Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Based Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Low Count and Background Radionuclides Analysis - 20488

The US Department of Energy (DOE) is often faced with the need to evaluate radionuclides at low concentrations. When site sample data are likely to be close to threshold activity concentrations of interest, then the means by which the radiochemical analysis is performed and reported is critical. This situation can occur when differentiating from zero (presence/absence) for radionuclides that do not occur naturally, close comparison with environmental background for naturally occurring radionuclides, close comparison with a risk- or dose-based threshold concentrations of interest, or even comparisons across studies. There are several analytical issues that are of concern, but the two that appear to cause incorrect decisions to be made most often involve establishing detection limits and subtracting ambient background conditions in the laboratory. These issues are not critical when radionuclide activity concentrations are large relative to thresholds of concern, but they seem to be poorly understood when it matters. When the comparisons are important and are likely to be close to a threshold of interest, then the general contract with the analytical laboratories needs to be changed so that the right or appropriate data are obtained. The concern is that important decisions are made incorrectly more often as greater scrutiny is placed on DoE's radionuclide cleanup or monitoring decisions by the public and other stakeholders. Examples are presented of problems that have been observed for different projects, both within and outside the realm of DOE and NRC remediation and radioactive waste disposal problems, and solutions are offered that should lead to better data from which important decisions need to be made. The first example is from Los Alamos National Laboratory (LANL) and involves radionuclide concentrations in soil and rock beneath LANL's Material Disposal Area (MDA) G. An initial review of the data led to a conclusion that americium and plutonium are a long way present beneath MDA G. A more thorough review of the data that accounted properly for ambient background and the detection limits that had been established led to the opposite conclusion. Another example is from the Nevada National Security Site where tritium results from one of the wells were unexpectedly high. Proper understanding and analysis of ambient background led to the conclusion that the increased concentrations were not so obvious, and that a different contract with the analytical laboratory was needed to provide more appropriate data to support a better determination. Other examples are used from regulatory review of projects in Nevada, where background levels and secular equilibrium for naturally occurring radionuclides are not established correctly because of analytical issues. The same basic issues have also been found to create difficulties analyzing historical data from the West Valley Demonstration Project. There is evidence in the data that the apparent lack of secular equilibrium where it is expected to exist is related to ambient background subtraction or other analytical issues. A final example is presented for analysis of Tc-99 in samples of depleted uranium. In this case, two different studies that were performed only three months apart provide quite different results. The US Environmental Protection Agency (EPA) established the data quality objectives (DQO) process in the mid-1980's to establish decision performance criteria for data collection. EPA guidance (EPA G-4, for example) clearly distinguishes between DQOs and measurement performance objectives (MQOs) that should be addressed for laboratory analysis of samples. The language of DQOs and MQOs has become confused over time it seems, and the subsequent effects seem to include a lack of attention to decision performance and a routine approach to measurement quality. In order to better address radionuclide sample analysis when the concentrations are close to thresholds of concern, which might be zero for some radionuclides, background for others, and risk-based thresholds for yet others, it is important that routine laboratory analysis methods are adjusted, and that the project team and the laboratory work closely together to ensure that the data meets the MQO requirements of laboratory analysis and reporting of results, and that the MQOs effectively support project-specific DQOs. This basic approach will be applied in Los Alamos in the coming year to the collection of moisture data from underneath MDA T that will be analyzed for americium and neptunium isotopes. Proper understanding of the radiochemistry methods and reporting, and of appropriate statistical methods is critical to the success of such projects, ensuring that the right decisions are made. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

ARCADE Technical Pathway and Industry Impact

The Advanced Reactor Cyber Analysis and Development Environment (ARCADE) simplifies the evaluation and assessment of robustness factor and cyber resilience that support secure-by-design for advanced reactor nuclear power plants. In this manner, ARCADE supports risk-informed performance based (RIPB) evaluations of cybersecurity through its integration of plant physics with high-fidelity emulations of control systems. This cross domain approach enables comprehensive analysis of control system sensitivities, cyber-attack scenarios, and their consequences. ARCADE has been custom developed to meet the demands identified in Tier 1 of the Tiered Cyber Analysis (TCA) as outlined in NRC Draft Regulation Guide (RG) 5.96, which provides a RIPB cybersecurity approach for new reactors.

97 MATHEMATICS AND COMPUTING↗

Risk-based area of review estimation in overpressured reservoirs to support injection well storage facility permit requirements for CO 2 storage projects

This paper by the Energy & Environmental Research Center presents a workflow and modeling approach for delineating a risk-based area of review (AOR) to support a U.S. Environmental Protection Agency (EPA) Class VI permit for a carbon dioxide (CO 2 ) storage project. The approach combines semianalytical solutions for estimating formation fluid leakage through a hypothetical leaky wellbore with the results of numerical reservoir simulations to define the AOR. The modeling utilizes 1) semianalytical solutions from the peer-reviewed literature for formation fluid leakage through abandoned wellbores by Raven (1990) and Avci (1994), 2) a FORTRAN model compiled and described in Cihan et al. (2011, 2012) called ASLMA (Analytical Solution for Leakage in Multilayered Aquifers), and 3) a computational framework for estimating a risk-based AOR first proposed by Oldenburg et al. (2014, 2016). Therefore, the approach builds upon well-established research and underlying hydrogeological principles that have been upheld for nearly three decades. Moreover, the ASLMA model has been broadly applied to an array of storage projects. The work presented herein extends these earlier works using a custom wrapper written in the software environment, R (R Core Team, 2020), which was developed to perform multiple runs of the ASLMA model using given ranges for one or more input parameters. In addition, the current work simulates the pressure buildup within the storage reservoir in response to CO 2 injection using a compositional simulator to better accommodate the temporospatial evolution of pressure buildup within the storage reservoir that is more accurately modeled using a heterogeneous geologic model and a compositional simulator that accounts for the multiphase interactions. The workflow is demonstrated using a case study for a 180,000-metric-ton-per-year storage project located in the PCOR (Plains CO 2 Reduction) Partnership region. For the storage project evaluated here, under the scenario where the leaky wellbore is open to a saline aquifer (thief zone) between the overlying seal (cap rock) and the underground sources of drinking water (USDW), the risk-based AOR essentially collapses to the areal extent of the CO 2 plume in the storage reservoir because the pressure buildup in the storage reservoir beyond the CO 2 plume is insufficient to drive formation fluids up a hypothetical leaky wellbore into the USDW. However, even under the conservative assumption that the leaky wellbore is not open to a thief zone, beyond the areal extent of the CO 2 plume, the incremental leakage is less than 400 m 3 over 20 years, which represents ~0.0001% or less of the total volume of water contained within the USDW rock volume. As discussed in the text, the threshold criterion for defining the risk-based AOR is site-specific and should be informed by the results of the sensitivity analysis and available site characterization data. The approach outlined in this paper is designed to be protective of USDWs and, therefore, comply with the Safe Drinking Water Act requirements and provisions for the U.S. EPA Class VI Underground Injection Control (UIC) Program (Class VI Rule) and North Dakota Administrative Code Chapter 43-05-01.

54 ENVIRONMENTAL SCIENCES↗

Moon, Mars and Minds: Evaluating Parkinson’s disease mortality among U.S. radiation workers and veterans in the million person study of low-dose effects

Background: Radiation is one of the most important stressors related to missions in space beyond Earth’s orbit. Epidemiologic studies of exposed workers have reported elevated rates of Parkinson’s disease. The importance of cognitive dysfunction related to low-dose rate radiation in humans is not defined. A meta-analysis was conducted of six cohorts in the Million Person Study (MPS) of low-dose health effects to learn whether there is consistent evidence that Parkinson’s disease is associated with radiation dose to brain. Materials and methods: The MPS evaluates all causes of death among U.S. radiation workers and veterans, including Parkinson’s disease. Systematic and consistent methods are applied to study all categories of workers including medical radiation workers, industrial radiographers, nuclear power plant workers, atomic veterans, and Manhattan Projects workers at the Los Alamos National Laboratory and at Rocky Flats. Consistent methods for all cohorts are used to estimate organ-specific doses and to obtain vital status and cause of death. Results: The meta-analysis include 6 cohorts within the MPS, consisting of 517,608 workers and 17,219,001 person-years of observation. The mean dose to brain ranged from 6.9 to 47.6 mGy and the maximum dose from 0.76 to 2.7 Gy. Five of the 6 cohorts revealed positive associations with Parkinson’s disease. The overall summary estimate from the meta-analysis was statistically significant based on 1573 deaths due to Parkinson’s disease. The summary excess relative risk at 100 mGy was 0.17 (95% CI: 0.05; 0.29). Conclusions: Parkinson’s disease was positively associated with radiation in the MPS cohorts indicating the need for careful evaluation as to causality in other studies, delineation of possible mechanisms, and assessing possible implications for space travel as well as radiation protection guidance for terrestrial workers.

60 APPLIED LIFE SCIENCES↗

Increasing Mosquito Abundance Under Global Warming

Mosquitoes are a key virus vector that poses significant health threats globally, affecting 700 million individuals and causing 1 million deaths annually. Accurately predicting mosquito abundance and dispersion remains a challenge. Complex interactions between mosquito dynamics and various environmental factors, notably hydrology, contribute to this challenge. Existing models typically focus on precipitation and temperature and often overlook further impacts of hydrological variables within mosquito modeling. In this study, we developed an artificial intelligence‐based model for mosquito dynamics, explicitly accounting for different hydrological variables, such as precipitation, soil moisture and streamflow. Using Toronto, Canada, as a case study, we identified causal relationships between changes in mosquito populations, hydrological factors, vegetation (e.g., leaf area index), and climate variables (e.g., daylight length, precipitation, and temperature). We embedded these relationships into a Long Short‐Term Memory (LSTM) Neural Network Model capable of accurately detecting mosquito dynamics across annual, seasonal, and monthly time scales. The LSTM is able to explain, on average, approximately 40% of the variance in the observed mosquito abundance data. Using the calibrated model, we predicted that the summer season mosquito abundance would increase by ∼16% and ∼19% under an intermediate greenhouse emission scenario, Shared Socioeconomic Pathway (SSP) 2–4.5, and a high greenhouse emission scenario, SSP5‐8.5, respectively. We expect that this model can serve as a valuable tool and inform science‐based decisions affecting mosquito dynamics and public health. It can also build a foundation for future risk analysis at the regional and larger scales.

54 ENVIRONMENTAL SCIENCES↗

Baycal

Bayesian Model Calibration (BayCal) toolkit is a software plugin for Risk Analysis Virtual Environment (RAVEN) framework, arming at inversely quantifying the uncertainties associated with simulation model parameters based on available experiment data. BayCal seeks statistical inference of the uncertain input parameters that are consistent with the available measurement data or observed data. The unique feature of BayCal is the capability to be linked with RAVEN to build corresponding calibration workflows for complex multi-physics simulations. In addition to be able to use the machine learning capability of RAVEN to significantly reduce the computational cost of expensive simulation models, another distinctive feature of BayCal is the capability to deal with high-dimensional correlated model outputs, such as time series observations at multiple locations, via principal component analysis (PCA) technique.

Wang, Congjian↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploring for Superhot Geothermal Targets in Magmatic Settings: Developing a Methodology

This paper presents preliminary results from a subset of work carried out as part of a multinational research project entitled DErisking Exploration for multiple geothermal Plays in magmatic ENvironments (DEEPEN). One objective of DEEPEN is to develop a customized approach to exploration for superhot geothermal plays in magmatic systems. This paper summarizes key geologic components, risk factors, and exploration methods for geothermal plays in magmatic settings based on a review and comparative analysis of international training sites. As part of a Play Fairway Analysis (PFA) approach to exploring for multiple play types in a single magmatic system, training data were compiled and weights assigned to various evidence layers. Two different approaches for weighting exploration datasets are described in this paper - one based on expert opinions and the other using statistical learning. Weights produced by both approaches will be input into a 3D PFA workflow that combines multiple exploration datasets to generate 3D geothermal favorability models, which will be applied to two international demonstration sites.

GEOTHERMAL ENERGY↗

Using Machine Learning to Understand Electric and Hybrid Vehicles Ownership in Burdened and Nonburdened Communities

Transitioning to electric and hybrid vehicles (EHVs) for all communities is a pivotal step toward sustainable transportation and environmental conservation. This paper aims to understand the adoption of EHVs, focusing on burdened communities (BCs) in the United States. The EHV ownership-based analysis combines two datasets—behavioral data from the Puget Sound Regional Travel Survey integrated with BCs (Justice40) data covering transportation insecurity, environmental burden, social vulnerability, health vulnerability, and climate and disaster risk burden. After creating this unique database, descriptive analysis and modeling are used to analyze the data and predict EHV ownership in the future. Specifically, we use a new method that combines particle swarm optimization (PSO) with a stacking model named PSO-Stacking, which incorporates heterogeneous base learners of machine learning and deep learning. PSO applies a customized objective function to select the optimal hyperparameters for heterogeneous learners within the stacking model, effectively addressing challenges such as multicollinearity, data imbalance, nonlinearity, and overfitting. The proposed solution covers more accurate results than standard benchmark models for EHV ownership in BCs and non-BCs. In addition, the results of the PSO-Stacking method are explained using the local interpretable model-agnostic explanations technique. Results show a negative correlation between the BCs indicators, that is, higher transportation insecurity associated with lower EHV ownership. Furthermore, BCs have higher future climate risk scores, diesel particulate matter levels, and PM2.5 in the air than non-BCs because of higher conventional vehicle ownership. These communities are at higher risk and can benefit from electrification, EV infrastructure, and EV policies to address environmental challenges.

Aslam, Zeeshan [ORNL]↗

Failure Analysis–Informed Risk Assessment Framework for Geological Carbon Storage Using Numerical Simulation and Machine Learning

Geological carbon storage (GCS) is recognized as a critical technology for achieving large-scale reductions in anthropogenic carbon dioxide (CO 2 ) emissions. Ensuring long-term containment and safety requires robust risk assessment frameworks that account for geological uncertainty and identify potential failure scenarios. Among various indicators, the area of review (AoR) serves as a key metric for evaluating storage performance, regulatory compliance, and monitoring design, as it delineates the spatial extent impacted by pressure buildup and plume migration. However, conventional AoR-based risk assessments typically perturb parameters within narrow uncertainty bounds, potentially overlooking rare but high-impact events arising from extreme geological conditions. In this study, we present a failure analysis–informed risk assessment framework for large-scale GCS projects to improve site prescreening and monitoring design. A suite of 300 numerical simulations was generated using stochastic geological models that vary five key parameters: net-to-gross ratio, anisotropy azimuth, porosity multiplier, permeability multiplier, and vertical-to-horizontal permeability ratio. Among these, 200 realizations represent normal geological uncertainty, while 100 additional cases explore extreme yet plausible conditions for failure-case analysis. The AoR was simulated and computed from pressure and CO 2 saturation fields, where the baseline AoR boundary, representing the extent predicted under typical geological uncertainty, was defined as the union of 200 normal-range simulations, and failure was identified when extreme-range cases exceeded this baseline. Results show that incorporating broader parameter uncertainty produces significantly larger AoR extents, underscoring the potential underestimation of risk under conventional uncertainty ranges. Furthermore, spatial probability maps derived from failure-induced AoR exceedance identify regions requiring enhanced monitoring attention. Various machine learning (ML)–based classifiers were developed to predict failure occurrence from geological parameters, with the random forest model achieving the highest performance (F1-score of 0.986). Consistent findings from correlation coefficient, feature importance, and Sobol sensitivity analyses reveal that low net-to-gross ratios and permeability multipliers are the dominant risk drivers, reflecting reduced reservoir connectivity and limited pressure dissipation. Altogether, these results provide a novel framework for risk-informed site prescreening and monitoring design that explicitly considers rare but high-impact geological scenarios in GCS projects.

25 ENERGY STORAGE↗

Software Verification and Validation Guidelines for Non-Linear Soil-Structure Interaction Analysis

Seismic analysis of structures, systems, and components (SSCs), including the consideration of soil-structure interaction (SSI) effects, is an important and required step in the design and licensing of nuclear power plant SSCs important to safety. Historically, the SSI analysis of nuclear structures has been performed using equivalent linear methods. However, there has been considerable industry investment in alternative seismic design and analysis approaches to reduce the construction cost of new reactors. Toward that goal and in alignment with the Licensing Modernization Project (LMP) framework, the Nuclear Regulatory Commission (US NRC) has proposed a risk-informed, performance-based approach to seismic design that allows inelastic response in those nuclear plant structures not required for confinement. As a complementary effort, reactor designers are exploring nonlinear seismic analysis methods to optimize structural designs and reduce construction costs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk-informed Predictive Analytics To Achieve Cost-effective Condition-based Monitoring And Maintenance Strategy

The research involves developing risk-informed predictive analytic capabilities to achieve condition-based monitoring and maintenance strategies to reduce overall maintenance costs. The research utilizes data (real-time data, periodic data, and institutional knowledge) related to a particular plant asset from a specific nuclear plant site to develop risk-informed predictive analytic algorithms. The developed algorithms and codes are used to optimize the maintenance strategy and estimate/forecast generation costs based on the state of health of the plant asset. Developed codes specifically include 1. Parameter estimation code based on Bayesian inference 2. Statistical data analysis code 3. Feature engineering code 4. Health classifier code 5. Diagnosis code 6. Prognosis code 7. Hazard code 8. Generation risk code 9. Economic code

Agarwal, Vivek↗

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

Multiple aspects maintenance ontology-based intelligent maintenance optimization framework for safety-critical systems

Abstract Maintenance optimization is a process for improving the efficiency of maintenance strategies and activities, considering various aspects of the target system and components, such as the probabilities of system failures and the cost of repair and replacement of a failed component. The improvement of maintenance optimization algorithms generally requires information from various data sources. For example, it may require the system risk information derived from risk analysis tools or the residual lifetime of a component from fault prognosis tools. The requirements of data acquisition (DAQ) and aggregation pose new challenges for maintenance management systems (MMSs) that implement and use these maintenance optimization algorithms. This paper proposes a multiple aspects maintenance ontology-based framework to facilitate DAQ from MMSs, online monitoring systems, fault detection and discrimination tools, risk assessment tools, decision-making tools, and component identification tools, and accelerate the implementation and verification of contemporary maintenance optimization models and algorithms. The proposed framework consists of a multi-aspect maintenance ontology with critical information for maintenance optimization and application interfaces for collecting information from various data sources, such as fault prognosis tools, online monitoring tools, risk assessment tools, and decision-making algorithms. In addition, this paper proposes a heuristic method for integrating concepts and properties from other existing ontologies into the proposed framework when the existing ontology is not fully compatible with the ontology under construction. Finally, the paper verifies the proposed ontology framework using a feedwater system designed for nuclear power plants with valves and filters as the components under maintenance.

Diao, Xiaoxu (ORCID:0000000346726352)↗

Health Analysis and Research for Public Events (HARPE) Tool (Final CRADA Report)

Based on its experience in building assessment tools, Argonne National Laboratory (Argonne) has demonstrated expertise in developing comparative methodologies and question sets that provide both a physical and cyber-based risk assessment for the commercial facilities sector. A high-level risk assessment tool can be beneficial for venues and organizations that fall under a wide array of facility characterizations, ultimately accommodating the evolving landscape of threats specific to these facilities. The Health Analysis and Research for Public Events (HARPE) Tool is an assessment that seeks to help facility managers assess and mitigate aspects of safety, security, and emergency management within their venues. With the pandemic featuring prominently in today’s landscape, we have adapted and extended the scope of the HARPE tool so that it offers users the ability to integrate assessments of their preparation for, response to, and recovery from threats faced at the venue arising from the COVID-19 pandemic. Traditional threats and hazards remain prevalent in today’s landscape, and the best defense is a proactive approach to preventing and mitigating these threats. At the very core of prevention and mitigation is the first step of conducting a risk assessment—this is the gap that HARPE fills. While it is obvious that the response to COVID-19 is health and sanitation driven, leaders within the commercial facilities sector must also know where to best extend their efforts in mitigating future threats arising from the pandemic. Public events and mass gatherings are directly impacted by COVID-19; however, with the help of HARPE, leaders can focus their attention on core impact areas related to the safety and security of returning to a new normal, as they assess their risks using the Argonne-developed tool. HARPE provides an important solution to the COVID-19 situation by assisting venue managers and health officials in identifying their risks.

59 BASIC BIOLOGICAL SCIENCES↗

Default Radioactive and Hazardous Waste Management (RHWM) Dose Conversion Factors (DCFs) and Weighting Factors and plutonium-239 equivalent Curie (PE-Ci) methodology for acceptance into the Waste Storage Facilities

DOE-STD-5506-2007 (Ref. 1) is the standard that provides the methodology for preparing hazard analysis and accident analysis for transuranic (TRU) waste facilities. The Waste Storage Facilities hazard and accident analysis for the DSA is developed in accordance with DOE-STD- 5506-2007. Two related issues need to be addressed when implementing DOE-STD-5506-2007 regarding the calculation of consequences from TRU waste releases in accident analysis: Consequences determined in accident analysis must be modeled using inhalation Dose Conversion Factors (DCFs) that are consistent with those from the International Commission on Radiological Protection Publication 72 (ICRP-72, Ref. 2).; The use of a statistical Material at Risk (MAR) representing the distribution of radiological loading of TRU waste containers based on the use of a plutonium-239 equivalent Curie (PE-Ci) methodology. The PE-Ci methodology simplifies accident analysis by allowing one to model releases based on the Curie value of one standard nuclide (e.g., Pu-239) instead of needing to model releases for every potential nuclide of interest. This is accomplished by normalizing the Curie value of all nuclides to a single Curie value of a standard nuclide by using a Weighting Factor that is a ratio of the DCFs associated with the nuclides and that of the standard nuclide. By using the ICRP-72 DCFs to calculate PE-Ci values used in the statistical MAR, the accident analysis that uses that statistical MAR will be consistent with the consequence methodology identified in DOE-STD- 5506-2007.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Comparison of Geochemical Reactivity of Marcellus and Caney Shale Based on Effluent Analysis

ABSTRACT: In this comparative study, we analyzed the changes in elemental concentrations of hydraulic fracturing fluids after interaction with the Marcellus and Caney Shale formations. The focus was on assessing the inherent risks and environmental implications associated with flowback waters, including their impact on soil, ground, and drinking water quality, and human health safety. The chemical compositions of effluents were determined through Inductively Coupled Plasma Optical Emission Spectroscopy (ICP-OES) and Mass spectrometry (ICP-MS). The Marcellus Shale, showed concentrations of Cd, averaging 0.380 ppm far exceeding safe water thresholds. Significant levels of As, Se, B, and Pb were detected in both shales, raising concerns about soil and water contamination. Analyzing the effluents from representative samples of sections of the Marcellus (S2 and S7) and Caney (R1 and R2) indicates different geochemical responses over 4 weeks of experiments. This comparison underscores the chemical changes and environmental considerations linked to hydraulic fracturing across shale formations, suggesting the value of tailored monitoring and regulatory measures for each type. 1. INTRODUCTION The Caney and Marcellus shales, differing in geology and geochemistry, represent distinct unconventional reservoirs. The Caney shale, is more ductile, with higher produced water volumes, (Smith et al., 2022) contrasts with the brittle Marcellus shale known for lower brine production but significant data availability. This study aims to elucidate the possible environmental health and safety issues that may arise from the hydraulic fracturing processes. The interaction between fracturing fluids and clays presents a significant challenge. The primary base of these fluids is water, which, when introduced to clay, can induce swelling and constrict flow pathways. This phenomenon is attributed to water molecules infiltrating the layers of clay, particularly in 2:1-type clays, leading to an increased distance between layers. To counteract this, clay stabilizers are employed (Awejori et al., 2021). Despite their effectiveness, these stabilizers are considered temporary solutions. Upon completion of the fracturing process, a concomitant amount of contaminated waters (flow back), with varied content is collected at the surface. From these, we can infer the geochemical reactions and the environmental challenges associated with these waters. Flowback waters can be reinjected or used for other purposes such as irrigation. This requires adequate screening and treatment for safe use.

Dje, L. B.↗