Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Emerging Techniques for Vicarious Calibration of Visible Through Short Wave Infrared Remote Sensing Systems

Simple field-portable white light LED calibration source shows promise for visible range (420-750 nm) 1) Prototype demonstrated <0.5% drift over 10-40 C temperature range; 2) Additional complexity (more LEDs) will be necessary for extending spectral range into the NIR and SWIR; 3) LED long lifetimes should produce at least several hundreds of hours or more stability, minimizing need for expensive calibrations and supporting long-duration field campaigns; and 4) Enabling technology for developing autonomous sites.

Ryan, Robert E.↗

Direct Observations of Nucleation in a Nondilute Multicomponent Alloy

The chemical pathways leading to gamma'(L1(sub 2)) nucleation from nondilute Ni-5.2 Al-14.2 Cr at. %, gama(fcc), at 873 K are followed with radial distribution functions and isoconcentration surface analyses of direct-space atom-probe tomographic images. Although Cr atoms initially are randomly distributed, a distribution of congruent Ni3Al short-range-order domains (SRO), [R] approx. equals 0.6 nm, results from Al diffusion during quenching. Domain site occupancy develops as their number density increases leading to Al-rich phase separation by gamma'-nucleation, [R]=0.75 nm, after SRO occurs.

Sudbrack, Chantal K.↗

Robotic Lunar Landers for Science and Exploration

The Moon provides an important window into the early history of the Earth, containing information about planetary composition, magmatic evolution, surface bombardment, and exposure to the space environment. Robotic lunar landers to achieve science goals and to provide precursor technology development and site characterization are an important part of program balance within NASA s Science Mission Directorate (SMD) and Exploration Systems Mission Directorate (ESMD). A Robotic Lunar Lan-der mission complements SMD's initiatives to build a robust lunar science community through R&A lines and increases international participation in NASA's robotic exploration of the Moon.

Cohen, B. A.↗

Georgia Energy III Project Summary - Identifying Habitat and Solar Site Conflict in Georgia by Developing an Environmental Sensitivity Public Mapping Too

The rapid expansion of the solar industry across the state of Georgia has a detrimental effect on the habitats of keystone and threatened species, such as the gopher tortoise (Gopherus polyphemus) and the American black bear (Ursus americanus). NASA DEVELOP collaborated with the Georgia Chapter of The Nature Conservancy (TNC) and the Georgia Department of Natural Resources to continue the research from two previous NASA DEVELOP projects in 2017. The team worked to assess the conflict between solar suitability and environmentally sensitive areas with the Land-Use Conflict Identification Strategy (LUCIS) and to determine how conflict has changed since the 2017 analysis. The project utilized Terra/Aqua Clouds and the Earth's Radiant Energy System (CERES) satellite data and other ancillary datasets to conduct and compare a general statewide LUCIS analysis from 2017 to 2019 and to complete an in-depth LUCIS analysis of Georgia’s fastest-growing solar counties—Taylor, Twiggs, Decatur, and Brooks. The analysis indicated that between 2017 and 2019, the entire state saw high conflict areas increase by 38%. Project partners will use these findings to target areas for promotion of conservation policy and education efforts. The team also provided the TNC with a publicly available web application, called the Environmental Sensitivity Mapping Tool (ESMT), that can be updated as new data are released. The ESMT will be used to educate interest groups, such as solar developers and conservationists, to help them recognize and mitigate the negative effects of solar development on the environment.

DEVELOP Project Summary↗

Per- and Polyfluoroalkyl Substances Confirmatory Sampling Report, South Repeater Building (SWMU 121), Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Confirmatory Sampling (CS) Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document CS activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121, formerly known as the Area 3 Repeater Building (A3RB). A Phase I SWMU Assessment and Confirmatory Sampling Report (NASA 2019) and a Phase II and III SWMU Assessment and Confirmatory Sampling Report (NASA 2022b) were previously submitted detailing Center-Wide assessment activities performed at the John F. Kennedy Space Center (KSC) in Florida that identified 33 locations of concern and 19 areas of potential concern at KSC associated with the storage, use, or release of materials containing PFAS. A review of the analytical results from investigation derived waste samples collected in 2020 from the South Repeater Building area indicated concentrations of perfluorooctanesulfonic acid (PFOS) were above Florida Department of Environmental Protection (FDEP) provisional Groundwater Cleanup Target Levels of 70 nanograms per liter (ng/L) at a concentration of 1,750 ng/L. Following this review, the KSC Fire Chief was contacted; the Chief recalled fighting a brush fire in 1998 in the area, during which an unknown volume of aqueous film-forming foam was used to extinguish the fire. The Phase II and Phase III SWMU Assessment Report recommended this area proceed to CS. Historical results in this area are provided in Appendix A . PFAS CS activities were contracted at the South Repeater Building. Initial CS activities were conducted in accordance with the PFAS Assessment and Mitigation Work Plan (AECOM 2022), which was submitted to the NASA Remediation Project Management team and accepted by the team on November 1 and 8, 2021. The objectives of the PFAS CS were to: - - Confirm and begin to assess the extent of PFAS affected media in the South Repeater Building area. - - Identify locations for groundwater, soil, surface water, and soil core sampling. - - Qualitatively characterize the migration potential of released PFAS to environmental media (soil, groundwater, and surface water). The following activities were completed to meet the PFAS CS objectives: - - Installation of monitoring wells via direct push technology (DPT) and rotosonic techniques - - Groundwater, soil, and surface water sampling - - Collection of soil cores to evaluate site lithology - - Development of initial PFAS plume characterization

PFAS↗

Building a Successful Security Infrastructure: What You Want vs. What You Need vs. What You Can Afford

With the fast growing popularity of the Internet, many organizations are racing to get onto the on-ramp to the Information Superhighway. However, with frequent headlines such as 'Hackers' break in at General Electric raises questions about the Net's Security', 'Internet Security Imperiled - Hackers steal data that could threaten computers world-wide' and 'Stanford Computer system infiltrated; Security fears grow', organizations find themselves rethinking their approach to the on-ramp. Is the Internet safe? What do I need to do to protect my organization? Will hackers try to break into my systems? These are questions many organizations are asking themselves today. In order to safely travel along the Information Superhighway, organizations need a strong security framework. Developing such a framework for a computer site, whether it be just a few dozen hosts or several thousand hosts is not an easy task. The security infrastructure for a site is often developed piece-by-piece in response to security incidents which have affected that site over time. Or worse yet, no coordinated effort has been dedicated toward security. The end result is that many sites are still poorly prepared to handle the security dangers of the Internet. This paper presents guidelines for building a successful security infrastructure. The problem is addressed in a cookbook style method. First is a discussion on how to identify your assets and evaluate the threats to those assets; next are suggestions and tips for identifying the weak areas in your security armor. Armed with this information we can begin to think about what you really need for your site and what you can afford. In this stage of the process we examine the different categories of security tools and products that are available and then present some tips for deciding what is best for your site.

Crabb, Michele D.↗

Telerobotic ground-remote operations

The Telerobotic Ground-Remote Operations task consists of development of a demonstration local-site operator control station that includes a graphical user interface (GUI) for control of a remote robot, and development of operator-assisted perception algorithms and software that will provide flexible and accurate world modeling capabilities. The topics covered are presented in view graph form and include: (1) local site development configuration; (2) system design; (3) operator control station (local site) software block diagram; (4) operator-assisted perception; and (5) program status.

Bon, Bruce↗

Goddard Geophysical and Astronomical Observatory

This report summarizes the technical parameters and the technical staff of the VLBI system at the fundamental station GGAO. It also gives an overview about the VLBI activities during the report year. The Goddard Geophysical and Astronomical Observatory (GGAO) consists of a 5-meter radio telescope for VLBI, a new 12-meter radio telescope for VLBI2010 development, a 1-meter reference antenna for microwave holography development, an SLR site that includes MOBLAS-7, the NGSLR development system, and a 48" telescope for developmental two-color Satellite Laser Ranging, a GPS timing and development lab, a DORIS system, meteorological sensors, and a hydrogen maser. In addition, we are a fiducial IGS site with several IGS/IGSX receivers. GGAO is located on the east coast of the United States in Maryland. It is approximately 15 miles NNE of Washington, D.C. in Greenbelt, Maryland.

Figueroa, Ricardo↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

Strawman Philosophical Guide for Developing International Network of GPM GV Sites

The creation of an international network of ground validation (GV) sites that will support the Global Precipitation Measurement (GPM) Mission's international science programme will require detailed planning of mechanisms for exchanging technical information, GV data products, and scientific results. An important component of the planning will be the philosophical guide under which the network will grow and emerge as a successful element of the GPM Mission. This philosophical guide should be able to serve the mission in developing scientific pathways for ground validation research which will ensure the highest possible quality measurement record of global precipitation products. The philosophical issues, in this regard, partly stem from the financial architecture under which the GV network will be developed, i.e., each participating country will provide its own financial support through committed institutions -- regardless of whether a national or international space agency is involved.At the 1st International GPM Ground Validation Workshop held in Abingdon, UK in November-2003, most of the basic tenants behind the development of the international GV network were identified and discussed. Therefore, with this progress in mind, this presentation is intended to put forth a strawman philosophical guide supporting the development of the international network of GPM GV sites, noting that the initial progress has been reported in the Proceedings of the 1st International GPM GV Workshop -- available online. The central philosophical issues themselves, all flow from the fact that each participating institution can only bring to the table, GV facilities and scientific personnel that are affordable to the sanctioning (funding) national agency (be that a research, research-support, or operational agency). This situation imposes on the network, heterogeneity in the measuring sensors, data collection periods, data collection procedures, data latencies, and data reporting capabilities. Therefore, in order for the network to be effective in supporting the central scientific goals of the GPM mission, there must be a basic agreed upon doctrine under which the network participants function vis-a-vis: (1) an overriding set of general scientific requirements, (2) a minimal set of policies governing the free flow of GV data between the scientific participants, (3) a few basic definitions concerning the prioritization of measurements and their respective value to the mission, (4) a few basic procedures concerning data formats, data reporting procedures, data access, and data archiving, and (5) a simple means to differentiate GV sites according to their level of effort and ability to perform near real-time data acquisition - data reporting tasks. Most important, in case they choose to operate as a near real-time data collection-data distribution site, they would be expected to operate under a fairly narrowly defined protocol needed to ensure smooth GV support operations. This presentation will suggest measures responsive to items (1) - (5) from which to proceed,. In addition, this presentation will seek to stimulate discussion and debate concerning how much heterogeneity is tolerable within the eventual GV site network, given that the any individual GV site can only be considered scientifically useful if it supports the achievement of the central GPM Mission goals. Only ground validation research that has a direct connection to the space mission should be considered justifiable given the overarching scientific goals of the mission. Therefore each site will have to seek some level of accommodation to what the GPM Mission requires in the way of retrieval error characterization, retrieval error detection and reporting, and generation of GV data products that support assessment and improvement of the mission's standard precipitation retrieval algorithms. These are all important scientific issues that will be best resolved in open scientific debate.

Smith, Eric A.↗

ESRI applications of GIS technology: Mineral resource development

The application of geographic information systems technology to large scale regional assessment related to mineral resource development, identifying candidate sites for related industry, and evaluating sites for waste disposal is discussed. Efforts to develop data bases were conducted at scales ranging from 1:3,000,000 to 1:25,000. In several instances, broad screening was conducted for large areas at a very general scale with more detailed studies subsequently undertaken in promising areas windowed out of the generalized data base. Increasingly, the systems which are developed are structured as the spatial framework for the long-term collection, storage, referencing, and retrieval of vast amounts of data about large regions. Typically, the reconnaissance data base for a large region is structured at 1:250,000 scale, data bases for smaller areas being structured at 1:25,000, 1:50,000 or 1:63,360. An integrated data base for the coterminous US was implemented at a scale of 1:3,000,000 for two separate efforts.

Derrenbacher, W.↗

GIS modeling of archaeological site locations: A low-tech approach

A Geographic Information System (GIS)-type analysis of archaeological site locations using a dBase III plus program and a desk top computer is presented. A previously developed model of site locations in the Sequatchie Valley of northeastern Alabama is tested against known site locations in another large survey area there. The model fails to account for site locations in the test area. A model is developed for the test area and indicates the site locations are indeed different. Whether this is due to differences in site locations on a sub-regional level, or to sample error in the original model is unknown.

Futato, Eugene M.↗

System integration of marketable subsystems

These monthly reports, covering the period February 1978 through June 1978, describe the progress made in the major areas of the program. The areas covered are: systems integration of marketable subsystems; development, design, and building of site data acquisition subsystems; development and operation of the central data processing system; operation of the MSFC Solar Test Facility; and systems analysis.

Source record↗

System integration of marketable subsystems

Progress is reported in the following areas: systems integration of marketable subsystems; development, design, and building of site data acquisition subsystems; development and operation of the central data processing system; operation of the MSFC Solar Test Facility; and systems analysis.

Source record↗

Wind turbine siting: A summary of the state of the art

The process of siting large wind turbines may be divided into two broad steps: site selection, and site evaluation. Site selection is the process of locating windy sites where wind energy development shows promise of economic viability. Site evaluation is the process of determining in detail for a given site the economic potential of the site. The state of the art in the first aspect of siting, site selection is emphasized. Several techniques for assessing the wind resource were explored or developed in the Federal Wind Energy Program. Local topography and meteorology will determine which of the techniques should be used in locating potential sites. None of the techniques can do the job alone, none are foolproof, and all require considerable knowledge and experience to apply correctly. Therefore, efficient siting requires a strategy which is founded on broad based application of several techniques without relying solely on one narrow field of expertise.

Hiester, T. R.↗