Search NASA⌕ Search

SEARCH · Search NASA

Results for “State Fleets”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Development of wind turbine blade recycling baselines in the United States

Over the past several years, the wind energy industry has received scrutiny regarding wind turbine blade (WTB) recycling due to the landfilling of WTBs caused by a lack of industrially viable recycling solutions. The amount of WTBs that will need to be recycled is set to increase in the United States as the deployment of wind energy is expected to rapidly grow to meet the nation's energy goals by 2035. While significant progress has been made worldwide, it is still unclear which WTB recycling solutions would be the most cost and energy effective within the United States for the existing fleet of wind turbines. To guide researchers and industry with a clear path forward, a range of options for WTB recycling in the United States are modeled through development of baseline scenarios and the use of formal life cycle assessment (LCA). Model data have been collected through literature review, industry engagement, and expert opinion regarding current end of life practices and considerations surrounding equipment, labor, and logistics. A detailed baseline for WTB decommissioning processes has been developed and used to assess alternative approaches, such as on-site shredding to compare the impacts on greenhouse gas (GHG) emissions. The developed LCA model and baseline scenarios for WTB recycling is used to assess the current WTB decommissioning practices in the United States along with emerging recycling pathways, including cement kiln co-processing and pyrolysis. Initial findings indicate that there are different approaches to decommissioning WTBs in the United States, each of which has unique implications for recycling. In light of this finding, additional results from the modeling will be used to better understand decommissioning practices and assist in making educated decisions on recycling pathways for the future. Throughout the analysis, focus was given to where international efforts might differ from the United States. WTB recycling is occurring worldwide, and different countries have different drivers for creating markets for recycled WTB materials. The contrasts and similarities between the United States and other countries offer insight to areas of opportunity that the United States could investigate and areas that can be readily transferred from existing solutions. By modeling and characterizing the current decommissioning practices and potential recycling solutions for the United States, a clearer vision will be created for pathways forward as to how to handle end of life WTBs to enable more efficient and cost-effective opportunities for material recovery from end-of-life WTBs.

Korey, Matt↗

National Clean Fleets Partnership [Fact Sheet]

Provides an overview of Clean Cities National Clean Fleets Partnership (NCFP). The NCFP is open to large private-sector companies that have fleet operations in multiple states. Companies that join the partnership receive customized assistance to reduce petroleum use through increased efficiency and use of alternative fuels. This initiative provides fleets with specialized resources, expertise, and support to successfully incorporate alternative fuels and fuel-saving measures into their operations. The National Clean Fleets Partnership builds on the established success of DOE's Clean Cities program, which reduces petroleum consumption at the community level through a nationwide network of coalitions that work with local stakeholders. Developed with input from fleet managers, industry representatives, and Clean Cities coordinators, the National Clean Fleets Partnership goes one step further by working with large private-sector fleets.

02 PETROLEUM↗

Craig Energy Center Feasibility Study

Tri-State Generation and Transmission Association Inc. (“Tri-State”) provides wholesale electric power to its member cooperatives and public power districts that collectively deliver electricity to more than a million consumers in Colorado, Nebraska, New Mexico and Wyoming. The Craig Power Station has been an integral part of Tri-State’s dispatchable generation fleet that ensures an affordable, reliable and resilient energy supply for its members. The ownership of the Craig Station Unit 1&2 is a collaborative between Tri-State, Salt River Project Agricultural Improvement and Power District, Platte River Power Authority, PacifiCorp, and Public Service Company of Colorado and is known as the Yampa Project. Tri-State owns all of Craig Unit 3 and is the operator of all three units. All three of the Craig units have planned retirement dates that will not extend beyond 2028 and Tri-State Generation wanted to evaluate carbon-neutral emitting technologies that could provide approximately 300 megawatts (“MWs) of capacity and energy that will be lost after Unit 3 ceases operation, as well as provide a similar level of economic benefits to the Craig community. This report is to serve as a technology feasibility study constrained to the current land area available at the Craig site and was conducted based on the limitations of the region.

25 ENERGY STORAGE↗

Nuclear Waste Policy in the United States

The current U.S. reactor fleet produces 2,100–2,400 ton/yr of spent nuclear fuel (SNF). After 50-plus years of nuclear power generation, 58,000 tons of SNF has accumulated in temporary storage at the reactor sites. How did we get where we are, and where do we go from here?

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants (Final Scientific / Technical Report)

Increasing the competitiveness of the existing pulverized-coal utility fleet in the United States may be achieved by decreasing heat rate, via increases in steam cycle efficiency through upgraded steam temperatures and use of latest technology available in steam turbine and blading design. The average net plant efficiency of the US coal-fired fleet is approximately 33% (HHV). Plant efficiency increases to approximately 41.4% (HHV) at 1,350°F (732°C) steam temperature. However, achieving these Advanced Ultra-Super Critical (AUSC) steam conditions requires the use of advanced high-temperature materials. While there has been a significant amount of DOE-funded materials R&D, most of the related design work has focused on new (greenfield) units, rather than on opportunities to retrofit this advanced technology to the existing utility fleet. If technology, based upon the advanced materials required for AUSC steam conditions, may be applied to the existing fleet, using an economically viable retrofit, a higher capacity factor can be expected as a result of the increased plant competitiveness. The Electric Power Research Institute (EPRI) was awarded a project by the US Department of Energy to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants: 2,400 psig (16.6 MPa) subcritical and 3,500 psig (24.1 MPa) supercritical pulverized coal units. The nine upgrade options that were originally being considered included increasing the main and reheat steam temperatures from 1,000°F (538°C) to 1,100°, 1,200°, and 1,350°F (593°C, 649°C, and 732°C) while holding the steam pressures constant at their original design values, and cases where just the main steam or reheat steam temperatures were increased. The objective was to minimize the modifications required to the existing power plant while still providing a significant improvement in heat rate. The upgrade options assumed that the boiler enclosure envelope remained unchanged from each base case, and that all applicable OEM design guidelines for normal commercial units were imposed. For the highest temperature supercritical case, an option of using a low-pressure molten salt loop to transfer heat from the furnace to the steam was examined. The first major task of the work scope was designed to examine the technical feasibility of various upgrade options, while the subsequent work determined economic viability of the technically feasible upgrade options. Prior to evaluating the effect of these increased temperatures, a “base case” model of a subcritical and supercritical PC boiler was created, which was used for comparative purposes. Upgrade options were evaluated at full-load, part-load and dynamic transient conditions. Once the technical feasibility of each upgrade option was evaluated, the economic value of the heat rate improvement of each feasible option was determined by detailed modeling of unit dispatch in several regional power markets. The dispatch model was used to estimate the amount of revenue from power sales the upgraded unit would receive in comparison to a non-upgraded version of the same power plant. As a parallel task to the dispatch analysis, the capital cost of implementing the upgrades was estimated. The capital cost estimates were then compared to the increased revenue estimated by the dispatch modeling to determine the economic attractiveness of each upgrade option. Several upgrade options were determined to be technically feasible. The net present value (NPV) of the costs for steam cycle upgrades considered in this study ranged from approximately $\$$111 to $\$$130 million. The economic modeling results show that the unit dispatch changes resulting from steam cycle upgrades are relatively small, due largely to heat rate (and operating cost) changes being relatively small. Additionally, the cost of each upgrade exceeds the net revenue increases associated with the upgrade case. Note that the breakeven values are higher for subcritical retrofits, but the capital costs for the subcritical upgrades are also slightly higher. In typical new pulverized coal plants, fuel accounts for approximately 25% of the cost of electricity (COE), while capital costs represent around 50% of the COE. Therefore, in order to improve the heat rate by 4% one can only afford to increase the capital cost by 2%, at the same cost of electricity. The conclusion of this study is that without a cost for emitting CO 2 , it will be difficult to pay for significant efficiency improvements on plants firing low cost coals.

01 COAL, LIGNITE, AND PEAT↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2017, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. Two-thirds of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the sixth in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement ("PPA") prices, the levelized cost of solar energy (LCOE), and the market value of solar. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate. Highlights from this year's edition include: -Installation and Technology Trends: The use of solar trackers dominated 2017 installations with nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the high-insolation Southwest, the median insolation level at newly built project sites declined again in 2017. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio grew to 1.32 in 2017, allowing the inverters to operate closer to full capacity for a greater percentage of the day. -Installed Prices: Median installed PV project prices have steadily fallen by two-thirds since the 2007-2009 period, to $2.0/WAC (or $1.6/WDC) for projects completed in 2017. The lowest 20th percentile of projects within our 2017 sample were priced at or below $1.8/WAC, with the lowest-priced projects around $0.9/WAC. Overall price dispersion across the entire sample has decreased steadily every year since 2013; similarly, price variation across regions decreased in 2017. -Operation and Maintenance ("O&M") Costs: PV O&M costs were in the neighborhood of $16/kWAC-year, or $8/MWh, in 2017. These numbers include only those costs incurred to directly operate and maintain the generating plant. -Capacity Factors: The cumulative net AC capacity factors of individual projects vary widely, from 14.3% to 35.2%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010-vintage to 2013-vintage projects, where they've remained fairly steady among more-recent project vintages as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. -PPA Prices and LCOE: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time, by $20-$30/MWh per year on average from 2006 through 2012, with a smaller price decline of ~$10/MWh per year evident from 2013 through 2016. Most recent PPAs in our sample—including many outside of California and the Southwest—are priced at or below $40/MWh levelized (in real 2017 dollars), with a few priced as aggressively as ~$20/MWh. The median LCOE among operational PV projects in our sample has followed PPA prices lower, suggesting a relatively competitive market for PPAs. -Solar's Wholesale Energy Market Value: Falling PPA prices have been offset to some degree by a decline in the wholesale energy market value of solar within higher-penetration markets like California, where solar earned just 79% of the average price across all hours within CAISO's real-time wholesale energy market in 2017 (down from 125% back in 2012). In other markets with less solar penetration, however, solar's hourly generation profile still earns more than the average wholesale price (e.g., 127% in ERCOT, 112% in PJM). -Solar+Storage: Adding battery storage is one way to at least partially restore the value of solar, and three recent PV+storage PPAs in Nevada (each using 4-hour batteries sized at 25% of PV nameplate capacity) suggest that the incremental PPA price adder for storage has fallen to ~$5/MWh, down from ~$15/MWh just a year ago for a similarly configured project. As PV plus battery storage becomes more cost-effective, a number of developers are regularly offering it as a viable upgrade to standalone PV. At the end of 2017, there were at least 188.5 GW of utility-scale solar power capacity within the interconnection queues across the nation. The 2017 growth within these queues is widely distributed across all regions of the country, but is most pronounced in the up-and-coming Midwest region, which accounts for 27% of the 99.2 GW of new queue capacity. The widening geographic distribution is as clear of a sign as any that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States (2019 Ed.)

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2018, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. More than three-quarters of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the seventh in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement (“PPA”) prices, the levelized cost of solar energy (LCOE), and the market value of solar. The report also includes data and observations about completed or recently announced solar+storage projects. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

14 SOLAR ENERGY↗

Utility-Scale Solar 2016: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2016, the utility-scale sector installed more than 2.5 times as much new capacity as did the residential and commercial sectors combined, and is expected to maintain its dominant position for at least another five years. This report—the fifth edition in an ongoing annual series—provides data-driven analysis of the utility-scale solar project fleet in the United States. We analyze not just installed project prices, but also operating costs, capacity factors, and power purchase agreement ("PPA") prices from a large sample of utility-scale PV and CSP projects throughout the United States. Highlights from this year's edition include the following: Installation Trends: The use of solar tracking devices dominated 2016 installations, at nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the Southwest, the median long-term average insolation level at newly built project sites declined again in 2016. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio has stabilized in 2016 at 1.3 for both tracking and fixed-tilt projects. Installed Prices: Median installed PV project prices within a sizable sample have fallen by two-thirds since the 2007-2009 period, to $2.2/WAC (or $1.7/WDC) for projects completed in 2016. The lowest 20th percentile of projects within our 2016 sample were priced at or below $2.0/WAC, with the lowest-priced projects around $1.5/WAC. Overall price dispersion across the entire sample and across geographic regions decreased significantly in 2016. Operation and Maintenance (“O&M”) Costs: What limited empirical O&M cost data are publicly available suggest that PV O&M costs were in the neighborhood of $18/kWAC-year, or $8/MWh, in 2016. These numbers include only those costs incurred to directly operate and maintain the generating plant. Capacity Factors: The cumulative net AC capacity factors of individual PV projects range widely, from 15.4% to 35.5%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed-tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010- to 2013-vintage projects, where they’ve remained fairly steady among both 2014- and 2015-vintage projects as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. Meanwhile, several of the newer CSP projects in the United States are struggling to match long-term performance expectations. PPA Prices: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time. Most recent PPAs in our sample are priced at or below $50/MWh levelized, with a few priced as aggressively as ~$30/MWh. Though impressive in pace and scale, these falling PPA prices have been offset to some degree by declining wholesale market value within high penetration markets like California, where in 2016 a MWh of solar generation was worth just 83% of a MWh of flat, round-the-clock generation. At the end of 2016, there were at least 121.4 GW of utility-scale solar power capacity within the interconnection queues across the nation. The growth within these queues is widely distributed across all regions of the country: California and the Southeast each account for 23% of the 83.3 GW of solar that first entered the queues in 2016, followed by the Northeast (17%), the Southwest (16%), the Central region (12%), Texas (6%) and the Northwest (3%). The widening geographic distribution of solar projects is a clear sign that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

Demonstration of the Human and Technology Integration Guidance for the Design of Plant-Specific Advanced Automation and Data Visualization Techniques

Nuclear power continues to be a safe, reliable, and carbon-free electricity generating source for the United States, though the cost of operating and maintaining the current United States nuclear power plant fleet has become uncompetitive with other sources. This gap is attributed to the advent of new digital instrumentation and control technologies that other electricity generating industries are currently leveraging to streamline work and greatly reduce operating, maintenance, and support costs. Digital instrumentation and control systems and control room modernization offers significant opportunities to reduce operating and maintenance costs to ensure the continued operation of the existing United States light-water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fleet Compliance Annual Report: Model Year 2016, Fiscal Year 2017

This annual report of the Alternative Fuel Transportation Program, which ensures compliance with DOE regulations covering state government and alternative fuel provider fleets pursuant to the Energy Policy Act of 1992 (EPAct), as amended, provides fleet compliance results for manufacturing year 2016 / fiscal year 2017.

33 ADVANCED PROPULSION SYSTEMS↗

Fleet Compliance Annual Report: Model Year 2017, Fiscal Year 2018

This annual report of the Alternative Fuel Transportation Program, which ensures compliance with DOE regulations covering state government and alternative fuel provider fleets pursuant to the Energy Policy Act of 1992 (EPAct), as amended, provides fleet compliance results for manufacturing year 2017 / fiscal year 2018.

33 ADVANCED PROPULSION SYSTEMS↗

Fleet Compliance Annual Report (MY 2018, FY2019)

The U.S. Department of Energy (DOE) regulates covered state government and alternative fuel provider fleets, pursuant to the Energy Policy Act of 1992 (EPAct), as amended. For model year (MY) 2018, the compliance rate with this program for the more than 311 reporting fleets was 100%. Fleets used either Standard Compliance or Alternative Compliance reporting methods.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Utility-Scale Solar 2015: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

The utility-scale solar sector—defined here to include any ground-mounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar power (“CSP”) project that is larger than 5 MWAC in capacity—has led the overall U.S. solar market in terms of installed capacity since 2012. It is expected to maintain its market-leading position for at least another five years, driven in part by December 2015’s three-year extension of the 30% federal investment tax credit (“ITC”) through 2019 (coupled with a favorable switch to a “start construction” rather than a “placed in service” eligibility requirement, and a gradual phase down of the credit to 10% by 2022). In fact, in 2016 alone, the utility-scale sector is projected to install more than twice as much new capacity as it ever has previously in a single year. This unprecedented boom makes it difficult, yet more important than ever, to stay abreast of the latest utility-scale market developments and trends. This report—the fourth edition in an ongoing annual series—is intended to help meet this need, by providing in-depth, annually updated, data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes not just installed project costs or prices—i.e., the traditional realm of most solar economic analyses—but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects throughout the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

14 SOLAR ENERGY↗

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the United States Forest Service: Caribou-Targhee National Forest

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect and evaluate data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect and evaluate data to validate the utilization of advanced electric drive vehicle transportation. This report focuses on the Caribou-Targhee National Forest (CTNF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements. ITSNA acknowledges the support of Idaho National Laboratory and CTNF for participation in the study. ITSNA is pleased to provide this report and is encouraged by enthusiasm and support from the Forest Service and CTNF personnel.

33 ADVANCED PROPULSION SYSTEMS↗

What's New: Winter 2007 Update

Newsletter covers items of pertinence to fleets covered under the EPAct State and Alternative Fuel Provider Rule.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impacts of the consumer heterogeneity in fuel economy valuation on compliance with fuel economy standards

This study quantified the significance of assuming heterogeneity in consumer valuation of fuel economy on the estimated compliance with fuel economy standards, with two approaches. One is mathematical derivation on how the heterogeneity affects the estimated market acceptance of high-efficiency vehicles. The other is a consumer choice based simulation method to analyze the heterogeneity impacts on the compliance with the fuel economy standards for the entire light duty vehicle fleet in the United States. Our findings suggest that the direction of the impact of heterogeneity assumption depends on market positions of high-efficiency vehicles: (1) with the “Likely-Accept” condition, where high-efficiency vehicles sell well and higher achieved fuel economy is expected, the heterogeneity assumption can add additional risks to the compliance; and (2) with the “Likely-Reject” condition where the fuel economy standards may have difficulty in compliance, the heterogeneity can reduce the risks and improve the compliance outcome. It is concluded that consideration of fuel economy valuation heterogeneity is important in fuel economy standard analysis. In conclusion, it is hoped that such consideration may provide a framework to reconcile the different views on consumer valuation of fuel economy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗