Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

A Comprehensive Survey of Coal Ash Law and Commercialization: Its Environmental Risks, Disposal Regulation, and Beneficial Use Markets

This white paper was commissioned by the National Association of Regulatory Utility Commissioners (NARUC) under a grant from the U.S. Department of Energy (DOE), in response to a major rule, Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals From Electric Utilities; Final Rule (Final Rule) issued by the U.S. Environmental Protection Agency (EPA) on April 17, 2015, on coal ash disposal and remediation of disposal sites, which has significant implications to states. It subjects state environmental agencies and public utility commissions to regulatory responsibilities to implement federal regulations under the Final Rule and oversee the cost implications on electric customers. To better evaluate the regulatory issues underlying the choices facing utilities and independent power producers (IPPs) regarding coal ash management options under the Final Rule, an overview of coal ash production and disposal practices is helpful. This comprehensive survey provides background information on the following topics: (a) coal ash production by a coal combustion generation plant, (b) the historical practices of utility waste management practices, (c) coal ash toxicity and related constituents, (d) further understanding of potential impacts to groundwater, and (e) the aging structures and outdated designs of coal ash surface impoundments and landfills.

01 COAL, LIGNITE, AND PEAT↗

Real-time Event Detection Using Rank Signatures of Real-world PMU Data

Timely detection of power system events is a crucial task, which can facilitate the implementation of remedial actions to improve reliability, resiliency, and security of the system. Meanwhile, the widespread deployment of phasor measurement units (PMUs) makes it possible to develop data-driven event detection techniques. However, relying purely on data without incorporating domain knowledge for the event detection task in power systems poses substantial security and stability risks due to issues associated with data misinterpretation and model accuracy. In this regard, we propose a real-time event detection method using real-world PMU data by incorporating domain knowledge to adequately capture the event signatures. Specifically, we track the change in rank signatures of PMU data to accurately localize the events. To optimize the detection process, we incorporate an offline Bayesian optimization algorithm to tune the parameters by efficiently searching for the best values. The experiments using the real-world PMU dataset from a U.S. interconnection show that the proposed event detection approach can efficiently detect the events from PMU data streams with high accuracy.

Ghasemkhani, Amir↗

Plant Growth Study: Growth of Three Plant Species in 100-OL-1 Operable Unit Soils

Soil contamination from historical application of lead arsenate pesticides persists in the 100-OL-1 Operable Unit (OU) of the U.S. Department of Energy’s Hanford Site in Benton County, Washington. A remedial investigation used a portable X-ray fluorescence analyzer to estimate and map the concentrations of metals in surface soil in the 133 decision units comprising the OU. There is variability in lead and arsenic concentrations among the non-contiguous decision units, and an incomplete understanding of the ecological and human risks from soil contamination. While general screening criteria for lead are reported in literature, limited information is available on the impacts of heavy metals on site-specific plant and animal life. To address this information gap, a study on plant growth in Hanford soils was conducted using native bluegrass (Poa secunda), invasive cheatgrass (Bromus tectorum), and buttercrunch lettuce (Lactuca sativa). The latter is included because it is a common species used in plant growth studies. Soil samples were collected from a single general location within the 100-OL-1 OU, prepared, and categorized as having low, medium, or high concentrations of lead and arsenic, with the high concentration soil having concentrations of up to 3,400 and 790 mg/kg lead and arsenic, respectively. Additionally, a synthetic soil was prepared and used as a control, in accordance with standard plant growth protocols. Fifty-four seeds of each plant species were planted in each of the four soil types following the procedure outlined by the Washington State Department of Ecology. Germination rates and biomass measurements were recorded for 20 days. Both bluegrass and lettuce germination rates appeared to be reduced at the highest lead and arsenic concentrations (Pb: 3400 mg/kg, As: 790 mg/kg), while cheatgrass germination rates were unaffected. Total biomass for all species appeared to be related to the relative concentrations of lead and arsenic in the soil. Results of this growth study agree reasonably well with previous Hanford Site plant growth studies and provide additional data for assessing ecological risk at the Hanford Site.

54 ENVIRONMENTAL SCIENCES↗

Nanoparticle Injection Technology for Remediating Leaks of CO 2 Storage Formation (Final Report)

Leakage of a well can occur through the wellbore, the annulus between well tubing and steel casing, or on the outside of the casing. The overall goal of the project is to develop a new technology that can repair or reduce the leakage of wellbore. The new technology is based on simultaneously injecting nanoparticles electrochemically and removing some of the harmful ions in the system so the distressed cement materials can be densified and the corrosion risk of steel casing can be reduced. There were two objectives. One is the development of the injection technology for leakage repair and the other is the development of new numerical simulation models that can simulate and predict the performance of the new repair technology. An electro-migration testing unit and a in-house wellbore testing system were developed; healing agents with nanoparticles were selected, numerical models were developed to simulate the electro-migration technology, and the effectiveness of the new technology were evaluated.

42 ENGINEERING↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nanoparticle Injection Technology for Remediating Leaks of CO 2 Storage Formation (Final Technical Report)

Leakage of a well can occur through the wellbore, the annulus between well tubing and steel casing, or on the outside of the casing. The overall goal of the project is to develop a new technology that can repair or reduce the leakage of wellbore. The new technology is based on simultaneously injecting nanoparticles electrochemically and removing some of the harmful ions in the system so the distressed cement materials can be densified and the corrosion risk of steel casing can be reduced. There were two objectives. One is the development of the injection technology for leakage repair and the other is the development of new numerical simulation models that can simulate and predict the performance of the new repair technology. An electro-migration testing unit and an in-house wellbore testing system were developed; healing agents with nanoparticles were selected, numerical models were developed to simulate the electro-migration technology, and the effectiveness of the new technology was evaluated.

42 ENGINEERING↗

Los Alamos National Laboratory 2022 Annual Site Environmental Report (Rev. 2)

Los Alamos National Laboratory (Laboratory) annual site environmental reports are prepared each year by the Laboratory’s environmental organizations as required by U.S. Department of Energy Order 231.1B, Administrative Change 1, Environment, Safety, and Health Reporting, and Order 458.1, Administrative Change 4, Radiation Protection of the Public and the Environment. The chapters in this report discuss our compliance with environmental laws, regulations, and orders (Chapter 2, Compliance Summary); how we manage the Laboratory’s environmental performance and assure the quality of data from analysis of environmental samples (Chapter 3, Environmental Programs and Analytical Data Quality); how we monitor for air emissions of radioactive materials and for weather conditions (Chapter 4, Air Quality); how we monitor for effects of Laboratory operations on groundwater quality (Chapter 5, Groundwater Protection); how we monitor the levels of chemicals and radionuclides in storm water runoff and sediment (Chapter 6, Watershed Quality); how we monitor for the levels and effects of chemicals and radionuclides in plants, animals, soil, and vegetation (Chapter 7, Ecosystem Health); and finally, what radioactive dose or risk from chemical exposure that members of the public could experience as a result of Laboratory operations (Chapter 8, Public Dose and Risk Assessment).

54 ENVIRONMENTAL SCIENCES↗

Feasibility Study for Cathodic Protection of Waste Tanks at Hanford

The Hanford Nuclear Reservation site contains approximately 211 million liters of radioactive and chemically hazardous waste arising from nuclear weapons production, beginning with World War II, and continuing through the Cold War. The waste is stored in 177 carbon-steel underground storage tanks, of which 149 are single-shell tanks (SSTs) and the remaining are double-shell tanks (DSTs). The mission of an ongoing River Protection Project is to retrieve the waste from the underground storage tanks and then treat and immobilize (i.e., vitrify) it for disposal. Waste from the older SSTs is being progressively retrieved into the newer DSTs for storage pending treatment, immobilization, and disposal. Waste chemistry controls are in place to mitigate general corrosion, pitting corrosion, and stress corrosion cracking (SCC) and minimize corrosion risks to the carbon steel tank liners of DST at the Hanford Site. The chemistry control program focuses on preserving liner integrity while balancing the need for caustic/nitrite additions that have large downstream impacts on vitrification. Some of the DSTs store salt cake or sludge waste layers contain out-of-specification interstitial liquids that contact the primary tank bottom or sidewall. Remediation of such layers through chemical additions is not practical. At the present time, the most significant leak integrity concern at Hanford is for corrosion of the tank bottoms of DSTs where the solids layer is out of specification because of hydroxide ion depletion and consequently, pH values that are less than 12. Cathodic protection (CP) has been proposed as a possible way to protect the liners of such tanks against corrosion. The objective of this project was to investigate the feasibility of applying CP to Hanford DSTs to mitigate internal corrosion of the carbon steel tank primary liners. The scope of the project included (1) a literature review on the application of CP to storage tank systems, in general, and to waste tanks at the Savannah River Site (SRS) and Hanford, (2) a review of the finite element analysis (FEA) model recently developed to evaluate potentials for a DST, and (3) the development of a boundary element analysis (BEA) model for CP for a DST. Tank AN-107, one of the Hanford DSTs, was selected for this work because (1) the bottommost waste layer in the tank is out-of-specification, and (2) electrochemical and resistivity data, based on recent waste sampling and testing, are available for this tank. The overarching conclusion of this study is that, based on the available information, it is feasible to apply CP to mitigate internal corrosion of the primary liners of the Hanford DSTs. However, significant additional information and work are required before a CP system can be designed. Recommendations for next steps in the design of the CP system will be presented.

WIERSMA, BRUCE↗

Annual Site Environmental Report (2019)

Los Alamos National Laboratory’s (the Laboratory’s) annual site environmental reports are prepared by the Laboratory’s environmental organizations, as required by U.S. Department of Energy Order 231.1B, Administrative Change 1, Environment, Safety, and Health Reporting, and Order 458.1, Administrative Change 3, Radiation Protection of the Public and the Environment. The following chapters in this report discuss our success in complying with environmental laws, regulations, and orders (Chapter 2, Compliance Summary); how we manage the Laboratory’s environmental performance (Chapter 3, Environmental Programs); how we monitor for air emissions of radioactive materials and climate conditions (Chapter 4, Air Quality); how we monitor for effects of Laboratory operations on groundwater quality (Chapter 5, Groundwater Protection); how we monitor the movement of chemicals and radionuclides by storm water runoff and the levels of chemicals and radionuclides in deposited sediment (Chapter 6, Watershed Quality); how we monitor for the presence, levels, and effects of chemicals and radionuclides in plants, animals, and soil (Chapter 7, Ecosystem Health); and finally, what radionuclide dose or risk from chemical exposure members of the public may experience as a result of Laboratory operations (Chapter 8, Public Dose and Risk Assessment).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Support for Reactor Operators in Case of Cyber-Security Threats (NEUP Final Report)

Increasing use of digital technology in nuclear power plants (NPPs) poses cyber-security as a crucial threat to public safety and to continuous energy production. Cyber-security risks are comprised of complex known and unknown interactions between various entities, system vulnerabilities, network protocols, human users and malicious attacks. There is little understanding or research geared towards plant operators’ response under cyber-security threats and operational procedures to cope with such threats. This is particularly critical when a cyber-security event masquerades as a safety incident or an evolving accident. Instead of leading operators to the remediation of the accident, the masked cyber event may lead them to circumvent the safety mechanisms of the plant. Given these challenges, the objective of this project is to develop a tool to characterize abnormal NPP events as “cyber” or “safety” incidents, and to further develop this tool as a real-time operator aid to assist in response to the incident. This NEUP Final Report summarizes the research efforts towards the above goals and the results in the following three aspects. First, a methodology for classifying abnormal NPP events as cyber-attacks or safety incidents was developed. This provides the basis for responding to potential cyber-attacks. In this methodology, the causal relationships between various variables (i.e., physical variables, network variables, and control variables) for a nuclear system under consideration are modeled using dynamic Bayesian networks. Based on observations of certain variables (i.e., the evidence), inference is performed to identify the state of hidden variables, which helps indicate the occurrence of cyber-attacks or safety incidents. The proposed methodology was applied to the full scope NPP simulator system at The Ohio State University as a case study. The result shows that the proposed methodology is capable of distinguishing between cyber-attacks and safety incidents. Second, a game-theoretic approach for responding to cyber-attacks on nuclear power plants was developed. This is the second major goal of the project, and the method is used to recommend optimal responses to reactor operators in the case of cyber-attacks. We consider two cases in this research. In the first case, the interaction between the defender (i.e., the reactor operator) and the attacker is modeled as a two-player, nonzero-sum, Markov game with an infinite time horizon. In the second case, we consider a semi-Markov game between the defender and the attacker within a finite time horizon. The model in the second case enables us to consider the time sensitive response of the defender. In each case, the method for deriving the Nash equilibrium is developed. The Nash Equilibrium of the game provides the valid prediction of both players’ actions because no single player can benefit from unilaterally deviating from the equilibrium policy if the other player adheres to his/hers, hence it provides the best response of the defender to cyber-attacks. The proposed method in each case is demonstrated through a simplified benchmark digital feedwater control system. Third, a prototype display is developed to integrate the above information. The prototype display depicts the communication information to the operator and incorporates the cyber-security tool developed by the team into the interface. It consists of the regular display in current control rooms, as well as a panel used to indicate the occurrence of cyber-attacks or safety events and a panel used to guide the operator’s response to detected cyber-attacks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Trace metal transfer to passerines inhabiting wastewater treatment wetlands

Wastewater treatment wetlands are cost-effective strategies for remediating trace metals in industrial effluent. However, biogeochemical exchange between wastewater treatment wetlands and adjacent environments provides opportunities for trace metals to cycle in surrounding ecosystems. The transfer of trace metals to wildlife inhabiting treatment wetlands must be considered when evaluating wetland success. Using passerine birds as bioindicators, we conducted a multi-tissue analysis to investigate the mobilization of zinc, copper, and lead derived from wastewater to terrestrial wildlife in treatment wetlands and surrounding habitat. In addition, we evaluate the strength of relationships between metal concentrations in non-lethal (blood and feathers) and lethal (muscle and liver) sample types for estimation of toxicity risk. From July 2020 to August 2021, 177 passerines of seven species were captured at two wetlands constructed to treat industrial wastewater and two reference wetlands in the coastal plain of South Carolina. Feather, blood, liver, and muscle samples from each bird were analyzed for fourteen metals using inductively coupled plasma mass spectrometry and direct mercury analysis. Passerines inhabiting wastewater treatment wetlands accumulated higher concentrations of zinc in liver, copper in blood, and lead in feathers than passerines in reference wetlands, but neither blood nor feather concentrations were correlated with internal tissue concentrations. Of all the detected metals, only mercury in the blood showed a strong predictive relationship with mercury in internal tissues. This study indicates that trace metals derived from wastewater are bioavailable and exported to terrestrial wildlife and that passerine biomonitoring is a valuable tool for assessing metal transfer from treatment wetlands. Furthermore, regular blood sampling can reveal proximate trace metal exposure but cannot predict internal body burdens for most metals.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Autonomous System Subversion Tactics: Prototypes and Recommended Countermeasures

One of the fielding requirements for Advanced and Small Modular Reactors (AR/SMR) is the ability to support remote and autonomous operations. Autonomous Control Systems (ACS) are found on platforms such as Autonomous Space Vehicles, Cruise Missiles, and advanced driver-assistance systems. Each of these ACS implementations depends upon a set of decision support subsystems responsible for supporting Autonomous Mission Managers (names vary based upon field and author preferences). These Autonomous Mission Managers receive inputs from system sensors (e.g., LIDAR collection from an automobile travelling down a street; transients from a nuclear reactor), and perform a set of classifications (e.g., Red Traffic Light; Small Pedestrian at 10m; Load Rejection; Single Coolant Pump Trip), and then use these classifications in combination with recommendation algorithms to achieve platform goals (e.g., Stop the Vehicle at the Traffic Light, Avoid the Small Pedestrian; Trip the Reactor to prevent a Safety Event). The design, implementation, and fielding of an ACS capability will alter the cyber-attack surface such that existing risk management plans will need to be updated to include how to protect and defend against data-science and decision-support-system attack classes. These attack classes would include protection of the design and training environments where algorithm selection and testing and training data would be obvious attack vectors. These attack classes would also require an informed set of detection and response procedures to identify anomalous behaviors and document best practices for anomaly assessment and vulnerability mitigation and remediation. Last year we published a Cyber Threat Assessment Methodology for Autonomous and Remote Operations for AR/SMRs along with a companion publication on Cyber Attack and Defense Use Cases. The focus of the methodology was on describing and enumerating ACS processes, components, and functions such that security engineers could: evaluate subversion options against the target; identify threat actor attributes and capabilities derived from each subversion option; and identify security controls and response countermeasures. The Use Cases document offered detailed methodology examples including an assessment of a Military Base SMR, an Autonomous System Decision Loop, and implementation of AR/SMR Machine Learning algorithms. Our proposal at the end of last year was to focus on implementation of subversion prototypes related to the last Use Case area: AR/SMR Machine Learning (ML) Algorithms. We included six attack scenarios in our Use Cases paper: a Poisoning Attack against ML functions implemented using an FPGA; a Trojaning Attack against ML classifiers exploiting the excitability of Nuclear Engineers; a Backdooring Attack against ML Training environments to ensure persistence of an attack vector; a False Positive Evasion Attack against multi-factor Access Control Systems using clever inputs; an Inference Attack against ML models by an Insider with access to the Operational environment; and an Adversarial Reprogramming Attack against a Material Access Control Video Surveillance System. At the beginning of this year these six attack scenarios were provided to our research teams at Georgia Tech and Idaho State University and each team successfully implemented a subversion attack against a ML implementation to include transient misclassifications. While this is a notable outcome from this type of research, this paper offers the reader insight into not only how to structure and execute these types of attacks, but into the thought process behind how the researcher investigated the problem space, performed initial algorithm implementation, and the trial-and-error behind arriving at the successful subversion prototypes. We include in this paper a set of associated Scenarios on how these subversion prototypes could be implemented and an initial set of guidance for AR/SMR architects, Nuclear Regulators, and Cyber Defenders to implement awareness and defense capabilities into their current operational portfolios.

42 ENGINEERING↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stakeholder-Engaged Structured Decision Making for the Los Alamos Legacy Cleanup Mission - 20501

The Los Alamos National Laboratory (LANL) environmental legacy cleanup program requires decisions to be made for environmental remediation, decommissioning and disposal or management of radioactive waste. This legacy cleanup program was established to address groundwater contamination, material disposal areas (MDAs) that have been used to dispose of radioactive and other waste material, and 'aggregate areas' that might produce radioactive or other chemical waste as a result of remediation activities. The LANL site is regulated for environmental concerns under the Resource Conservation and Recovery Act (RCRA). However, some parts of LANL, such as material disposal area G (MDA G), have disposed of radioactive waste under DOE Order 435.1, and are subject to other regulations. For example, decommissioning the remote-handled TRU material stored in 33 shafts at MDA G falls under EPA's 40 CFR 191. Collectively, the regulations are all aimed in the same direction of finding the best solution, either through constructs such as 'as low as reasonably achievable' (ALARA), considering balancing factors as opposed to only cost and human health risk, and, under EPA regulations such as RCRA and NEPA, evaluating impact from all chemicals and both human health and ecological endpoints. Despite the basic goals and objectives of the regulations or their guidance, the main challenge is in their implementation. Arguably perhaps, but really in principle, all of these (and similar) regulations are asking for a decision analysis to be performed. Implementation challenges encountered have included lack of understanding of decision analysis in the industry, lack of effective stakeholder engagement in the decision analysis process, and lack of appreciation of the need to separate value judgments from science, the latter leading to developing conservative, or protective, science-based models. Conservative models lead to poor solutions, lack of effective stakeholder engagement leads to long drawn out protracted approaches to finding a solution (which also might never be found with this approach), and lack of understanding of decision analysis and Bayesian statistics causes poor models to be built, which creates unfortunate situations of 'garbage in, garbage out' becoming the basis for decision making. Stakeholder-engaged structured decision making (SDM) is an approach to solving problems that relies on the theory of decision science to involve stakeholders in the decision-making process. This approach incorporates stakeholder values using a scientifically rigorous methodology that separates value judgments from science in a way that helps avoid the pitfalls of biased, protective, or conservative modeling. This approach has its foundation in Keeney's 1992 treatise on value-focused thinking [1]. Keeney advocated a paradigm shift in decision making based on the idea that the standard way of thinking about decisions is backwards. The standard approach of focusing first on identifying alternatives rather than on articulating values results in a reactive approach with the emphasis on mechanics and fixed choices instead of the core values that have meaning to stakeholders. This paradigm shift effectively engages all stakeholders in the decision-making process while using a values focused thinking approach that can lead to the identification of decision opportunities and the creation of better alternatives. The intent is to be proactive and generate solutions that are related directly to values and objectives as identified by stakeholders. There are, perhaps, two overarching reasons why SDM can be used to benefit LANL's environmental legacy cleanup. Some of LANL's remaining waste management and environmental management problems are challenging and complex (for example, the Cr and RDX plumes, and MDAs) and while the traditional approach has, arguably, worked well for relatively simple risk-based problems, it cannot, or should not, be applied to more complex problems if the most effective and efficient solutions are desired. The second reason is cost. This has perhaps become more critical since publication of the Government Accountability Office (GAO) reports that DoE's environmental liability is considered a high-risk concern for the nation [2]. The focus of SDM is on structuring solutions to decision risk problems by first addressing stakeholder and decision maker values and subsequently developing decision objectives and ways to measure those objectives, preference weighting across objectives, identifying decision alternatives that best achieve those values, and characterizing uncertainty in predictions of the measures. Because a complete decision model is created using SDM, it can be evaluated to find the main elements of the model that drive, or predict, the best solution. This approach creates complete decision models that are transparent, traceable, reproducible and technically defensible. The science behind SDM, or decision analysis, is well founded, yet it is not unusual to see ad hoc approaches to decision making implemented under various environmental regulations that are pertinent to the LANL site, including NEPA, RCRA and DOE Order 435.1. Such ad hoc approaches are often not transparent or traceable, and lack reproducibility and technical defensibility. The LANL legacy cleanup program has embarked on using SDM to address the complex problems that remain. Stakeholder meetings have been held, and a prototype version of the stakeholder value system has been developed. Further meetings are expected in the future to address specific project needs. This is a long-term endeavor considering the complex environmental problems faced by DOE EM in Los Alamos (EM-LA), and careful planning, consideration of stakeholder value systems, and engagement with stakeholders throughout the SDM process is expected to lead to a successful endpoint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Inertial Support: Modeling Fast Frequency Response Controls for Energy Storage System Inverters

Reduction of power system inertia is a growing concern for grid operators given the transition under way from conventional fossil generators to inverter-based resources. One key concern is the rapid and severe dip in power system frequency following a large disturbance which could trigger remedial actions including operation of under frequency load shedding (UFLS) relays. A potential solution is to utilize battery energy storage systems (BESS) to provide fast frequency response(FFR) to mitigate the system frequency impact of low system inertia. In this work, we investigate different control parameters to achieve modeled FFR response from BESS in the simulated US Western Interconnection. First, a very low inertia model is developed from an existing positive sequence model of the Western Interconnection. Afterwards, we tune the BESS dynamic response parameters to eliminate any risks of reaching UFLS relay thresholds following the loss of large generators. Finally, we investigate the relative impact of having large BESS units in comparison of multiple smaller units in the same area. The results of the analyses indicate that 1 GW of transmission-connected BESS can help mitigate the frequency drop caused by large generators outages in the Western Interconnection, and significantly reduce the risk of under frequency load shedding.

power system dynamic performance, Low Inertia, Fas↗

Green buffers near industrial plants, examples in Jefferson County TX

Green buffers between industrial plants and residential areas have multiple purposes in mitigating air pollution and protecting the environment. This study focuses on providing information on examples of green space development by industries near residential areas in Jefferson County, Texas. One represents a full buffer where residences were totally removed, another is a partial buffer where some residences were removed in a neighborhood and the third represents vegetation of a formerly industrial facility. Additional estimates on benefits of buffer spaces with respect to a pollutant plume are also considered. The study used geospatial and property data from 1966 to 2020. The transition from a residential area to a full or partial buffers highlights possible mitigation of air pollution impacts while serving additional functions, such as boosting stormwater infiltration and improving the aesthetic attractiveness of the area. The transformation from oil tanks to forested space may display the potential for environmental remediation, but not all spaces are suitable for fully forested buffers, as safety and other limitations should be considered. With the analysis of the classic Plume Equation insights can be provided regarding the possible impact of green buffers on ground-level pollutant concentrations. The calculations for atmospheric stability classes A-F and for various stack heights provide an understanding of how different conditions may affect the pollutant concentrations. The presence of a green buffer can play a crucial role in controlling ground-level pollution concentrations and reduce a community’s perception of risk.

54 ENVIRONMENTAL SCIENCES↗

Low Count and Background Radionuclides Analysis - 20488

The US Department of Energy (DOE) is often faced with the need to evaluate radionuclides at low concentrations. When site sample data are likely to be close to threshold activity concentrations of interest, then the means by which the radiochemical analysis is performed and reported is critical. This situation can occur when differentiating from zero (presence/absence) for radionuclides that do not occur naturally, close comparison with environmental background for naturally occurring radionuclides, close comparison with a risk- or dose-based threshold concentrations of interest, or even comparisons across studies. There are several analytical issues that are of concern, but the two that appear to cause incorrect decisions to be made most often involve establishing detection limits and subtracting ambient background conditions in the laboratory. These issues are not critical when radionuclide activity concentrations are large relative to thresholds of concern, but they seem to be poorly understood when it matters. When the comparisons are important and are likely to be close to a threshold of interest, then the general contract with the analytical laboratories needs to be changed so that the right or appropriate data are obtained. The concern is that important decisions are made incorrectly more often as greater scrutiny is placed on DoE's radionuclide cleanup or monitoring decisions by the public and other stakeholders. Examples are presented of problems that have been observed for different projects, both within and outside the realm of DOE and NRC remediation and radioactive waste disposal problems, and solutions are offered that should lead to better data from which important decisions need to be made. The first example is from Los Alamos National Laboratory (LANL) and involves radionuclide concentrations in soil and rock beneath LANL's Material Disposal Area (MDA) G. An initial review of the data led to a conclusion that americium and plutonium are a long way present beneath MDA G. A more thorough review of the data that accounted properly for ambient background and the detection limits that had been established led to the opposite conclusion. Another example is from the Nevada National Security Site where tritium results from one of the wells were unexpectedly high. Proper understanding and analysis of ambient background led to the conclusion that the increased concentrations were not so obvious, and that a different contract with the analytical laboratory was needed to provide more appropriate data to support a better determination. Other examples are used from regulatory review of projects in Nevada, where background levels and secular equilibrium for naturally occurring radionuclides are not established correctly because of analytical issues. The same basic issues have also been found to create difficulties analyzing historical data from the West Valley Demonstration Project. There is evidence in the data that the apparent lack of secular equilibrium where it is expected to exist is related to ambient background subtraction or other analytical issues. A final example is presented for analysis of Tc-99 in samples of depleted uranium. In this case, two different studies that were performed only three months apart provide quite different results. The US Environmental Protection Agency (EPA) established the data quality objectives (DQO) process in the mid-1980's to establish decision performance criteria for data collection. EPA guidance (EPA G-4, for example) clearly distinguishes between DQOs and measurement performance objectives (MQOs) that should be addressed for laboratory analysis of samples. The language of DQOs and MQOs has become confused over time it seems, and the subsequent effects seem to include a lack of attention to decision performance and a routine approach to measurement quality. In order to better address radionuclide sample analysis when the concentrations are close to thresholds of concern, which might be zero for some radionuclides, background for others, and risk-based thresholds for yet others, it is important that routine laboratory analysis methods are adjusted, and that the project team and the laboratory work closely together to ensure that the data meets the MQO requirements of laboratory analysis and reporting of results, and that the MQOs effectively support project-specific DQOs. This basic approach will be applied in Los Alamos in the coming year to the collection of moisture data from underneath MDA T that will be analyzed for americium and neptunium isotopes. Proper understanding of the radiochemistry methods and reporting, and of appropriate statistical methods is critical to the success of such projects, ensuring that the right decisions are made. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗