Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

GSFC Risk Assessment Process for Inherited Items

The NASA Goddard Space Flight Center Safety and Mission Assurance Directorate is implementing an alternate process for approval of Spacecraft Inherited Items in accordance with Goddard Procedural Requirements 8730.5. A Commodity Risk Assessment Engineer is performing an Inherited Item Risk Assessment (I2RA) for the use of Spacecraft Standard Components (items generally necessary to control the spacecraft, e.g. reaction wheel assemblies) and payload flight spares or Built-to-Print items. The I2RA may take into account prior space flight performance, criticality of the component, qualification records, quality and reliability records, storage conditions, manufacturer assessments, and mission specific parameters like mission environment and duration. The I2RA provides a means to accept for the entire item materials, parts or workmanship non-conformances, that do not significantly increase risk.

Risk Assessment↗

Robotic Mars Sample Return: Risk Assessment and Analysis Report

A comparison of the risk associated with two alternative scenarios for a robotic Mars sample return mission was conducted. Two alternative mission scenarios were identified, the Jet Propulsion Lab (JPL) reference Mission and a mission proposed by Johnson Space Center (JSC). The JPL mission was characterized by two landers and an orbiter, and a Mars orbit rendezvous to retrieve the samples. The JSC mission (Direct/SEP) involves a solar electric propulsion (SEP) return to earth followed by a rendezvous with the space shuttle in earth orbit. A qualitative risk assessment to identify and characterize the risks, and a risk analysis to quantify the risks were conducted on these missions. Technical descriptions of the competing scenarios were developed in conjunction with NASA engineers and the sequence of events for each candidate mission was developed. Risk distributions associated with individual and combinations of events were consolidated using event tree analysis in conjunction with Monte Carlo techniques to develop probabilities of mission success for each of the various alternatives. The results were the probability of success of various end states for each candidate scenario. These end states ranged from complete success through various levels of partial success to complete failure. Overall probability of success for the Direct/SEP mission was determined to be 66% for the return of at least one sample and 58% for the JPL mission for the return of at least one sample cache. Values were also determined for intermediate events and end states as well as for the probability of violation of planetary protection. Overall mission planetary protection event probabilities of occurrence were determined to be 0.002% and 1.3% for the Direct/SEP and JPL Reference missions respectively.

Lalk, Thomas R.↗

A Corrosion Risk Assessment Model for Underground Piping

The Pressure Systems Manager at NASA Ames Research Center (ARC) has embarked on a project to collect data and develop risk assessment models to support risk-informed decision making regarding future inspections of underground pipes at ARC. This paper shows progress in one area of this project - a corrosion risk assessment model for the underground high-pressure air distribution piping system at ARC. It consists of a Corrosion Model of pipe-segments, a Pipe Wrap Protection Model; and a Pipe Stress Model for a pipe segment. A Monte Carlo simulation of the combined models provides a distribution of the failure probabilities. Sensitivity study results show that the model uncertainty, or lack of knowledge, is the dominant contributor to the calculated unreliability of the underground piping system. As a result, the Pressure Systems Manager may consider investing resources specifically focused on reducing these uncertainties. Future work includes completing the data collection effort for the existing ground based pressure systems and applying the risk models to risk-based inspection strategies of the underground pipes at ARC.

Datta, Koushik↗

"Making Safety Happen" Through Probabilistic Risk Assessment at NASA

NASA is using Probabilistic Risk Assessment (PRA) as one of the tools in its Safety & Mission Assurance (S&MA) tool belt to identify and quantify risks associated with human spaceflight. This paper discusses some of the challenges and benefits associated with developing and using PRA for NASA human space programs. Some programs have entered operation prior to developing a PRA, while some have implemented PRA from the start of the program. It has been observed that the earlier a design change is made in the concept or design phase, the less impact it has on cost and schedule. Not finding risks until the operation phase yields much costlier design changes and major delays, which can result in discussions of just accepting the risk. Risk contributors identified by PRA are not just associated with hardware failures. They include but are not limited to crew fatality due to medical causes, the environment the vehicle and crew are exposed to, the software being used, and the reliability of the crew performing required actions. Some programs have entered operation prior to developing a PRA, and while PRA can still provide a benefit for operations and future design trades, the benefit of implementing PRA from the start of the program provides the added benefit of informing design and reducing risk early in program development. Currently, NASA’s International Space Station (ISS) program is in its 20th year of on-orbit operations around the Earth and has several new programs in the design phase preparing to enter the operation phase all of which have active (or living) PRAs. These programs incorporate PRA as part of their Risk-Informed, Decision-Making (RIDM) process. For new NASA human spaceflight programs discussion begins with mission concept, establishing requirements, forming the PRA team, and continues through the design cycles into the operational phase. Several examples of PRA related applications and observed lessons are included.

Applications↗

Comparison of Artemis 2 and Artemis 5 Model Outcomes Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. This presentation will seek to compare IMPACT’s computational results upon potential complex space medical conditions (e.g., sprain/strain back or sleep disturbance) using IMPACT’s risk metrics and the associated optimized medical sets/kits between two Artemis missions: single segment Artemis 2 and multi-segmented Artemis 5. OVERVIEW By identifying potential medical conditions in space using input criteria such as crew quantity and composition, certain crew physical characteristics, mission duration and mission activities, IMPACT can produce analyses on the type of medical resources and capabilities needed to produce an optimized medical set/kit to address those medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. IMPACT’s risk metrics include loss of crew life (LOCL) – a measure of crew mortality due to medical conditions in space, return to definitive care (RTDC) – the need to perform crew evacuation, and task time lost (TTL) – a measure of the inability to perform activities due to crew disability. These risk metrics are applied to every medical condition identified by IMPACT’s computation analyses for every segment of the mission. Medical sets/kits are optimized to address these medical conditions but must fit within the stated Artemis Design Reference Mission (DRM) request for mass and volume physical size constraints. ANTICIPATED ANALYSIS AND CONCLUSION Using two Artemis missions, Artemis 2 and Artemis 5, IMPACT will provide the analyses for comparison of medical set/kit contents based upon mass and/or volume requirements and identify the at-risk medical conditions within both missions. This paper serves as an initial exploration of probabilistic risk assessment (PRA) medical risk calculations between two crewed Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

probabilistic risk assessment↗

The Future of Integrated Performance Modeling in the Crew Health and Performance – Probabilistic Risk Assessment Project

The NASA engineering community utilizes event-driven and fault-tree probabilistic techniques to classify risks in the space environment by taking advantage of the inherent knowledge of complex spaceflight system design and testing to quantify failure risk. In harmonizing the risk of human space flight, answering the question of ‘How do we balance health, performance and resource risks with other engineering risks on long duration space missions?’ remains a deeply challenging and largely qualitative practice. The Human Research Program’s Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) was a significant step forward in efforts to robustly quantify the risk to crew health for exploration missions. However, there remains a significant gap in the ability to comprehensively assess and characterize risk across the disparate functionalities and capabilities which comprise the Crew Health and Performance (CHP) system. The Crew Health and Performance – Probabilistic Risk Assessment (CHP-PRA) project seeks to characterize CHP risks by expanding beyond the foundation established by its PRA predecessors like IMM and MEDPRAT, that simulate medical risk metrics like loss of crew life and evacuations. One of the new risk measures in the CHP-PRA system is embodied in our Performance Risk Model (PRisM). PRisM provides a novel way of assessing crew performance on mission tasks, using a generalized framework which relates back to NASA-STD-3001. This approach allows PRisM to capture and integrate data from a variety of different domains into a single, unified, reproducible representation of astronaut performance. In this presentation, we discuss the motivation for the CHP-PRA work and give a high level overview of the goals of the project, outline the forward work for PRisM, and discuss collaboration opportunities for the community who might explore if their domain knowledge and data could be represented, integrated, and quantified with these tools, whose outcomes are metrics useful for supporting operational mission planning and decision making.

Lauren McIntyre↗

Extravehicular Activity Micormeteoroid and Orbital Debris Risk Assessment Methodology

A well-known hazard associated with exposure to the space environment is the risk of vehicle failure due to an impact from an micrometeoroid and orbital debris (MMOD) particle. Among the vehicles of importance to NASA is the extravehicular mobility unit (EMU) “spacesuit” used while performing a US extravehicular activity (EVA). An EMU impact is of great concern as a large leak could prevent an astronaut from safely reaching the airlock in time resulting in a loss of life. For this reason, a risk assessment is provided to the EVA office at the Johnson Space Center (JSC) prior to certification of readiness for each US EVA. To assess the risk of failure, a detailed finite element model (FEM) of the EMU has been created which has regions for the various shielding configurations. Each shielding configuration is based on the layers and materials over the innermost bladder layer that maintains the acceptable atmospheric environment for the astronaut. Ballistic limit equations (BLE) for each shielding configuration have been determined from hypervelocity impact testing of samples of the EMU layup.

Hoffman, K. D.↗

A Quantitative Software Risk Assessment Model

This slide presentation reviews a risk assessment model as applied to software development. the presentation uses graphs to demonstrate basic concepts of software reliability. It also discusses the application to the risk model to the software development life cycle.

Lee, Alice↗

Natural Hazard Risk Assessments at the Global Scale

Since 1990, natural hazards have led to over 1.6 million fatalities globally, and economic losses are estimated at an average of around USD 260–310 billion per year. The scientific and policy communities recognise the need to reduce these risks. As a result, the last decade has seen a rapid development of global models for assessing risk from natural hazards at the global scale. In this paper, we review the scientific literature on natural hazard risk assessments at the global scale, and we specifically examine whether and how they have examined future projections of hazard, exposure, and/or vulnerability. In doing so, we examine similarities and differences between the approaches taken across the different hazards, and we identify potential ways in which different hazard communities can learn from each other. For example, there are a number of global risk studies focusing on hydrological, climatological, and meteorological hazards that have included future projections and disaster risk reduction measures (in the case of floods), whereas fewer exist in the peer-reviewed literature for global studies related to geological hazards. On the other hand, studies of earthquake and tsunami risk are now using stochastic modelling approaches to allow for a fully probabilistic assessment of risk, which could benefit the modelling of risk from other hazards. Finally, we discuss opportunities for learning from methods and approaches being developed and applied to assess natural hazard risks at more continental or regional scales. Through this paper, we hope to encourage further dialogue on knowledge sharing between disciplines and communities working on different hazards and risk and at different spatial scales.

Philip J. Ward↗

Fractal Risk Assessment of ISS Propulsion Module in Meteoroid and Orbital Debris Environments

A unique and innovative risk assessment of the International Space Station (ISS) Propulsion Module is conducted using fractal modeling of the Module's response to the meteoroid and orbital debris environments. Both the environment models and structural failure modes due to the resultant hypervelocity impact phenomenology, as well as Module geometry, are investigated for fractal applicability. The fractal risk assessment methodology could produce a greatly simplified alternative to current methodologies, such as BUMPER analyses, while maintaining or increasing the number of complex scenarios that can be assessed. As a minimum, this innovative fractal approach will provide an independent assessment of existing methodologies in a unique way.

Mog, Robert A.↗

Metal Vapor Arcing Risk Assessment Tool

The Tin Whisker Metal Vapor Arcing Risk Assessment Tool has been designed to evaluate the risk of metal vapor arcing and to help facilitate a decision toward a researched risk disposition. Users can evaluate a system without having to open up the hardware. This process allows for investigating components at risk rather than spending time and money analyzing every component. The tool points to a risk level and provides direction for appropriate action and documentation.

Hill, Monika C.↗

Investigating Risks Due to Artemis EVA Tempo Via Probabilistic Risk Assessment

Spaceflight operations pose unique challenges to crew health, safety, and resource management. As space agencies and private companies continue to push the boundaries of human exploration, it is essential to understand the risks associated with Extravehicular Activities (EVAs) and develop strategies to mitigate them. The tempo at which EVAs are conducted – the total number and frequency of these activities – can have a profound impact on medical risks, resource consumption, and overall mission success. Probabilistic risk assessment (PRA) provides a powerful framework for evaluating complex systems and identifying potential hazards. Our work employs the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) [1] to simulate mission events, occurrence and treatment of medical conditions, and track the utilization of resources. Coupled with the Evidence Library [2], a medical evidence base for exploration-class missions developed by the Exploration Medical Capability within NASA’s Human Research Program, we can estimate these risks with increased fidelity and optimize medical kit contents to meet specific mission requirements. This presentation provides a detailed examination of how EVA tempo influences medical risk estimates for a lunar surface design reference mission. A comprehensive analysis is conducted to assess the additional mass and volume burden imposed on medical kits required to maintain adequate levels of risk mitigation. Furthermore, we estimate the distribution of the number of successful EVAs completed based on the level of task impairment imposed by medical events and flight rules related to specific medical events, such as decompression sickness.

Modeling↗

Spaceflight Medical Evacuation Risk Assessment Principles - A Qualitative Investigation

BACKGROUND Future human space exploration beyond Low Earth Orbit (LEO) will require innovative solutions in many areas, primarily those that provide direct medical support to crew on long-duration missions and optimize their health and performance. The associated challenges therein will be numerous, including but not necessarily limited to extended one-way or "asynchronous" communication delays, minimal to non-existent resupply, and a prolonged transit time to "definitive care" ranging from 3-days to 9-months. At the same time, long-duration exploration spacecraft and crew will face restrictions on mass, power, volume, and data far more significant than that seen in current LEO settings. Given these limitations, medical risk assessment is of primary importance, especially evaluating the implications of a medical evacuation of an ill or injured crewmember. Such evacuations are complicated, potentially dangerous, and well may be impossible in certain phases of the mission. Regardless, such issues must be weighed against the risks of the injured crew remaining aboard a spacecraft with limited medical resources. OBJECTIVE This qualitative study drew from the experiences of subject matter experts (SMEs) in spaceflight and appropriate analog environments (i.e., military, disaster, and extreme environment fields) to identify unique principles common amongst medical evacuation considerations helpful in informing future risk assessment tools. Appropriate analog environments included austere operational settings where multiple factors (weather, logistics/limited resupply, denied/extreme environments, and patient condition) resulted in a limited ability to provide definitive local medical care. The fundamental principles in question revolved around scenarios where evacuation became a complicating yet necessary consideration and where life-threatening medical concerns had to be weighed against critical mission objective(s). The primary authors collected semi-structured data gathered through in-depth interviews with 16 subject matter experts (SMEs). Interview questions investigated how these SMEs consider and weigh the attendant risks present in medical evacuation scenarios. Among the critical questions posed were those that sought to understand how the SME balanced the challenges and requirements of medical evacuation (or keeping an injured patient "on-site" aka: "prolonged field care") against the evacuation operation's risks on impacting overarching mission success. The team analyzed interview transcripts for common themes and principles using the qualitative methods of thematic analysis based on consensus, co-occurrence, and comparison. As a result, nine primary risk consideration themes and nine contributing factor themes emerged, all of which will ideally inform future medical evacuation decision-making tools and operational decision-making for exploration class missions. Specific aims for this study included: 1. Identification of common principles used to assess risks and benefits of medical evacuations in extreme environments 2. Identification of common points of friction or complication and challenges in extreme environment evacuations

A T Almand↗

Micrometeoroid and Orbital Debris Risk Assessment With Bumper 3

The Bumper 3 computer code is the primary tool used by NASA for micrometeoroid and orbital debris (MMOD) risk analysis. Bumper 3 (and its predecessors) have been used to analyze a variety of manned and unmanned spacecraft. The code uses NASA's latest micrometeoroid (MEM-R2) and orbital debris (ORDEM 3.0) environment definition models and is updated frequently with ballistic limit equations that describe the hypervelocity impact performance of spacecraft materials. The Bumper 3 program uses these inputs along with a finite element representation of spacecraft geometry to provide a deterministic calculation of the expected number of failures. The Bumper 3 software is configuration controlled by the NASA/JSC Hypervelocity Impact Technology (HVIT) Group. This paper will demonstrate MMOD risk assessment techniques with Bumper 3 used by NASA's HVIT Group. The Permanent Multipurpose Module (PMM) was added to the International Space Station in 2011. A Bumper 3 MMOD risk assessment of this module will show techniques used to create the input model and assign the property IDs. The methodology used to optimize the MMOD shielding for minimum mass while still meeting structural penetration requirements will also be demonstrated.

Hyde, J.↗

A Pilot Project for Quantifying the Effect of Medical Provider Knowledge, Skills, and Abilities on Outcomes for Spaceflight Using a Probabilistic Risk Assessment Tool

In order to enable the future of long-duration deep space exploration we must confront the uncertainty in medical risk. Limitations of communication, resupply, and evacuation in deep space will require a high degree of crew autonomy and accurate risk assessment will be critical to ensure adequate crew training and medical system design. To address this, NASA’s Human Research Program Exploration Medical Capability Element has developed the Informing Mission Planning via Analysis of Complex Tradespaces Tool (IMPACT). IMPACT is a suite of tools that can provide evidence-based, data-driven trade space assessments between available medical resources in the mass- and volume-constrained environment of a deep space exploration vehicle. In the current model, medical conditions either can or cannot be treated based on the availability of medical system resources and equipment. However, medical outcomes often depend just as much on the knowledge, skills, and abilities (KSA) of the provider operating the system. This paper presents a method for modeling and quantifying the effect of medical officer KSA on medically relevant mission risk outcomes during spaceflight.

capabilities↗

Risk Assessment System

FEAT, a software system for evaluating risks, was developed by Lockheed and later enhanced under NASA funding. FEAT uses directed graph - or digraph - models to provide information on cause and effect if a set of failure events occurs. James Miller, the program designer at Lockheed, formed DiGraphics, Inc. to market the software that has evolved from FEAT. The Diquest Analyzer, the company's flagship product, assists product designers in identifying the redundancies and weaknesses of a system. The software has applications in the chemical industry for risk assessment, design evaluation, and change management. Additional markets have been found in operations monitoring diagnostics and training of new personnel.

Source record↗