Reliability Impacts in Life Support Architecture and Technology Selection

Equivalent System Mass (ESM) and reliability estimates were performed for different life support architectures based primarily on International Space Station (ISS) technologies. The analysis was applied to a hypothetical 1-year deep-space mission. High-level fault trees were initially developed relating loss of life support functionality to the Loss of Crew (LOC) top event. System reliability was then expressed as the complement (nonoccurrence) this event and was increased through the addition of redundancy and spares, which added to the ESM. The reliability analysis assumed constant failure rates and used current projected values of the Mean Time Between Failures (MTBF) from an ISS database where available. Results were obtained showing the dependence of ESM on system reliability for each architecture. Although the analysis employed numerous simplifications and many of the input parameters are considered to have high uncertainty, the results strongly suggest that achieving necessary reliabilities for deep-space missions will add substantially to the life support system mass. As a point of reference, the reliability for a single-string architecture using the most regenerative combination of ISS technologies without unscheduled replacement spares was estimated to be less than 1%. The results also demonstrate how adding technologies in a serial manner to increase system closure forces the reliability of other life support technologies to increase in order to meet the system reliability requirement. This increase in reliability results in increased mass for multiple technologies through the need for additional spares. Alternative parallel architecture approaches and approaches with the potential to do more with less are discussed. The tall poles in life support ESM are also reexamined in light of estimated reliability impacts.

Lange, Kevin E.↗

Assessment of Service Life for Regenerative ECLSS Resin Beds

The International Space Station (ISS) Water Processor Assembly (WPA) and Oxygen Generation Assembly (OGA) manage and process water at various levels of cleanliness for multiple purposes. The effluent of theWPA and the influent of the OGA require water at very high levels of purity. The bulk of the water purification that occurs in both systems is performed by consumable activated carbon and ion exchange resin beds. Replacement beds must be available on orbit in order to continue the ISS critical processes of water purification and oxygen generation. Various hurdles exist in order to ensure viable spare resin beds. These include the characteristics of resin beds such as: storage environment, shelf life requirements, microbial growth, and variations in the levels and species of contaminants the beds are required to remove. Careful consideration has been given to match water models, bed capacities and spares traffic models to ensure that spares are always viable. The results of these studies and considerations, in particular, how shelf life requirements affect resin bed life management, are documented in this paper.

Cloud, Dale L.↗

[MaRS Project]

The Space Exploration Division of the Safety and Mission Assurances Directorate is responsible for reducing the risk to Human Space Flight Programs by providing system safety, reliability, and risk analysis. The Risk & Reliability Analysis branch plays a part in this by utilizing Probabilistic Risk Assessment (PRA) and Reliability and Maintainability (R&M) tools to identify possible types of failure and effective solutions. A continuous effort of this branch is MaRS, or Mass and Reliability System, a tool that was the focus of this internship. Future long duration space missions will have to find a balance between the mass and reliability of their spare parts. They will be unable take spares of everything and will have to determine what is most likely to require maintenance and spares. Currently there is no database that combines mass and reliability data of low level space-grade components. MaRS aims to be the first database to do this. The data in MaRS will be based on the hardware flown on the International Space Stations (ISS). The components on the ISS have a long history and are well documented, making them the perfect source. Currently, MaRS is a functioning excel workbook database; the backend is complete and only requires optimization. MaRS has been populated with all the assemblies and their components that are used on the ISS; the failures of these components are updated regularly. This project was a continuation on the efforts of previous intern groups. Once complete, R&M engineers working on future space flight missions will be able to quickly access failure and mass data on assemblies and components, allowing them to make important decisions and tradeoffs.

Aruljothi, Arunvenkatesh↗

Supportability Challenges, Metrics, and Key Decisions for Future Human Spaceflight

Future crewed missions beyond Low Earth Orbit (LEO) represent a logistical challenge that is unprecedented in human space flight. Astronauts will travel farther and stay in space for longer than any previous mission, far from timely abort or resupply from Earth. Under these conditions, supportability { defined as the set of system characteristics that influence the logistics and support required to enable safe and effective operations of systems { will be a much more significant driver of space system lifecycle properties than it has been in the past. This paper presents an overview of supportability for future human space flight. The particular challenges of future missions are discussed, with the differences between past, present, and future missions highlighted. The relationship between supportability metrics and mission cost, performance, schedule, and risk is also discussed. A set of pro- posed strategies for managing supportability is presented (including reliability growth, uncertainty reduction, level of repair, commonality, redundancy, In-Space Manufacturing (ISM) (including the use of material recycling and In-Situ Resource Utilization (ISRU) for spares and maintenance items), reduced complexity, and spares inventory decisions such as the use of predeployed or cached spares - along with a discussion of the potential impacts of each of those strategies. References are provided to various sources that describe these supportability metrics and strategies, as well as associated modeling and optimization techniques, in greater detail. Overall, supportability is an emergent system characteristic and a holistic challenge for future system development. System designers and mission planners must carefully consider and balance the supportability metrics and decisions described in this paper in order to enable safe and effective beyond-LEO human space flight.

Owens, Andrew C.↗

Oxygen Storage Tanks Are Feasible for Mars Transit

The Mars transit tanks will probably be titanium lined, composite over wrapped pressure vessels (COPVs) similar to those used in the space shuttle and International Space Station(ISS). Since the mass of a storage tank is proportional to the mass of the gas it contains, the required oxygen will use about the same mass of tanks regardless of the number and size ofthe tanks. Using existing relatively small COPVs is possible. Pressure vessels can fail due torupture and leakage but no failures have occurred in space and the expected failure rates are very low. Since one or two spare tanks are required for reliability, using smaller tanks can reduce the total mass. For a Mars round trip, the mass of oxygen and tanks including spares is roughly equal to the mass of the ISS Oxygen Generation Assembly (OGA) and its spares. Since the OGA must orbit Mars and be returned to Earth, while half the storage tanks are emptied on the way to Mars and can be abandoned, storage tanks have a significant launch mass advantage over the OGA. Storage tanks are simpler, more reliable,and have fewer failure modes than an OGA. They would have smaller design and development costs and need less crew time and maintenance. Oxygen storage tanks are feasible for Mars transit and are attractive compared to the ISS OGA.

Jones, Harry W.↗

ECLSS Does Not Exist in a Vacuum: Integrated Analysis is Necessary to Inform System Architecture Decisions

Environmental Control and Life Support System (ECLSS) architecture selection has profound implications for mission cost and mass extending far beyond the ECLSS itself. Similarly, other mission architecture decisions – particularly involving transportation systems – can influence optimal ECLSS architectures. Loop closure influences requirements for water, oxygen, and other consumables. System maintainability and reliability influences spares mass and risk. System, consumables, and spares mass interact with transportation system architectures and propellant demands and propulsion element sizing. All these interactions with other systems must be considered when evaluating ECLSS options. Analyses that focus only on maximizing ECLSS loop closure – or minimizing ECLSS mass, or minimizing ECLSS life cycle cost – may lead to sub-optimal or even counterproductive system architecture and investment decisions at the mission level. For example, an ECLSS architecture that minimizes ECLSS lifecycle cost but results in excessively high logistics mass could lead to significantly increased transportation system costs or make interplanetary transportation infeasible. Increased loop closure could result in higher development costs and higher mass if system/spares mass increases outweigh consumables reduction. In addition, systems mass and consumables mass are not directly comparable and have different impacts on propellant requirements, as consumables mass changes over the course of the mission. This paper presents an integrated analysis examining the overall impact of different ECLSS and transportation architectures on mass for a crewed Mars mission, including the habitat and transportation systems as well as consumables, spares, and propellant. Key observations are discussed, along with opportunities for further sensitivity analysis and model development. Overall, ECLSS development activities must consider their impacts at the mission level, as part of an integrated system, rather than in isolation.

Systems Analysis↗

Integrated Trajectory, Habitat, and Logistics Analysis and Trade Study for Human Mars Missions

Environmental Control and Life Support System (ECLSS) architecture selection has profound implications for mission cost and mass extending far beyond the ECLSS itself. Similarly, other mission architecture decisions – particularly involving transportation systems – can influence optimal ECLSS architectures. Loop closure influences requirements for water, oxygen, and other consumables. System maintainability and reliability influences spares mass and risk. System, consumables, and spares mass interact with transportation system architectures and propellant demands and propulsion element sizing. All these interactions with other systems must be considered when evaluating ECLSS options. Analyses that focus only on maximizing ECLSS loop closure – or minimizing ECLSS mass, or minimizing ECLSS life cycle cost – may lead to sub-optimal or even counterproductive system architecture and investment decisions at the mission level. For example, an ECLSS architecture that minimizes ECLSS life cycle cost but results in excessively high logistics mass could lead to significantly increased transportation system costs or make interplanetary transportation infeasible. Increased loop closure could result in higher development costs and higher mass if system/spares mass increases outweigh consumables reduction. In addition, systems mass and consumables mass are not directly comparable and have different impacts on propellant requirements, as consumables mass changes over the course of the mission. This paper presents an integrated analysis examining the overall impact of different ECLSS and transportation architectures on mass for a crewed Mars mission, including the habitat and transportation systems as well as consumables, spares, and propellant. Key observations are discussed, along with opportunities for further sensitivity analysis and model development. Overall, ECLSS development activities must consider their impacts at the mission level, as part of an integrated system, rather than in isolation.

Mars↗

Integrated Trajectory, Habitat, and Logistics Analysis and Trade Study for Human Mars Missions

Environmental Control and Life Support System (ECLSS) architecture selection has profound implications for mission cost and mass extending far beyond the ECLSS itself. Similarly, other mission architecture decisions – particularly involving transportation systems – can influence optimal ECLSS architectures. Loop closure influences requirements for water, oxygen, and other consumables. System maintainability and reliability influences spares mass and risk. System, consumables, and spares mass interact with transportation system architectures, including propellant demands and propulsion element sizing. All these interactions with other systems must be considered when evaluating ECLSS options. Analyses that focus only on maximizing ECLSS loop closure – or minimizing ECLSS mass, or minimizing ECLSS life cycle cost – may lead to sub-optimal or even counterproductive system architecture and investment decisions at the mission level. For example, an ECLSS architecture that minimizes ECLSS life cycle cost but results in excessively high logistics mass could lead to significantly increased transportation system costs or make interplanetary transportation infeasible. Increased loop closure could result in higher development costs and higher mass if system/spares mass increases outweigh consumables reduction. In addition, systems mass and consumables mass are not directly comparable and have different impacts on propellant requirements, as consumables mass changes over the course of the mission. This paper presents an integrated analysis examining the overall impact of different ECLSS and transportation architectures on Earth departure mass for a crewed Mars mission, including the habitat and transportation systems as well as consumables, spares, and propellant. Key observations are discussed, along with opportunities for further sensitivity analysis and model development. Overall, ECLSS development activities must consider their impacts at the mission level, as part of an integrated system, rather than in isolation.

Mars↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Surface Hardness Testing of Mobile Launcher 1 (ML-1) Vehicle Support Posts (VSP) Following Artemis I Launch Exposure

Following the successful launch of Artemis I on November 16th, 2022 (Fig 1), a surface hardness assessment was performed on the eight primary VSPs (Figs. 2, 3) located on the Zero Deck of the ML. This assessment was performed as part of an instrument investigation for strain gauges installed on VSP interior surfaces that had a “strange reaction”. This report does not address the VSP strain gauge investigation, but rather VSP structural integrity for future service (Artemis II, III, …). Surface hardness measurements were taken to assess the strength of the ASTM A148 steel castings to confirm thermal exposure from launch had not reannealed the VSPs. However unlikely, it is possible high temperature may have heated and tempered (reannealed) the VSPs, resulting in a change of built-in stresses. This loss in built-in stress may explain the change in off-set measured by the strain gauges. Initial hardness measurements were made at two interior surfaces of VSPs near the strain gauges and the corresponding exterior surfaces (engine hole-facing). Field hardness measurements on the exterior, engine hole surface-facing surfaces for all eight VSPs ranged from 175 to 226 HB/P, well below the minimum hardness of 302 Brinell (HB). Opposing interior surface hardness measurements near strain gauges ranged from 264 to 358 HB/P. In all cases for flight VSPs, a drop in interior-to-exterior hardness ranging from 70 to 132 HB/P was measured. Surface hardness measurements were then made on the two spare VSPs not exposed to launch temperatures for baseline comparison. These two spare VSPs had a drop in Brinell hardness from interior to exterior surfaces ranging from 3 to 17 HB/P. The large interior-to-exterior delta hardness for eight flight VSPs but not for the two spare VSPs suggests launch exposure temperatures softened the exterior surfaces, raising two questions: 1) Are the VSPs compromised for future use, and 2) How deep is the exterior surface softening effect? To address concerns of low surface hardness values at non-critical exterior surfaces, additional field surface hardness measurements were taken at high-stress locations on VSP3: Both door jams, back radius, and internal left and right radius near the base. These values came in well above the required minimum hardness (317 to 365 HB/P). For a more representative pre-launch versus post-launch surface hardness comparison, VSP Acceptance Data Packages (ADPs) were reviewed, and hardness measurements were made at the same eight original locations on VSP3 where hardness measurements were made at the foundry. To determine the degree of softening, 1/8” of material was machined away at three exterior surfaces of engine hole-facing side (Fig. 4). A significant increase in surface hardness was measured ranging from 50 to 86 HB/P. Values at these three locations were still slightly below the required minimum hardness, so an additional 1/8” material was machined away, and hardness values were retaken. At the ¼” depth, hardness values increased to 321 to 324 HB/P. These values fall above the required minimum, concluding surface hardness testing. Rationale for VSP continued use was reached with no restrictions during a Chief Engineering Review based on hardness values exceeding minimum at critical locations and subsurface locations for VSP #3.

Artemis I↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

Current Environmental Control and Life Support System (ECLSS) development and test activities are not generating data fast enough to provide statistically-supportable precise Orbital Replacement Unit (ORU) failure rate estimates for future missions. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches – namely regular resupply and rapid abort capabilities – will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of operations on board the International Space Station (ISS), a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass for future missions. A Bayesian failure rate estimation approach, such as the one currently implemented by the ISS Program, can help reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior failure rate estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, these subjective (and often inaccurate) prior estimates currently have a strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Supportability↗

UV + Damp Heat Induced Power Losses in Fielded Utility N-Type Si PV Modules

A recent trend in commercial PV modules is a transition to n-type silicon cells, including passivated emitter rear totally diffused (n-PERT), tunnel oxide passivated contact (TOPCon), and silicon heterojunction (SHJ). There is evidence via lab studies that some of these cells are more susceptible to UV induced degradation (UVID), yet there is a lack of confirmation that such degradation occurs in the field. Current IEC standards designed to screen for early module failures require only minimal UV exposure (15 kWh/m2 280-400 nm, ~2-3 months equivalent outdoor exposure). Here, we investigate fielded n-PERT silicon (Si) modules from a commercial utility that show power losses of ~2%/year. We present a comprehensive picture of the physics and chemistry of degradation supported by both module and cell electronic characterization (EL, PL, IV, EQE, and DLIT) and materials-level morphological and chemical analysis (SEM, EDS, XPS, FTIR, and HPLC). All sampled site modules show short circuit current (Isc) and open circuit voltage (Voc) losses when compared to unfielded spares, with the most severely degraded also having losses in fill factor (FF). We identify two different degradation modes contributing to overall power loss: (1) external quantum efficiency (EQE) measurements show losses in the blue range of the spectra, indicative of cell surface recombination losses, and (2) variations in high series resistance (Rs) at the cell level that are correlated with compositional differences in cell metallization. Using unfielded spares, we were able to reproduce Voc, Isc, and EQE losses via a minimum UV stress of 67.5 kWh/m2 (280-400 nm), 4.5x the exposure currently required in IEC 61215-2 (MQT 10). Degradation continued with additional UV dosage equivalent to the fielded modules (405 kWh/m2 total), with power loss leveling out at an average of 6.1%. Subsequent 1000 h of 85% RH/85degrees C damp heat testing showed that cells exposed to UV underwent additional severe series resistance degradation, even those without the susceptible paste composition seen in the field, whereas non-UV exposed cells saw little change. We attribute this to higher concentrations of acetic acid generated on the UV exposed area of the module, leading to degradation of the gridline/cell interface and high Rs. This study is unique in that it reproduces field observed utility scale UVID with an accelerated test and supports the need for standards development for longer UV exposure combined with other stress factors to catch materials interplay within a module package.

14 SOLAR ENERGY↗

Design and calculations for HWR Strongback

The PIP-II Superconductive Linac is a linear accelerator that provides the first stage of beam acceleration. The velocity increase is achieved through a sequence of different cryomodules, where all the cavities are aligned to form a continuous string. The cryomodule team is currently developing a spare for the HWR cryomodule. This spare will not be an exact replica of the existing one, but rather will be based on the SSR f650 cryomodule design created for PIP-II . Each cavity , magnet , and coupler form a unit, with a total of eight units per string. These components, together with additional equipment (such as piping , the thermal shield , and beamline interconnections ), are supported by the Strongback . The aim of this project is to develop a brand-new Strongback design for HWR cavities, and to perform the related analyses and calculations in order to meet the required specifications.

43 PARTICLE ACCELERATORS↗

Hybrid redundancy system for improving reliability - A concept

System combines two concepts - triple modular redundancy (TMR) and spares (replacement system) redundancy. System has triplicated active unit core with associated bank of specifically arranged standby spare units. Curves plotted from characteristic equation show hybrid system is more reliable than conventional TMR systems.

Mathur, F. P.↗

A reliability and comparative analysis of two standby system configurations.

Equations are derived which enable one to calculate the system reliability for parallel or triple modular redundant systems with standby spares. Software error detection is introduced into the TMR/Spares system configuration in order to utilize fully all of the units. An indication of the sensitivity of the system reliability to an increase in the number of spares, partitioning, switching, variations in the powered and unpowered failures rates, and time is presented. A comparison of the parallel and the TMR/Spares system configurations, under similar conditions, is given.

Taylor, D. S.↗

Skylab program. Earth resources experiment package. Sensor performance report. Volume 7 (S190B): SL2, SL3 and SL4 evaluations

The S190B Earth Terrain Camera (ETC) operated acceptably for all of its scheduled EREP passes throughout the SL2 mission. The crew reported no problems in unstowing the camera, changing filters, installing the ETC window in the SAL, or installing the camera onto the window. The ETC was operated for a total of seven times with no failures. The clock on the ETC was checked on DOY 170 (June 19, 1973) and was found to be 30 min. and 58 sec. slower than GMT. The change in time was expected since a similar circumstance was experienced during ETC qualification testing for launch vibration. A leak existed in the seal of the spare magazine to the camera vacuum interface. For EREP passes 08 and 10, black-and-white film EK 3414 (roll no. 82) was installed in this spare magazine. Since there was an audible hiss, the vacuum hose was not connected to the camera. This caused the vacuum platen to be inoperable, resulting in some degradation in resolution for this roll of film. The vegetation of the South American jungle areas proved to be much darker than vegetation found in the United States, and was consequently about 1/2 stop underexposed in all cases.

Kenney, G. P.↗

Early Mariner comet flyby

An inexpensive first mission to a faint short period comet utilizing the spare Mariner Venus/Mercury spacecraft is studied with regard to science rationale and instrumentation and engineering feasibility and design. The spare Mariner spacecraft, suitably modified, is shown to be compatible with science requirements of a first comet flyby. Important aspects of this early mission would be penetration of the comet's gaseous coma and the approach of the nucleus to within hundreds of km in order to obtain in situ measurements and imaging that will help to establish comet science models and determine the hazards of a comet environment to future comet missions.

Nock, K. T.↗