Search NASA⌕ Search

SEARCH · Search NASA

Results for “STS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

STS-105 Mission Highlights Resource Tape: Flight Days 10-13

A continuation of 'STS-105 Mission Highlights Resource Tape: Flight Days 1-3' (internal ID 2002046550), 'STS-105 Mission Highlights Resource Tape: Flight Days 4-6' (internal ID 2002046549), and 'STS-105 Mission Highlights Resource Tape: Flight Days 7-9' (internal ID 2002046552), this video shows footage from flight days 10 through 13 of the STS-105 mission. The Multipurpose Logistics Module (MPLM) is moved from the International Space Station (ISS) to the payload bay of Discovery. The STS-105 crew (Commander Scott Horowitz, Pilot Fred Sturckow, and Mission Specialists Dan Barry and Pat Forrester) and Expedition 2 crew (Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms) bid farewell to the Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov), who are to remain on ISS. ISS is seen against the Earth as Discovery performs its fly-around after the orbiter undocks. There is no flight day footage from flight day 12. Discovery is seen landing.

Source record↗

STS-105 Mission Highlights Resource Tape: Flight Days 1-3

An overview of the STS-105 mission is given through footage of each flight day. Scenes from flight days one through three show activities such as astronaut prelaunch procedures (breakfast, suit-up, and boarding Discovery), the launch from multiple vantage points, and various on-orbit activities. Expedition 3 (E3) Commander Frank Culbertson, Jr. and Flight Engineer Mikhail Turin perform the H-Reflex Experiment, an experiment to test the effects of microgravity on the human spinal cord. As Discovery approaches the International Space Station (ISS), the Expedition 2 (E2) crew, Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms, are seen working in the Destiny Laboratory Module aboard ISS. Discovery docks to the space station and the three crews (STS-105, E2, and E3) greet each other after the hatches between the orbiter and ISS are opened. As Discovery passes over the United States, Utah, Wyoming, South Dakota, and Minnesota are seen through patchy clouds. Footage from flight days 4-13 can be found on 'STS-105 Mission Highlights Resource Tape: Flight Days 4-6' (internal ID 2002046549), 'STS-105 Mission Highlights Resource Tape: Flight Days 7-9' (internal ID 2002046552), and 'STS-105 Mission Highlights Resource Tape: Flight Days 10-13' (internal ID 2002046551).

Source record↗

STS 110 Mission Highlights Resource Tape

A continuation of 'STS 110 Mission Highlights Resource Tape'. This video, Part 3 of 4, shows footage from flight days 6 through 9 of STS-110. The spacecrew includes Michael J. Bloomfield, Commander Stephen N. Frick, Pilot; Jerry L. Ross, Mission Specialist; Steven L. Smith, Mission Specialist; Ellen Ochoa, Mission Specialist; Lee M.E. Morin, Mission Specialist; Rex J. Walheim, Mission Specialist. On flight day 6, Ross and Morin conduct an EVA (extravehicular activity) to secure a tripod like strut to the S0 Truss of the International Space Station (ISS). They also move the drag link and keel pins from one face of the Truss to the other to free the rail on the truss for a railcar to move. Smith installs a camera onto the CANADARM robotic arm on flight day 7, and on flight day 8 the restraints are removed from the railcar connected to the S0 Truss in preparation for checkout. The checkout of the railcar is shown, including its inaugural run. Ross and Morin conduct another EVA on flight day 9 to complete the outfitting of the S0 Truss Structure. Notable footage includes views of Ross and Morin at work from the helmet-mounted camera on Ross' EVA suit, including close-ups of the pistol grip tool, CANADARM 2 onboard the ISS lit at sunrise, a 'diamond ring' effect formed by the Sun between the Earth's limb and the ISS, a brief shot of the Yucatan peninsula, and a end-to-end pan down the length of the ISS. The activities from other flights days can be seen on "STS 110 Mission Highlights Resource Tape" Part 1 of 4 (internal ID 2002137575), "STS 110 Mission Highlights Resource Tape" Part 2 of 4 (internal ID 2002137573), and "STS 110 Mission Highlights Resource Tape" Part 4 of 4 (internal ID 2002137517).

Source record↗

STS 110 Mission Highlights Resource Tape

A continuation of 'STS 110 Mission Highlights Resource Tape'. This video, Part 2 of 4, shows footage from flight days 3 through 5 of STS-110. The flight crew includes Michael J. Bloomfield, Commander; Stephen N. Frick, Pilot; Jerry L. Ross, Mission Specialist; Steven L. Smith, Mission Specialist; Ellen Ochoa, Mission Specialist; Lee M.E. Morin, Mission Specialist; Rex J. Walheim, Mission Specialist. The coverage from flight day 3 includes docking replays of Atlantis and the International Space Station (ISS), and postdocking procedures, as well as intermingling of the flight crew with the Expedition 4 crew (Yury I. Onufrienko, Commander; Daniel W. Bursch, Flight Engineer; Carl E. Walz, Flight Engineer) of the ISS. Flight day 4 includes an EVA (extravehicular activity) in which Walheim and Smith lift the S0 Truss from the payload bay, and temporarily clamp it onto the Destiny laboratory. On flight day 5 a suite of spaceborne experiments (not shown) arrives at Destiny, including protein crystal growth and wheat plant growth experiments. Notable footage includes Hawaii, New Zealand, and sunrise on Atlantis. An unknown object steaks across the field of view during the video, with the Earth in the background. The activities of the other flight days can be seen on 'STS 110 Mission Highlights Resource Tape, Part 1 of 4' (internal ID 2002137575), 'STS 110 Mission Highlights Resource Tape, Part 3 of 4' (internal ID 2002137574), and 'STS 110 Mission Highlights Resource Tape, Part 4 of 4' (internal ID 2002137517).

Source record↗

STS 110 Mission Highlights Resource Tape

A continuation of 'STS 110 Mission Highlights Resource Tape'. This video, Part 4 of 4, shows footage from flight days 10 through 12 of STS-110. The spacecrew includes Michael J. Bloomfield, Commander; Stephen N. Frick, Pilot; Jerry L. Ross, Mission Specialist; Steven L. Smith, Mission Specialist; Ellen Ochoa, Mission Specialist; Lee M.E. Morin, Mission Specialist; Rex J. Walheim, Mission Specialist. Flight day 10 includes an exchange of farewells with the Expedition 4 crew (Yury I. Onufrienko, Commander; Daniel W. Bursch, Flight Engineer; Carl E. Walz, Flight Engineer) of the International Space Station (ISS), and undocking. The video includes many views of the ISS as Atlantis departs, including cloud cover and the Earth's limb as backgrounds. There is also a view of Atlantis with its payload bay open. On flight day 11, in preparation for landing, the crew conducts a checkout of flight controls and a test firing. A spaceborne wheat plant experiment onboard the ISS is briefly shown. Flight day 12 includes closing the payload bay, suit-up, and landing. Kennedy Space Center is seen from the air, and the video shows landing replays, as well as a heads-up display view of the landing. Earth views include clear views of Western Sahara, Morocco, Mauritania, and Algeria, with the Atlantic Ocean, a cloud obstructed view of Newfoundland and the Atlantic, Pacific Ocean sun glint, and an excellent view of the Chicago area and Lake Michigan at night. The activities from other flights days can be seen on "STS 110 Mission Highlights Resource Tape" Part 1 of 4 (internal ID 2002137575), "STS 110 Mission Highlights Resource Tape" Part 2 of 4 (internal ID 2002137573), and "STS 110 Mission Highlights Resource Tape" Part 3 of 4 (internal ID 2002137574).

Source record↗

Summary Report of Mission Acceleration Measurements for STS-95

John H. Glenn's historic return to space was a primary focus of the STS-95 mission. The Hubble Space Telescope (HST) Orbital Systems Test (HOST). an STS-95 payload, was an in-flight demonstration of HST components to be installed during the next HST servicing mission. One of the components under evaluation was the cryocooler for the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). Based on concerns about vibrations from the operation of the NICMOS cryocooler affecting the overall HST line-of-sight requirements, the Space Acceleration Measurement System for Free-Flyers (SAMS-FF) was employed to measure the vibratory environment of the STS-95 mission, including any effects introduced by the NICMOS cryocooler. The STS-95 mission represents the first STS mission supported by SAMS-FF. Utilizing a Control and Data Acquisition Unit (CDU) and two triaxial sensor heads (TSH) mounted on the HOST support structure in Discovery's cargo bay, the SAMS-FF and the HOST project were able to make vibratory measurements both on-board the vibration-isolated NICMOS cryocooler and off-board the cryocooler mounting plate. By comparing the SAMS-FF measured vibrations on-board and off-board the NICMOS cryocooler, HST engineers could assess the cryocooler g-jitter effects on the HST line-of-sight requirements. The acceleration records from both SAMS-FF accelerometers were analyzed and significant features of the microgravity environment are detailed in this report.

McPherson, Kevin↗

Development of methodologies and procedures for identifying STS users and uses

A study was conducted to identify new uses and users of the new Space Transporation System (STS) within the domestic government sector. The study develops a series of analytical techniques and well-defined functions structured as an integrated planning process to assure efficient and meaningful use of the STS. The purpose of the study is to provide NASA with the following functions: (1) to realize efficient and economic use of the STS and other NASA capabilities, (2) to identify new users and uses of the STS, (3) to contribute to organized planning activities for both current and future programs, and (4) to air in analyzing uses of NASA's overall capabilities.

Archer, J. L.↗

Phase 2 STS new user development program. Volume 1: Executive summary

A methodology for developing new users for STS other than NASA and DoD, thereby maximizing the use of the STS system was developed. The approach to user development, reflected in the implementation plan, and attendant informational material to be used were evaluated by conducting a series of test cases with selected user organizations. These test case organizations were, in effect, used as consultants to evaluate the effectiveness, the needs, the completeness, and the adequacy of the user development approach and informational material. The selection of the test cases provided a variety of potential STS users covering industry, other government agencies, and the educational sector. The test cases covered various use areas and provided a mix of user organization types. A summary of the actual test cases conducted is given. The conduct of the test cases verified the general approach of the implementation plan, the validity of the user development strategy prepared for each test case organization and the effectiveness of the STS basic and user customized informational material.

Mcdowell, J. R.↗

STS pilot user development program

Full exploitation of the STS capabilities will be not only dependent on the extensive use of the STS for known space applications and research, but also on new, innovative ideas of use originating with both current and new users. In recognition of this, NASA has been engaged in a User Development Program for the STS. The program began with four small studies. Each study addressed a separate sector of potential new users to identify techniques and methodologies for user development. The collective results established that a user development function was not only feasible, but necessary for NASA to realize the full potential of the STS. This final report begins with a description of the overall pilot program plan, which involved five specific tasks defined in the contract Statement of Work. Each task is then discussed separately; but two subjects, the development of principal investigators and space processing users, are discussed separately for improved continuity of thought. These discussions are followed by a summary of the primary results and conclusions of the Pilot User Development Program. Specific recommendations of the study are given.

Mcdowell, J. R.↗

STS-1 operational flight profile. Volume 4: Onorbit profile-cycle 3.1.1

The orbital flight test (OFT) phase of the shuttle program consists of four orbital flights beginning in November 1980and continuing through 1981. The major purpose of the OFT program is to demonstrate and verify shuttle systems and flight capabilities by satisfying the OFT requirements, is presented. The onorbit portion of the operational flight profile (OFP) for the first Space Transportation System-1 (STS-1) flight is presented. This onorbit document (volume 4) is one in a series that, taken together, will define the STS-1 OFP. This OFP onorbit document represents a combination of the STS-1 ground rules and constraints and the initialization data. The STS-1 flight activities described reflect the trajectory, consumable, crew activity, and flight requirement baseline as of May 1, 1980. Flight plans for the ascent, onorbit, and descent phases of the test flight are presented.

Source record↗

Ambitious STS-7 mission to feature first landing at Kennedy

The STS-7 press briefing schedule, NASA select television schedule; launch preparations, countdown and liftoff; major countdown milestones; launch window; STS-7 flight sequence of events, landing timeline; STS-7 flight timeline; landing and post landing operations; flight objectives; Telesat's ANIK-C 2; PALAPA-B; STS-7 experiments; and spacecraft tracking and data network are presented.

Garrett, D.↗

The development of STS payload environmental engineering standards

The presently reported effort to provide a single set of standards for the design, analysis and testing of Space Transportation System (STS) payloads throughout the NASA organization must be viewed as essentially experimental, since the concept of incorporating the diverse opinions and experiences of several separate field research centers may in retrospect be judged too ambitious or perhaps even naive. While each STS payload may have unique characteristics, and the project should formulate its own criteria for environmental design, testing and evaluation, a reference source document providing coordinated standards is expected to minimize the duplication of effort and limit random divergence of practices among the various NASA payload programs. These standards would provide useful information to all potential STS users, and offer a degree of standardization to STS users outside the NASA organization.

Bangs, W. F.↗

Modulated beam injection from the Space Shuttle during magnetic conjunctions of STS 3 with the DE 1 satellite

An electron beam emitted from the Office of Space Sciences 1 pallet on STS 3 was pulsed with specially designed very low frequency (VLF) formats in an attempt to generate whistler mode waves. Modulated operations of the beam emitted by a fast pulse electron generator (FPEG) were initiated during times of magnetic conjunctions between STS 3 and the high-altitude DE 1 satellite equipped with broadband VLF receivers. Coordinated FPEG/VLF modulation and DE 1 wideband data acquisition were achieved in 12 different cases. No evidence of any waves generated by FPEG were detected on the DE 1 analog wideband data. However, it is shown that in all of the cases, either the STS 3 attitude was such that the emitted electrons struck the main body of the vehicle, or it was not possible for whistler mode waves to propagate from the STS 3 location up to the vicinity of the DE 1 satellite.

Inan, U. S.↗

Atmospheric environment for Space Shuttle (STS-41G) launch

Selected atmospheric conditions that were observed near Space Shuttle STS-41G launch time on October 5, 1984 at Kennedy Space Center in Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual obsrvations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere-measured vertical wind profiles is given. The final atmospheric tape consisting of wind and thermodynamic parameters versus altitude for STS-41G vehicle ascent was constructed. The STS-41G ascent atmospheric data tape was constructed. The STS-41G ascent atmospheric data tape was constructed by Marshall Space Flight Center's Atmospheric Sciences Division to provide an internally consistent data set for use in post flight performance assessments.

Johnson, D. L.↗

Evaluate the application of modal test and analysis processes to structural fault detection in MSFC - STS project elements

The Space Transportation System (STS) is a complex and expensive flight system intended to carry unique payloads into low Earth orbit and return. A catastrophic failure, such as STS 51-L, resulted in the loss of both human life as well as expensive and unique hardware. The impact of this incident reaffirms the need to do everything possible to ensure the integrity and reliability of STS. One means of achieving this goal is to expand the number of inspection technologies available. Reported here is the evaluation of the use of modal analysis and test techniques for the purpose of assessing the structural integrity of STS components for which Marshall Space Flight Center has responsibility. This entailed reviewing existing literature and developing a low-level experimental program determine the feasibility of using this technology for structural fault detection.

Springer, William T.↗

Atmospheric environment for Space Shuttle (STS-27) launch

Selected articles on atmospheric conditions observed near Space Shuttle STS-27 launch time on December 2, 1988, at Kennedy Space Center, Florida are summarized. STS-27 carried a Department of Defense payload and the flight azimuth in this report will be denoted by reference flight azimuth, since the actual flight azimuth is not known. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of pre-launch Jimsphere-measured vertical wind profiles is given. The final atmospheric tape, which consists of wind and thermodynamic parameters versus altitude, for STS-27 vehicle ascent was constructed. The STS-27 ascent atmospheric data tape was constructed by Marshall Space Flight Center's Earth Science and Applications Division to provide an internally consistent data set for use in post-flight performance assessments.

Jasper, G. L.↗

STS payload design load evolution

Payload development and design load requirements for the U.S. National Space Transportation System (STS) are discussed. The STS requires that all payloads be compatible with STS verification loads which are calculated approximately one year prior to launch. Payload design and all verification testing are completed prior to this final load cycle. Various approaches to preliminary design loads, load updates, and test load definitions and also to STS model and forcing functions revisions are presented.

Hamilton, David A.↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Volume 1: Executive summary

The feasibility of replacing the Space Transportation System (STS) Solid Rocket Boosters (SRBs) with Liquid Rocket Boosters (LRBs) was studied. Feasibility required acceptable technical risk, program costs, and a program plan which supports STS requirements. Three major goals were identified to direct booster design and operation: increased STS safety and reliability; STS/LRB integration with minimum impact; and increased STS performance. Two booster engine designs were studied. The first engine design was a turbopump-fed engine with state-of-the-art design, and the second was a pressure-fed engine which might provide a lower cost alternative to the pump-fed concept. Both booster concepts were carried through to completion of conceptual design and all system impacts and program costs were identified. Applications for LRB use in the Advanced Launch System (ALS) program were studied using the pump-fed LRB baseline concept and variations on the baseline concept. Support for the Pressure-Fed Booster Test Bed (PFBTB) included test program planning and costs and technical support.

Source record↗