom-up approach to cut circuits according to resource constraints, e.g., qubit counts, on each worker. FitCut also includes a scheduling algorithm that optimizes resource utilization across workers. Implemented with Qiskit and evaluated extensively, FitCut significantly outperforms the Qiskit Circuit Knitting Toolbox, reducing time costs by factors ranging from 3 to 2000 and improving resource utilization rates by up to 3.88 times on the worker side, achieving a system-wide improvement of 2.86 times.

Kan, Shuwen [Fordham University]↗

Scheduling spacecraft operations

A prototype scheduling system named MAESTRO currently under development is being used to explore possible approaches to the spacecraft operations scheduling problem. Results indicate that the appropriate combination of heuristic and other techniques can provide an acceptable solution to the scheduling problem over a wide range of operational scenarios and management approaches. These can include centralized or distributed instrument or systems control, batch or incremental scheduling, scheduling loose resource envelopes or exact profiles, and scheduling with varying degrees of user intervention. Techniques used within MAESTRO to provide this flexibility and power include constraint propagation mechanisms, multiple asynchronous processes, prioritized transaction-based command management, resource opportunity calculation, user-alterable selection and placement mechanisms, and maintenance of multiple schedules and resource profiles. These techniques and scheduling complexities requiring them are discussed.

Britt, Daniel L.↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spread spectrum scheduling requests for wireless communication resource

Apparatuses, systems and methods are disclosed for wireless communication. A base station may communicate with a plurality of user equipments (UEs) without allocating spectral resources to the UEs for communicating scheduling requests. The base station may detect a scheduling request from a requesting UE of the plurality of UEs. The scheduling request may include a spread spectrum signal based on a spreading sequence. The scheduling request may indicate an identity for a requesting UE without indicating information other than the identity. The base station may grant spectral resources to the requesting UE in response to detecting a scheduling request.

Moradi, Hussein↗

System/360 Computer Assisted Network Scheduling (CANS) System

Computer assisted scheduling techniques that produce conflict-free and efficient schedules have been developed and implemented to meet needs of the Manned Space Flight Network. CANS system provides effective management of resources in complex scheduling environment. System is automated resource scheduling, controlling, planning, information storage and retrieval tool.

Brewer, A. C.↗

Development of a research project selection model: Application to a civil helicopter research program

A model is described for planning and decision making in research project selection. Evaluations of each project's direct and indirect benefits, uncertainty in achieving these benefits, and schedule priority with resource budget and program balance constraints are considered. The combination of the interactive effect of project selection, resource allocation and scheduling considerations into one model permits tradeoff alternatives to be studied. Clients' value judgments are used in evaluating the benefits from each proposed project. The model is applied to the NASA Civil Helicopter Technology Program. Research project priorities for this program are established, strengths and weaknesses of the model are discussed, and areas of future development are recommended.

Schoultz, M. B.↗

Temporal and Resource Reasoning for Planning, Scheduling and Execution in Autonomous Agents

This viewgraph slide tutorial reviews methods for planning and scheduling events. The presentation reviews several methods and uses several examples of scheduling events for the successful and timely completion of the overall plan. Using constraint based models the presentation reviews planning with time, time representations in problem solving and resource reasoning.

Muscettola, Nicola↗

Reducing the complexity of software systems - A strategic software perspective

The results of a combined management and technical initiative aimed at reducing the size and complexity associated with developing operations planning, scheduling, and resource management software systems are presented. The initiative has produced operations concepts, functional requirements, system architectures, a comprehensive lexicon, and software tools to revolutionize the traditional software technology and development practices for planning, scheduling, and resource management systems used in space operations control centers. Examples of technology and practices to reduce complexity include a method for projecting design consequences from an operations concept, a universal architecture for heuristic algorithms, an object-oriented framework for describing large classes of problems that parametrically adapt to all domain peculiarities, the identification of general approaches which respond to changes with minimum impact on systems implementations, and a management structure for prototyping to minimize the risks of ill-conceived designs.

Hornstein, Rhoda S.↗

The resource envelope as a basis for space station management system scheduling

The Platform Management System (PMS) Resource Envelope Scheduling System (PRESS) expert system prototype developed for space station scheduling is described. The purpose of developing the prototype was too investigate the resource envelope concept in a practical scheduling application, using a commercially available expert system shell. PRESS is being developed on an IBM PC/AT using Teknowledge, Inc.'s M.1 expert system shell.

Bush, Joy↗

A hierarchically distributed architecture for fault isolation expert systems on the space station

The Space Station Axiomatic Fault Isolating Expert Systems (SAFTIES) system deals with the hierarchical distribution of control and knowledge among independent expert systems doing fault isolation and scheduling of Space Station subsystems. On its lower level, fault isolation is performed on individual subsystems. These fault isolation expert systems contain knowledge about the performance requirements of their particular subsystem and corrective procedures which may be involved in repsonse to certain performance errors. They can control the functions of equipment in their system and coordinate system task schedules. On a higher level, the Executive contains knowledge of all resources, task schedules for all systems, and the relative priority of all resources and tasks. The executive can override any subsystem task schedule in order to resolve use conflicts or resolve errors that require resources from multiple subsystems. Interprocessor communication is implemented using the SAFTIES Communications Interface (SCI). The SCI is an application layer protocol which supports the SAFTIES distributed multi-level architecture.

Miksell, Steve↗

JCL Implementation On A Human Spaceflight Program

Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.

Kulpa, Vyga↗

Building a Wide-Area File Transfer Performance Predictor: An Empirical Study

Wide-area data transfer is central to geographically distributed scientific workflows. Faster delivery of data is important for these workflows. Predictability is equally (or even more) important. With the goal of providing a reasonably accurate estimate of data transfer time to improve resource allocation & scheduling for workflows and enable end-to-end data transfer optimization, we apply machine learning methods to develop predictive models for data transfer times over a variety of wide area networks. To build and evaluate these models, we use 201,388 transfers, involving 759 million files totaling 9 PB transferred, over 115 heavily used source-destination pairs (“edges”) between 135 unique endpoints. We evaluate the models for different retraining frequencies and different window size of history data. In the best case, the resulting models have a median prediction error of ≤21% for 50% of the edges, and ≤32% for 75% of the edges. We present a detailed analysis of these results that provides insights into the cause of some of the high errors. We envision that the performance predictor will be informative for scheduling geo-distributed workflows. The insights also suggest obvious directions for both further analysis and transfer service optimization.

Liu, Zhengchun↗