Search NASA⌕ Search

SEARCH · Search NASA

Results for “Shuttle Landing Facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Simulation of Shuttle launch G forces and acoustic loads using the NASA Ames Research Center 20G centrifuge

The high cost and long times required to develop research packages for space flight can often be offset by using ground test techniques. This paper describes a space shuttle launch and reentry simulating using the NASA Ames Research Center's 20G centrifuge facility. The combined G-forces and acoustic environment during shuttle launch and landing were simulated to evaluate the effect on a payload of laboratory rates. The launch G force and acoustic profiles are matched to actual shuttle launch data to produce the required G-forces and acoustic spectrum in the centrifuge test cab where the rats were caged on a free-swinging platform. For reentry, only G force is simulated as the aero-acoustic noise is insignificant compared to that during launch. The shuttle G-force profiles of launch and landing are achieved by programming the centrifuge drive computer to continuously adjust centrifuge rotational speed to obtain the correct launch and landing G forces. The shuttle launch acoustic environment is simulated using a high-power, low-frequency audio system. Accelerometer data from STS-56 and microphone data from STS-1 through STS-5 are used as baselines for the simulations. This paper provides a description of the test setup and the results of the simulation with recommendations for follow-on simulations.

Shaw, T. L.↗

Aircraft nose gear shimmy studies

An overview of previous studies involving aircraft nose gear shimmy behavior is given together with some test results identifying the influence of different factors inducing shimmy. A NASA Langley test program conducted at the Landing Loads Track (LLT) facility to evaluate shimmy characteristics of an actual Space Shuttle nose gear is described together with some of the test results. Based on results from these various evaluations, recommendations are made concerning nose gear design features, such as corotating wheels, to minimize the occurence of shimmy.

Yager, Thomas J.↗

Modular space station phase B extension: Shuttle interface requirements

The interface requirements cover both the ground and orbital phases of operation from the launch of the first MSS module until the initial modular station has been manned and in routine operation. As a point of reference, the two-stage, fully reusable space shuttle was selected. The space shuttle is briefly described from the standpoint of its features most important to the interface requirements with the MSS. The environment induced upon the MSS elements when transported to and from orbit by the shuttle orbiter also is included. The mission operation includes the space shuttle launch facilities, the ground flow of the MSS modules, and the orbital operations of rendezvous, MSS buildup, resupply of the manned station, and orbiter descent and landing. The shuttle's once-around abort case is described as it affects the MSS interface requirements. The interfaces between the orbiter and the MSS resulting from the ground and orbital operations, are also described.

Source record↗

Space Shuttle Program Progress Report

A status report is presented on progress in the design, manufacturing and testing of components of the space transportation system (STS), and primarily the Space Shuttle vehicles. Project landmarks from 1969 to 1981 are indicated, fabrication of the Shuttle Orbiter and rollout of the first prototype are described, fabrication and assembly of some Orbiter parts are sketched, and some of the subsystems (thermal protection, avionics, maneuvering aids, reaction control, remote manipulator) are described. Also discussed are: Orbiter carrier aircraft, Shuttle main engine and tests, external fuel tank, solid rocket booster, launch and landing facilities. A separate section is devoted to ground tests (vibration, propulsion, electronics, avionics integration), trainers and simulators, and flight tests (captive flight, free flight, landing and approach, orbital flight).

Thompson, R. F.↗

The NASA landing gear test airplane

A tire and landing gear test facility has been developed and incorporated into a Convair 990 aircraft. The system can simulate tire vertical load profiles to 250,000 lb, sideslip angles to 15 degrees, and wheel braking on actual runways. Onboard computers control the preprogrammed test profiles through a feedback loop and also record three axis loads, tire slip angle, and tire condition. The aircraft to date has provided tire force and wear data for the Shuttle Orbiter tire on three different runways and at east and west coast landing sites. This report discusses the role of this facility in complementing existing ground tire and landing gear test facilities, and how this facility can simultaneously simulate the vertical load, tire slip, velocity, and surface for an entire aircraft landing. A description is given of the aircraft as well as the test system. An example of a typical test sequence is presented. Data collection and reduction from this facility are discussed, as well as accuracies of calculated parameters. Validation of the facility through ground and flight tests is presented. Tests to date have shown that this facility can operate at remote sites and gather complete data sets of load, slip, and velocity on actual runway surfaces. The ground and flight tests have led to a successful validation of this test facility.

Carter, John F.↗

Satellite land remote sensing advancements for the eighties; Proceedings of the Eighth Pecora Symposium, Sioux Falls, SD, October 4-7, 1983

Among the topics discussed are NASA's land remote sensing plans for the 1980s, the evolution of Landsat 4 and the performance of its sensors, the Landsat 4 thematic mapper image processing system radiometric and geometric characteristics, data quality, image data radiometric analysis and spectral/stratigraphic analysis, and thematic mapper agricultural, forest resource and geological applications. Also covered are geologic applications of side-looking airborne radar, digital image processing, the large format camera, the RADARSAT program, the SPOT 1 system's program status, distribution plans, and simulation program, Space Shuttle multispectral linear array studies of the optical and biological properties of terrestrial land cover, orbital surveys of solar-stimulated luminescence, the Space Shuttle imaging radar research facility, and Space Shuttle-based polar ice sounding altimetry.

Source record↗

Kennedy Space Center Space Shuttle facilities.

Description of tasks and facilities involved in the processing of Space Shuttle missions at the Kennedy Space Center. Responsibilities considered include vehicle integration and launch, recovery and refurbishment of the spent solid rocket motors, and landing and refurbishment of the Orbiter vehicles. Facility options are evaluated for transportation, on-site processing, mating, and recovery of the booster, drop tank, and Orbiter elements. Processing flow patterns are outlined for assembly, maintenance, checking, safing, refurbishment, and launch operations.

Clark, R. L.↗

Simulation studies of alternate longitudinal control systems for the space shuttle orbiter in the landing regime

Simulations of the space shuttle orbiter in the landing task were conducted by the NASA Ames-Dryden Flight Research Facility using the Ames Research Center vertical motion simulator (VMS) and the total in-flight simulator (TIFS) variable-stability aircraft. Several new control systems designed to improve the orbiter longitudinal response characteristics were investigated. These systems improved the flightpath response by increasing the amount of pitch-rate overshoot. Reduction in the overall time delay was also investigated. During these evaluations, different preferences were noted for the baseline or the new systems depending on the pilot background. The trained astronauts were quite proficient with the baseline system and found the new systems to be less desirable than the baseline. On the other hand, the pilots without extensive flight training with the orbiter had a strong preference for the new systems. This paper presents the results of the VMS and TIFS simulations. A hypothesis is presented regarding the control strategies of the two pilot groups and how this influenced their control systems preferences. Interpretations of these control strategies are made in terms of open-loop aircraft response characteristics as well as pilot-vehicle closed-loop characteristics.

Powers, B. G.↗

Simulation studies of alternate longitudinal control systems for the Space Shuttle Orbiter in the landing regime

Simulations of the Space Shuttle Orbiter in the landing task were conducted by the NASA Ames-Dryden Flight Research Facility using the Ames Research center vertical motion simulation (VMS) and the total in-flight simulator (TIFS) variable-stability aircraft. Several new control systems designed to improve the orbiter longitudinal response characteristics were investigated. These systems improved the flightpath response by increasing the amount of pitch-rate overshoot. Reduction in the overall time delay was also investigated. During these evaluations, different preferences were noted for the baseline or the new systems depending on the pilot background. The trained astronauts were quite proficient with the baseline system and found the new systems to be less desirable than the baseline. On the other hand, the pilots without extensive flight training with the Orbiter had a strong preference for the new systems. This paper presents the results of the VMS and TIFS simulations. A hypothesis is presented regarding the control strategies of the two pilot groups and how this influenced their control system preferences. Interpretations of these control strategies are made in terms of open-loop aircraft response characteristics as well as pilot-vehicle closed-loop characteristics.

Powers, B. G.↗

Orbiter post-tire failure and skid testing results

An investigation was conducted at the NASA Langley Research Center's Aircraft Landing Dynamics Facility (ALDF) to define the post-tire failure drag characteristics of the Space Shuttle Orbiter main tire and wheel assembly. Skid tests on various materials were also conducted to define their friction and wear rate characteristics under higher speed and bearing pressures than any previous tests. The skid tests were conducted to support a feasibility study of adding a skid to the orbiter strut between the main tires to protect an intact tire from failure due to overload should one of the tires fail. Roll-on-rim tests were conducted to define the ability of a standard and a modified orbiter main wheel to roll without a tire. Results of the investigation are combined into a generic model of strut drag versus time under failure conditions for inclusion into rollout simulators used to train the shuttle astronauts.

Daugherty, Robert H.↗

The influence of the launch site operational environment on Space Shuttle scientific payloads

The effects of prelaunch assembly, testing, and integration activities on the scientific payload at the KSC are examined. The functions of the Shuttle and payload organizations of the KSC are discussed. The processing of the various types of pyaloads, and the amount of access to the payload during processing and after landing are described. The KSC facility contains: an Operations and Checkout Building, a Vertical Processing Facility, Cargo Integration and Test Equipment, an Orbiter Processing Facility, a Payload Changeout Room, payload transportation equipment, and Shuttle launch pads.

Schuiling, Roelof L.↗

STS-94 Mission Highlights Resource Tape

The flight crew of STS-94, Cmdr. James D. Halsell, Jr., Pilot Susan L. Still, Payload Cmdr. Janice E. Voss, Mission Specialists Micheal L. Gernhardt and Donald A. Thomas, and Payload Specialists Gregory T. Linteris and Roger K. Crouch can be seen preforming pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. The crew is seen continuing the payload activation process, as the research efforts of the Microgravity Science Laboratory (MSL) mission get into full swing. The crew is seen in the Microgravity Science Laboratory aboard Space Shuttle Columbia activating the final experiment facility and beginning additional experiments, among the more than 30 investigations to be conducted during the 16-day mission. The tape concludes with the re-entery and landing of the Shuttle.

Source record↗

ASTROMAG: A superconducting particle astrophysics magnet facility for the space station

This paper describes a superconducting magnet system which is the heart of a particle astrophysics facility to be mounted on a portion of the proposed NASA space station. This facility will complete the studies done by the electromagnetic observatories now under development and construction by NASA. The paper outlines the selection process of the type of magnet to be used to analyze the energy and momentum of charged particles from deep space. The ASTROMAG superconducting magnet must meet all the criteria for a shuttle launch and landing, and it must meet safety standards for use in or near a manned environment such as the space station. The magnet facility must have a particle gathering aperture of at least 1 square meter steradian and the facility should be capable of resolving heavy nuclei with a total energy of 10 Tev or more.

Green, M. A.↗

Lightweight Seat Lever Operation Characteristics

In 1999, a Shuttle crew member was unable to operate the backrest lever for the lightweight seat in microgravity. It is essential that crew members can adjust this backrest lever, which is titled forward during launch and then moved backward upon reaching orbit. This adjustment is needed to cushion the crew members during an inadvertent crash landing situation. JSCs Anthropometry and Biomechanics Facility (ABF) performed an evaluation of the seat controls and provided recommendations on whether the seat lever positions and operations should be modified. The original Shuttle seats were replaced with new lightweight seats whose controls were moved, with one control at the front and the other at the back. The ABF designed a 12-person experiment to investigate the amount of pull force exerted by suited subjects, when controls were placed in the front and back of the lightweight seat. Each subject was asked to perform the pull test at least three times for each combination of lever position and suit pressure conditions. The results showed that, in general, the subjects were able to pull on the lever at the back position with only about half the amount of force that they were able to exert on the lever at the front position. In addition, the results also showed that subjects wearing the pressurized suit were unable to reach the seat lever when it was located at the back. The pull forces on the front lever diminished about 50% when subjects wore pressurized suits. Based on these results from this study, it was recommended that the levers should not be located in the back position. Further investigation is needed to determine whether the levers at the front of the seat could be modified or adjusted to increase the leverage for crew members wearing pressurized launch/escape suits.

Rajulu, Sudhakar↗

A simulated annealing approach to schedule optimization for the SES facility

The Shuttle Engineering Simulator (SES) is a facility which houses the software and hardware for a variety of simulation systems. The simulators include the Autonomous Remote Manipulator, the Manned Maneuvering Unit, Orbiter/Space Station docking, and shuttle entry and landing. The SES simulators are used by various groups throughout NASA. For example, astronauts use the SES to practice maneuvers with the shuttle equipment; programmers use the SES to test flight software; and engineers use the SES for design and analysis studies. Due to its high demand, the SES is busy twenty-four hours a day and seven days a week. Scheduling the facility is a problem that is constantly growing and changing with the addition of new equipment. Currently a number of small independent programs have been developed to help solve the problem, but the long-term answer lies in finding a flexible, integrated system that provides the user with the ability to create, optimize, and edit the schedule. COMPASS is an interactive and highly flexible scheduling system. However, until recently COMPASS did not provide any optimization features. This paper describes the simulated annealing extension to COMPASS. It now allows the user to interweave schedule creation, revision, and optimization. This practical approach was necessary in order to satisfy the operational requirements of the SES.

Mcmahon, Mary Beth↗

Meteorological Radar Facility for the Space Shuttle

A proposed meteorological radar facility for Space Shuttle missions is described as a device suitable for providing vertical profiles of the precipitation distribution in the atmosphere above land masses and over ocean, thus ensuring three-dimensional mapping of the hydrometeor-precipitation distribution in the atmosphere. Some performance characteristics essential to orbiting meteorological radar systems and typical parameters are discussed, including large swath width, narrow beamwidth, frequency agility, and antenna configuration and orientation. Also discussed are the capabilities of the device as a test bed sensor with multiple mode capability, being able to operate in real aperture/pulse radar, real aperture/pulse Doppler and synthetic azimuth processing modes.

Eckerman, J.↗