Search NASA⌕ Search

SEARCH · Search NASA

Results for “Security Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Creating Continuous Integration Infrastructure for Software Development on U.S. Department of Energy High-Performance Computing Systems

The Exascale Computing Project (ECP) software deployment effort developed and advanced DevOps capabilities. One goal was to enable robust continuous integration (CI) workflows that span the protected high performance computing (HPC) environments found within many of the Department of Energy’s (DOE) national laboratories. This article highlights several challenges encountered with enabling automation, such as charging models for CI jobs, and meeting individualized security requirements that revolve around strongly associating running code with a human identity. Here, it also describes how the Jacamar CI tool evolved to meet latter requirements and became a key aspect of the solutions currently offered. Derived from this experience, we offer a conceptual framework for understanding current and future CI challenges at DOE facilities and offer suggestions for long-term solutions.

97 MATHEMATICS AND COMPUTING↗

Secure Cryptographic Key Management System (CKMS) Considerations for Smart Grid Devices

In this paper, we examine some unique challenges associated with key management in the Smart Grid and concomitant research initiatives: 1) effectively model security requirements and their implementations, and 2) manage keys and key distribution for very large scale deployments such as Smart Meters over a long period of performance. This will set the stage to: 3) develop innovative, low cost methods to protect keying material, and 4) provide high assurance authentication services. We will present our perspective on key management and will discuss some key issues within the life cycle of a cryptographic key designed to achieve the following: 1) control systems designed, installed, operated, and maintained to survive an intentional cyber assault with no loss of critical function, and 2) widespread implementation of methods for secure communication between remote access devices and control centers that are scalable and cost-effective to deploy.

99 GENERAL AND MISCELLANEOUS↗

Security Licensing Basis Framework Development

This report summarizes a technology-inclusive and performance-based method to determine the physical security licensing basis for a commercial nuclear reactor under the proposed 10 CFR 73.100 for Part 53 licensees. The method focuses on the identification of security functions, the contributing security systems and programs to meet those functions, the identification of security events that will provide the foundation for the security licensing basis and includes a risk-informed performance-based defense in depth adequacy method. The method can also be employed to justify performance-based alternative measures to traditional security requirements found in 10 CFR 73.55.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

Utilization of GIS technology to support development of flow and contaminant fate and transport models at US DOE sites - 15457

U.S. Department of Energy (DOE) sites have accumulated years of data and millions of spatial and temporal records related to the hydrological cycle, contaminant transport, and parameters of remediation technologies. In addition, numerical models which use field monitoring data to help understand flow and transport produce gigabytes of computed spatial and temporal data for each computation node. There is a need therefore for an advanced spatial data structure that can be used to address the management, processing, and analysis of spatial and temporal numerical modeling data derived from multiple sources. This can be accomplished using a geo-database. The development of an ArcSDE geo-database facilitates the centralized storage, backup, accessibility, organization, and management of model configuration and computed simulation data, putting it into a structured, coherent, and logical computer-supported system. GIS data processing and automation would enable faster and hence more complex analyses of field test data. The Applied Research Center (ARC) at Florida International University (FIU) has provided analysis of flow and transport for several watersheds at DOE's Oak Ridge Reservation (ORR), including East Fork Poplar Creek (EFPC), Upper EFPC in the Y-12 National Security Complex area (Y-12 NSC) and White Oak Creek (WOC). Integrated surface and subsurface flow, fate and transport models were developed to provide analysis of contaminant patterns within each watershed. In addition, digital monitoring data available from the Oak Ridge Environmental Information System (OREIS) related to mercury (Hg) contamination and remediation within these watersheds was used for calibration and verification of the model. Experimental studies were also carried out which provided kinetic and equilibrium data about important parameters related to Hg transport, speciation and methylation/demethylation kinetics within the watershed. Geographic Information Systems (GIS) technology was employed to support the modeling work through storage and geo-processing of spatial and temporal data required by the models and to produce hydrogeological maps for visualization. An ArcGIS geo-database was developed for centralized storage and management of experimental and computed model data and its capabilities were extended over the years using tools such as ModelBuilder combined with Python scripting to automate repetitive tasks, perform statistical analyses and generate maps and reports. The hydrologic geo-database model developed possesses a structure that enables linkage with scalable hydrologic modeling tools/applications to model hydrologic systems, and in this case, enables the testing of the potential impacts of various remediation scenarios on the ORR watersheds. The ArcSDE geo-database can also be used to automate and simplify the process of calling stored GIS and time series data. This geo-database can serve as a tool for contaminant flow and transport analyses which require large amounts of high-quality spatial and temporal data in order to ensure reliability and validity of modeling results. The existing geo-database structure developed for the hydrological modeling at ORR was designed to be replicable for application at other DOE sites. An investigation of downloadable free/open source GIS software along with required security protocols to facilitate online querying of the database was also conducted to determine methods by which project-derived data can be more easily shared with other project stakeholders such as DOE personnel and site contractors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dual-Doppler Feasibility Study

When two or more Doppler weather radar systems are monitoring the same region, the Doppler velocities can be combined to form a three-dimensional (3-D) wind vector field thus providing for a more intuitive analysis of the wind field. A real-time display of the 3-D winds can assist forecasters in predicting the onset of convection and severe weather. The data can also be used to initialize local numerical weather prediction models. Two operational Doppler Radar systems are in the vicinity of Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS); these systems are operated by the 45th Space Wing (45 SW) and the National Weather Service Melbourne, Fla. (NWS MLB). Dual-Doppler applications were considered by the 45 SW in choosing the site for the new radar. Accordingly, the 45th Weather Squadron (45 WS), NWS MLB and the National Aeronautics and Space Administration tasked the Applied Meteorology Unit (AMU) to investigate the feasibility of establishing dual-Doppler capability using the two existing systems. This study investigated technical, hardware, and software requirements necessary to enable the establishment of a dual-Doppler capability. Review of the available literature pertaining to the dual-Doppler technique and consultation with experts revealed that the physical locations and resulting beam crossing angles of the 45 SW and NWS MLB radars make them ideally suited for a dual-Doppler capability. The dual-Doppler equations were derived to facilitate complete understanding of dual-Doppler synthesis; to determine the technical information requirements; and to determine the components of wind velocity from the equation of continuity and radial velocity data collected by the two Doppler radars. Analysis confirmed the suitability of the existing systems to provide the desired capability. In addition, it is possible that both 45 SW radar data and Terminal Doppler Weather Radar data from Orlando International Airport could be used to alleviate any radar geometry issues at the NWS MLB radar, such as the "cone of silence" or beam blockage. In the event of a radar outage at one of the sites, the multi-radar algorithms would provide continuing coverage of the area through use of the data from the remaining operational radar sites. There are several options to collect, edit, synthesize and display dual-Doppler data sets. These options include commercial packages available for purchase and a variety of freeware packages available from the National Center for Atmospheric Research (NCAR) for processing raw radar data. However, evaluation of the freeware packages revealed that they do not have sufficient documentation and configuration control to be certified for 45 SW use. Additionally, a TI data line must be installed/leased from the NWS MLB office and CCAFS to enable the receipt of NWS MLB raw radar data to use in the dual-Doppler synthesis. Integration of the TI data line into the Eastern Range infrastructure that will meet the security requirements necessary for 45 SW use is time-consuming and costly. Overall evaluation indicates that establishment of the dual-Doppler capability using the existing operational radar systems is desirable and feasible with no technical concerns. Installation of such a system represents a significant enhancement to forecasting capabilities at the 45 WS and at NWS MLB. However, data security and cost considerations must be evaluated in light of current budgetary constraints. In any case, gaining the dual-Doppler capability will provide opportunities for better visualization of the wind field and better forecasting of the onset of convection and severe weather events to support space launch operations at KSC and CCAFS.

Huddleston, Lisa L.↗

Review of Prior U.S. Attribute Measurement Systems

Attribute Measurement Systems have been developed and demonstrated several times in the United States over the last decade or so; under the Trilateral Initiative (1996-2002), FMTTD (Fissile Material Transparency Technology Demonstration, 2000), and NG-AMS (Next Generation Attribute Measurement System, 2005-2008). Each Attribute Measurement System has contributed to the growing body of knowledge regarding the use of such systems in warhead dismantlement and other Arms Control scenarios. The Trilateral Initiative, besides developing prototype hardware/software, introduced the topic to the international community. The 'trilateral' parties included the United States, the Russian Federation, and the International Atomic Energy Agency (IAEA). With the participation of a Russian delegation, the FMTTD demonstrated that measurements behind an information barrier are feasible while meeting host party security requirements. The NG-AMS system explored the consequences of maximizing the use of Commercial off the Shelf (COTS) equipment, which made construction easier, but authentication harder. The 3rd Generation Attribute Measurement System (3G-AMS) will further the scope of previous systems by including additional attributes and more rigor in authentication.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modernization of the Cassini Ground System

The Cassini Spacecraft and its ground system have been operational for over 16 years. Modernization presents several challenges due to the personnel, processes, and tools already invested and embedded into the current ground system structure. Every mission's ground system has its own unique complexities and challenges, involving various organizational units. As any mission from its inception to its execution, schedules are always tight. This forces GDS engineers to implement a working ground system that is not necessarily fully optimized. Ground system challenges increase as technology evolves and cyber threats become more sophisticated. Cassini's main challenges were due to its ground system existing before many security requirements were levied on the multi-mission tools and networks. This caused a domino effect on Cassini GDS tools that relied on outdated technological features. In the aerospace industry reliable and established technology is preferred over innovative yet less proven technology. Loss of data for a spacecraft mission can be catastrophic; therefore, there is a reluctance to make changes and updates to the ground system. Nevertheless, all missions and associated teams face the need to modernize their processes and tools. Systems development methods from well-known system analysis and design principles can be applied to many missions' ground systems. Modernization should always be considered, but should be done in such a way that it does not affect flexibility nor interfere with established practices. Cassini has accomplished a secure and efficient ground data system through periodic updates. The obstacles faced while performing the modernization of the Cassini ground system will be outlined, as well as the advantages and challenges that were encountered.

Razo, Gus↗

Modernization of the Cassini Ground System

The Cassini Spacecraft and its ground system have been operational for over 16 years. Modernization presents several challenges due to the personnel, processes, and tools already invested and embedded into the current ground system structure. Every mission's ground system has its own unique complexities and challenges, involving various organizational units. As any mission from its inception to its execution, schedules are always tight. This forces GDS engineers to implement a working ground system that is not necessarily fully optimized. Ground system challenges increase as technology evolves and cyber threats become more sophisticated. Cassini's main challenges were due to its ground system existing before many security requirements were levied on the multi-mission tools and networks. This caused a domino effect on Cassini GDS tools that relied on outdated technological features. In the aerospace industry reliable and established technology is preferred over innovative yet less proven technology. Loss of data for a spacecraft mission can be catastrophic; therefore, there is a reluctance to make changes and updates to the ground system. Nevertheless, all missions and associated teams face the need to modernize their processes and tools. Systems development methods from well-known system analysis and design principles can be applied to many missions' ground systems. Modernization should always be considered, but should be done in such a way that it does not affect flexibility nor interfere with established practices. Cassini has accomplished a secure and efficient ground data system through periodic updates. The obstacles faced while performing the modernization of the Cassini ground system will be outlined, as well as the advantages and challenges that were encountered.

Razo, Gus↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Offload NIC for NASA, NLR, and Grid Computing

This work addresses distributed data management and access dynamically configurable high-speed access to data distributed and shared over wide-area high-speed network environments. An offload engine NIC (network interface card) is proposed that scales at nX10-Gbps increments through 100-Gbps full duplex. The Globus de facto standard was used in projects requiring secure, robust, high-speed bulk data transport. Novel extension mechanisms were derived that will combine these technologies for use by GridFTP, bandwidth management resources, and host CPU (central processing unit) acceleration. The result will be wire-rate encrypted Globus grid data transactions through offload for splintering, encryption, and compression. As the need for greater network bandwidth increases, there is an inherent need for faster CPUs. The best way to accelerate CPUs is through a network acceleration engine. Grid computing data transfers for the Globus tool set did not have wire-rate encryption or compression. Existing technology cannot keep pace with the greater bandwidths of backplane and network connections. Present offload engines with ports to Ethernet are 32 to 40 Gbps f-d at best. The best of ultra-high-speed offload engines use expensive ASICs (application specific integrated circuits) or NPUs (network processing units). The present state of the art also includes bonding and the use of multiple NICs that are also in the planning stages for future portability to ASICs and software to accommodate data rates at 100 Gbps. The remaining industry solutions are for carrier-grade equipment manufacturers, with costly line cards having multiples of 10-Gbps ports, or 100-Gbps ports such as CFP modules that interface to costly ASICs and related circuitry. All of the existing solutions vary in configuration based on requirements of the host, motherboard, or carriergrade equipment. The purpose of the innovation is to eliminate data bottlenecks within cluster, grid, and cloud computing systems, and to add several more capabilities while reducing space consumption and cost. Provisions were designed for interoperability with systems used in the NASA HEC (High-End Computing) program. The new acceleration engine consists of state-ofthe- art FPGA (field-programmable gate array) core IP, C, and Verilog code; novel communication protocol; and extensions to the Globus structure. The engine provides the functions of network acceleration, encryption, compression, packet-ordering, and security added to Globus grid or for cloud data transfer. This system is scalable in nX10-Gbps increments through 100-Gbps f-d. It can be interfaced to industry-standard system-side or network-side devices or core IP in increments of 10 GigE, scaling to provide IEEE 40/100 GigE compliance.

Awrach, James↗

Cyber-Physical Tabletop Exercise for Small Modular Reactor Facilities

U.S. nuclear power facilities face increasing challenges in meeting dynamic security requirements caused by evolving and expanding threats while keeping costs reasonable to make nuclear energy competitive. This evolving threat landscape includes adversaries having offensive cyber capabilities to attack information technology (IT) systems and operation technology (OT) systems. These adversaries may have the ability to attack the physical protection system (PPS) networks with potential consequential impacts that could degrade the effectiveness of the PPS. These cyber attacks may also be used to attack the safety and operational systems used to operate and ensure the safety of the reactor. Additionally, adversaries may gain access to unmanned aerial systems (UAS) that may be used to provide reconnaissance and surveillance of the facility, provide information to the adversaries, and be equipped with kinetic capabilities such as explosives or weapons that can be used to directly attack the facility. The Department of Energy’s Office of Nuclear Energy’s Advanced Reactor Safeguards and Security (ARSS) program funded Sandia National Laboratories (SNL) and Idaho National Laboratory (INL) to develop a cyber-physical tabletop exercise (TTX). This exercise was conducted on a hypothetical small modular reactor (SMR) facility, and only considered a potential adversary cyber attack on the PPS to a physical attack on the hypothetical facility to achieve a radiological release. This cyber-physical TTX is meant to provide lessons learned to integrate the cyber security system design and the physical protection system (PPS) design to decrease design, operation, and maintenance costs as well as increase effectiveness for defending against design basis threat attacks at the facility. This TTX will also provide a framework and method for SMR and microreactor vendors to conduct their own cyber-physical TTX and gain impactful insights to improving the cyber and physical protection system design for their SMR or microreactor facility design.

42 ENGINEERING↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modularization of Small Modular Reactor Facilities: Physical Protection Recommendations

U.S. nuclear power facilities face increasing challenges in meeting dynamic security requirements caused by evolving and expanding threats while keeping costs reasonable to make nuclear energy competitive. In consideration of the economic viability of small modular reactor (SMR) facilities, many designers and utilities are considering a modular approach to the construction and operation of these facilities. This modular approach considers building and operating a first unit; once the first reactor is in operation, construction will begin on a second reactor. This process would allow the vendor or utility to ensure production of energy and financial income while the second reactor is under construction. This project evaluates the feasibility of modular construction in terms of physical protection and identifies several recommendations for vendors and utilities considering this approach. To conduct this evaluation, a hypothetical three-unit SMR facility was developed, a physical protection system (PPS) was considered for the design, and a hypothetical design basis threat (DBT) was used to evaluate this PPS. Multiple outsider sabotage scenarios were examined, with adversary team sizes ranging from 4-to-8 to determine security system effectiveness. The results of this work will influence PPS designs and facility designs for U.S. domestic SMRs. This work will also demonstrate how a series of experimental and modeling capabilities across the Department of Energy (DOE) complex can impact the design and completion of security-by-design (SeBD) for SMRs considering modular construction. The conclusions and recommendations in this document may be applicable to all SMR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving the nuclear data base for non-proliferation and homeland security

Many of the technical advances in non-proliferation and homeland security require calculations of transport of neutrons and gamma-rays through materials. The nuclear data base on which these calculations are made must be of high quality in order for the calculated responses to be credible. At the Los Alamos Neutron Science Center, three spallation neutron sources are being used to provide high-quality cross section and structure data with reactions induced by neutrons. Neutron transmission, neutron-induced fission and capture cross sections, neutron emission in fission, and gamma-ray production by neutrons are principal areas of research. Furthermore, these sources are also being used to validate calculations of the characterization and response of new detectors and detection techniques. Current research activities are summarized here.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗