Nasa's relay i still going strong news release no. 64-1
Relay satellite destruction failure, anticipated lifespan, and history of transmissions
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Relay satellite destruction failure, anticipated lifespan, and history of transmissions
Scientific information transmissions from Pioneer VI and VII space probes
An optimization technique for generating antenna illumination tapers allows improved microwave transmission efficiencies from proposed solar power satellite (SPS) systems and minimizes sidelobe levels to meet preset environmental standards. The cumulative microwave power density levels from 50 optimized SPS systems are calculated at the centroids of each of the 3073 counties in the continental United States. These cumulative levels are compared with Environmental Protection Agency (EPA) measured levels of electromagnetic radiation in seven eastern cities. Effects of rectenna relocations upon the power levels/population exposure rates are also studied.
The objective of this study was to evaluate proposed design characteristics and applications of automated biomonitoring devices for real-time toxicity detection in water quality control on-board permanent space stations. Simulated tests in downlinking transmissions of automated biomonitoring data to Earth-receiving stations were simulated using satellite data transmissions from remote Earth-based stations.
Results of an overall evaluation of the solar power satellite concept are reported. Specific topics covered include: solid state sandwich configuration; parametric development of reliability design; power distribution system for solid state solar power satellites; multibeam transmission; GEO base system configuration; suppression of the heavy lift launch vehicle trajectory; conceptual design of an offshore space center facility; solar power satellite development and operations scenario; and microwave power transmission technology, advancement, development, and facility requirements.
Three fixed service telecommunications demand assessment studies were completed for NASA by The Western Union Telegraph Company and the U.S. Telephone and Telegraph Corporation. They provided forecasts of the total U.S. domestic demand, from 1980 to the year 2000, for voice, data, and video services. That portion that is technically and economically suitable for transmission by satellite systems, both large trunking systems and customer premises services (CPS) systems was also estimated. In order to provide a single set of forecasts a NASA synthesis of the above studies was conducted. The services, associated forecast techniques, and data bases employed by both contractors were examined, those elements of each judged to be the most appropriate were selected, and new forecasts were made. The demand for voice, data, and video services was first forecast in fundamental units of call-seconds, bits/year, and channels, respectively. Transmission technology characteristics and capabilities were then forecast, and the fundamental demand converted to an equivalent transmission capacity. The potential demand for satellite-provided services was found to grow by a factor of 6, from 400 to 2400 equivalent 36 MHz satellite transponders over the 20-year period. About 80 percent of this was found to be more appropriate for trunking systems and 20 percent CPS.
Integrated electron content of ionosphere determined from measurements of polarization angle received from Syncom III transmissions, presenting mean diurnal variation
Microwave communications, discussing radio relay techniques, carrier telephony, satellite microwave communications, television, laser light wave communication, etc
Accomplishments of meteorological satellites and transmission of information from special sensors to the ground support system
The single factor that irrevocably distinguishes geostationary satellite telephony transmission from terrestrial transmission is the greater propagation delay over satellite links. This difference has always provoked vigorous debate over the impact of delay on the subscribers using services incorporating satellite links. The issue is addressed from a variety of directions including human factors studies, laboratory subjective tests that evaluate delay with and without echo, and field tests that obtain data on the opinion of subscribers regarding the quality of service of operational circuits in both national U.S. domestic and international trans-Atlantic network. The tests involved the use of both echo suppressors and echo cancellers.
Development of a forecast of the total domestic telecommunications demand, identification of that portion of the telecommunications demand suitable for transmission by satellite systems, identification of that portion of the satellite market addressable by CPS systems, identification of that portion of the satellite market addressable by Ka-band CPS system, and postulation of a Ka-band CPS network on a nationwide and local level were achieved. The approach employed included the use of a variety of forecasting models, a parametric cost model, a market distribution model and a network optimization model. Forecasts were developed for: 1980, 1990, 2000; voice, data and video services; terrestrial and satellite delivery modes; and C, Ku and Ka-bands.
During 1972 time transfer experiments were run between the U.S. Naval Observatory and the Royal Greenwich Observatory and, in 1973, between the U.S. Naval Observatory and the Division of National Mapping in Canberra, Australia. In both cases the time transfer agent was the TIMATION 2 satellite, 1969-82B. The satellite ephemerides were computed from data provided by the Defense Mapping Agency TRANET. This net tracked the satellite's Doppler transmissions. The phase of the satellite clock was determined from knowledge of the position of the satellite and of the observer and the computed distance between the two. By monitoring the clock on successive passes the rate of the satellite clock was determined at Washington. By again monitoring the satellite clock at the distant station the satellite clock could be compared to the local clock and this local clock compared to the U.S. Naval Observatory clocks. In 1972 the RMS of observations at Greenwich deviated by approximately 1/4 microsecond from a straight line when compared to the Naval Observatory. In 1973 the observation errors at Canberra were approximately half as great.
Mathematical data compression model for satellite measurement histogram transmission
As a result of a consortium of several industries and organizations, an economical, versatile, and stable data collection and transmission buoy has been designed, developed, and deployed to gather and transmit water quality data to a ground receiving station at three-minute intervals and to the earth resources technology satellite (ERTS) as it passes over the deployed buoy every 12 hours. The buoy system, designed for both fresh and salt water application, gathers data inclusive of temperature measurement, conductivity, relative acidity, dissolved oxygen, current speed, and direction. The mechanical design philosophy used to determine and satisfy boundary conditions involving stability, ease of deployment, servicing and maintenance, minimal manufacturing costs, and fresh and salt water installation capability is discussed. The development of peripheral handling equipment and anchoring systems is described.
During the 1970-1980 time period a substantial advance has been made in developing all portions of a microwave power transmission system for the solar power satellite (SPS). The most recent advances pertain to the transmitting portion of the system in the satellite and are based upon experimental observations of the use of the magnetron combined with a passive directional device to convert it into a highly efficient directional amplifier with excellent low-noise properties and potentially very long life. The ability of its microwave output to track a phase reference makes it possible to combine it with many other radiating units to provide a highly coherent microwave beam. The ability of its output to track an amplitude reference while operating from a dc power source with varying voltage makes it possible to eliminate most of the power conditioning equipment that would otherwise be necessary.
Optimization of satellite data acquisition & transmission techniques
Latitude and longitude grid additions to video picture onboard satellite - automatic picture transmission
The potential United States domestic telecommunications demand for satellite provided customer premises voice, data and video services through the year 2000 were forecast, so that this information on service demand would be available to aid in NASA program planning. To accomplish this overall purpose the following objectives were achieved: development of a forecast of the total domestic telecommunications demand, identification of that portion of the telecommunications demand suitable for transmission by satellite systems, identification of that portion of the satellite market addressable by Computer premises services systems, identification of that portion of the satellite market addressabble by Ka-band CPS system, and postulation of a Ka-band CPS network on a nationwide and local level. The approach employed included the use of a variety of forecasting models, a market distribution model and a network optimization model. Forecasts were developed for; 1980, 1990, and 2000; voice, data and video services; terrestrial and satellite delivery modes; and C, Ku and Ka-bands.