Preliminary Hyde Memorial State Park Modular Pumped Hydro Energy Storage Sizing Study
Hyde Memorial State Park has lost grid supplied power and has been running on a diesel generator for some time now. The powerline that feeds the park is a state owned, 5 mile underground extension from the PNM service connection point. The line has decayed over the past 30 plus years and due to the location (much of it running under the road) the cost of repair and the logistics of closing the road are not good options. In June 2019 through a state contractor, the State of New Mexico Energy, Minerals and Natural Resources Department completed a renewable energy microgrid feasibility study to see if it was technically and economically feasible to operate the park without future grid power. The study looked at solar plus battery storage and a propane generator as a possible option. New Mexico State Parks Division has indicated their wish to move forward with the microgrid project which will now go out to one of the state’s energy services performance contractors. The contractor will have to finalize the feasibility study and develop a complete list of construction costs. Given, the lack of long-term O&M data on the battery, as part of the next phase of the project the State of New Mexico Energy, Minerals and Natural Resources Department asked Los Alamos National Laboratory to preliminary examine the potential for pumped hydro as an alternative to batteries.