Search NASA⌕ Search

SEARCH · Search NASA

Results for “Sample Receiving Facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Investigation of Tank 241-AN-101 Floating Solids

Tank 241-AN-101 is the receiver tank for retrieval of several C-Farms waste tanks, including Tanks 241-C-102 and 241-C-111. Tank 241 C 111 received first-cycle decontamination waste from the bismuth phosphate process and Plutonium and Uranium Extraction cladding waste, as well as hydraulic fluid. Three grab samples, 1AN-16-01, 1AN-16-01A, and 1AN-16-01B, were collected at the surface of Tank 241-AN-101 on April 25, 2016, after Tank 241-C-111 retrieval was completed. Floating solids were observed in the three grab samples in the 11A hot cell after the samples were received at the 222-S Laboratory. Routine chemical analyses, solid phase characterization on the floating and settled solids, semivolatile organic analysis mainly on the aqueous phase for identification of degradation products of hydraulic fluids were performed. Investigation of the floating solids is reported.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results For The Third Quarter Calendar Year 2016 Tank 50H Salt Solution Sample

In this memorandum, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2016 (CY16) sample of Tank 50H salt solution are presented in tabulated form. The Third Quarter CY16 Tank 50H samples (a 200 mL sample obtained 6” below the surface (HTF-5-16-63) and a 1 L sample obtained 66” from the tank bottom (HTF-50-16-64)) were obtained on July 14, 2016 and received at Savannah River National Laboratory (SRNL) on the same day. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours, and the samples were pulled immediately after pump shut down. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Third Quarter CY16 sampling of Tank 50H were requested by Savannah River Remediation (SRR) personnel and details of the testing are presented in the SRNL TTQAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cleanup Verification Package for the 118-F-5 PNL Sawdust Pit

This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-5 Burial Ground, the PNL (Pacific Northwest Laboratory) Sawdust Pit. The 118-F-5 Burial Ground was an unlined trench that received radioactive sawdust from the floors of animal pens in the 100-F Experimental Animal Farm.

100-F Experimental Animal Farm↗

Development of a direct-sampling RF receiver for precision beam charge measurements in the MOLLER experiment

Here, we have developed and tested a direct-sampling RF receiver capable of measuring the amplitude of a 1497 MHz sinusoidal beam signal in 0.5 ms integration windows with a relative uncertainty of better than 10 parts per million. The receiver is intended for measuring signals from beam current monitoring cavities on the beamline of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The beam signal strength, frequency, and integration window fulfill the thus far unmet requirements of the upcoming MOLLER experiment to measure the beam charge for different helicity states.

47 OTHER INSTRUMENTATION↗

Improved Acquisition and Reconstruction for Wavelength-Resolved Neutron Tomography

Wavelength-resolved neutron tomography (WRNT) is an emerging technique for characterizing samples relevant to the materials sciences in 3D. WRNT studies can be carried out at beam lines in spallation neutron or reactor-based user facilities. Because of the limited availability of experimental time, potential imperfections in the neutron source, or constraints placed on the acquisition time by the type of sample, the data can be extremely noisy resulting in tomographic reconstructions with significant artifacts when standard reconstruction algorithms are used. Furthermore, making a full tomographic measurement even with a low signal-to-noise ratio can take several days, resulting in a long wait time before the user can receive feedback from the experiment when traditional acquisition protocols are used. In this paper, we propose an interlaced scanning technique and combine it with a model-based image reconstruction algorithm to produce high-quality WRNT reconstructions concurrent with the measurements being made. The interlaced scan is designed to acquire data so that successive measurements are more diverse in contrast to typical sequential scanning protocols. The model-based reconstruction algorithm combines a data-fidelity term with a regularization term to formulate the wavelength-resolved reconstruction as minimizing a high-dimensional cost-function. Using an experimental dataset of a magnetite sample acquired over a span of about two days, we demonstrate that our technique can produce high-quality reconstructions even during the experiment compared to traditional acquisition and reconstruction techniques. In summary, the combination of the proposed acquisition strategy with an advanced reconstruction algorithm provides a novel guideline for designing WRNT systems at user facilities.

47 OTHER INSTRUMENTATION↗

Analytical Results Of MOX Colemanite Concrete Sample PBC-44.2

The Mixed Oxide Fuel Fabrication Facility (MFFF) will use colemanite bearing concrete neutron absorber panels credited with attenuating neutron flux in the criticality design analyses and shielding operators from radiation. The Savannah River National Laboratory is tasked with measuring the total density, partial hydrogen density, and partial boron density of the colemanite concrete. Sample PBC-44.2 was received on 9/20/2012 and analyzed. The average total density measured by the ASTM method C 642 was 2.03 g/cm 3 , within the lower bound of 1.88 g/cm 3 . The average partial hydrogen density was 6.64E-02 g/cm 3 as measured using method ASTM E 1311 and met the lower bound of 6.04E-02 g/cm 3 . The average measured partial boron density was 1.97E-01 g/cm 3 which met the lower bound of 1.65E-01 g/cm 3 measured by the ASTM C 1301 method.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analytical Results of MOX Colemanite Concrete Samples Poured August 29, 2012

The Mixed Oxide Fuel Fabrication Facility (MFFF) will use colemanite bearing concrete neutron absorber panels credited with attenuating neutron flux in the criticality design analyses and shielding operators from radiation. The Savannah River National Laboratory is tasked with measuring the total density, partial hydrogen density, and partial boron density of the colemanite concrete. Samples poured 8/29/12 were received on 9/20/2012 and analyzed. The average total density of each of the samples measured by the ASTM method C 642 was within the lower bound of 1.88 g/cm 3 . The average partial hydrogen density of samples 8.6.1, 8.7.1, and 8.5.3 as measured using method ASTM E 1311 met the lower bound of 6.04E-02 g/cm 3 . The average measured partial boron density of each sample met the lower bound of 1.65E-01 g/cm 3 measured by the ASTM C 1301 method. The average partial hydrogen density of samples 8.5.1, 8.6.3, and 8.7.3 did not meet the lower bound. The samples, as received, were not wrapped in a moist towel as previous samples and appeared to be somewhat drier. This may explain the lower hydrogen partial density with respect to previous samples.

36 MATERIALS SCIENCE↗

Analytical Results of MOX Colemanite Concrete Samples Poured August 29, 2012

The Mixed Oxide Fuel Fabrication Facility (MFFF) will use colemanite bearing concrete neutron absorber panels credited with attenuating neutron flux in the criticality design analyses and shielding operators from radiation. The Savannah River National Laboratory is tasked with measuring the total density, partial hydrogen density, and partial boron density of the colemanite concrete. Samples poured 8/29/12 were received on 9/20/2012 and analyzed. The average total density of each of the samples measured by the ASTM method C 642 was within the lower bound of 1.88 g/cm 3 . The average partial hydrogen density of samples 8.6.1, 8.7.1, and 8.5.3 as measured using method ASTM E 1311 met the lower bound of 6.04E-02 g/cm 3 . The average measured partial boron density of each sample met the lower bound of 1.65E-01 g/cm 3 measured by the ASTM C 1301 method. The average partial hydrogen density of samples 8.5.1, 8.6.3, and 8.7.3 did not meet the lower bound. The samples, as received, were not wrapped in a moist towel as previous samples and appeared to be somewhat drier. This may explain the lower hydrogen partial density with respect to previous samples.

36 MATERIALS SCIENCE↗

Analytical Results of MOX Colemanite Concrete Sample PBC-44.2

The Mixed Oxide Fuel Fabrication Facility (MFFF) will use colemanite bearing concrete neutron absorber panels credited with attenuating neutron flux in the criticality design analyses and shielding operators from radiation. The Savannah River National Laboratory is tasked with measuring the total density, partial hydrogen density, and partial boron density of the colemanite concrete. Sample PBC-44.2 was received on 9/20/2012 and analyzed. The average total density measured by the ASTM method C 642 was 2.03 g/cm 3 , within the lower bound of 1.88 g/cm3. The average partial hydrogen density was 6.64E-02 g/cm 3 as measured using method ASTM E 1311 and met the lower bound of 6.04E-02 g/cm 3 . The average measured partial boron density was 1.70E-01 g/cm 3 which met the lower bound of 1.65E-01 g/cm 3 measured by the ASTM C 1301 method.

36 MATERIALS SCIENCE↗

Remaining Sites Verification Package for the 116-C-3, 105-C Chemical Waste Tanks, Waste Site Reclassification Form 2008-002

The 116-C-3 waste site consisted of two underground storage tanks designed to receive mixed waste from the 105-C Reactor Metals Examination Facility chemical dejacketing process. Confirmatory evaluation and subsequent characterization of the site determined that the southern tank contained approximately 34,000 L (9,000 gal) of dejacketing wastes, and that the northern tank was unused. In accordance with this evaluation, the verification sampling and modeling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrate that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also show that residual contaminant concentrations are protective of groundwater and the Columbia River.

100B/C Area↗

Tank Side Cesium Removal for Hanford Tank Waste - Actual Waste Demonstrations - 20467

The US DOE and its contractors are evaluating several options for treating Hanford tank supernate streams to provide feed for the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant. At this time, the intent is to deploy a Tank-Side Cesium Removal system. The key unit operations for this process are filtration and cesium removal by ion exchange. To assess the anticipated performance of the system, tests with actual waste were performed with samples from Hanford tanks AW-102 and AP-107 to provide basis data regarding the performance of the system in treating these materials. The decanted supernate waste samples from tanks AW-102 and AP-107 were received directly by the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. These samples were then filtered to provide data on dead-end filtration with a Mott{sup TM} filter media grade 5. Subsequently, the samples were run through 10-milliliter ion exchange columns containing crystalline silicotitanate to assess the dynamic ion exchange performance of these feeds. Test results demonstrated that the planned TSCR operations should meet process performance expectations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical results of MOX colemanite concrete sample poured may 4, 2012

The Mixed Oxide Fuel Fabrication Facility (MFFF) will use Colemanite bearing concrete neutron absorber panels credited with attenuating neutron flux in the criticality design analyses. The Savannah River National Laboratory is tasked with measuring the total density, partial hydrogen density, and partial boron density of the colemanite concrete. Sample 04 May 12/Test/S1-1, S1-2, and S1-3 was received on 5/9/2012 and analyzed. The total density measure by the ASTM method C 642 was 2.00 g/cm 3 , within the lower bound of 1.88 g/cm 3 . The partial hydrogen density of 6.35E-02 g/cm 3 as measured using method ASTM E 1311 met the lower bound of 6.04E-02 g/cm 3 . The measured partial boron density of 1.88E-01 g/cm{sup 3} exceeded the lower bound of 1.65E-01 g/cm{sup 3} when the sodium peroxide fusion dissolution method was used in place of the prescribed ASTM C 1301 method.

08 HYDROGEN↗

Evaluation of Naturally Occurring Be-7 Activity on LANL Stack Filter Clumps

Los Alamos National Laboratory (LANL) is responsible for providing solutions to challenging issues through multidisciplinary science, engineering, and technology that impact national security. As part of the Radioactive Air Emissions Management (RAEM) Team, it is our responsibility to ensure LANL operates within the requirements of the Code of Federal Regulations 40 CFR 61, Subpart H, National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities (Rad-NESHAP). The standard states, “Emissions of radionuclides to the ambient air from Department of Energy facilities shall not exceed those amounts that would cause any member of the public to receive in any year an effective dose equivalent of 10 mrem/yr” (EPA, 2002) During a routine assessment of LANL’s Rad-NESHAP compliance program, an opportunity for improvement was identified that addresses the evaluation of routine stack samples which potentially have naturally occurring radioactive materials (NORM) on the filter media. In the past and based on professional judgment, detections of NORM such as K-40 and Be-7 typically were rejected from the analytical results. The assessment finding suggested developing a technical criterion to ensure that such rejections were justified, comparing actual measured values with anticipated NORM concentrations for various stacks located at LANL. The significance of accepting or rejecting samples as “true” or “NORM” and its impact on the RAEM’s mission and compliance to the regulations is explained later in the document. Additionally, this document will describe the process and calculations for how such results are to be accepted as actual samples “true positive” or rejected as NORM.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Test Bed: Treatability of Hanford Tank Waste - 18501

In an effort to advance the Low Activity Waste Pretreatment System technology readiness level at the Hanford Site, the effectiveness of a critical technology element, sRF ion-exchange resin, was demonstrated in the selective removal of Cs-137 from 11.5 L of composited Hanford supernate tank waste. Prior to ion-exchange, solids filtration was performed on the tank waste composite. Between the time of filtrate collection and filtrate processing on the ion-exchange columns, additional solids had formed. These secondary solids resulted from the combination of supernates high in fluoride content with supernates high in phosphate content and the relatively short blend time. Samples were collected before, during and after the ion-exchange process for characterization of a full suite of constituents (inorganic, organic, and radionuclides) to aid in the classification of the cesium-removed waste for shipping, receiving, treatment, and disposal determinations. Following chemical analysis, the remaining 10.8 L (2.9 gal) of cesium-depleted waste was shipped to an off-site vendor for grout-encapsulation and eventual disposal at the Waste Control Specialists Federal Waste Disposal Facility in Andrews, Texas as low-level waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada Test Site 2007 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2007 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2007a; 2008; Warren and Grossman, 2008). Direct radiation monitoring data indicate exposure levels at the RWMSs are at background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. A single gamma spectroscopy measurement for cesium was slightly above the minimum detectable concentration, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. The measured levels of radionuclides in air particulates are below derived concentration guides for these radionuclides. Radon flux from waste covers is well below regulatory limits. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 136.8 millimeters (mm) (5.39 inches [in.]) of precipitation at the Area 3 RWMS during 2007 is 13 percent below the average of 158.1 mm (6.22 in.), and the 123.8 mm (4.87 in.) of precipitation at the Area 5 RWMS during 2007 is 6 percent below the average of 130.7 mm (5.15 in.). Soil-gas tritium monitoring at borehole GCD-05U continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward movement percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Data from the automated vadose zone monitoring system for the operational waste pit covers show that evaporation continues to slowly remove soil moisture that came from the heavy precipitation in the fall of 2004 and the spring of 2005. The vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS effectively removes moisture from the cover by evapotranspiration. During 2007, there was no drainage through 2.4 meters (8 feet) of soil from the Area 3 drainage lysimeters that received only natural precipitation or were vegetated but water drained from the bare-soil Area 3 drainage lysimeter that received 3 times natural precipitation. Elevated tritium levels in plants and animals sampled from the Area 3 and Area 5 RWMSs show tritium uptake by the biota, but the low levels of other radionuclides do not suggest that there has been intrusion into the waste. All 2007 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada Test Site 2009 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2009 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NTS. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. All gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below the minimum detectable concentrations, and concentrations of americium and plutonium are only slightly above detection limits. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. Radon flux from waste covers is well below regulatory limits. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 87.6 millimeters (mm) (3.45 inches [in.]) of precipitation at the Area 3 RWMS during 2009 is 43 percent below the average of 152.4 mm (6.00 in.), and the 62.7 mm (2.47 in.) of precipitation at the Area 5 RWMS during 2009 is 49 percent below the average of 122.5 mm (4.82 in.). Soil-gas tritium monitoring at borehole GCD-05 continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Data from the automated vadose zone monitoring system for the operational waste pit covers show that moisture from precipitation did not percolate below 90 centimeters (cm) (3 feet [ft]) before being removed by evaporation. Moisture from precipitation did not percolate below 30 cm (1 ft) in the vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS before being removed by evapotranspiration. During 2009, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation or were vegetated, but water drained from the bare-soil Area 3 drainage lysimeter that received 3 times natural precipitation. Elevated tritium levels in plants and animals sampled from the Area 3 and Area 5 RWMSs show tritium uptake by the biota, but the low levels of other radionuclides do not indicate that there has been biota intrusion into the waste. All 2009 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical Results of MOX Colemanite Concrete Sample Poured July 25, 2012 -- Cured 28 Days

The Mixed Oxide Fuel Fabrication Facility (MFFF) will use Colemanite bearing concrete neutron absorber panels credited with attenuating neutron flux in the criticality design analyses and shielding operators from radiation. The Savannah River National Laboratory is tasked with measuring the total density, partial hydrogen density, and partial boron density of the colemanite concrete. Samples 8.1.2, 8.2.2, 8.3.2, and 8.4.2 were received on 8/1/2012 and analyzed after curing for 28 days. The average total density measured by the ASTM method C 642 was 2.09 g/cm 3 , within the lower bound of 1.88 g/cm 3 . The average partial hydrogen density was 7.48E-02 g/cm 3 as measured using method ASTM E 1311 and met the lower bound of 6.04E-02 g/cm 3 . The average measured partial boron density was 1.71E-01 g/cm 3 which met the lower bound of 1.65E-01 g/cm 3 measured by the ASTM C 1301 method.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗