Search NASA⌕ Search

SEARCH · Search NASA

Results for “Structures, Design and Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Bench-Scale Development of Promoted High-Capacity Structured Sorbents (Final Technical Report)

The project objective was to develop high-capacity structured sorbent capable of achieving low CO 2 removal from air. The sorbent framework consists of an amine-functionalized onto hydrophobic polymer backbone with an added promoter. The functionalized amine provides high CO 2 capacity and adsorption rates and the polymer backbone to reduce water uptake. For the sorbent development, multiple functionalized amines and promoters were assessed to select a candidate that achieved high CO 2 capacity, high adsorption rate, and high stability. A sorbent-coated filter design was selected as the structured sorbent, which provides high sorbent loading capacity and contains an electrically conductive nonwoven filter substrate that can be Joule-heated to provide efficient utilization of available electricity for sorbent regeneration. A commercial partner operated a pilot filter manufacturing line to produce the filter panels coated with the developed sorbent. A 1 kg CO 2 /day bench unit was designed and fabricated to test the structured filter sorbent. The key achievements from the structured sorbent development activity were demonstrating that existing filter industrial-scale processes can be used for manufacturing Susteon’s structured sorbent and completing a proof-of-concept demonstration of the commercially manufactured structured sorbent filters for CO 2 capture from air with direct, Joule-heated regeneration. A techno-economic assessment with sensitivity analysis was conducted on a 100,000 TPY facility with 85% operating capacity. Through sorbent optimization and process design improvements, it is estimated that the cost of capture was reduced from $\$$349/tCO 2 to $\$$241/tCO 2 . The TEA projects further reductions to $165/tCO 2 through enhancements in CO 2 adsorption rate and sorbent capacity and reducing manufacturing and scale up risks. A life cycle analysis was conducted on the same 100,000 TPY facility and confirmed that the facility’s electricity demand drives its greenhouse gas impact. It was determined that electricity supplied through the current grid mix would result in net-positive CO 2 emissions and that achieving net-negative emissions is only possible by powering the system with renewable electricity or fossil fuel sources equipped with carbon capture and sequestration.

36 MATERIALS SCIENCE↗

HYDROGEN GENERATION FROM ELECTROLYSIS - REVISED FINAL TECHNICAL REPORT

DOE GO13028-0001 DESCRIPTION/ABSTRACT This report is a summary of the work performed by Teledyne Energy Systems to understand high pressure electrolysis mechanisms, investigate and address safety concerns related to high pressure electrolysis, develop methods to test components and systems of a high pressure electrolyzer, and produce design specifications for a low cost high pressure electrolysis system using lessons learned throughout the project. Included in this report are data on separator materials, electrode materials, structural cell design, and dissolved gas tests. Also included are the results of trade studies for active area, component design analysis, high pressure hydrogen/oxygen reactions, and control systems design. Several key pieces of a high pressure electrolysis system were investigated in this project and the results will be useful in further attempts at high pressure and/or low cost hydrogen generator projects. An important portion of the testing and research performed in this study are the safety issues that are present in a high pressure electrolyzer system and that they can not easily be simplified to a level where units can be manufactured at the cost goals specified, or operated by other than trained personnel in a well safeguarded environment. The two key objectives of the program were to develop a system to supply hydrogen at a rate of at least 10,000 scf/day at a pressure of 5000psi, and to meet cost goals of $600/ kW in production quantities of 10,000/year. On these two points TESI was not successful. The project was halted due to concerns over safety of high pressure gas electrolysis and the associated costs of a system which reduced the safety concerns.

08 HYDROGEN↗

A gravo-aeroelastically scaled wind turbine rotor at field-prototype scale with strict structural requirements

A new sub-scale field-prototype design solution is developed to realize the dynamics, structural response, and distributed loads (gravitational, aerodynamic, centrifugal) that are characteristic of a full-scale large, modern wind turbine rotor. Prior work in sub-scale wind turbine testing has focused on matching aerodynamic/aero-elastic characteristics of full-scale rotors at wind tunnel scale. However, large-scale rotor designs must expand beyond this limited set of scaling parameters for cost-effective prototyping and meet strict requirements for structural safety for field testing. Here, the challenge lies in producing a structural design meeting two competing objectives: novel scaling objectives that prescribe the sub-scale blade to have low mass and stiffness; and traditional structural safety objectives that drive the design to have higher stiffness and mass. A 20% gravo-aeroelastically scaled wind turbine blade is developed successfully that satisfies these competing objectives. First, it achieved close agreement for non-dimensional tip deflection and flap-wise blade frequency (both within 2.1%) with a blade mass distribution constrained to produce target gravitational and centrifugal loads. Second, the entire blade structure was optimized to ensure a safe, manufacturable solution meeting strict strength requirements for a testing site that can experience up to 45 m/s wind gusts. The prototype-scale blade was fabricated and successfully proof-load tested.

17 WIND ENERGY↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

Aquantis 2.5 MW Ocean Current Generation Device - Scaled Tank Test Design and Results

Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Rig Structural Analysis Results. This is the detailed documentation for scaled device testing in a tow tank, including models, drawings, presentations, cost of energy analysis, and structural analysis. This dataset also includes specific information on drivetrain, roller bearing, blade fabrication, mooring, and rotor characteristics.

16 TIDAL AND WAVE POWER↗

Highly tunable structure-by-design polymer brush membranes for organic solvent nanofiltration

Synthetic polymeric nanofiltration membrane processes offer an alternate low-energy option to energy-intensive distillation to fractionate similar size organic solvents for chemical, petroleum, food and biotechnology industries. Here, in this study, we synthesize and test a new class of structure-by-design hydrophilic polymeric brush membranes, that address the limitations of commercial polymer membranes, are tunable and exhibit commercially relevant filtration performance. Because these brush membranes are grafted by Single Electron Transfer-Living Radical Polymerization (SET-LRP) and replace statistically random phase inversion or interfacial polymerization used for synthesizing commercial polymer membranes, their porous structure can be remodeled by varying their morphology and chemistry. We graft hydroxyethyl methacrylate (HEMA) brush structures with short and long crosslinkers, demonstrate two competing phenomena - pore stiffening and opening - and obtain high selectivity at reasonable permeability for commercially relevant methanol/toluene separation. This new class of stable, tunable, and scalable membranes offers exciting opportunities to reduce energy for separation of organic solvents.

42 ENGINEERING↗

Probing the Degradation Mechanisms in Electrolyte Solutions for Li-ion Batteries by In-Situ Transmission Electron Microscopy

One of the goals in the development of new battery technologies is to find new electrolytes with increased electrochemical stability. In-situ (scanning) transmission electron microscopy ((S)TEM) using an electrochemical fluid cell provides the ability to rapidly and directly characterize electrode/electrolyte interfacial reactions under battery relevant electrochemical conditions. Furthermore, as the electron beam itself causes a localized electrochemical reaction when it interacts with the electrolyte, the breakdown products that occur during the first stages of battery operation can potentially be simulated and characterized using a straightforward in-situ liquid stage (without electrochemical biasing capabilities). In this paper, we have studied the breakdown of a range of inorganic/salt complexes that are used in state-of-the-art Li-ion battery systems. The results of the in-situ (S)TEM experiments matches with previous stability tests performed during battery operation and the breakdown products and mechanisms are also consistent with known mechanisms. This analysis indicates that in-situ liquid stage (S)TEM observations can be used to directly test new electrolyte designs and provide structural insights into the origin of the solid electrolyte interphase (SEI) formation mechanism.

25 ENERGY STORAGE↗

Characterization of Soft Error Rate Against Memory Elements Spacing and Clock Skew in a Logic with Triple Modular Redundancy in a 65nm Process

Single Event Effects introduce soft errors in ASICs. Design methodologies like Triple ModularRedundancy (TMR) with clock skew insertion, a system level redundancy technique is a commonpractice by designers to mitigate soft errors. However, the optimal spacing between memoryelements in a TMR in 65nm process hasn't been addressed so far. RD53SEU is a mini ASICdevelopment under the framework of the CERN RD53 collaboration to characterize the soft errorrates against the separation spacing and clock skew between memory elements in a TMR. Thisarticle describes the architecture and design aspects of the various test structures on the RD53SEUtest chip.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Solid-phase Submonomer Synthesis of Peptoid Polymers and their Self-Assembly into Highly-Ordered Nanosheets

Peptoids are a novel class of biomimetic, non-natural, sequence-specific heteropolymers that resist proteolysis, exhibit potent biological activity, and fold into higher order nanostructures. Structurally similar to peptides, peptoids are poly N-substituted glycines, where the side chains are attached to the nitrogen rather than the alpha-carbon. Their ease of synthesis and structural diversity allows testing of basic design principles to drive de novo design and engineering of new biologically-active and nanostructured materials. Here, a simple manual peptoid synthesis protocol is presented that allows the synthesis of long chain polypeptoids ( up to 50mers) in excellent yields. Only basic equipment, simple techniques (e.g. liquid transfer, filtration), and commercially available reagents are required, making peptoids an accessible addition to many researchers' toolkits. The peptoid backbone is grown one monomer at a time via the submonomer method which consists of a two-step monomer addition cycle: acylation and displacement. First, bromoacetic acid activated in situ with N,N'- diisopropylcarbodiimide acylates a resin-bound secondary amine. Second, nucleophilic displacement of the bromide by a primary amine follows to introduce the side chain. The two-step cycle is iterated until the desired chain length is reached. The coupling efficiency of this two-step cycle routinely exceeds 98% and enables the synthesis of peptoids as long as 50 residues. Highly tunable, precise and chemically diverse sequences are achievable with the submonomer method as hundreds of readily available primary amines can be directly incorporated. Peptoids are emerging as a versatile biomimetic material for nanobioscience research because of their synthetic flexibility, robustness, and ordering at the atomic level. The folding of a single-chain, amphiphilic, information-rich polypeptoid into a highly-ordered nanosheet was recently demonstrated. This peptoid is a 36-mer that consists of only three different commercially available monomers: hydrophobic, cationic and anionic. The hydrophobic phenylethyl side chains are buried in the nanosheet core whereas the ionic amine and carboxyl side chains align on the hydrophilic faces. The peptoid nanosheets serve as a potential platform for membrane mimetics, protein mimetics, device fabrication, and sensors. Methods for peptoid synthesis, sheet formation, and microscopy imaging are described and provide a simple method to enable future peptoid nanosheet designs.

59 BASIC BIOLOGICAL SCIENCES↗

KJRR-FAI Status Report of Conceptual Design Activities

The Korea Atomic Energy Research Institute has initiated the Ki-Jang Research Reactor (KJRR) project to construct a new dedicated radio-isotope production facility in the KiJang province of South Korea. The KJRR will employ a uranium-molybdenum dispersion plate-type fuel clad in aluminum. The KJRR fuel assembly design will undergo irradiation in the Advanced Test Reactor (ATR) as part of the regulatory qualification of the fuel. The Idaho National Laboratory performed a multi-disciplined conceptual design effort and found that one full-size KJRR fuel assembly can be irradiated in the ATR’s north east flux trap. The analyses accomplished during the conceptual design phase are sufficient to prove viability of the overall design and irradiation campaign. Requirements for fission power can be met. The desired burnup can be achieved well within 15% depending on reactor operating availability. Mechanical design and structural analysis show that structural integrity of the irradiation test is maintained. It is recommended that future detailed design efforts be based on the concept described in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Investigation of the adhesive bonding technology for the insulator structure of EAST neutral beam injector

A key issue on the development of EAST ion source was the junction design of insulator structure, which consists of three insulators and four supporting flanges of electrode grid. Because the ion source is installed on the vertical plane, the insulator structure has to withstand large bending and shear stress due to the gravity of whole ion source. Through a mechanical analysis, it was calculated that the maximum bending normal stress was 0.34 MPa and shear stress was 0.23 MPa on the insulator structure. Due to the advantages of simplicity and high strength, the adhesive bonding technology was applied to the junction of insulator structure. A tensile testing campaign of different junction designs between insulator and supporting flange was performed, and a junction design of stainless steel and fiber enhanced epoxy resin with epoxy adhesive was determined. The insulator structure based on the determined design can satisfy both the requirements of high-voltage holding and mechanical strength.

42 ENGINEERING↗

Design and testing of photonic band gap channel-drop-filters

We have designed, fabricated and tested several novel passive mm-wave spectrometers based on Photonic Band Gap (PBG) structures. Our spectrometers were designed to operate in the frequency ranges of 90-130 and 220-300 GHz. We built and tested both metallic and dielectric silicon Channel-Drop-Filter (CDF) structures at 90-130 GHz. We are currently fabricating a dielectric CDF structure to operate at 220-300 GHz. The complete recent test results for the metal version and preliminary test results for the higher frequency silicon versions will be presented at the conference.

47 OTHER INSTRUMENTATION↗

An L-Band Superconducting Traveling Wave Accelerating Structure With Feedback

The most severe problem of the International Linear Collider is its high cost, resulting in part from the enormous length of the collider. This length is determined mainly by the achievable accelerating gradient in the RF system of the ILC. In the ILC project the required accelerating gradient is higher than 30 MeV/m. Further improvement of the coupling to the beam may be achieved by using a Traveling Wave SC structure [1]. We have demonstrated that an additional gradient increase of up to 46% may be possible if a {pi}/2 TW SC structure is employed. However, a TW SC structure requires a SC feedback waveguide to return the few GW of circulating RF power from the structure output back to the structure input. The test cavity with feedback is designed to demonstrate the possibility of achieving a significantly higher gradient than existing SC structures. The double-coupler powering excitation and tuning have been studied numerically and the corresponding model results are presented. The proposed double-coupler powering scheme significantly reduces the tuning requirements as long as any of the partial modes of given magnitude and phase are excited independently, providing a clear traveling wave regime of structure operation.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Analysis of Design Alternatives of Actively Cooled RF Window for MPEX

The Materials Plasma Exposure eXperiment (MPEX) has been designed as a linear plasma divertor simulator in order to address plasma material interaction (PMI) science for next-generation fusion devices. It will have the capability to test neutron irradiated samples with plasma fluxes of greater than 10 24 m -2 s -1 . It is expected to operate steady state for up to 10 6 s to consider PMI affects through reactor end of life. The conceptual design of MPEX was completed in 2019, with preliminary design having begun in 2020. The plasma source for MPEX is a helicon antenna, where the energized helical antenna sits outside of the vacuum in order to minimize impurities in the plasma. It is expected to receive up to 200 kW of continuous power, and so the antenna and the window must be actively cooled. The water-cooled copper antenna has been operated at full power on the Proto-MPEX device (which is a test facility to demonstrate the plasma source and heating systems). The water-cooled window, however, is a novel component that must meet numerous competing requirements. It requires a low dielectric loss to allow the Radio Frequency (RF) power to create the plasma within the vacuum boundary. It must be structurally robust to handle the significant heat flux from the plasma and any heat from dielectric coupling. It must be compatible with the coolant (preferably water). It requires a vacuum seal that minimizes impurities into the plasma and does not compromise the structural integrity of the window. Two window designs have been tested. Results from these tests, where temperatures are measured and heat fluxes inferred from infrared camera data, have been correlated with thermal-structural simulations. When these simulations are extrapolated to the full power steady-state heat fluxes that are expected in MPEX, the designs do not appear to have the necessary structural robustness. This study explores design alternatives for the MPEX helicon antenna window, presents analysis results for several of the alternatives, and shows a viable solution that satisfies the requirements for MPEX operation.

Tipton Jr, Joseph↗

Characterization of basin concrete in support of structural integrity demonstration for extended storage

Concrete core samples from C basin were characterized through material testing and analysis to verify the design inputs for structural analysis of the L Basin and to evaluate the type and extent of changes in the material condition of the concrete under extended service for fuel storage. To avoid the impact on operations, core samples were not collected from L area, but rather, several concrete core samples were taken from the C Basin prior to its closure. C basin was selected due to its similar environmental exposure and service history compared to L Basin. The microstructure and chemical composition of the concrete exposed to the water was profiled from the water surface into the wall to evaluate the impact and extent of exposure. No significant leaching of concrete components was observed. Ingress of carbonation or deleterious species was determined to be insignificant. No evidence of alkali-silica reactions (ASR) was observed. Ettringite was observed to form throughout the structure (in air voids or pores); however, the sulfur content was measured to be consistent with the initial concrete that was used to construct the facility. Similar ettringite trends were observed in the interior segments of the core samples. The compressive strength of the concrete at the mid-wall of the basin was measured, and similar microstructural analysis was conducted on these materials post compression testing. The microstructure was determined to be similar to near-surface segments of the core samples. The average strength was 4148 psi, which is well-above the design strength of 2500 psi. The analyses showed that phase alterations and minor cracking in a microstructure did not affect the design specification for the concrete.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗