Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site screening”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Sequence and structural implications of a bovine corneal keratan sulfate proteoglycan core protein. Protein 37B represents bovine lumican and proteins 37A and 25 are unique

Amino acid sequence from tryptic peptides of three different bovine corneal keratan sulfate proteoglycan (KSPG) core proteins (designated 37A, 37B, and 25) showed similarities to the sequence of a chicken KSPG core protein lumican. Bovine lumican cDNA was isolated from a bovine corneal expression library by screening with chicken lumican cDNA. The bovine cDNA codes for a 342-amino acid protein, M(r) 38,712, containing amino acid sequences identified in the 37B KSPG core protein. The bovine lumican is 68% identical to chicken lumican, with an 83% identity excluding the N-terminal 40 amino acids. Location of 6 cysteine and 4 consensus N-glycosylation sites in the bovine sequence were identical to those in chicken lumican. Bovine lumican had about 50% identity to bovine fibromodulin and 20% identity to bovine decorin and biglycan. About two-thirds of the lumican protein consists of a series of 10 amino acid leucine-rich repeats that occur in regions of calculated high beta-hydrophobic moment, suggesting that the leucine-rich repeats contribute to beta-sheet formation in these proteins. Sequences obtained from 37A and 25 core proteins were absent in bovine lumican, thus predicting a unique primary structure and separate mRNA for each of the three bovine KSPG core proteins.

NASA Discipline Cell Biology↗

Aviation Research and the Internet

The Internet is a network of networks. It was originally funded by the Defense Advanced Research Projects Agency or DOD/DARPA and evolved in part from the connection of supercomputer sites across the United States. The National Science Foundation (NSF) made the most of their supercomputers by connecting the sites to each other. This made the supercomputers more efficient and now allows scientists, engineers and researchers to access the supercomputers from their own labs and offices. The high speed networks that connect the NSF supercomputers form the backbone of the Internet. The World Wide Web (WWW) is a menu system. It gathers Internet resources from all over the world into a series of screens that appear on your computer. The WWW is also a distributed. The distributed system stores data information on many computers (servers). These servers can go out and get data when you ask for it. Hypermedia is the base of the WWW. One can 'click' on a section and visit other hypermedia (pages). Our approach to demonstrating the importance of aviation research through the Internet began with learning how to put pages on the Internet (on-line) ourselves. We were assigned two aviation companies; Vision Micro Systems Inc. and Innovative Aerodynamic Technologies (IAT). We developed home pages for these SBIR companies. The equipment used to create the pages were the UNIX and Macintosh machines. HTML Supertext software was used to write the pages and the Sharp JX600S scanner to scan the images. As a result, with the use of the UNIX, Macintosh, Sun, PC, and AXIL machines, we were able to present our home pages to over 800,000 visitors.

Scott, Antoinette M.↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Enhanced Climatic Warming Over the Tibetan Plateau Due to Doubling CO2: A Model Study

A number of studies have presented the evidences that surface climate change associated with global warming at high elevation sites shows more pronounced warming than at low elevations, i.e. an elevation dependency of climatic warming pointed out that snow-albedo feedback may be responsible for the excessive warming in the Swiss Alps. From an ensemble of climate change experiments of increasing greenhouse gases and aerosols using an air-sea coupled climate model, Eyre and Raw (1999) found a marked elevation dependency of the simulated surface screen temperature increase over the Rocky Mountains. Using almost all available instrumental records, Liu and Chen (2000) showed that the main portion of the Tibetan Plateau (TP) has experienced significant ground temperature warming since the middlebrows, especially in winter, and that there is a tendency for the warming trend to increase with elevation in the TP as well as its surrounding areas. In this paper, we will investigate the mechanism of elevation dependency of climatic warming in the TP by using a high-resolution regional climate model.

Chen, Baode↗

Grain Boundary Engineering the Mechanical Properties of Allvac 718Plus(Trademark) Superalloy

Grain Boundary Engineering can enhance the population of structurally-ordered "low S" Coincidence Site Lattice (CSL) grain boundaries in the microstructure. In some alloys, these "special" grain boundaries have been reported to improve overall resistance to corrosion, oxidation, and creep resistance. Such improvements could be quite beneficial for superalloys, especially in conditions which encourage damage and cracking at grain boundaries. Therefore, the effects of GBE processing on high-temperature mechanical properties of the cast and wrought superalloy Allvac 718Plus (Allvac ATI) were screened. Bar sections were subjected to varied GBE processing, and then consistently heat treated, machined, and tested at 650 C. Creep, tensile stress relaxation, and dwell fatigue crack growth tests were performed. The influences of GBE processing on microstructure, mechanical properties, and associated failure modes are discussed.

Gabb, Timothy P.↗

Fire Station #2, Former Sewage Treatment Plant #17, and Towway Area-SWMU 114 PFAS Site Assessment Progress Report Kennedy Space Center, Florida

This PFAS Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from November 2021 through August 2022 at Solid Waste Management Unit (SWMU) 114 located within Kennedy Space Center (KSC), Florida. SWMU 114 includes area around Fire Station #2, Former Sewage Treatment Plant #17, the southern portion of the Shuttle Landing Facility Runway, Remote Launch Vehicle Hangar, and the Towway area. Fire Station #2 was constructed in 2008 and is currently active, housing fire station personnel and equipment, including aqueous film forming foam (AFFF). Releases of AFFF has occurred at SWMU 114. Previous environmental assessments have been performed at SWMU 114, including soil, groundwater, and surface water sampling for volatile organic compounds, polycyclic aromatic hydrocarbons, total petroleum hydrocarbons, and metals. No active remediation has been performed at the SWMU 114. PFAS site assessment field activities were conducted at SWMU 114 from November 2021 through August 2022. During the 2021-2022 Site Assessment, 124 direct-push samples were collected from 27 locations, 17 surface water samples were collected from 15 locations, 41 groundwater samples were collected from 37 newly installed monitoring wells, five concrete samples were collected from four locations, and one asphalt sample was collected. Additionally, two soil borings were advanced to 60 feet for lithologic descriptions, ten staff gauges were installed, and one round of water level measurements were collected from monitoring wells and staff gauges for groundwater flow determination. All groundwater and surface water samples were analyzed for 25 PFAS analytes by USEPA Method 537M. Concrete, and asphalt samples were analyzed by synthetic precipitation leaching procedure (SPLP) PFAS analysis by USEPA Modified Method 537M. Groundwater results were compared to the most recent Regional Screening Levels (RSLs) published by USEPA for residential tap water (USEPA, 2022a) to determine the extent of PFAS contamination at SWMU 114 for six PFAS analytes (PFOA, PFNA, PFBS, PFHxS, PFOS, and GenX). Surface water results were compared to the FDEP surface water screening levels (SW SLs) (FDEP, 2020) for PFOA and PFOS. The PFAS investigation concluded that groundwater exceeding RSLs extends east and south to Banana Creek and west to approximately the center of the SLF runway. The extent of PFAS is approximated to the north, to an area between Sharkey Road and Astronaut Road, where samples below the RSLs do not fully bound SWMU 114. At least two distinct PFAS source areas are located near Fire Station #2 and along Towway, at S114-MW0007S, within SWMU 114. Groundwater head measurements indicate that flow at SWMU 114 is generally similar across the shallow and intermediate water tables. A northeast to southwest trending groundwater divide is located near the middle of Towway where groundwater southeast of the divide flows to the south and groundwater northwest of the divide flows to the west. The groundwater divide generally separates the two areas of higher PFAS concentrations. Surface water samples indicated concentrations of PFOS above the SW SLs in surface water bodies across the site. Further assessment and sampling are required to better understand the interaction between groundwater and surface water at SWMU 114. Concrete and asphalt samples collected confirm that a significant release of AFFF occurred near the stormwater pond northwest of Fire Station #2. Additional concrete samples surrounding Fire Station #2 and at the northwest and southeast edges of the SLF tarmac indicate elevated PFOS concentrations. These results indicate that discharges of AFFF in these locations have infiltrated into asphalt and concrete and may act as a continuing source of PFAS to groundwater and surface water after rain events. Additional direct-push samples are required to delineate PFAS at SWMU 114. Samples may need to extend beyond the Former SLF Rescue Building and Morpheous Test Site to delineate PFAS in groundwater. Monitoring wells should be sampled and gauged quarterly to determine if seasonal impacts are observable, especially in shallow wells near surface water features. Furthermore, surface water samples should be collected from additional ditches to further define the extent of surface water impacts at SWMU 114 and extending along the SLF runway. Staff gauges should be gauged quarterly with groundwater gauging to determine surface water flow and interaction with groundwater. The PFAS sampling results and path forward for SWMU 114 were presented to the KSC Remediation Team in October 2022. Once the PFAS SAPR is approved, it will be submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

Space environmental effects on coated optics

Several high reflectance mirrors and an output window were selected for the Long Duration Exposure Facility (LDEF) by pre-flight screening using laboratory simulation of natural space radiation. One mirror, a silicon/aluminum oxide design, showed expected excellent stability in orbit and a long shelf life. An aluminum oxide coated calcium fluoride window also showed good stability. Less stable but more interesting behavior was observed in the zinc sulfide based mirrors that showed contamination effects and related dendrite formation. These samples, which were located on both leading and trailing edges, also had interesting impact sites.

T M Donovan↗

Wilson Corners SWMU 001 2014 Annual Long Term Monitoring Report Kennedy Space Center, Florida

This document presents the findings of the 2014 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration (NASA) John F. Kennedy Space Center (KSC), Florida. The goals of the 2014 annual LTM event were to evaluate the groundwater flow direction and gradient and to monitor the vertical and downgradient horizontal extent of the volatile organic compounds (VOCs) in groundwater at the site. The LTM activities consisted of an annual groundwater sampling event in December 2014, which included the collection of water levels from the LTM wells. During the annual groundwater sampling event, depth to groundwater was measured and VOC samples were collected using passive diffusion bags (PDBs) from 30 monitoring wells. In addition to the LTM sampling, additional assessment sampling was performed at the site using low-flow techniques based on previous LTM results and assessment activities. Assessment of monitoring well MW0052DD was performed by collecting VOC samples using low-flow techniques before and after purging 100 gallons from the well. Monitoring well MW0064 was sampled to supplement shallow VOC data north of Hot Spot 2 and east of Hot Spot 4. Monitoring well MW0089 was sampled due to its proximity to MW0090. MW0090 is screened in a deeper interval and had an unexpected detection of trichloroethene (TCE) during the 2013 LTM, which was corroborated during the March 2014 verification sampling. Monitoring well MW0130 was sampled to provide additional VOC data beneath the semi-confining clay layer in the Hot Spot 2 area.

Monitoring↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Characterization testing of a 40 Ahr bipolar nickel hydrogen battery

In a continuing effort to develop NiH2 bipolar technology to a point where it can be used efficiently in space flight, testing of a second 40 Ahr, 10-cell bipolar battery has begun. This battery has undergone extensive characterization testing to determine the effects of such operating parameters as charge and discharge rates, temperature, and pressure. The fundamental design of this actively cooled bipolar battery is the same as the first battery. Most of the individual components, however, are from different manufacturers. Different testing procedures as well as certain unique battery characteristics make it difficult to directly compare the two sets of results. In general, the performance of this battery throughout characterization produced expected results. The main differences seen between the first and second batteries occurred during the high-rate discharge portion of the test matrix. The first battery also had poor high-rate discharge results, although better than those of the second battery. Minor changes were made to the battery frame design used for the first battery in an attempt to allow better gas access to the reaction sites for the second build and hopefully improve performance. The changes, however, did not improve the performance of the second battery and could have possibly contributed to the poorer performance that was observed. There are other component differences that could have contributed to the poorer performance of the second battery. The H2 electrode in the second battery was constructed with a Goretex backing which could have limited the high-rate current flow. The gas screen in the second battery had a larger mesh which again could have limited the high-rate current flow. Small scale 2 x 2 batteries are being tested to evaluate the effects of the component variations.

Brewer, Jeffrey C.↗

The Micro-Pulse Lidar Network (MPLNET): A Federated Network of Micro-pulse Lidars and AERONET Sunphotometers

We present the formation of a new global-ground based eye-safe lidar network, the NASA Micro-Pulse Lidar Network (MPLNET). The aim of MPLNET is to acquire long- term observations of aerosol and cloud vertical profiles at unique geographic sites within the NASA Aerosol Robotic Network (AERONET). MPLNET utilizes standard instrumentation and data processing algorithms for efficient network operations and direct comparison of data between each site. The micro-pulse lidar is eye-safe, compact, and commercially available, and most easily allows growth of the network without sacrificing standardized instrumentation goals. Network growth follows a federated approach, pioneered by AERONET, wherein independent research groups may join MPLNET with their own instrument and site. MPLNET sites produce not only vertical profile data, but also column-averaged products already available from AERONET (aerosol optical depth, sky radiance, size distributions). Algorithms are presented for each MPLNET data product. Real-time Level 1 data products (next-day) include daily lidar signal images from the surface to -2Okm, and Level 1.5 aerosol extinction profiles at times co-incident with AERONET observations. Quality assured Level 2 aerosol extinction profiles are generated after screening the Level 1.5 results and removing bad data. Level 3 products include continuous day/night aerosol extinction profiles, and are produced using Level 2 calibration data. Rigorous uncertainty calculations are presented for all data products. Analysis of MPLNET data show the MPL and our analysis routines are capable of successfully retrieving aerosol profiles, with the strenuous accounting of uncertainty necessary for accurate interpretation of the results.

Welton, Ellsworth J.↗

Monoclonal antibody to a cancer-specific and drug-responsive hydroquinone (NADH) oxidase from the sera of cancer patients

Monoclonal antibodies were generated in mice to a 34-kDa circulating form of a drug-responsive hydroquinone (NADH) oxidase with a protein disulfide-thiol interchange activity specific to the surface of cancer cells and the sera of cancer patients. Screening used Western blots with purified 34-kDa tNOX from HeLa cells and the sera of cancer patients. Epitopes were sought that inhibited the drug-responsive oxidation of NADH with the sera of cancer patients, but which had no effect on NADH oxidation with the sera of healthy volunteers. Two such antisera were generated. One, designated monoclonal antibody (mAb) 12.1, was characterized extensively. The NADH oxidase activity inhibited by mAb 12.1 also was inhibited by the quinone site inhibitor capsaicin (8-methyl- N-vanillyl-6-noneamide). The inhibition was competitive for the drug-responsive protein disulfide-thiol interchange activity assayed either by restoration of activity to scrambled RNase or by cleavage of a dithiodipyridine substrate, and was uncompetitive for NADH oxidation. Both the mAb 12.1 and the postimmune antisera immunoprecipitated drug-responsive NOX activity and identified the same 34-kDa tNOX protein in the sera of cancer patients that was absent from sera of healthy volunteers, and was utilized as immunogen. Preimmune sera from the same mouse as the postimmune antisera was without effect. Both mouse ascites containing mAb 12.1 and postimmune sera (but not preimmune sera) slowed the growth of human cancer cell lines in culture, but did not affect the growth of non-cancerous cell lines. Immunocytochemical and histochemical findings showed that mAb 12.1 reacted with the surface membranes of human carcinoma cells and tissues.

NASA Discipline Cell Biology↗

Know Your Enemy - Implementation of Bioremediation within a Suspected DNAPL Source Zone Following High-Resolution Site Characterization at Contractors Road Heavy Equipment Area, Kennedy Space Center, Florida

The National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), has adopted high-resolution site characterization (HRSC) sampling techniques during baseline sampling prior to implementation of remedies to confirm and refine the conceptual site model (CSM). HRSC sampling was performed at Contractors Road Heavy Equipment Area (CRHE) prior to bioremediation implementation to verify the extent of the trichloroethene (TCE) dense non-aqueous phase liquid (DNAPL) source area (defined as the area with TCE concentrations above 1% solubility) and its daughter product dissolved plume that had been identified during previous HRSC events. The results of HRSC pre-bioremediation implementation sampling suggested that the TCE source area was larger than originally identified during initial site characterization activities, leading to a design refinement to improve electron donor distribution and increase the likelihood of achieving remedial objectives. Approach/Activities: HRSC was conducted from 2009 through 2014 to delineate the vertical and horizontal extent of chlorinated volatile organic compounds (CVOCs) in the groundwater. Approximately 2,340 samples were collected from 363 locations using direct push technology (DPT) groundwater sampling techniques. Samples were collected from up to 14 depth intervals at each location using a 4-foot sampling screen. This HRSC approach identified a narrow (approx. 5 to 30 feet wide), approximately 3,000 square foot TCE DNAPL source area (maximum detected TCE concentration of 160,000 micrograms per liter [micro-g/L] at DPT sampling location DPT0225). Prior to implementation of a bioremediation interim measure, HRSC baseline sampling was conducted using DPT groundwater sampling techniques. Concentrations of TCE were an order of magnitude lower than previous reported (12,000 micro-g/L maximum at DPT sampling location DPT0225) at locations sampled adjacent to previous sampling locations. To further evaluate the variability in concentrations observed additional sampling was conducted in 2016. The results identified higher concentrations than originally detected within the previously defined source area and the presence of source zone concentrations upgradient of the previously defined source area (maximum concentration observed 570,000 micro-g/L). The HRSC baseline sampling data allowed for a revision of the bioremediation design prior to implementation. Bioremediation was implemented within the eastern portion of the source area in November and December 2016 and quarterly performance monitoring was completed in March and June 2017. Reductions in CVOC concentrations from baseline were observed at all performance monitoring wells in the treatment area, and by June 2017, an approximate 95% CVOC mass reduction was observed based on monitoring well sampling results. Results/Lessons Learned: The results of this project suggest that, due to the complexity of DNAPL source zones, HRSC during pre-implementation baseline sampling in the TCE source zone was an essential strategy for verifying the treatment area and depth prior to remedy implementation. If the upgradient source zone mass was not identified prior to bioremediation implementation, the mass would have served as a long-term source for the dissolved plume.

Chrest, Anne↗

Fire Station #1 Area, SWMU 116 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Fire Station #1 (FS1) Area (formerly known as Fire Station #4) located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 116 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 116 as the fire station was identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. During the SA, a total of six soil, 48 groundwater direct push technology (DPT), eight groundwater monitoring well, and one surface water sample were collected between October 2021 and March 2022. The samples were analyzed for 28 PFAS compounds using the Department of Defense Quality Systems Manual-compliant Method. SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the FS1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSLs) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Overall, results from the SA showed exceedances of the applicable screening criteria for soil, groundwater and surface water. Considering the current and historical dataset, perfluorooctanesulfonic acid (PFOS) is the prevalent PFAS compound, which is indicative of AFFF releases. Based on results of the SA, additional groundwater DPT and surface water sampling should be considered, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between groundwater and surface water in the FS1 Area.

PFAS↗

Ohio's Abandoned Mine Lands Reclamation Program: a Study of Data Collection and Evaluation Techniques

The planning process for a statewide reclamation plan of Ohio abandoned minelands in response to the Federal Surface Mining Control and Reclamation Act of 1977 included: (1) the development of a screening and ranking methodology; (2) the establishment of a statewide review of major watersheds affected by mining; (3) the development of an immediate action process; and (4) a prototypical study of a priority watershed demonstrating the data collection, analysis, display and evaluation to be used for the remaining state watersheds. Historical methods for satisfying map information analysis and evaluation, as well as current methodologies being used were discussed. Various computer mapping and analysis programs were examined for their usability in evaluating the priority reclamation sites. Hand methods were chosen over automated procedures; intuitive evaluation was the primary reason.

Sperry, S. L.↗

TPSAS-NF1676L-34683-DND

The lidar on the Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) mission, makes robust measurements of dust and has generated a length of record that is significant both seasonally and inter-annually. We exploit this record to determine a multi-year climatology of the properties of Middle Eastern dust in the vicinity of Kuwait City. In particular seasonal optical depths of dust gridded in accordance with the Level 3 data products protocol between 2006 and 2015. The data are screened using standard CALIPSO quality assurance flags, cloud aerosol discrimination (CAD) scores, overlying features and layer properties. CALIPSO is collaboration between NASA and Centre National d’Études Spatiales (CNES), was launched in April 2006 to provide vertically resolved measurements of cloud and aerosol distributions. The primary instrument on the CALIPSO satellite is the Cloud-Aerosol Lidar with Orthogonal Polarization (CALIOP), a near-nadir viewing two-wavelength polarization-sensitive instrument. In addition to CALIPSO, we use the AErosol RObotic NETwork (AERONET) sites in the region to identify extreme dust events such as Sand and Dust Storms (SDS). The lidar measurements of the vertical location of the layers along with predominant prevailing wind vectors will enable identification of dust sources and inform mitigation solutions for extreme SDS.

Ali H Omar↗

Command and Data Handling Branch Internship

Modular Integrated Stackable Layers (MISL) is a computer system designed for simple, fast, and cost effective flexible reconfiguration in space environments such as the ISS and Orion projects for various uses. Existing applications include wireless and wired communications, data acquisition and instrumentation, and camera systems, and potential applications include bus protocol converters and subsystem control. MISL is based on Texas Instruments (TI)' MSP430 16-bit ultra-low-power microcontroller device. The purpose of my project was to integrate the MISL system with a liquid crystal display (LCD) touchscreen. The LCD, manufactured by Crystalfontz and part number CFAF320240F-035T-TS, is a 320 by 240 RGB resistive color screen including an optional carrier board. The vast majority of the project was done with Altium Designer, a tool for printed circuit board (PCB) schematic capture, 3D design, and FPGA (Field Programmable Gate Array) development. The new PCB was to allow the LCD to directly stack to the rest of MISL. Research was done with datasheets for the TI microcontroller and touchscreen display in order to meet desired hardware specifications. Documentation on prior MISL projects was also utilized. The initial step was to create a schematic for the LCD, power bus, and data bus connections between components. A layout was then designed with the required physical dimensions, routed traces and vias, power and ground planes, layer stacks, and other specified design rules such as plane clearance and hole size. Multiple consultation sessions were held with Hester Yim, the technical discipline lead for the Command and Data Handling Branch, and Christy Herring, the lead PCB layout designer in the Electronic Design and Manufacturing Branch in order to ensure proper configuration. At the moment, the PCB is awaiting revision by the latter-mentioned branch. Afterwards, the board will begin to undergo the manufacturing and testing process. Throughout the internship at Johnson Space Center, I gained several technical and professional skills. I gained proficiency in Altium Designer and experience using subversion clients, as well as knowledge in PSpice with OrCAD and battery design for spaceflight from on-site. I also gained networking, organization, and communication skills throughout meetings with coworkers and other interns. This internship at Johnson Space Center has impacted my future aspirations by further inspiring me to follow a career path into space rated engineering technology and human spaceflight applications. After graduation, I plan to attend graduate Modular Integrated Stackable Layers (MISL) is a computer system designed for simple, fast, and cost effective flexible reconfiguration in space environments such as the ISS and Orion projects for various uses. Existing applications include wireless and wired communications, data acquisition and instrumentation, and camera systems, and potential applications include bus protocol converters and subsystem control. MISL is based on Texas Instruments’ MSP430 16 bit ultra-low power microcontroller device. The purpose of my project was to integrate the MISL system with a liquid crystal display touchscreen. The LCD, manufactured by Crystalfontz and part number CFAF320240F-035T-TS, is a 320x240 RGB resistive color screen including an optional carrier board.The vast majority of the project was done with Altium Designer, a tool for printed circuit board (PCB) schematic capture, 3D design, and FPGA development. The new PCB was to allow the LCD to directly stack to the rest of MISL. Research was done with datasheets for the TI microcontroller and touchscreen display in order to meet desired hardware specifications. Documentation on prior MISL projects was also utilized. The initial step was to create a schematic for the LCD, power bus, and data bus connections between components. A layout was then designed with the required physical dimensions, routed traces and vias, power and ground planes, layer stacks, and other specified design rules such as plane clearance and hole size. Multiple consultation sessions were held with Hester Yim, the technical discipline lead for the Command and Data Handling Branch, and Christy Herring, the lead PCB layout designer in the Electronic Design and Manufacturing Branch in order to ensure proper configuration. At themoment, the PCB is awaiting revision by the latter-mentioned branch. Afterwards, the board will begin to undergo the manufacturing and testing process.Throughout the internship at Johnson Space Center, I gained several technical and professional skills. I gained proficiency in Altium Designer and experience using subversion clients, as well as knowledge in PSpice with OrCAD and battery design for spaceflight from on-site. I also gained networking, organization, and communication skills throughout meetings with coworkers and other interns. This internship at Johnson Space Center has impacted my future aspirations by further inspiring me to follow a career path into space rated engineering technology and human spaceflight applications. After graduation, I plan to attend graduate school for a master's or doctorate degree in electrical or computer engineering.

Billings, Rachel Mae↗

Large Payload Ground Transportation and Test Considerations

During test and verification planning for the Altair lunar lander project, a National Aeronautics and Space Administration (NASA) study team identified several ground transportation and test issues related to the large payload diameter. Although the entire Constellation Program-including Altair-has since been canceled, issues identified by the Altair project serve as important lessons learned for payloads greater than 7 m diameter being considered for NASA's new Space Launch System (SLS). A transportation feasibility study found that Altair's 8.97 m diameter Descent Module would not fit inside available aircraft. Although the Ascent Module cabin was only 2.35 m diameter, the long reaction control system booms extended nearly to the Descent Module diameter, making it equally unsuitable for air transportation without removing the booms and invalidating assembly workmanship screens or acceptance testing that had already been performed. Ground transportation of very large payloads over extended distances is not generally permitted by most states, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA's Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure-roads, bridges, airframes, and buildings-necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications.

Rucker, Michelle A.↗